Relocate chilled water pump
Closed Solicitation Posted
- Solicitation number
- 140P8225B0002
- Agency
- National Park Service Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Points of contact
-
- Michael Davidson michael_davidson@nps.gov (808) 285-1885
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service is seeking contractors to relocate a chilled water pump at the Pearl Harbor National Memorial Theater Building in Oahu, Hawaii. This construction project involves removing the existing chilled water pump, expansion tank, air separator, and chemical pot feeder from the theater basement crawl space and installing a new pump system with a concrete pad and CMU enclosure next to the existing chiller enclosure. The work includes electrical connections, piping modifications, and an optional shed-type roof installation, all while maintaining continuous air conditioning service during business hours. The solicitation requires electronic bid submission as a single PDF including completed SF1442, bid schedule, and bid guarantee, with proposals due July 14, 2025 at 12 PM Hawaii Time. A virtual bid opening will be held July 15, 2025 at 12 PM Mountain Time via Microsoft Teams, with evaluation based on firm fixed price proposals following standard federal procurement procedures.
This opportunity is designated as a 100% Small Business Set-Aside under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) with a size standard of $45 million. The project value is estimated between $500,000 and $1,000,000, with the contract performance period extended from the original 150 calendar days to 240 calendar days to accommodate procurement and long lead times for specialized equipment. The period of performance is scheduled from August 1, 2025 to March 29, 2026, with work beginning within 7 calendar days of notice to proceed. All work must be performed at the Pearl Harbor National Memorial site in Hawaii, requiring compliance with Davis-Bacon wage determinations and National Park Service code standards adopted in January 2024. The project includes two primary line items: the chilled water pump relocation and the optional shed-type roof installation, both priced as lump sum contract items.
Notice text
2 versions
Update #2 · Latest ·
PERL RELOCATE CHILLED WATER PUMP IAW CONSTRUCTION SPECIFICATIONS
Update #1 ·
RELOCATE CHILLED WATER PUMP IAW CONSTRUCTION SPECIFICATIONS
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140P8225B0002_Amd_0003.pdf | ||
| NAVFAC_Dwg_No_19003869_0002.pdf | ||
| NAVFAC_Dwg_No_19004137_0002.pdf | ||
| A1_(rev1)_0002.pdf | ||
| HVAC_Control_Panel_-_Photos_0002.pdf | ||
| Section_260543_-_Underground_Ducts_and_Raceways_for_Elec_Sys_(rev1)_0002.pdf | ||
| Sol_140P8225B0002_Amd_0002.pdf | ||
| G1_(rev1)_0002.pdf | ||
| M5_(rev1)_0002.pdf | ||
| M8_(rev1)_0002.pdf | ||
| Sol_140P8225B0002_Amd_0001.pdf | ||
| B08_Attach_2_Drawings.pdf | ||
| B08_Attach_5_Performance_Bond_SF25-23a_Exp_2027.pdf | ||
| B08_Attach_3_Contract_Bid_Schedule.docx | DOCX document | |
| Sol_140P8225B0002.pdf | ||
| B08_Attach_4_Payment_Bond_SF25A-23a_Exp_2027.pdf | ||
| B08_Attach_6_WD_18_Apr_2025.pdf | ||
| B08_Attach_1_Specifications.pdf |
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| Relocate chilled water pump | Solicitation | |
| Relocate chilled water pump IAW construction specifications | Pre-Solicitation | |
| Relocate chilled water pump IAW construction specifications | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity