This document is a Modified Chilled Water Schematic diagram for a chilled water pump relocation project at the Pearl Harbor National Park, Theater Building. The technical drawing details a complex piping system with multiple components including an expansion tank, air separator, chemical feeder, pressure regulators, valves, and control switches. The schematic outlines the sequence of operations for the chiller water pump, indicating work to be performed in existing chiller and pump enclosures, with specific points of connection and removal in the theater basement and underground conduits. The diagram includes a legend explaining various valve and control symbols, and provides technical specifications for connecting new and existing chilled water supply and return lines, with provisions for temporary bypass and system reconfiguration.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HS

HOA

M8

MODIFIED CHILLED WATER

SCHEMATIC AND DETAILS

T

(E) CH-1

AIR

SEPARATOR

TANK

EXPANSION

TANK

(E) CHWS & (E) CHWR UP

TO EXST AHUS AND FCUS

3" CHWR

P

CHWP-1

P

P

PP

(E) 3" CHWR

(E) 3" CHWS

LEGEND

P

BALL OR GATE VALVE

BUTTERFLY VALVE

CHECK VALVE

PRESS REGULATOR

FLEX CONNECTOR

PRESS GAUGE

STRAINER

HAND SWITCH

HAND-OFF-AUTO

POINT OF CONNECTION

POINT OF REMOVAL

HS

HOA

SEQUENCE OF OPERATION - CHILLER WATER PUMP

1. EXISTING CHILLED WATER PUMP CONTROL SEQUENCE REMAINS

UNCHANGED. NEW CHW PUMP SHALL BE CONNECTED TO THE

EXISTING TIME CLOCK. EXISTING TIME CLOCK STARTS THE CHW PUMP

AND ALL AIR HANDLING UNITS IN THE THEATER BUILDING.

2. NEW CHW PUMP CAN BE STARTED MANUALLY VIA AN EXISTING H-O-A

SWITCH LOCATED IN THE PROJECTION ROOM AT THE THEATER BLDG.

3. EXISTING CHILLER CONTROL REMAINS UNCHANGED:

A. THE EXISTING CHILLER STARTS AFTER A TIME DELAY AND UPON

VERIFICATION OF CHW FLOW.

B. THE CHILLER CAN BE MANUALLY STARTED VIA AN EXISTING

INDIVIDUAL H-O-A SWITCH LOCATED IN THE PROJECTION ROOM AT

THE THEATER BLDG.

5. EXISTING CONTROLS FOR AIR HANDLING UNITS REMAIN UNCHANGED:

A. EXISTING AIR HANDLING UNITS CAN BE MANUALLY STARTED VIA

EXISTING INDIVIDUAL H-O-A SWITCHES LOCATED IN THE

PROJECTION ROOM AT THE THEATER BLDG.

POC

POR

NEW CHWR PIPING TO CLOSE LOOP

FOR REMOVAL OF EXST CHWP AND

ACCESSORIES IN THEATER BASEMENT

(E) 3" CHWR

POC

(N) 3" CHWR

(E) 3" CHWS

POC

(N) 3" CHWS

WORK IN EXISTING

CHILLER ENCLOSURE

WORK IN NEW

CHWP ENCLOSURE

CHW CHEM

FEEDER

AUTOMATIC

AIR VENT

PRESSURE

GAUGE

PRESSURE

REGULATOR

MAKE-UP

WATER

(E) 1" PVC CONTROL CONDUIT

(UNDERGROUND)

(E) H-O-A SWITCH, LOCATED

IN EXISTING PROJECTION

ROOM AT THEATER BLDG

POC (UNDERGROUND)

WORK IN EXISTING

THEATER BASEMENT

POC

3" CHWS

TEMPORARY

BYPASS

T P

3" CHWR

TEMPORARY

BYPASS

DISCONNECT EXST CHW

PIPING AFTER NEW CHWP IS

OPERATIONAL. CAP BYPASS

CHW AFTER REMOVING EXST

CWHP IN THEATRE

BASEMENT

SCALE: 1/2" = 1'

MODIFIED CHILLED WATER SCHEMATIC

LICENSED

PROFESSIONAL

ENGINEER

No. 5788-M

EXST JB IN CHILLER

ENCLOSURE

(N) 3/4" CONDUIT

FOR CHWP

CONTROL