B08_Attach_2_Drawings.pdf

PDF 2 MB Posted

Attached to
RELOCATE CHILLED WATER PUMP Federal contract opportunity
Solicitation number
140P8225B0002
Issued by
Department of the Interior National Park Service

About this file

These are architectural and mechanical engineering drawings for a chilled water pump relocation project at the Pearl Harbor National Memorial Theater Building on Oahu, Hawaii. The comprehensive set of 13 technical drawings details the demolition, installation, and modification of the existing chilled water system, including site plans, equipment enclosure plans, mechanical notes, electrical plans, and schematic diagrams. Key elements include installing a new chilled water pump (CHWP-1), creating a new pump enclosure, modifying existing piping connections, and implementing a staged construction sequence that maintains continuous operation of the theater's air conditioning system. The project involves careful coordination to minimize disruption, with specific requirements such as maintaining chilled water service during business hours (7 AM - 5 PM), installing bypass piping, and following National Park Service code compliance standards adopted in January 2024.

View the file

Other files for this federal contract opportunity

Other files attached to RELOCATE CHILLED WATER PUMP, newest first.
File Type Posted
Sol_140P8225B0002_Amd_0003.pdf PDF
A1_(rev1)_0002.pdf PDF
HVAC_Control_Panel_-_Photos_0002.pdf PDF
Section_260543_-_Underground_Ducts_and_Raceways_for_Elec_Sys_(rev1)_0002.pdf PDF
M5_(rev1)_0002.pdf PDF
M8_(rev1)_0002.pdf PDF
Sol_140P8225B0002_Amd_0002.pdf PDF
G1_(rev1)_0002.pdf PDF
NAVFAC_Dwg_No_19003869_0002.pdf PDF
NAVFAC_Dwg_No_19004137_0002.pdf PDF
Sol_140P8225B0002_Amd_0001.pdf PDF
B08_Attach_5_Performance_Bond_SF25-23a_Exp_2027.pdf PDF
B08_Attach_3_Contract_Bid_Schedule.docx DOCX document
B08_Attach_1_Specifications.pdf PDF
Sol_140P8225B0002.pdf PDF
B08_Attach_4_Payment_Bond_SF25A-23a_Exp_2027.pdf PDF
B08_Attach_6_WD_18_Apr_2025.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THE CONTRACTOR SHALL INSPECT THE PROJECT SITE BEFORE BIDDING AND

PROCEEDING WITH THE CONSTRUCTION.

2. THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE CONTRACTING OFFICER

FOR ANY MAJOR DEVIATIONS OR DISCREPANCIES DISCOVERED IN THE PLANS AND

SPECIFICATIONS DUE TO UNFORESEEN OR VARYING FIELD CONDITIONS.

3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE

INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. OMISSIONS IN

THE DRAWINGS, OR SPECIFICATIONS, OR THE OMISSION OF DETAILS OF WORK, SHALL

NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED, OR INCORRECTLY

DESCRIBED DETAILS OF THE WORK, BUT SHALL BE PERFORMED AS IF FULLY AND

CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS. THE

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER VERBALLY OF SUCH

OMISSIONS AND PROVIDE A WRITTEN STATEMENT OF THE OMISSIONS WITHIN (5)

WORKING DAYS OF VERBAL NOTIFICATION.

4. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES FOR EQUIPMENT TO BE INSTALLED

PRIOR TO ORDERING OF EQUIPMENT AND NOTIFY THE CONTRACTING OFFICER OF ANY

INADEQUATE CLEARANCES OR CONDITIONS THAT WILL PREVENT THE PROPER

INSTALLATION, MAINTENANCE, AND OPERATION OF THE EQUIPMENT.

5. PROVIDE SHOP DRAWINGS FOR THE LAYOUT OF EQUIPMENT AND PIPING SHOWING

COORDINATION OF ALL WORK WITH ALL OTHER TRADES.

6. COORDINATION OF EQUIPMENT ELECTRICAL CHARACTERISTICS: COORDINATE VOLTAGE

AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR

TO ORDERING.

7. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING AND DUCTWORK.

PROVIDE OFFSETS AS NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE

WITH OTHER TRADES.

8. PROPERLY FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR

PARTITIONS WITH A UL APPROVED SYSTEM APPROPRIATE FOR THE PENETRATION TYPE

AND FIRE RATING. FIRE STOP ALL PENETRATIONS BETWEEN FLOORS.

9. ROUTE ALL CONTROL AND MOTOR STARTER WIRING IN CONDUIT.

10. REPAIR ANY DAMAGES TO EXISTING CONSTRUCTION RESULTING FROM THE

INSTALLATION OF MECHANICAL ITEMS. THE AREAS REPAIRED SHALL MATCH THE

ADJACENT SURFACES IN TEXTURE AND COLOR.

11. VERIFY AND COORDINATE ALL WALL AND FLOOR PENETRATIONS WITH THE STRUCTURAL

AND ARCHITECTURAL DRAWINGS AND NOTIFY THE CONTRACTING OFFICER OF ANY

CONFLICTS PRIOR TO THE START OF CONSTRUCTION.

12. PROVIDE ACCESS PANEL TO ALL CONCEALED VALVES, DAMPERS, AND EQUIPMENT.

COORDINATE THE LOCATION OF ACCESS PANEL TO ENSURE THAT THE EQUIPMENT CAN

BE MAINTAINED ADEQUATELY.

13. PATCH AND PAINT ALL NEW EXPOSED WORK, COLOR TO MATCH EXISTING SURFACES.

PATCH AND PAINT ALL EXISTING DISTURBED WORK, COLOR TO MATCH EXISTING

ADJACENT SURFACES, UNLESS OTHERWISE NOTED IN THE ARCHITECTURAL FINISH

SCHEDULE.

GENERAL NOTES ADDITIONAL NOTES

1. CODES, STANDARDS REGULATIONS AND GUIDELINES: ALL WORK SHALL COMPLY WITH

THE LATEST VERSIONS OF APPLICABLE CODES, STANDARDS, REGULATIONS, AND

GUIDELINES. PER POLICY MEMORANDUM 23-01 APPROVED ON MAY 9, 2023, THE NATIONAL

PARK SERVICES (NPS) HAS ADOPTED THE INTERNATIONAL CODE COUNCIL'S (ICC) SUITE

OF CODES AND STANDARDS EFFECTIVE JANUARY 1, 2024. ADDITIONALLY, THE LATEST

NFPA 70 (NATIONAL ELECTRIC CODE) IS ALSO ADOPTED EFFECTIVE JANUARY 1, 2024. ALL

WORK SHALL COMPLY WITH THE ICC SUITE OF CODES AND STANDARDS AND NFPA 70, AS

APPLICABLE. ADDITIONAL CODES, STANDARDS, REGULATIONS, AND GUIDELINES MAY

ALSO APPLY.

2. ENSURE EMPLOYEES ARE TRAINED IN THE REQUIREMENTS OF 29 CFR 1910.146, "PERMIT

REQUIRED CONFINED SPACES", AND UNDERSTAND REQUIREMENTS ASSOCIATED WITH

WORKING IN CONFINED SPACES.

M1

MECHANICAL NOTES AND

EQUIPMENT SCHEDULES

SYMBOL ABBRV. DESCRIPTION

LIST OF ABBREVIATIONS & SYMBOLS

VALVE, BALL OR GATE

MINIMUMMIN

GALLONGAL

VALVE, BUTTERFLY

VALVE, CHECK

TYPICALTYP

UNDERGROUNDUG

ABOVE FINISHED FLOORAFF

CHILLED WATERCHW

CHILLED WATER RETURNCHWR

CHILLED WATER SUPPLYCHWS

BACK FLOW PREVENTERBFP

FLEX CONNECTOR

POINT OF CONNECTIONPOC

POINT OF REMOVALPOR

HAND SWITCHHS

HAND-OFF-AUTOHOA

HS

PRESSURE REGULATOR

PRESSURE GAUGEP

STRAINER

COLD WATER CW

WATERW

EXISTINGEXST, (E)

NEW(N)

PUMP SCHEDULE

ID NO. SERVICE TYPE GPM

TOTAL HEAD

(FT) RPM EFFICIENCY

ELECTRICAL

REMARKS

HP V PH

CHWP-1 CHILLED

WATER END SUCTION 60 80 1800 52% 5 208 3 PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC

INSULATION, WITH ALUMINUM JACKET

EXPANSION TANK

ID NO. SERVICE TYPE

TANK VOLUME

(GAL)

ACCEPTANCE VOLUME

(GAL)

TANK

DIAMETER (IN)

CONNECTION

SIZE (IN) WT (LBS) REMARKS

ET-1 CHILLED

WATER VERTICAL 4 2.5 14 3/4 45 PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC

INSULATION, WITH ALUMINUM JACKET

AIR SEPARATOR

ID NO. SERVICE TYPE TANK HT (IN) TANK

DIAMETER (IN)

CONNECTION

SIZE (IN) WT (LBS) REMARKS

AS-1 CHILLED

WATER

VERTICAL WITH

STRAINER 27-1/4 14 3 110

PROVIDE WITH BASE RING.

PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC

INSULATION, WITH ALUMINUM JACKET

HOSE BIBBHB

AIR SEPARATORAS

CHEMICAL POT FEEDERCF

CHILLED WATER PUMPCHWP

EXPANSION TANKET

COPPERCOP

SUGGESTED SEQUENCE OF CONSTRUCTION

WORK HOURS LIMITATIONS

1. THEATER BUILDING IS OCCUPIED AND IN OPERATION SEVEN DAYS PER WEEK, INCLUDING

FEDERAL, STATE, AND LOCAL HOLIDAYS, EXCEPT THANKSGIVING DAY, DECEMBER 25, AND

JANUARY 1. NORMAL HOURS OF OPERATIONS ARE 7:00 AM TO 5:00 PM.

2. NO AIR CONDITIONING OUTAGES IN THE THEATER BUILDING WILL BE ALLOWED DURING

NORMAL HOURS OF OPERATION.

NOTE: THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION IS

FOR INFORMATION ONLY. MEANS AND METHODS FOR CONSTRUCTION

REMAINS THE RESPONSIBILITY OF THE CONTRACTOR.

1. INSTALL CHWR BYPASS IN BASEMENT TO ALLOW OPERATION OF THE EXISTING CHILLED

WATER PUMP UNTIL NEW CHILLED WATER PUMP IS INSTALLED AND TESTED.

2. INSTALL STUB-OUTS WITH SHUT-OFF VALVES FOR CHWS AND CHWR BYPASS PIPING NEAR

THE NEW PUMP ENCLOSURE.

3. INSTALL STUB-OUTS WITH SHUT-OFF VALVES FOR CHWS AND CHWR BYPASS PIPNG AT

THE EXISTING CHILLER ENCLOSURE.

4. INSTALL CHW BYPASS PIPING TO ALLOW DEMOLITION OF THE BURIED CHW PIPING IN THE

AREA OF THE NEW PUMP ENCLOSURE.

5. CONSTRUCT THE NEW PUMP ENCLOSURE, AND INSTALL CHILLED WATER PUMP, PIPING

AND ACCESSORIES WITHIN THE ENCLOSURE.

6. TEST THE OPERATION OF THE NEW CHW PUMP, WHILE UTILIZING THE PUMP BYPASS

PIPING IN THE THEATER BASEMENT.

7. AFTER NEW CHW PUMP SYSTEM HAS BEEN TESTED AND APPROVED FOR PERMANENT

OPERATION, REMOVE THE CHILLED WATER BYPASS PIPING AT THE CHILLER AND REMOVE

THE EXISTING CHW PUMP AND PIPING IN THE THEATER BASEMENT.

LICENSED

PROFESSIONAL

ENGINEER

No. 5788-M

BFP

M2

OVERALL

MECHANICAL PLAN

6'

SCALE: 3/32" = 1'

12' 24'

NORTH

EXST ELEC EQUIP.

SEE ELEC. SHTS.

LAWN

AREA

GRAVEL

ACCESS RD

(N) 3/4" CW

EXST FH

EXST 8" W

TAP INTO EXST 8" W.

SEE DET 1/M7 FOR

CONNECTION DETAIL

EXST 8" W

APPROX.

SHORELINE

EXST 3" UNDERGROUND

CHWS AND CHWR

EXST 1" PVC CONTROL

CONDUIT, UNDERGROUND

THEATER BLDG

BASEMENT

SCALE: 3/32" = 1'

CHILLER ENCLOSURE DEMO PLAN

SEE 1/M3 FOR DEMO PLAN, 1/M4 FOR

SUGGESTED BYPASS PLAN, AND 1/M5

FOR NEW WORK PLAN

SEE 2/M3 FOR DEMO PLAN, 2/M4 FOR

SUGGESTED BYPASS PLAN, AND 2/M5

FOR NEW WORK PLAN

LICENSED

PROFESSIONAL

BF

P

SCALE: 1/2" = 1'

BASEMENT DEMO PLAN

NORTH

NOTES:

1. EXISTING CHW LINE IS COPPER TUBING WITH INSULATION.

POR

POR

POR. REMOVE

CHWR PIPING.

REMOVE EXST CHW LINES. APPROX 3' BELOW

GRADE

REMOVE CHW PUMP AND ALL

ACCESSORIES, INCLUDING BUT

NOT LIMITED TO PIPING, VALVES,

AIR SEPARATOR TANK AND

EXPANSION TANK

EXST PIPE HANGER TO

REMAIN. TYP OF 2

3" CHWR

12'

EXST CONCRETE

PAD TO REMAIN

REMOVE EXST INSULATION

ON EXST 3" CHWS & CHWR

EXST CHW RISERS UP TO ROOF

1' 7"

1'

SCALE: 1/2" = 1'

2' 4'

EXST CH-1

EXST CMU CHILLER

ENCLOSURE

EXST CHWREXST CHWS

EXST CHWR (ABOVE)

& CHWS (BELOW)

M3

MECHANICAL DEMOLITION

PLANS

CONNECT INTO EXST 1" PVC CTRL CONDUIT FOR NEW CHW PUMP

CONTROLS.

EDGE OF EXISTING

GRAVEL ACCESS ROAD EXST ELEC PANEL.

SEE ELECTRICAL PLANS.

REMOVE EXST 3/4" CW CONNECTED TO AIR

SEPARATOR. CAP CW DOWNSTREAM OF

EXST SHUT-OFF VALVE.

EXST 3/4" CW TO

REMAIN

SCALE: 1/2" = 1'

CHILLER ENCLOSURE DEMO PLAN

SEE 2/M4 FOR SUGGESTED

TEMPORARY BYPASS PIPING

LICENSED

PROFESSIONAL

1'

SCALE: 1/2" = 1'

NORTH

CHW STUBOUTS WITH

SHUTOFF VALVES

FOR NEW CHW

CONNECTIONS

POC. CONNECT NEW CHWS

AND CHWR TO EXST LINES

UNDERGROUND. PROVIDE

SHUTOFF VALVE AT RISERS.

EXST CMU CHILLER

ENCLOSURE

12'

2' 4'

NOTES:

1. EXISTING CHW LINES ARE COPPER TUBING WITH

INSULATION.

2. CHW SYSTEM MUST BE ACTIVE AT ALL TIMES DURING

BUSINESS HOURS (7 AM - 5 PM)

M4

MECHANICAL CHILLED WATER

SUGGESTED BYPASS PLANS

EXST CHWR (ABOVE)

& CHWS (BELOW)

3" CHWR (ABOVE)

AND CHWS

(BELOW) BYPASS

NEW VALVE BOX

EXST 3" CHWS

EXST 3" CHWR

1" PVC CONTROL

CONDUIT FOR CHW PUMP

EXST 1" PVC

CONTROL CONDUIT

POC

CHW STUB OUTS

FOR NEW CHW PIPES

3' BELOW GRADE

POC. CONNECT NEW CHWS

AND CHWR TO EXST LINES

IN BASEMENT.

EXST CHWP TO REMAIN

OPERATING UNTIL NEW

WORK IS COMPLETE

SCALE: 1/2" = 1'

SUGGESTED PIPING PLAN DURING BYPASS

SCALE: 1/2" = 1'

BASEMENT SUGGESTED PIPING PLAN DURING BYPASS

3" CHWR (ABOVE)

AND CHWS

(BELOW) BYPASS

EXST AIR SEPARATOR AND

EXST EXPANSION TANK TO

REMAIN DURING BYPASS

PHASE.

LICENSED

PROFESSIONAL

CLOSE BYPASS VALVES

AND CAP CHWR LINES

NORTH

EXST CHWR (ABOVE)

& CHWS (BELOW)

CAP BYPASS LINES

EXST CMU CHILLER

ENCLOSURE

CHWP

DISCONNECT

SWITCH.

SEE ELEC.

12'

1'

SCALE: 1/2" = 1'

2' 4'

NOTES:

1. EXISTING CHW LINES ARE COPPER TUBING WITH

INSULATION.

2. PROVIDE INSULATION ON ALL NEW CHILLED WATER

LINES AND CHW EQUIPMENT, INCLUDING BUT NOT

LIMITED TO CHW PUMP, AIR SEPARATOR TANK, AND

EXPANSION TANK. SEE SPECS FOR INSULATION

REQUIREMENTS.

M5

MECHANICAL PLANS

EXST CHWR (ABOVE)

& CHWS (BELOW)

3" CHWR

CHWP-1

CF-1

ET-1

AS-1

NEW CMU ENCLOSURE

SEE ARCH. SHTS.

NEW 3/4" WATER

EXST 3" CHWS

EXST 3" CHWR

1" PVC CONTROL

CONDUIT FOR CHW PUMP

HB

BFP

EXST 1" PVC

CONTROL CONDUIT

POC

3" CHWS

CAP BYPASS LINES

POC

CAP CW

SCALE: 1/2" = 1'

EQUIPMENT ENCLOSURE PLAN

SCALE: 1/2" = 1'

BASEMENT PLAN

EXST BFP IN

BASEMENT TO REMAIN

EXST 3" CWHR TO REMAIN.

SUSPENDED FROM FLOOR

SLAB ABOVE

EXST 3" CWHS TO REMAIN.

SUSPENDED FROM FLOOR

SLAB ABOVE

PROVIDE NEW INSULATION

ON EXST 3" CHWR & CHWS.

PROVIDE NEW INSULATION

SHIELDS AT EXST PIPE

HANGERS.

LICENSED

PROFESSIONAL

ENGINEER

2/M6 1/M6

M6

MECHANICAL SECTIONS

ET-1

SCALE: 1" = 1'

CHW PUMP SECTION

SCALE: 1" = 1'

CHW PUMP ACCESSORY SECTION

SCALE: 1" = 1'

BASEMENT CHW PIPING ISOMETRIC

3" CHWR

3" CHWS

3" CHWR

AS-1

CF-1

3/4" CHW LINE

TO ET-1

3/4" CW

VALVE BOX

CAP BYPASS

PIPING AFTER

NEW WORK IS

COMPLETE

POC. CONNECT EXST

UNDERGROUND 3"

CHWS AND CHWR

POC. CONNECT

NEW CHWS AND

CHWR PIPING TO

BYPASS PIPING

NEW CHW PUMP

CONCRETE PAD.

MIN 8" TALL

CONCRETE PAD.

MIN 6" TALL

EXST CMU WALL

NEW CMU WALL

EXST CMU WALL

NEW CMU WALL

CAP BYPASS AFTER

NEW WORK IS

COMPLETE

EXST CHWR BELOW

BASEMENT CEILING

POC. CONNECT

BYPASS TO EXST

CHWS AND CHWR

PIPING

POC. CONNECT

NEW CHWS AND

CHWR PIPING TO

BYPASS PIPING

3/4" CHW PIPING

CONNECTED TO

CHEM FEEDER

POC. CONNECT

BYPASS PIPING TO

EXST CHWR PIPING

BELOW BASEMENT

CEILING

NOTE: INSULATION AND JACKET

NOT SHOWN FOR CLARITY

NOTE: INSULATION AND JACKET

NOT SHOWN FOR CLARITY

LICENSED

PROFESSIONAL

ENGINEER

No. 5788-M

SLAB ON

GRADE - SEE A1

SLAB ON

GRADE - SEE A1

CONCRETE PAD

8" HIGH

(SEE NOTE)

6"

12"18"

COVER

6"

36"

COVER

24"

24"

12"

M7

MECHANICAL DETAILS

3/4" CHAMFER

CONCRETE

SLAB-ON-GRADE

EQUIPMENT PAD,

6" LARGER THAN

EQUIPMENT ALL

AROUND

#4 AT 12" OC, EACH WAY

ROUGHEN SURFACE TO

1/8" AMPLITUDE AND

APPLY BONDING AGENT

PIPE

1/2" TO 3/4"

CLEARANCE

1" MIN.

THICKNESS

SOLID GROUT

TO SLEEVE

INSULATION

WITH JACKET

PACK FIBERGLASS

INSULATION TO

MEDIUM DENSITY (3

PCF)

EXST CMU OR

CONCRETE WALL

STAINLES STEEL

PIPE SLEEVE

NOTE: EQUIPMENT PAD SHALL BE MINIMUM 8" HIGH AT PUMP,

AND MINIMUM 6" HIGH AT OTHER EQUIPMENT

EXST 8" WATER LINE

SERVICE SADDLE

CORP STOP

3/4" COP WATER SERVICE

LINE TO PUMP ENCLOSURE

NOTE: EXST WATER LINE IS MATERIAL IS EITHER

CAST IRON OR PVC. CONTRACTOR TO VERIFY.

INV: 0.35 MSL

(VERIFY)

EXST GRADE AT 4.0 +/- MSL

(VERIFY)

EXST

GRADE

TOP SOIL & TURF TO

MATCH EXST GRADE

SURFACE CONDITION

IN GRAVEL ROAD

AREAS

SURFACE

CONDITION IN

GRASSED AREAS

GRAVEL TOPPING

TO MATCH

EXISTING

3/4" SERVICE

WATER LINE

TRENCH BACKFILL

TOP SOIL & TURF TO

MATCH EXST GRADE

EXST

GRADE

SCALE: 1" = 1'-0"

SERVICE WATER LINE CONNECTION

1 SCALE: 1" = 1'-0"

CONCRETE EQUIPMENT PAD

2 NOT TO SCALE

PIPING THRU WALL PENETRATION

SCALE: 1" = 1'-0"

TRENCH DETAILS

AT SERVICE WATER LINE

AT BURIED CHILLED WATER PIPING

CHILLED WATER PIPE

INSULATION

SAND PIPE BEDDING

IN ACCORDANCE

WITH PIPE MFR'S

RECOMMENDATIONS

TRENCH BACKFILL

NOT TO SCALE

PIPING THRU FLOOR SLAB

CHILLED WATER

PIPE

INSULATION

INSULATION

JACKET

1/4" MINIMUM

WATERPROOF SEALANT

STAINLESS STEEL

PIPE SLEEVE

CONTINUOUS WATERPROOF

ELASTOMERIC LATEX

SEALANT SUCH AS DAP

DYNAFLEX 230 SEALANT

(BOTH ENDS)

CONCRETE

SLAB-ON-GRADE

NOT TO SCALE

HOSE BIBB WITH VACUUM BREAKER

CMU WALL

(TYP)

1/4" MASONRY

SCREW, 316 SS

(TYP)

BALL COCKCOPPER PIPE

CLAMP (TYP)

FINISHED

CONCRETE

FLOOR

3/4" HOSE BIBB,

NO KINK TYPE

WITH VACUUM

BREAKER

90 DEG

ELBOW

3/4 COPPER

WATER PIPE

LICENSED

PROFESSIONAL

HS

HOA

M8

MODIFIED CHILLED WATER

SCHEMATIC AND DETAILS

T

(E) CH-1

AIR

SEPARATOR

TANK

EXPANSION

TANK

(E) CHWS & (E) CHWR UP

TO EXST AHUS AND FCUS

3" CHWR

P

CHWP-1

P

P

PP

(E) 3" CHWR

(E) 3" CHWS

LEGEND

P

BALL OR GATE VALVE

BUTTERFLY VALVE

CHECK VALVE

PRESS REGULATOR

FLEX CONNECTOR

PRESS GAUGE

STRAINER

HAND SWITCH

HAND-OFF-AUTO

POINT OF CONNECTION

POINT OF REMOVAL

HS

HOA

SEQUENCE OF OPERATION - CHILLER WATER PUMP

1. EXISTING CHILLED WATER PUMP CONTROL SEQUENCE REMAINS

UNCHANGED. NEW CHW PUMP SHALL BE CONNECTED TO THE

EXISTING TIME CLOCK. EXISTING TIME CLOCK STARTS THE CHW PUMP

AND ALL AIR HANDLING UNITS IN THE THEATER BUILDING.

2. NEW CHW PUMP CAN BE STARTED MANUALLY VIA AN EXISTING H-O-A

SWITCH LOCATED IN THE PROJECTION ROOM AT THE THEATER BLDG.

3. EXISTING CHILLER CONTROL REMAINS UNCHANGED:

A. THE EXISTING CHILLER STARTS AFTER A TIME DELAY AND UPON

VERIFICATION OF CHW FLOW.

B. THE CHILLER CAN BE MANUALLY STARTED VIA AN EXISTING

INDIVIDUAL H-O-A SWITCH LOCATED IN THE PROJECTION ROOM AT

THE THEATER BLDG.

5. EXISTING CONTROLS FOR AIR HANDLING UNITS REMAIN UNCHANGED:

A. EXISTING AIR HANDLING UNITS CAN BE MANUALLY STARTED VIA

EXISTING INDIVIDUAL H-O-A SWITCHES LOCATED IN THE

PROJECTION ROOM AT THE THEATER BLDG.

POC

POR

NEW CHWR PIPING TO CLOSE LOOP

FOR REMOVAL OF EXST CHWP AND

ACCESSORIES IN THEATER BASEMENT

(E) 3" CHWR

POC

(N) 3" CHWR

(E) 3" CHWS

POC

(N) 3" CHWS

WORK IN EXISTING

CHILLER ENCLOSURE

WORK IN NEW

CHWP ENCLOSURE

CHW CHEM

FEEDER

AUTOMATIC

AIR VENT

PRESSURE

GAUGE

PRESSURE

REGULATOR

MAKE-UP

WATER

(E) 1" PVC CONTROL CONDUIT

(UNDERGROUND)

(E) H-O-A SWITCH, LOCATED

IN EXISTING PROJECTION

ROOM AT THEATER BLDG

POC (UNDERGROUND)

WORK IN EXISTING

THEATER BASEMENT

POC

3" CHWS

TEMPORARY

BYPASS

T P

3" CHWR

TEMPORARY

BYPASS

DISCONNECT EXST CHW

PIPING AFTER NEW CHWP IS

OPERATIONAL. CAP BYPASS

CHW AFTER REMOVING EXST

CWHP IN THEATRE

BASEMENT

SCALE: 1/2" = 1'

MODIFIED CHILLED WATER SCHEMATIC

LICENSED

PROFESSIONAL

G1
A1