B08_Attach_2_Drawings.pdf
PDF 2 MB Posted
- Attached to
- RELOCATE CHILLED WATER PUMP Federal contract opportunity
- Solicitation number
- 140P8225B0002
About this file
These are architectural and mechanical engineering drawings for a chilled water pump relocation project at the Pearl Harbor National Memorial Theater Building on Oahu, Hawaii. The comprehensive set of 13 technical drawings details the demolition, installation, and modification of the existing chilled water system, including site plans, equipment enclosure plans, mechanical notes, electrical plans, and schematic diagrams. Key elements include installing a new chilled water pump (CHWP-1), creating a new pump enclosure, modifying existing piping connections, and implementing a staged construction sequence that maintains continuous operation of the theater's air conditioning system. The project involves careful coordination to minimize disruption, with specific requirements such as maintaining chilled water service during business hours (7 AM - 5 PM), installing bypass piping, and following National Park Service code compliance standards adopted in January 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8225B0002_Amd_0003.pdf | ||
| A1_(rev1)_0002.pdf | ||
| HVAC_Control_Panel_-_Photos_0002.pdf | ||
| Section_260543_-_Underground_Ducts_and_Raceways_for_Elec_Sys_(rev1)_0002.pdf | ||
| M5_(rev1)_0002.pdf | ||
| M8_(rev1)_0002.pdf | ||
| Sol_140P8225B0002_Amd_0002.pdf | ||
| G1_(rev1)_0002.pdf | ||
| NAVFAC_Dwg_No_19003869_0002.pdf | ||
| NAVFAC_Dwg_No_19004137_0002.pdf | ||
| Sol_140P8225B0002_Amd_0001.pdf | ||
| B08_Attach_5_Performance_Bond_SF25-23a_Exp_2027.pdf | ||
| B08_Attach_3_Contract_Bid_Schedule.docx | DOCX document | |
| B08_Attach_1_Specifications.pdf | ||
| Sol_140P8225B0002.pdf | ||
| B08_Attach_4_Payment_Bond_SF25A-23a_Exp_2027.pdf | ||
| B08_Attach_6_WD_18_Apr_2025.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE CONTRACTOR SHALL INSPECT THE PROJECT SITE BEFORE BIDDING AND
PROCEEDING WITH THE CONSTRUCTION.
2. THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE CONTRACTING OFFICER
FOR ANY MAJOR DEVIATIONS OR DISCREPANCIES DISCOVERED IN THE PLANS AND
SPECIFICATIONS DUE TO UNFORESEEN OR VARYING FIELD CONDITIONS.
3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE
INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. OMISSIONS IN
THE DRAWINGS, OR SPECIFICATIONS, OR THE OMISSION OF DETAILS OF WORK, SHALL
NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED, OR INCORRECTLY
DESCRIBED DETAILS OF THE WORK, BUT SHALL BE PERFORMED AS IF FULLY AND
CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER VERBALLY OF SUCH
OMISSIONS AND PROVIDE A WRITTEN STATEMENT OF THE OMISSIONS WITHIN (5)
WORKING DAYS OF VERBAL NOTIFICATION.
4. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES FOR EQUIPMENT TO BE INSTALLED
PRIOR TO ORDERING OF EQUIPMENT AND NOTIFY THE CONTRACTING OFFICER OF ANY
INADEQUATE CLEARANCES OR CONDITIONS THAT WILL PREVENT THE PROPER
INSTALLATION, MAINTENANCE, AND OPERATION OF THE EQUIPMENT.
5. PROVIDE SHOP DRAWINGS FOR THE LAYOUT OF EQUIPMENT AND PIPING SHOWING
COORDINATION OF ALL WORK WITH ALL OTHER TRADES.
6. COORDINATION OF EQUIPMENT ELECTRICAL CHARACTERISTICS: COORDINATE VOLTAGE
AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR
TO ORDERING.
7. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING AND DUCTWORK.
PROVIDE OFFSETS AS NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE
WITH OTHER TRADES.
8. PROPERLY FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR
PARTITIONS WITH A UL APPROVED SYSTEM APPROPRIATE FOR THE PENETRATION TYPE
AND FIRE RATING. FIRE STOP ALL PENETRATIONS BETWEEN FLOORS.
9. ROUTE ALL CONTROL AND MOTOR STARTER WIRING IN CONDUIT.
10. REPAIR ANY DAMAGES TO EXISTING CONSTRUCTION RESULTING FROM THE
INSTALLATION OF MECHANICAL ITEMS. THE AREAS REPAIRED SHALL MATCH THE
ADJACENT SURFACES IN TEXTURE AND COLOR.
11. VERIFY AND COORDINATE ALL WALL AND FLOOR PENETRATIONS WITH THE STRUCTURAL
AND ARCHITECTURAL DRAWINGS AND NOTIFY THE CONTRACTING OFFICER OF ANY
CONFLICTS PRIOR TO THE START OF CONSTRUCTION.
12. PROVIDE ACCESS PANEL TO ALL CONCEALED VALVES, DAMPERS, AND EQUIPMENT.
COORDINATE THE LOCATION OF ACCESS PANEL TO ENSURE THAT THE EQUIPMENT CAN
BE MAINTAINED ADEQUATELY.
13. PATCH AND PAINT ALL NEW EXPOSED WORK, COLOR TO MATCH EXISTING SURFACES.
PATCH AND PAINT ALL EXISTING DISTURBED WORK, COLOR TO MATCH EXISTING
ADJACENT SURFACES, UNLESS OTHERWISE NOTED IN THE ARCHITECTURAL FINISH
SCHEDULE.
GENERAL NOTES ADDITIONAL NOTES
1. CODES, STANDARDS REGULATIONS AND GUIDELINES: ALL WORK SHALL COMPLY WITH
THE LATEST VERSIONS OF APPLICABLE CODES, STANDARDS, REGULATIONS, AND
GUIDELINES. PER POLICY MEMORANDUM 23-01 APPROVED ON MAY 9, 2023, THE NATIONAL
PARK SERVICES (NPS) HAS ADOPTED THE INTERNATIONAL CODE COUNCIL'S (ICC) SUITE
OF CODES AND STANDARDS EFFECTIVE JANUARY 1, 2024. ADDITIONALLY, THE LATEST
NFPA 70 (NATIONAL ELECTRIC CODE) IS ALSO ADOPTED EFFECTIVE JANUARY 1, 2024. ALL
WORK SHALL COMPLY WITH THE ICC SUITE OF CODES AND STANDARDS AND NFPA 70, AS
APPLICABLE. ADDITIONAL CODES, STANDARDS, REGULATIONS, AND GUIDELINES MAY
ALSO APPLY.
2. ENSURE EMPLOYEES ARE TRAINED IN THE REQUIREMENTS OF 29 CFR 1910.146, "PERMIT
REQUIRED CONFINED SPACES", AND UNDERSTAND REQUIREMENTS ASSOCIATED WITH
WORKING IN CONFINED SPACES.
M1
MECHANICAL NOTES AND
EQUIPMENT SCHEDULES
SYMBOL ABBRV. DESCRIPTION
LIST OF ABBREVIATIONS & SYMBOLS
VALVE, BALL OR GATE
MINIMUMMIN
GALLONGAL
VALVE, BUTTERFLY
VALVE, CHECK
TYPICALTYP
UNDERGROUNDUG
ABOVE FINISHED FLOORAFF
CHILLED WATERCHW
CHILLED WATER RETURNCHWR
CHILLED WATER SUPPLYCHWS
BACK FLOW PREVENTERBFP
FLEX CONNECTOR
POINT OF CONNECTIONPOC
POINT OF REMOVALPOR
HAND SWITCHHS
HAND-OFF-AUTOHOA
HS
PRESSURE REGULATOR
PRESSURE GAUGEP
STRAINER
COLD WATER CW
WATERW
EXISTINGEXST, (E)
NEW(N)
PUMP SCHEDULE
ID NO. SERVICE TYPE GPM
TOTAL HEAD
(FT) RPM EFFICIENCY
ELECTRICAL
REMARKS
HP V PH
CHWP-1 CHILLED
WATER END SUCTION 60 80 1800 52% 5 208 3 PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC
INSULATION, WITH ALUMINUM JACKET
EXPANSION TANK
ID NO. SERVICE TYPE
TANK VOLUME
(GAL)
ACCEPTANCE VOLUME
(GAL)
TANK
DIAMETER (IN)
CONNECTION
SIZE (IN) WT (LBS) REMARKS
ET-1 CHILLED
WATER VERTICAL 4 2.5 14 3/4 45 PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC
INSULATION, WITH ALUMINUM JACKET
AIR SEPARATOR
ID NO. SERVICE TYPE TANK HT (IN) TANK
DIAMETER (IN)
CONNECTION
SIZE (IN) WT (LBS) REMARKS
AS-1 CHILLED
WATER
VERTICAL WITH
STRAINER 27-1/4 14 3 110
PROVIDE WITH BASE RING.
PROVIDE WITH MIN. 1.5" THICK ELASTOMERIC
INSULATION, WITH ALUMINUM JACKET
HOSE BIBBHB
AIR SEPARATORAS
CHEMICAL POT FEEDERCF
CHILLED WATER PUMPCHWP
EXPANSION TANKET
COPPERCOP
SUGGESTED SEQUENCE OF CONSTRUCTION
WORK HOURS LIMITATIONS
1. THEATER BUILDING IS OCCUPIED AND IN OPERATION SEVEN DAYS PER WEEK, INCLUDING
FEDERAL, STATE, AND LOCAL HOLIDAYS, EXCEPT THANKSGIVING DAY, DECEMBER 25, AND
JANUARY 1. NORMAL HOURS OF OPERATIONS ARE 7:00 AM TO 5:00 PM.
2. NO AIR CONDITIONING OUTAGES IN THE THEATER BUILDING WILL BE ALLOWED DURING
NORMAL HOURS OF OPERATION.
NOTE: THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION IS
FOR INFORMATION ONLY. MEANS AND METHODS FOR CONSTRUCTION
REMAINS THE RESPONSIBILITY OF THE CONTRACTOR.
1. INSTALL CHWR BYPASS IN BASEMENT TO ALLOW OPERATION OF THE EXISTING CHILLED
WATER PUMP UNTIL NEW CHILLED WATER PUMP IS INSTALLED AND TESTED.
2. INSTALL STUB-OUTS WITH SHUT-OFF VALVES FOR CHWS AND CHWR BYPASS PIPING NEAR
THE NEW PUMP ENCLOSURE.
3. INSTALL STUB-OUTS WITH SHUT-OFF VALVES FOR CHWS AND CHWR BYPASS PIPNG AT
THE EXISTING CHILLER ENCLOSURE.
4. INSTALL CHW BYPASS PIPING TO ALLOW DEMOLITION OF THE BURIED CHW PIPING IN THE
AREA OF THE NEW PUMP ENCLOSURE.
5. CONSTRUCT THE NEW PUMP ENCLOSURE, AND INSTALL CHILLED WATER PUMP, PIPING
AND ACCESSORIES WITHIN THE ENCLOSURE.
6. TEST THE OPERATION OF THE NEW CHW PUMP, WHILE UTILIZING THE PUMP BYPASS
PIPING IN THE THEATER BASEMENT.
7. AFTER NEW CHW PUMP SYSTEM HAS BEEN TESTED AND APPROVED FOR PERMANENT
OPERATION, REMOVE THE CHILLED WATER BYPASS PIPING AT THE CHILLER AND REMOVE
THE EXISTING CHW PUMP AND PIPING IN THE THEATER BASEMENT.
LICENSED
PROFESSIONAL
ENGINEER
No. 5788-M
BFP
M2
OVERALL
MECHANICAL PLAN
6'
SCALE: 3/32" = 1'
12' 24'
NORTH
EXST ELEC EQUIP.
SEE ELEC. SHTS.
LAWN
AREA
GRAVEL
ACCESS RD
(N) 3/4" CW
EXST FH
EXST 8" W
TAP INTO EXST 8" W.
SEE DET 1/M7 FOR
CONNECTION DETAIL
EXST 8" W
APPROX.
SHORELINE
EXST 3" UNDERGROUND
CHWS AND CHWR
EXST 1" PVC CONTROL
CONDUIT, UNDERGROUND
THEATER BLDG
BASEMENT
SCALE: 3/32" = 1'
CHILLER ENCLOSURE DEMO PLAN
SEE 1/M3 FOR DEMO PLAN, 1/M4 FOR
SUGGESTED BYPASS PLAN, AND 1/M5
FOR NEW WORK PLAN
SEE 2/M3 FOR DEMO PLAN, 2/M4 FOR
SUGGESTED BYPASS PLAN, AND 2/M5
FOR NEW WORK PLAN
LICENSED
PROFESSIONAL
BF
P
SCALE: 1/2" = 1'
BASEMENT DEMO PLAN
NORTH
NOTES:
1. EXISTING CHW LINE IS COPPER TUBING WITH INSULATION.
POR
POR
POR. REMOVE
CHWR PIPING.
REMOVE EXST CHW LINES. APPROX 3' BELOW
GRADE
REMOVE CHW PUMP AND ALL
ACCESSORIES, INCLUDING BUT
NOT LIMITED TO PIPING, VALVES,
AIR SEPARATOR TANK AND
EXPANSION TANK
EXST PIPE HANGER TO
REMAIN. TYP OF 2
3" CHWR
12'
EXST CONCRETE
PAD TO REMAIN
REMOVE EXST INSULATION
ON EXST 3" CHWS & CHWR
EXST CHW RISERS UP TO ROOF
1' 7"
1'
SCALE: 1/2" = 1'
2' 4'
EXST CH-1
EXST CMU CHILLER
ENCLOSURE
EXST CHWREXST CHWS
EXST CHWR (ABOVE)
& CHWS (BELOW)
M3
MECHANICAL DEMOLITION
PLANS
CONNECT INTO EXST 1" PVC CTRL CONDUIT FOR NEW CHW PUMP
CONTROLS.
EDGE OF EXISTING
GRAVEL ACCESS ROAD EXST ELEC PANEL.
SEE ELECTRICAL PLANS.
REMOVE EXST 3/4" CW CONNECTED TO AIR
SEPARATOR. CAP CW DOWNSTREAM OF
EXST SHUT-OFF VALVE.
EXST 3/4" CW TO
REMAIN
SCALE: 1/2" = 1'
CHILLER ENCLOSURE DEMO PLAN
SEE 2/M4 FOR SUGGESTED
TEMPORARY BYPASS PIPING
LICENSED
PROFESSIONAL
1'
SCALE: 1/2" = 1'
NORTH
CHW STUBOUTS WITH
SHUTOFF VALVES
FOR NEW CHW
CONNECTIONS
POC. CONNECT NEW CHWS
AND CHWR TO EXST LINES
UNDERGROUND. PROVIDE
SHUTOFF VALVE AT RISERS.
EXST CMU CHILLER
ENCLOSURE
12'
2' 4'
NOTES:
1. EXISTING CHW LINES ARE COPPER TUBING WITH
INSULATION.
2. CHW SYSTEM MUST BE ACTIVE AT ALL TIMES DURING
BUSINESS HOURS (7 AM - 5 PM)
M4
MECHANICAL CHILLED WATER
SUGGESTED BYPASS PLANS
EXST CHWR (ABOVE)
& CHWS (BELOW)
3" CHWR (ABOVE)
AND CHWS
(BELOW) BYPASS
NEW VALVE BOX
EXST 3" CHWS
EXST 3" CHWR
1" PVC CONTROL
CONDUIT FOR CHW PUMP
EXST 1" PVC
CONTROL CONDUIT
POC
CHW STUB OUTS
FOR NEW CHW PIPES
3' BELOW GRADE
POC. CONNECT NEW CHWS
AND CHWR TO EXST LINES
IN BASEMENT.
EXST CHWP TO REMAIN
OPERATING UNTIL NEW
WORK IS COMPLETE
SCALE: 1/2" = 1'
SUGGESTED PIPING PLAN DURING BYPASS
SCALE: 1/2" = 1'
BASEMENT SUGGESTED PIPING PLAN DURING BYPASS
3" CHWR (ABOVE)
AND CHWS
(BELOW) BYPASS
EXST AIR SEPARATOR AND
EXST EXPANSION TANK TO
REMAIN DURING BYPASS
PHASE.
LICENSED
PROFESSIONAL
CLOSE BYPASS VALVES
AND CAP CHWR LINES
NORTH
EXST CHWR (ABOVE)
& CHWS (BELOW)
CAP BYPASS LINES
EXST CMU CHILLER
ENCLOSURE
CHWP
DISCONNECT
SWITCH.
SEE ELEC.
12'
1'
SCALE: 1/2" = 1'
2' 4'
NOTES:
1. EXISTING CHW LINES ARE COPPER TUBING WITH
INSULATION.
2. PROVIDE INSULATION ON ALL NEW CHILLED WATER
LINES AND CHW EQUIPMENT, INCLUDING BUT NOT
LIMITED TO CHW PUMP, AIR SEPARATOR TANK, AND
EXPANSION TANK. SEE SPECS FOR INSULATION
REQUIREMENTS.
M5
MECHANICAL PLANS
EXST CHWR (ABOVE)
& CHWS (BELOW)
3" CHWR
CHWP-1
CF-1
ET-1
AS-1
NEW CMU ENCLOSURE
SEE ARCH. SHTS.
NEW 3/4" WATER
EXST 3" CHWS
EXST 3" CHWR
1" PVC CONTROL
CONDUIT FOR CHW PUMP
HB
BFP
EXST 1" PVC
CONTROL CONDUIT
POC
3" CHWS
CAP BYPASS LINES
POC
CAP CW
SCALE: 1/2" = 1'
EQUIPMENT ENCLOSURE PLAN
SCALE: 1/2" = 1'
BASEMENT PLAN
EXST BFP IN
BASEMENT TO REMAIN
EXST 3" CWHR TO REMAIN.
SUSPENDED FROM FLOOR
SLAB ABOVE
EXST 3" CWHS TO REMAIN.
SUSPENDED FROM FLOOR
SLAB ABOVE
PROVIDE NEW INSULATION
ON EXST 3" CHWR & CHWS.
PROVIDE NEW INSULATION
SHIELDS AT EXST PIPE
HANGERS.
LICENSED
PROFESSIONAL
ENGINEER
2/M6 1/M6
M6
MECHANICAL SECTIONS
ET-1
SCALE: 1" = 1'
CHW PUMP SECTION
SCALE: 1" = 1'
CHW PUMP ACCESSORY SECTION
SCALE: 1" = 1'
BASEMENT CHW PIPING ISOMETRIC
3" CHWR
3" CHWS
3" CHWR
AS-1
CF-1
3/4" CHW LINE
TO ET-1
3/4" CW
VALVE BOX
CAP BYPASS
PIPING AFTER
NEW WORK IS
COMPLETE
POC. CONNECT EXST
UNDERGROUND 3"
CHWS AND CHWR
POC. CONNECT
NEW CHWS AND
CHWR PIPING TO
BYPASS PIPING
NEW CHW PUMP
CONCRETE PAD.
MIN 8" TALL
CONCRETE PAD.
MIN 6" TALL
EXST CMU WALL
NEW CMU WALL
EXST CMU WALL
NEW CMU WALL
CAP BYPASS AFTER
NEW WORK IS
COMPLETE
EXST CHWR BELOW
BASEMENT CEILING
POC. CONNECT
BYPASS TO EXST
CHWS AND CHWR
PIPING
POC. CONNECT
NEW CHWS AND
CHWR PIPING TO
BYPASS PIPING
3/4" CHW PIPING
CONNECTED TO
CHEM FEEDER
POC. CONNECT
BYPASS PIPING TO
EXST CHWR PIPING
BELOW BASEMENT
CEILING
NOTE: INSULATION AND JACKET
NOT SHOWN FOR CLARITY
NOTE: INSULATION AND JACKET
NOT SHOWN FOR CLARITY
LICENSED
PROFESSIONAL
ENGINEER
No. 5788-M
SLAB ON
GRADE - SEE A1
SLAB ON
GRADE - SEE A1
CONCRETE PAD
8" HIGH
(SEE NOTE)
6"
12"18"
COVER
6"
36"
COVER
24"
24"
12"
M7
MECHANICAL DETAILS
3/4" CHAMFER
CONCRETE
SLAB-ON-GRADE
EQUIPMENT PAD,
6" LARGER THAN
EQUIPMENT ALL
AROUND
#4 AT 12" OC, EACH WAY
ROUGHEN SURFACE TO
1/8" AMPLITUDE AND
APPLY BONDING AGENT
PIPE
1/2" TO 3/4"
CLEARANCE
1" MIN.
THICKNESS
SOLID GROUT
TO SLEEVE
INSULATION
WITH JACKET
PACK FIBERGLASS
INSULATION TO
MEDIUM DENSITY (3
PCF)
EXST CMU OR
CONCRETE WALL
STAINLES STEEL
PIPE SLEEVE
NOTE: EQUIPMENT PAD SHALL BE MINIMUM 8" HIGH AT PUMP,
AND MINIMUM 6" HIGH AT OTHER EQUIPMENT
EXST 8" WATER LINE
SERVICE SADDLE
CORP STOP
3/4" COP WATER SERVICE
LINE TO PUMP ENCLOSURE
NOTE: EXST WATER LINE IS MATERIAL IS EITHER
CAST IRON OR PVC. CONTRACTOR TO VERIFY.
INV: 0.35 MSL
(VERIFY)
EXST GRADE AT 4.0 +/- MSL
(VERIFY)
EXST
GRADE
TOP SOIL & TURF TO
MATCH EXST GRADE
SURFACE CONDITION
IN GRAVEL ROAD
AREAS
SURFACE
CONDITION IN
GRASSED AREAS
GRAVEL TOPPING
TO MATCH
EXISTING
3/4" SERVICE
WATER LINE
TRENCH BACKFILL
TOP SOIL & TURF TO
MATCH EXST GRADE
EXST
GRADE
SCALE: 1" = 1'-0"
SERVICE WATER LINE CONNECTION
1 SCALE: 1" = 1'-0"
CONCRETE EQUIPMENT PAD
2 NOT TO SCALE
PIPING THRU WALL PENETRATION
SCALE: 1" = 1'-0"
TRENCH DETAILS
AT SERVICE WATER LINE
AT BURIED CHILLED WATER PIPING
CHILLED WATER PIPE
INSULATION
SAND PIPE BEDDING
IN ACCORDANCE
WITH PIPE MFR'S
RECOMMENDATIONS
TRENCH BACKFILL
NOT TO SCALE
PIPING THRU FLOOR SLAB
CHILLED WATER
PIPE
INSULATION
INSULATION
JACKET
1/4" MINIMUM
WATERPROOF SEALANT
STAINLESS STEEL
PIPE SLEEVE
CONTINUOUS WATERPROOF
ELASTOMERIC LATEX
SEALANT SUCH AS DAP
DYNAFLEX 230 SEALANT
(BOTH ENDS)
CONCRETE
SLAB-ON-GRADE
NOT TO SCALE
HOSE BIBB WITH VACUUM BREAKER
CMU WALL
(TYP)
1/4" MASONRY
SCREW, 316 SS
(TYP)
BALL COCKCOPPER PIPE
CLAMP (TYP)
FINISHED
CONCRETE
FLOOR
3/4" HOSE BIBB,
NO KINK TYPE
WITH VACUUM
BREAKER
90 DEG
ELBOW
3/4 COPPER
WATER PIPE
LICENSED
PROFESSIONAL
HS
HOA
M8
MODIFIED CHILLED WATER
SCHEMATIC AND DETAILS
T
(E) CH-1
AIR
SEPARATOR
TANK
EXPANSION
TANK
(E) CHWS & (E) CHWR UP
TO EXST AHUS AND FCUS
3" CHWR
P
CHWP-1
P
P
PP
(E) 3" CHWR
(E) 3" CHWS
LEGEND
P
BALL OR GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
PRESS REGULATOR
FLEX CONNECTOR
PRESS GAUGE
STRAINER
HAND SWITCH
HAND-OFF-AUTO
POINT OF CONNECTION
POINT OF REMOVAL
HS
HOA
SEQUENCE OF OPERATION - CHILLER WATER PUMP
1. EXISTING CHILLED WATER PUMP CONTROL SEQUENCE REMAINS
UNCHANGED. NEW CHW PUMP SHALL BE CONNECTED TO THE
EXISTING TIME CLOCK. EXISTING TIME CLOCK STARTS THE CHW PUMP
AND ALL AIR HANDLING UNITS IN THE THEATER BUILDING.
2. NEW CHW PUMP CAN BE STARTED MANUALLY VIA AN EXISTING H-O-A
SWITCH LOCATED IN THE PROJECTION ROOM AT THE THEATER BLDG.
3. EXISTING CHILLER CONTROL REMAINS UNCHANGED:
A. THE EXISTING CHILLER STARTS AFTER A TIME DELAY AND UPON
VERIFICATION OF CHW FLOW.
B. THE CHILLER CAN BE MANUALLY STARTED VIA AN EXISTING
INDIVIDUAL H-O-A SWITCH LOCATED IN THE PROJECTION ROOM AT
THE THEATER BLDG.
5. EXISTING CONTROLS FOR AIR HANDLING UNITS REMAIN UNCHANGED:
A. EXISTING AIR HANDLING UNITS CAN BE MANUALLY STARTED VIA
EXISTING INDIVIDUAL H-O-A SWITCHES LOCATED IN THE
PROJECTION ROOM AT THE THEATER BLDG.
POC
POR
NEW CHWR PIPING TO CLOSE LOOP
FOR REMOVAL OF EXST CHWP AND
ACCESSORIES IN THEATER BASEMENT
(E) 3" CHWR
POC
(N) 3" CHWR
(E) 3" CHWS
POC
(N) 3" CHWS
WORK IN EXISTING
CHILLER ENCLOSURE
WORK IN NEW
CHWP ENCLOSURE
CHW CHEM
FEEDER
AUTOMATIC
AIR VENT
PRESSURE
GAUGE
PRESSURE
REGULATOR
MAKE-UP
WATER
(E) 1" PVC CONTROL CONDUIT
(UNDERGROUND)
(E) H-O-A SWITCH, LOCATED
IN EXISTING PROJECTION
ROOM AT THEATER BLDG
POC (UNDERGROUND)
WORK IN EXISTING
THEATER BASEMENT
POC
3" CHWS
TEMPORARY
BYPASS
T P
3" CHWR
TEMPORARY
BYPASS
DISCONNECT EXST CHW
PIPING AFTER NEW CHWP IS
OPERATIONAL. CAP BYPASS
CHW AFTER REMOVING EXST
CWHP IN THEATRE
BASEMENT
SCALE: 1/2" = 1'
MODIFIED CHILLED WATER SCHEMATIC
LICENSED
PROFESSIONAL
| G1 |
| A1 |
File details come from the government source that posted it. Updated .