G1_(rev1)_0002.pdf
PDF 215 KB Posted
- Attached to
- RELOCATE CHILLED WATER PUMP
- Solicitation number
- 140P8225B0002
About this file
This image is a Partial Site Plan drawing for a project located at Pearl Harbor National Memorial, Oahu. The architectural site plan is drawn at a 1" = 90' scale and includes detailed layout of multiple buildings and site features. Key elements include:
The site plan shows several labeled building blocks (Bldg. A-H) with specific annotations like "No Work" or "Project Area Limit", indicating a targeted renovation or construction project. The drawing includes site access points, existing security gate, guard shack, electrical panel, and contractor parking/storage area. Topographical contours and directional compass (North/South/East/West) are included. The plan appears to be specifically related to relocating a chilled water pump, as suggested by the federal contract opportunity details, with the drawing dated 11/17/24 and designed for the Department of the Interior National Park Service.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .