M5_(rev1)_0002.pdf

PDF 74 KB Posted

Attached to
RELOCATE CHILLED WATER PUMP Federal contract opportunity
Solicitation number
140P8225B0002
Issued by
Department of the Interior National Park Service

About this file

This document is a mechanical plans drawing (Sheet M5) for relocating a chilled water pump at the Pearl Harbor Theater Building, located at the National Memorial Park. The detailed technical drawing shows two plan views: an Equipment Enclosure Plan and a Basement Plan, which illustrate the proposed chilled water pump (CHWP) relocation and associated infrastructure modifications.

Key technical details include new 3/4" water connections, existing 3" chilled water return (CHWR) and supply (CHWS) lines, a new CMU enclosure, cap bypass lines, electrical disconnect switch, and a NEMA 4X starter for the chilled water pump. The drawing specifies installation of new insulation on chilled water lines and provides precise measurements and equipment positioning. The document is part of a Department of the Interior National Park Service solicitation (140P8225B0002) for chilled water pump relocation work, with the technical drawing providing specific implementation details for the proposed mechanical system modifications.

View the file

Other files for this federal contract opportunity

Other files attached to RELOCATE CHILLED WATER PUMP, newest first.
File Type Posted
Sol_140P8225B0002_Amd_0003.pdf PDF
NAVFAC_Dwg_No_19003869_0002.pdf PDF
NAVFAC_Dwg_No_19004137_0002.pdf PDF
A1_(rev1)_0002.pdf PDF
HVAC_Control_Panel_-_Photos_0002.pdf PDF
Section_260543_-_Underground_Ducts_and_Raceways_for_Elec_Sys_(rev1)_0002.pdf PDF
M8_(rev1)_0002.pdf PDF
Sol_140P8225B0002_Amd_0002.pdf PDF
G1_(rev1)_0002.pdf PDF
Sol_140P8225B0002_Amd_0001.pdf PDF
B08_Attach_2_Drawings.pdf PDF
B08_Attach_5_Performance_Bond_SF25-23a_Exp_2027.pdf PDF
B08_Attach_3_Contract_Bid_Schedule.docx DOCX document
B08_Attach_1_Specifications.pdf PDF
Sol_140P8225B0002.pdf PDF
B08_Attach_4_Payment_Bond_SF25A-23a_Exp_2027.pdf PDF
B08_Attach_6_WD_18_Apr_2025.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BF

P

CLOSE BYPASS VALVES

AND CAP CHWR LINES

NORTH

EXST CHWR (ABOVE)

& CHWS (BELOW)

CAP BYPASS LINES

EXST CMU CHILLER

ENCLOSURE

CHWP

DISCONNECT

SWITCH.

SEE ELEC.

12'

1'

SCALE: 1/2" = 1'

2' 4'

NOTES:

1. EXISTING CHW LINES ARE COPPER TUBING WITH

INSULATION.

2. PROVIDE INSULATION ON ALL NEW CHILLED WATER

LINES AND CHW EQUIPMENT, INCLUDING BUT NOT

LIMITED TO CHW PUMP, AIR SEPARATOR TANK, AND

EXPANSION TANK. SEE SPECS FOR INSULATION

REQUIREMENTS.

M5

MECHANICAL PLANS

EXST CHWR (ABOVE)

& CHWS (BELOW)

3" CHWR

CHWP-1

CF-1

ET-1

AS-1

NEW CMU ENCLOSURE

SEE ARCH. SHTS.

NEW 3/4" WATER

EXST 3" CHWS

EXST 3" CHWR

HB

BFP

EXST 1" PVC

CONTROL CONDUIT

FROM THEATER BLDG

TO CHILLER AREA

POC

3" CHWS

CAP BYPASS LINES

POC

CAP CW

SCALE: 1/2" = 1'

EQUIPMENT ENCLOSURE PLAN

SCALE: 1/2" = 1'

BASEMENT PLAN

EXST BFP IN

BASEMENT TO REMAIN

EXST 3" CWHR TO REMAIN.

SUSPENDED FROM FLOOR

SLAB ABOVE

EXST 3" CWHS TO REMAIN.

SUSPENDED FROM FLOOR

SLAB ABOVE

PROVIDE NEW INSULATION

ON EXST 3" CHWR & CHWS.

PROVIDE NEW INSULATION

SHIELDS AT EXST PIPE

HANGERS.

LICENSED

PROFESSIONAL

ENGINEER

No. 5788-M

2/M6 1/M6

NEMA 4X

STARTER

FOR CHWP

3/4" CONTROL CONDUIT

TO CHW PUMP

EXST JB

File details come from the government source that posted it. Updated .