M5_(rev1)_0002.pdf
PDF 74 KB Posted
- Attached to
- RELOCATE CHILLED WATER PUMP Federal contract opportunity
- Solicitation number
- 140P8225B0002
About this file
This document is a mechanical plans drawing (Sheet M5) for relocating a chilled water pump at the Pearl Harbor Theater Building, located at the National Memorial Park. The detailed technical drawing shows two plan views: an Equipment Enclosure Plan and a Basement Plan, which illustrate the proposed chilled water pump (CHWP) relocation and associated infrastructure modifications.
Key technical details include new 3/4" water connections, existing 3" chilled water return (CHWR) and supply (CHWS) lines, a new CMU enclosure, cap bypass lines, electrical disconnect switch, and a NEMA 4X starter for the chilled water pump. The drawing specifies installation of new insulation on chilled water lines and provides precise measurements and equipment positioning. The document is part of a Department of the Interior National Park Service solicitation (140P8225B0002) for chilled water pump relocation work, with the technical drawing providing specific implementation details for the proposed mechanical system modifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8225B0002_Amd_0003.pdf | ||
| NAVFAC_Dwg_No_19003869_0002.pdf | ||
| NAVFAC_Dwg_No_19004137_0002.pdf | ||
| A1_(rev1)_0002.pdf | ||
| HVAC_Control_Panel_-_Photos_0002.pdf | ||
| Section_260543_-_Underground_Ducts_and_Raceways_for_Elec_Sys_(rev1)_0002.pdf | ||
| M8_(rev1)_0002.pdf | ||
| Sol_140P8225B0002_Amd_0002.pdf | ||
| G1_(rev1)_0002.pdf | ||
| Sol_140P8225B0002_Amd_0001.pdf | ||
| B08_Attach_2_Drawings.pdf | ||
| B08_Attach_5_Performance_Bond_SF25-23a_Exp_2027.pdf | ||
| B08_Attach_3_Contract_Bid_Schedule.docx | DOCX document | |
| B08_Attach_1_Specifications.pdf | ||
| Sol_140P8225B0002.pdf | ||
| B08_Attach_4_Payment_Bond_SF25A-23a_Exp_2027.pdf | ||
| B08_Attach_6_WD_18_Apr_2025.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BF
P
CLOSE BYPASS VALVES
AND CAP CHWR LINES
NORTH
EXST CHWR (ABOVE)
& CHWS (BELOW)
CAP BYPASS LINES
EXST CMU CHILLER
ENCLOSURE
CHWP
DISCONNECT
SWITCH.
SEE ELEC.
12'
1'
SCALE: 1/2" = 1'
2' 4'
NOTES:
1. EXISTING CHW LINES ARE COPPER TUBING WITH
INSULATION.
2. PROVIDE INSULATION ON ALL NEW CHILLED WATER
LINES AND CHW EQUIPMENT, INCLUDING BUT NOT
LIMITED TO CHW PUMP, AIR SEPARATOR TANK, AND
EXPANSION TANK. SEE SPECS FOR INSULATION
REQUIREMENTS.
M5
MECHANICAL PLANS
EXST CHWR (ABOVE)
& CHWS (BELOW)
3" CHWR
CHWP-1
CF-1
ET-1
AS-1
NEW CMU ENCLOSURE
SEE ARCH. SHTS.
NEW 3/4" WATER
EXST 3" CHWS
EXST 3" CHWR
HB
BFP
EXST 1" PVC
CONTROL CONDUIT
FROM THEATER BLDG
TO CHILLER AREA
POC
3" CHWS
CAP BYPASS LINES
POC
CAP CW
SCALE: 1/2" = 1'
EQUIPMENT ENCLOSURE PLAN
SCALE: 1/2" = 1'
BASEMENT PLAN
EXST BFP IN
BASEMENT TO REMAIN
EXST 3" CWHR TO REMAIN.
SUSPENDED FROM FLOOR
SLAB ABOVE
EXST 3" CWHS TO REMAIN.
SUSPENDED FROM FLOOR
SLAB ABOVE
PROVIDE NEW INSULATION
ON EXST 3" CHWR & CHWS.
PROVIDE NEW INSULATION
SHIELDS AT EXST PIPE
HANGERS.
LICENSED
PROFESSIONAL
ENGINEER
No. 5788-M
2/M6 1/M6
NEMA 4X
STARTER
FOR CHWP
3/4" CONTROL CONDUIT
TO CHW PUMP
EXST JB
File details come from the government source that posted it. Updated .