This technical specification section (260543) details requirements for underground electrical ducts and raceways for the Chilled Water Pump Relocation project at Pearl Harbor National Memorial. The document specifies technical standards for PVC conduits, including Schedule 40 Rigid PVC Conduit (PVC-40) to be used for electrical feeders, branch circuits, and ducts crossing paved areas, with detailed installation requirements for excavation, burial depth, duct spacing, and joint connections.
Key technical specifications include installing underground ducts at least 36 inches below finished grade, using 3-inch sand bedding, maintaining minimum 3-inch spacing between like service ducts, and 6-inch spacing between power and communications ducts. The installation process requires specific techniques such as using solvent-cemented joints, supporting ducts with spacers, installing underground-line warning tape, and performing field quality control tests including pulling a test mandrel through ducts to verify joint integrity and bend radii. The specification ensures proper installation and performance of electrical underground infrastructure for the project at the Pearl Harbor National Memorial site.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERL – 328481 RELOCATE CHILLED WATER PUMP AT THEATER BUILDING
PEARL HARBOR NATIONAL MEMORIAL, OAHU
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 1
SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Type PVC raceways and fittings.
2. Fittings for conduit, tubing, and cable.
3. Solvent cements.
4. Duct accessories.
5. Duct sealing.
B. Related Requirements:
1. Section 260519 "Low-Voltage for Electrical Power Conductors and Cables" specifies nonmetallic underground conduit with conductors (Type NUCC).
2. Section 260553 "Identification for Electrical Systems" specifies underground-line warning tape and concrete cable routing markers (warning planks).
1.2 DEFINITIONS
A. Duct: A single raceway or multiple raceways, installed singly or as components of a duct bank.
PART 2 - PRODUCTS
2.1 TYPE PVC RACEWAYS AND FITTINGS
A. Performance Criteria:
1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.
2. General Characteristics: UL 651 and UL CCN DZYR.
B. Schedule 40 Rigid PVC Conduit (PVC-40) and Fittings:
1. Dimensional Specifications: Schedule 40.
2. Options:
a. Minimum Trade Size: Metric designator 21 (trade size 3/4).
b. Markings: For use with maximum 90 deg C wire.
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 2
2.2 FITTINGS FOR CONDUIT, TUBING, AND CABLE
A. Performance Criteria:
1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.
2.3 SOLVENT CEMENTS
A. Performance Criteria:
1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use.
2. General Characteristics: As recommended by conduit manufacturer in accordance with
UL 514B and UL CCN DWTT.
B. Solvent Cements for Type PVC Raceways and Fittings:
2.4 DUCT ACCESSORIES
A. Duct Spacers: Factory-fabricated, rigid, PVC interlocking spacers; sized for type and size of duct with which used, and selected to provide minimum duct spacing indicated while supporting duct during concreting or backfilling.
2.5 DUCT SEALING
A. Duct-Sealing Compound: Nonhardening, safe for contact with human skin, not deleterious to cable insulation, and workable at temperatures as low as 35 deg F (2 deg C). Compound must be capable of withstanding temperature of 300 deg F (150 deg C) without slump and adhering to clean surfaces of plastic ducts, metallic conduit, conduit and duct coatings, concrete, masonry, lead, cable sheaths, cable jackets, insulation materials, and common metals. Duct sealing compound must be removable without damaging ducts or cables.
PART 3 - EXECUTION
3.1 PREPARATION
A. Coordinate layout and installation of duct with final arrangement of other utilities, site grading, and surface features as determined in field. Notify Architect if there is conflict between areas of excavation and existing structures or archaeological sites to remain.
B. Clear and grub vegetation to be removed, and protect vegetation to remain in accordance with
Section 311000 "Site Clearing." Remove and stockpile topsoil for reapplication in accordance with Section 311000 "Site Clearing."
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 3
3.2 SELECTION OF UNDERGROUND DUCTS
A. Duct for Electrical Feeders 600 V and Less: PVC-40, concrete encased or direct buried as indicated.
B. Duct for Electrical Branch Circuits: PVC-40, direct buried unless otherwise indicated.
C. Underground Ducts Crossing Paved Paths Walks and Driveways: PVC-40 encased in reinforced concrete.
3.3 EARTHWORK
A. Excavation and Backfill: Comply with Section 312000 "Earth Moving," but do not use heavy-duty, hydraulic-operated, compaction equipment.
B. Restoration: Restore area immediately after backfilling is completed or after construction vehicle traffic in immediate area is complete.
C. Restore surface features at areas disturbed by excavation, and re-establish original grades unless otherwise indicated. Replace removed sod immediately after backfilling is completed.
D. Restore areas disturbed by trenching, storing of dirt, cable laying, and other work. Restore vegetation and include necessary topsoiling, fertilizing, liming, seeding, sodding, sprigging, and mulching. Comply with Section 329200 "Turf and Grasses" and Section 329300 "Plants."
E. Cut and patch existing pavement in path of underground duct with "Cutting and Patching"
Article in Section 017300 "Execution."
3.4 INSTALLATION OF DUCTS
A. Reference Standards:
1. Unless more stringent requirements are specified in Contract Documents or manufacturers' published instructions, comply with NEMA TCB 2 for installation of underground ducts.
2. Consult Architect for resolution of conflicting requirements.
B. Special Techniques:
1. Steel raceway, bends, and fittings in single duct run or duct bank must be of same type.
2. Slope: Pitch duct minimum slope of 1:300 down toward manholes and handholes and away from buildings and equipment. Slope duct from high point between two manholes to drain in both directions.
3. Expansion and Deflection Fittings: Install expansion and deflection fitting in each duct in area of disturbed earth adjacent to handhole.
4. Install expansion fitting near center of straight line duct with calculated expansion of more than 3/4 inch (19 mm).
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 4
5. Curves and Bends:
a. Use 5-degree angle couplings for small changes in direction. Use manufactured long sweep bends with minimum radius of 48 inch (1200 mm), both horizontally and vertically, at other locations unless otherwise indicated.
b. Field bending must be in accordance with NFPA 70 minimum radii requirements, except bends over 45 degrees must be made with minimum radius of 48 inch
(1200 mm). Use only equipment specifically designed for material and size involved. Use PVC heating bender for bending PVC conduit.
c. Duct must have maximum of 180 degrees of bends between pull points.
6. Joints: Use solvent-cemented joints in nonmetallic duct and fittings and make watertight in accordance with manufacturer's published instructions. Stagger couplings so those of adjacent duct do not lie in same plane. Couple steel conduits to ducts with adapters designed for this purpose, and encase coupling with minimum 3 inch (75 mm) of concrete for minimum of 12 inch (300 mm) on each side of coupling.
a. Install insulated grounding bushings on steel raceway terminations that are less than 12 inch (300 mm) below grade or floor level and do not terminate in hubs.
7. Building Wall Penetrations: Make transition from underground duct to steel raceway at least 10 ft (3 m) outside building wall, without reducing duct line slope away from building and without forming trap in line. Use fittings manufactured for transition to steel raceway type installed. Install steel raceway penetrations of building walls as specified in
Section 260544 "Sleeves and Sleeve Seals for Electrical Raceways and Cabling."
8. Sealing: Provide temporary closure at terminations of duct with pulled cables. Seal spare duct at terminations. Use sealing compound and plugs to withstand at least 15 psig
(1.03 MPa) hydrostatic pressure.
9. Pulling Cord: Install 200 lbf (1000 N) test nylon cord in empty ducts.
10. Direct-Buried Duct:
a. Excavate trench bottom to provide firm and uniform support for duct. Comply with requirements in Section 312000 "Earth Moving" for preparation of trench bottoms for pipes less than 6 inch (150 mm) in nominal diameter.
b. Width: Excavate trench 3 inch (75 mm) wider than duct on each side.
c. Depth: Install top of duct at least 36 inch (900 mm) below finished grade unless otherwise indicated.
d. Place minimum 3 inch (75 mm) of sand as bed for duct. Place sand to minimum of
6 inch (150 mm) above top level of duct.
e. Support ducts on duct spacers coordinated with duct size, duct spacing, and outdoor temperature.
f. Install duct with minimum of 3 inch (75 mm) between ducts for like services and
6 inch (150 mm) between power and communications duct.
g. Install manufactured duct elbows for stub-ups, at building entrances, and at changes of direction in duct direction unless otherwise indicated. Encase elbows for stub-up ducts throughout length of elbow.
11. Underground-Line Warning Tape: Bury conducting underground line specified in
Section 260553 "Identification for Electrical Systems" no less than 12 inch (300 mm) above ducts and approximately 12 inch (300 mm) below grade. Align tape parallel to and within 3 inch (75 mm) of centerline of duct. Provide additional warning tape for each
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260543 - 5
12 inch (300 mm) increment of duct-bank width over nominal 18 inch (450 mm). Space additional tapes 12 inch (300 mm) apart, horizontally across width of ducts.
3.5 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Demonstrate capability and compliance with requirements on completion of installation of underground duct.
2. Pull solid aluminum or wood test mandrel through duct to prove joint integrity and adequate bend radii, and test for out-of-round duct. Provide minimum 12 inch (300 mm) long mandrel equal to duct size minus 1/4 inch (6 mm). If obstructions are indicated, remove obstructions and retest.
B. Nonconforming Work:
1. Underground ducts and raceways will be considered defective if they do not pass tests and inspections.
2. Correct deficiencies and retest as specified above to demonstrate compliance.
C. Field Quality-Control Reports: Collect, assemble, and submit test and inspection reports.
3.6 CLEANING
A. Pull leather-washer-type duct cleaner, with graduated washer sizes, through full length of duct until duct cleaner indicates that duct is clear of dirt and debris. Follow with rubber duct swab for final cleaning and to assist in spreading lubricant throughout ducts.
END OF SECTION 260543