About this opportunity
This solicitation seeks construction services for recreation site improvements projects across multiple sites within the Chequamegon-Nicolet National Forest in Wisconsin. Work includes trail realignment, road and parking area construction, fencing, signage, electrical and wastewater infrastructure installation, and campground repairs. The soliciting agency is the U.S. Department of Agriculture Forest Service. Proposals will be evaluated based on past performance, experience, and technical approach, with award made to the offeror representing the best value without discussions. The deadline for proposals is March 20, 2023.
The total small business set-aside is designated under NAICS code 237310 for heavy and civil engineering construction, with a size standard of $40.5 million. The estimated value of the contract is between $1 million to $2 million. Projects will be performed across five locations—Valhalla Recreation Area, Wanoka Campground, Picnic Point Campground, Luna-White Deer Campground, and various host sites—and must be completed between June 15, 2023 to August 1, 2024. Optional work includes vault toilet relocation and boat ramp reconstruction.
Notice text
5 versions
Update #5 · Latest ·
Please see amendment 0005 changing proposals due date.
Please see attached amendment 0004 Picnic Point Vault Toilet specifications are attached to provide only the Picnic Point site information.
Please see attached amendment 0003
Please see attached amendment 0002 and plans and specifications for Luna-White Deer location.
Please see attached amendment 0001 for a question and answer.
VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS
THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING.
WANOKA CAMPGROUND IMPROVEMENTS (OBI)
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP.
PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI)
SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE.
LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
Project Magnatude is estimayed between $1M and $2M.
This project is a total small business set-aside under NAICS code 237310, size standard $40.5M
Update #4 ·
Please see attached amendment 0003
Please see attached amendment 0002 and plans and specifications for Luna-White Deer location.
Please see attached amendment 0001 for a question and answer.
VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS
THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING.
WANOKA CAMPGROUND IMPROVEMENTS (OBI)
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP.
PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI)
SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE.
LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
Project Magnatude is estimayed between $1M and $2M.
This project is a total small business set-aside under NAICS code 237310, size standard $40.5M
Update #3 ·
Please see attached amendment 0002 and plans and specifications for Luna-White Deer location.
Please see attached amendment 0001 for a question and answer.
VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS
THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING.
WANOKA CAMPGROUND IMPROVEMENTS (OBI)
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP.
PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI)
SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE.
LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
Project Magnatude is estimayed between $1M and $2M.
This project is a total small business set-aside under NAICS code 237310, size standard $40.5M
Update #2 ·
Please see attached amendment 0001 for a question and answer.
VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS
THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING.
WANOKA CAMPGROUND IMPROVEMENTS (OBI)
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP.
PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI)
SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE.
LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
Project Magnatude is estimayed between $1M and $2M.
This project is a total small business set-aside under NAICS code 237310, size standard $40.5M
Update #1 ·
VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS
THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING.
WANOKA CAMPGROUND IMPROVEMENTS (OBI)
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP.
PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI)
SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE.
LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING
THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
Project Magnatude is estimayed between $1M and $2M.
This project is a total small business set-aside under NAICS code 237310, size standard $40.5M
Files
Show all 26
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Recreation Site Improvements, Chequamegon/Nicollet NF | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Site Visit Effigy Mounds National Monument | — | No set-aside | |
| Septic Toilet Pumping for Chippewa National Forest | Forest Service | Total Small Business | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity