Picnic Point Vault Toilet Plans.pdf

PDF 2 MB Posted

Attached to
Recreation Site Improvements, Chequamegon/Nicollet NF
Solicitation number
12445523R0006
Issued by

About this file

This solicitation requests proposals for recreation site improvement projects within the Chequamegon-Nicollet National Forest. Work includes trail realignment and site upgrades at Valhalla Recreation Area, road reconditioning and repaving at Wanoka Campground and Picnic Point Campground, vault toilet replacement at Picnic Point Campground, electrical and wastewater infrastructure at Wanoka Campground, and road work at Luna-White Deer Campground. Optional items include relocating a vault toilet and constructing an overflow parking area at Wanoka Campground, and reconstructing a boat ramp at Picnic Point Campground. The estimated value is between $1-2 million. This small business set-aside solicitation is issued by the Department of Agriculture Forest Service. Proposals are due based on the solicitation schedule.

View the file

Other files

File Type Posted
12445523R0006 Amendment 5.pdf PDF
Revised Picnic Point Vault Toilet Specifications.docx DOCX document
12445523R0006 Amendment 4.pdf PDF
12445523R0006 Amendment 0003.pdf PDF
12445523R0006 Amendment 0002.pdf PDF
LunaWhite Deer CampgroundPSE Plan220222.pdf PDF
12445523R0006 Amendment 0001.pdf PDF
Wanoka Campground Improvements Specifications.docx DOCX document
Wanoka Campground Host Site Improvements.pdf PDF
Wanoka Campground_Supplemental Specifications_220222.docx DOCX document
Valhalla Recreation AreaPSE Plan220222.pdf PDF
Picnic PointGPNO202261T00194T00196.pdf PDF
Wanoka Campground_Special Provisions_220222.docx DOCX document
12445523R0006 RFP.docx DOCX document
Picnic Point Campground_Special Provisions_220222.docx DOCX document
wi10 Wage Rates.txt TXT text file
Wanoka Campground_PSE Plan_220222.pdf PDF
Picnic Point CampgroundPSE Plan220404.pdf PDF
ScheduleOfItems_Combined.pdf PDF
Picnic Point Vault Toilet Specifications.docx DOCX document
Self Cert GP- Luna-Whitedeer camp drive.pdf PDF
Valhalla Rec Area_Supplemental Specifications_220222.docx DOCX document
12445523R0006 SF 1442.pdf PDF
Valhalla Rec Area_Special Provisions_220712.docx DOCX document
Picnic Point Campground_Supplemental Specifications_220222.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

VICINITY MAP

SHEET 001 OF 004

TRAVEL DIRECTIONS:

FROM THE MEDFORD RANGER DISTRICT OFFICE, TRAVEL NORTH ON STATE HIGHWAY 13 N TOWARD COUNTY HIGHWAY M FOR 3.7 MILES. TURN LEFT ONTO COUNTY HIGHWAY M WEST FOR 7.2 MILES.

TURN RIGHT ONTO MONDEAUX DRIVE FOR 6.0 MILES. TURN RIGHT ONTO MONDEAUX AVE. (FR 102) FOR 1.4 MILES. TURN LEFT ONTO CAMPERS ROAD (FR 106) FOR 1.2 MILES TO REACH PICNIC POINT

CAMPGROUND NEAR N7546 CAMPERS ROAD, WESTBORO, WI 54490. LATITUDE 45.305648 AND

LONGITUDE -90.435760.

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

3/9 /21

:0

7 T

LE

MA

HI

EU

C

:\U

SE

RS

\T

LE

MA

HI

EU

\B

OX

IN

TE

RN

P

RO

JE

CT

S

- T

YL

ER

\2.

IN

P

RO

GR

ES

S\ 0.

VA

UL

T

TO

IL

ET

\S

TR

UC

TU

RE

S

DE

SI

GN

S

DR

AW

IN

GS

\D W

G_ W

OR

KI

NG

\C

_C

OV

ER

SH

EE

T.

DW

G;

United States Department of Agriculture

Forest Service

WISCONSIN

TAYLOR COUNTY

(R09) EASTERN REGION

CHEQUAMEGON-NICOLET NATIONAL FOREST

MEDFORD-PARK FALLS RANGER DISTRICT

PICNIC POINT CAMPGROUND

VAULT TOILET REPLACEMENT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

AutoCAD SHX Text

AutoCAD SHX Text

COVERSHEET

AutoCAD SHX Text 03/09/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-01 FRANKLIN LAKE BOAT LANDING SITE PLAN

AutoCAD SHX Text 02/11/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-02 FRANKLIN LAKE NATURE TRAIL SITE PLAN

AutoCAD SHX Text 02/11/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-03 KENTUCK LAKE BOAT LANDING SITE PLAN

AutoCAD SHX Text 02/11/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-04 KENTUCK LAKE CAMPSITE #5 SITE PLAN

AutoCAD SHX Text 03/08/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-05 KENTUCK LAKE CAMPSITE #19 SITE PLAN

AutoCAD SHX Text 02/11/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-06 KENTUCK LAKE CAMPSITE #23 SITE PLAN

AutoCAD SHX Text 02/11/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-07 BEAR PAW LAKE BOAT LANDING SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-08 BOOT LAKE DAY USE AREA SITE PLAN

AutoCAD SHX Text 03/08/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-09 BOOT LAKE CAMPSITE #4 SITE PLAN

AutoCAD SHX Text 02/12/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-10 BOOT LAKE CAMPSITE #15 SITE PLAN

AutoCAD SHX Text 02/12/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-11 BOOT LAKE CAMPSITE #29 SITE PLAN

AutoCAD SHX Text 02/12/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-12 FANNY LAKE TRAILHEAD SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-13 LAURA LAKE CAMPSITE #1 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-14 LAURA LAKE CAMPSITE #14 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-15 LAURA LAKE CAMPSITE #21 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-16 LAURA LAKE CAMPSITE #41 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-17 GORDON LAKE BOAT LANDING SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-18 PINE LAKE BOAT LANDING SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-19 PINE LAKE CAMPGROUND SITE PLAN

AutoCAD SHX Text 03/08/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-20 RICHARDSON LAKE CAMPSITE #7 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-21 RICHARDSON LAKE CAMPSITE #17 SITE PLAN

AutoCAD SHX Text 02/16/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-22 RICHARDSON LAKE CAMPSITE #26 SITE PLAN

AutoCAD SHX Text 02/17/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-23 PICNIC POINT CAMPGROUND SITE PLAN

AutoCAD SHX Text 02/17/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-24 LAKE OWEN PICNIC AREA SITE PLAN

AutoCAD SHX Text 02/17/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-25 VAULT DETAILS

AutoCAD SHX Text 02/10/2021

AutoCAD SHX Text

AutoCAD SHX Text

C-26 CONCRETE DETAILS

AutoCAD SHX Text 02/10/2021

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

8'-5"

4' TO

BRUSH

E

X

I S

T

I N

G

R

O

A

D

W

A

Y

CONCRETE SLAB

APPROX. 6' X 4'

TO BE REMOVED

EXISTING SINGLE VAULT

TO BE REMOVED

A

P

P

R

O

X

E

X

I S

T

I

G

A

D

W

A

Y

P

V

E

D

S

L

O

P

E

T

D

A

I N

NEW SLAB 14'-4" x 4'

TO BE INSTALLED

SEE DETAIL 2-2

P

R

I

V

U

L

I

S

T

A

L

L

A

T

I O

N

APPROX. NEW VAULT FOOTPRINT

DOORS TO EAST OR PARALLEL PAVEMENT

INSTALL TO MATCH EXISTING GRADE

SEE DETAIL 1-2

APPROX. FOOTPRINT

OF REMOVED VAULT

MINOR CLEARING OF

SMALL BRUSH WITHIN 4'

OF VAULT - AS NEEDED

NEW SIDEWALK

LENGTH: 2' MIN

TO BE INSTALLED

SEE DETAIL 2-3

M

I N

NOTE: FINAL SIDEWALK LOCATION, ELEVATIONS,

AND ROUTE TO BE COORDINATED AND APPROVED

WITH COR. ENSURE ABA COMPLIANCE.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/1 7/2

1 0 7:

T

LE

MA

HI

EU

C :\U

SE

RS

\T

LE

MA

HI

EU

\B

OX

IN

TE

RN

P

RO

JE

CT

S

- T

YL

ER

\2.

IN

P

RO

GR

ES

S\

0.

VA

UL

T

TO

IL

ET

\S

TR

UC

TU

RE

S

DE

SI

GN

S

DR

AW

IN

GS

\D

W G_

W

OR

KI

NG

\C

_P

IC

NI

CP

OI

NT

_S

IT

E.

DW

G;

R09

EASTERN REGION

PICNIC POINT

CAMPGROUND

VAULT TOILET

REPLACEMENT

CHEQUAMEGON-NICOLET

NATIONAL FOREST

MEDFORD-PARK FALLS RANGER

DISTRICT

PICNIC POINT

CAMPGROUND SITE

PLAN

02/17//2021

T.LEM C-23

02 027

PICNIC POINT

CAMPGROUND

TRAVEL DIRECTIONS FROM WESTBORO, WI:

DRIVE WEST OUT OF WESTBORO ON NORTH STREET / COUNTY HIGHWAY D FOR 6.7 MILES. TURN LEFT

ONTO MONDEAUX DR. (FR 104) FOR 1.1 MILES. CONTINUE STRAIGHT ONTO PARK RD (FR 106) FOR 1.5

MILES. CONTINUE STRAIGHT ONTO CAMPERS RD (FR 106) FOR 1.8 MILES. TURN LEFT INTO THE DRIVE

FOR PICNIC POINT CAMPGROUND.

APPROXIMATE EXISTING CONDITIONS:

REMOVE EXISTING VAULT & CONCRETE SLAB

PROPOSED CONDITIONS:

INSTALL ONE CXT DOUBLE CASCADIAN VAULT TOILET OR EQUIVALENT

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1-1 SITE BACKFILL AND FINAL GRADING REQUIREMENTS

INSTALLED SINGLE VAULT TOILET

M

I N

1' MIN

14'-7"

16'-7" MIN

1' MIN

M

I N

8'-6" MIN

6'-6"

M

I N

M

I N

3" MIN TOPSOIL

GRADE TO DRAIN

AWAY FROM BUILDING

1' MIN AGGREGATE BASE

COMPACTED 6" LIFTS

EXCAVATION BACKFILL

MATERIAL - COMPACTED

UNDISTURBED

MATERIAL

RESEED AND MULCH

DISTURBED SOILS

SAND LEVELING COURSE

PER MANUFACTURER SPEC

1-2 SITE BACKFILL AND FINAL GRADING REQUIREMENTS

INSTALLED DOUBLE VAULT TOILET

3" MIN TOPSOIL

GRADE TO DRAIN

AWAY FROM BUILDING

1' MIN AGGREGATE BASE

COMPACTED 6" LIFTS

EXCAVATION BACKFILL

MATERIAL -COMPACTED

UNDISTURBED

MATERIAL

RESEED AND MULCH

DISTURBED SOILS

1' MIN

M

I N

M

I N

16'-4" MIN

13'-6"

13'-11"

MIN

11'-11"

M

I N

M

I N

1' MIN

SAND LEVELING COURSE

PER MANUFACTURER SPEC

1-3 TYPICAL VAULT ABANDONED IN PLACE

3" MIN TOPSOIL

GRADE TO MATCH EXISTING

EXCAVATION BACKFILL MATERIAL

COMPACTED

UNDISTURBED

MATERIAL

RESEED AND MULCH

DISTURBED SOILS

VAULT WALLS

REMOVED TO 2'

BELOW GRADE MIN

DRILLED OR PUNCHED HOLES

TO DRAIN VAULT IN PLACE

ABANDONED EXISTING VAULT

ABOVE-GROUND STRUCTURE REMOVED

CONTENTS PUMPED AND DISPOSED

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/1 0/2

1 1 5:

T

LE

MA

HI

EU

C :\U

SE

RS

\T

LE

MA

HI

EU

\B

OX

IN

TE

RN

P

RO

JE

CT

S

- T

YL

ER

\2.

IN

P

RO

GR

ES

S\

0.

VA

UL

T

TO

IL

ET

\S

TR

UC

TU

RE

S

DE

SI

GN

S

DR

AW

IN

GS

\D

W G_

W

OR

KI

NG

\C

_V

AU

LT

_D

ET

AI

LS

.D

W G;

R09

EASTERN REGION

PICNIC POINT

CAMPGROUND

VAULT TOILET

REPLACEMENT

CHEQUAMEGON-NICOLET

NATIONAL FOREST

MEDFORD-PARK FALLS RANGER

DISTRICT

VAULT DETAILS

02/10/2021

T.LEM C-25

03 02704

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

2-2 TYPICAL CONCRETE APRON DOUBLE VAULT TOILET

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

14'-4"

X X X X X X X X X X X X X X

X X X X X X X X X X X X X X

X X X X X X X X X X X X X X

SECTION A-A

A

A

X X X

#3 REBAR MID-DEPTH

SLOPE: 0.5% TO 2.0%

SLOPE:

0.5% TO 2.0%

1'-2"

1'-2"

INSTALLED DOUBLE VAULT FOUNDATION FRONT

DOWELED TO SLAB; SEE DETAIL 2-4

INSTALLED

VAULT STRUCTURE

1'-6"

MAX

BAR

SPACE

M

A X

B E

T W

E E

N

M E

M B

E R

S

RESEED AND MULCH

DISTURBED SOILS2" MAX 2" MAX

COMPACTED SUBGRADE

COMPACTED GRAVEL FILL

CENTER SIDEWALK JOINT

WITH SLAB UNLESS

OTHERWISE NOTED

2-1 TYPICAL CONCRETE APRON SINGLE VAULT TOILET

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

X X

X

12'-7"

X X X X X X X X X X X X

X X X X X X X X X X X X

X X X X X X X X X X X X

A

A

SLOPE:

0.5% TO 2.0%

1'-1"

1'-1"

1'-6"

MAX

BAR

SPACE

M

A X

B E

T W

E E

N

M E

M B

E R

S

CENTER SIDEWALK JOINT

WITH SLAB UNLESS

OTHERWISE NOTED

VAULT ACCESS

HATCH AND VENT AREA

5' MAX BETWEEN 1" DEEP

CONTRACTION JOINTS

PLACED SYMMETRICALLY

5' MAX BETWEEN 1" DEEP

CONTRACTION JOINTS

PLACED SYMMETRICALLY

#3 REBAR

#3 REBAR

INSTALLED SINGLE VAULT FOUNDATION FRONT

DOWELED TO SLAB; SEE DETAIL 2-4

2' MAX

BETWEEN

DOWEL

BARS

2' MAX

BETWEEN

DOWEL

BARS

NOTE: SHALL BE

ABA COMPLIANT

NOTE: SHALL BE

ABA COMPLIANT

PROVIDE

BROOM FINISH

PROVIDE

BROOM FINISH

X X X X

X X

X X

X X

X X

X X

X X

X X

X X

SLOPE: 0.5% MIN - 2.0% MAX

COMPACTED SUBGRADE

COMPACTED GRAVEL FILL

#3 REBAR MID-DEPTH

2" MAX

2" MAX

5' MAX BETWEEN 1" DEEP

CONTRACTION JOINTS

25' MAX BETWEEN 3/8"

EXPANSION JOINTS

1'-6" MAX

BETWEEN

MEMBERS

1'-6" MAX

EXPANSION

JOINT TO

MEMBERS

B

B

SECTION B-B

2-3 TYPICAL CONCRETE SIDEWALK CONSTRUCTION

#3 REBAR

RESEED AND MULCH

DISTURBED SOILS

RUNNING SLOPE NOT TO EXCEED 1:20

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X

X X

X X

2" MAX

INSTALLED SINGLE VAULT FOUNDATION FRONT

NOTE: SHALL BE

ABA COMPLIANT

NOTE: SHALL BE

3/8" EXPANSION JOINT

AT ALL JOINTS WITH

EXISTING PAVEMENT

AND BOUNDING ALL

SIDEWALK CURVES.

PROVIDE

BROOM FINISH

X X

X X X

1' MIN

VAULT STRUCTURE

FOUNDATION

2-4 TYPICAL DOWEL TO VAULT STRUCTURE

MAIN SLAB #3 REBAR

6"

X X

DOWEL CONNECTIONS

#5 REBAR 12" MIN; MID-DEPTH OF SLAB SET LEVEL

24" MAX SPACING BETWEEN BARS

MAIN SLAB

DOWEL INTERIOR COATED

WITH ANCHORING EPOXY

EXPANSION JOINT MATERIAL

BETWEEN STRUCTURE AND SLAB

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/3 0/2

1 0 7:

T

LE

MA

HI

EU

C :\U

SE

RS

\T

LE

MA

HI

EU

\B

OX

IN

TE

RN

P

RO

JE

CT

S

- T

YL

ER

\2.

IN

P

RO

GR

ES

S\

0.

VA

UL

T

TO

IL

ET

\S

TR

UC

TU

RE

S

DE

SI

GN

S

DR

AW

IN

GS

\D

W G_

W

OR

KI

NG

\C

_C

ON

CR

ET

E_

DE

TA

IL

S.

DW

G;

R09

EASTERN REGION

PICNIC POINT

CAMPGROUND

VAULT TOILET

REPLACEMENT

CHEQUAMEGON-NICOLET

NATIONAL FOREST

MEDFORD-PARK FALLS RANGER

DISTRICT

CONCRETE DETAILS

02/10/2021

T.LEM C-26

04 02704

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Binder1.pdf
Compiled_3-08-21_Vaults_11x17
C00_COVERSHEET
Sheets and Views
C00_COVERSHEET-PLOT
Compiled_3-08-21_Vaults_11x17
C01_FranklinLkBL
Sheets and Views
C01_FranklinLkBL-PLOT
OLE1
C02_FranklinLkNT
Sheets and Views
C02_FranklinLkNT-PLOT
OLE1
C03_KentuckLkBL
Sheets and Views
C03_KentuckLkBL-PLOT
OLE1
C04_KentuckLkCG5
Sheets and Views
C04_KentuckLkCG5-PLOT
OLE1
C05_KentuckLkCG19
Sheets and Views
C05_KentuckLkCG19-PLOT
OLE1
C06_KentuckLkCG23
Sheets and Views
C06_KentuckLkCG23-PLOT
OLE1
C07_BearPawLk
Sheets and Views
C07_BearPawLk-PLOT
OLE1
C08_BootLkDU
Sheets and Views
C08_BootLkDU-PLOT
OLE1
C09_BootLk4
Sheets and Views
C09_BootLk4-PLOT
OLE1
C10_BootLk15
Sheets and Views
C10_BootLk15-PLOT
OLE1
C11_BootLk29
Sheets and Views
C11_BootLk29-PLOT
OLE1
C12_FannyLkTH
Sheets and Views
C12_FannyLkTH-PLOT
OLE1
C13_LauraLk1
Sheets and Views
C13_LauraLk1-PLOT
OLE1
C14_LauraLk14
Sheets and Views
C14_LauraLk14-PLOT
OLE1
C15_LauraLk21
Sheets and Views
C15_LauraLk21-PLOT
OLE1
C16_LauraLk41
Sheets and Views
C16_LauraLk41-PLOT
OLE1
C17_GordonLkBeach
Sheets and Views
C17_GordonLkBeach-PLOT
OLE1
C18_PineLkBL
Sheets and Views
C18_PineLkBL-PLOT
OLE1
C19_PineLkCG
Sheets and Views
C19_PineLkCG-PLOT
OLE1
C20_RICHARDSONLAKE7_SITE
Sheets and Views
C20_RICHARDSONLAKE7_SITE-PLOT
OLE1
C21_RICHARDSONLAKE17_SITE
Sheets and Views
C21_RICHARDSONLAKE17_SITE-PLOT
OLE1
C22_RICHARDSONLAKE26_SITE
Sheets and Views
C22_RICHARDSONLAKE26_SITE-PLOT
OLE1
C23_PICNICPOINT_SITE
Sheets and Views
C23_PICNICPOINT_SITE-PLOT
OLE1
C24_LAKEOWEN_SITE
Sheets and Views
PLOT
OLE1
C25_VAULT_DETAILS
Sheets and Views
C25_VAULT_DETAILS-PLOT
OLE1
C26_CONCRETE_DETAILS_Revised.pdf
Sheets and Views
PLOT
OLE1
Signature8:
2022-07-14T12:01:06-0500
JUSTIN BLAKE
2022-07-21T13:47:12-0500
DANIEL EKLUND

File details come from the government source that posted it. Updated .