Picnic Point Campground_Special Provisions_220222.docx

DOCX document 27 KB Posted

Attached to
Recreation Site Improvements, Chequamegon/Nicollet NF
Solicitation number
12445523R0006
Issued by

About this file

This document contains special provisions and specifications for recreation site improvements on national forests in Wisconsin. The scope of work includes trail realignments, site amenities like kiosks and fire pits, road and parking area surfacing, culvert and fencing installation, electrical and wastewater system upgrades, and erosion control. Services will be provided at recreation sites on the Chequamegon-Nicollet National Forest, specifically the Valhalla, Wanoka, Picnic Point, and Luna-White Deer recreation areas and campgrounds. Optional work includes overflow parking, toilet replacements, and boat ramp reconstruction. The solicitation is a total small business set-aside with an estimated value between $1-2 million. The solicitation was issued by the US Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
12445523R0006 Amendment 5.pdf PDF
Revised Picnic Point Vault Toilet Specifications.docx DOCX document
12445523R0006 Amendment 4.pdf PDF
12445523R0006 Amendment 0003.pdf PDF
12445523R0006 Amendment 0002.pdf PDF
LunaWhite Deer CampgroundPSE Plan220222.pdf PDF
12445523R0006 Amendment 0001.pdf PDF
Wanoka Campground Improvements Specifications.docx DOCX document
Wanoka Campground Host Site Improvements.pdf PDF
Wanoka Campground_Supplemental Specifications_220222.docx DOCX document
Valhalla Recreation AreaPSE Plan220222.pdf PDF
Picnic PointGPNO202261T00194T00196.pdf PDF
Wanoka Campground_Special Provisions_220222.docx DOCX document
12445523R0006 RFP.docx DOCX document
wi10 Wage Rates.txt TXT text file
Wanoka Campground_PSE Plan_220222.pdf PDF
Picnic Point CampgroundPSE Plan220404.pdf PDF
ScheduleOfItems_Combined.pdf PDF
Picnic Point Vault Toilet Specifications.docx DOCX document
Self Cert GP- Luna-Whitedeer camp drive.pdf PDF
Valhalla Rec Area_Supplemental Specifications_220222.docx DOCX document
Picnic Point Vault Toilet Plans.pdf PDF
12445523R0006 SF 1442.pdf PDF
Valhalla Rec Area_Special Provisions_220712.docx DOCX document
Picnic Point Campground_Supplemental Specifications_220222.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Provisions

Section 633 – Permanent Traffic Control

Add the following paragraph to Subsection 633.05:

633.05 Sign Panels.

Sign panels shall be provided by one of the following pre-approved Forest Service vendors:

Company Location
Comments

P&M Signs, Inc http://www.pmsignsinc.com 200 E. Broadway, Mountainair, NM 87036 505-847-2850 Fax 844-278-5445 Road signs (Al & plywood), Routed signs (oak, cedar & MDO plywood) and recycled plastic, Pink Rollup and hard side

Wood Products Signs http://www.woodproductsigns.com 4890 County Road 76, Parlin, CO 81239 970-641-1675 Fax 970-641-8107 Road signs (Al & plywood), Routed signs (oak, cedar & MDO plywood) and recycled plastic

Rockart, Inc. Signs & Markers http://www.rockartsigns.com 3006 N Maple St, Mesa, AZ 85215 480-854-3400 Fax 480-832-6390 Flexible markers, decals, recreation symbols, snow poles

Stonehouse Signs, Inc http://www.stonehousesigns.com 521 N. Great Southwest Pkwy. Arlington, TX 76011 1-817-640-0992 Fax 1-817-633-3131 Industrial Safety, Traffic/Parking and Facility Signs

DICKE Safety Products http://www.dicketool.com 1845 Anunsen Street NE, Salem, Oregon 97303 1-800-333-5641 Fax 503-364-0340 All signs, vests, flagging sets Pink Rollup vinyl signs w/portable stands

Zumar http://www.zumartraffic.com/ 7833 N. 106th Avenue, Glendale, AZ 85307 623 -931-7446 Fax 623-877-7446 Traffic signs, sign hardware, letters & numbers, recreation symbols

Safe-T-Lite https://www.facebook.com/safetlite 1051 N Emerald Ave, Modesto, Cal 95351 209-522-8913 Fax 209-522-6935 All signs

Carsonite Composites, LLC http://www.carsonite.com 19845 U.S. Highway 76 Newberry, South Carolina 29108 803-321-1185 Fax 803-276-8940 Flexible fiberglass sign, direct print, and decals, reflective sheeting, sign installation tools

Newman Traffic Signs https://www.newmansigns.com/ 1606 6th Ave SW, Jamestown, ND 58401 1-800-337-9770 Fax 701-952-2405 Metal traffic signs, U channel posts, construction signs

67001 – Boat Launch

Description

670.01 This work consists of furnishing and installing a boat launch, all associated approach roadway, landscaping, and permits to complete the item.

General

670.02 Construction Over or Adjacent to Navigable Waters.

Within 670.02, the term “governmental authority” means the U.S. Army Corps of Engineers, the U.S. Coast Guard, the WDNR, or other agency having jurisdiction over the navigable waters within the project limits and empowered to take the actions.

Conduct all work over, on, or adjacent to navigable waters so that free navigation of the waterways is not impeded and existing navigable depths are not impaired except as allowed by permit issued by the governmental authority. Obtain all permits before beginning construction.

Obtain all permits required. Obtain all permits and licenses, pay all charges and fees, and give all notices necessary to perform the work. The contractor shall comply with all permit requirements whether the permit is issued to the contractor, the state, or the maintaining authority.

Submit applications for U.S. Coast Guard and WDNR permits to the boating law administrator of the WDNR bureau of law enforcement. Provide one copy of each permit to the CO and post a copy at the project site before construction activities affecting navigation begin.

The governmental authority may supervise all construction and related operations as is customary for operations in navigable waters. Conform to special requirements or directions from the governmental authority.

Ascertain from the governmental authority the minimum horizontal and vertical clearance requirements for navigation during construction, and maintain those clearances during the period of construction.

If the governmental authority during progress of the work issues directions or orders affecting the contractor’s operations or order of procedure, the contractor shall promptly file with the CO a written copy of the directions or orders.

Should the contractor during the progress of the work lose, dump, throw overboard, sink, or misplace material or equipment, which in the opinion of the governmental authority may interfere with or obstruct navigation, the contractor shall promptly recover or remove the same. Give immediate notice with descriptions and locations of possible obstructions to the governmental authority. If the governmental authority requires, mark or buoy the obstructions until their removal. Should the contractor refuse, neglect, or delay compliance with the above requirements, the governmental authority may remove the obstructions. The CO may deduct the cost of this removal from payments due to the contractor, or may recover the cost under the bond deposited by the contractor.

During construction, provide temporary lights, waterway markers, other devices, or combination thereof as the governmental authority specifies and requires.

All expenses the contractor incurs to maintain navigation are incidental to the contract cost.

Material

670.03 Conform to the following Sections:

Asphalt Material702
Base, surface course aggregate, chip seal aggregate703
Soil704
Rock705
Roadside Improvement Material713
Geosynthetic Material714

670.04 Floating Turbidity Barrier.

(a) General. Furnish barrier made of coated impervious fabric capable of containing sediment at the location placed. It must have a cable, with a 5/16 inch or larger diameter, capable of supporting the barrier at the required height above the water. It must have a self-contained ballast that weighs at least 0.7 pound per foot. The ballast may be either chain or flexible cable. Barrier ends must have grommets to lace together adjoining sections. For anchor posts use one of the following: steel fence posts, steel pipes, or steel channels.

(b) Submittals. Submit a certificate of compliance certifying that the turbidity barrier fabric conforms to the following:

TEST REQUIREMENTMETHODVALUE[1]
Minimum grab tensile strengthASTM D4632200 lb
Minimum puncture strengthASTM D483390 lb
Maximum permeabilityASTM D44911x10-7 cm/s
Minimum ultraviolet stabilityASTM D435570%

(strength retained at 500 hrs of exposure) [1] Numerical values represent minimum or or maximum average roll values. Average test results from all rolls in a lot must conform the tabulated values.

Construction Requirements

670.05 Conform to the following Sections:

Mobilization151
Construction survey and staking152
Contractor quality control153
Contractor sampling and testing154
Soil erosion and sediment control157
Preparation for Roadway Excavation204
Roadway excavation204
Subexcavation204
Conserved Topsoil204
Waste204
Compaction204, 208, 301, 302
Geotextile Separation Applications207
Subbase, base, and surface course aggregate301
Crushed aggregate302
Asphalt concrete pavement and tack coat403, 412
Conserved topsoil624
Turf establishment635

670.06 Floating Turbidity Barrier.

Install turbidity barriers at locations the plans show or as the CO directs.

Place barriers, before beginning adjacent construction, in a way that causes minimum disturbance of the streambed and banks. Extend the barrier into the stream banks far enough to preclude washing out or erosion around the ends. Drive posts securely into the streambed at 10-foot intervals along the line of the barrier installation. Fasten the barrier to the posts and securely anchor the barrier load lines at the barrier ends and at 10-foot intervals between the barrier ends, unless the CO directs otherwise. Provide additional anchoring if necessary to maintain the barrier location during construction operations. Install sand bags as the plans show to anchor the barrier to the streambed. The CO may require additional sand bags to ensure adequate performance. Provide and anchor both danger buoys and navigational markers as required by permit under 670.02.

Maintain the integrity of the barrier as necessary to contain erosion from adjacent construction operations. Promptly correct deficiencies. Barrier maintenance includes removing and disposing of accumulations of soil and other detrimental material.

Remove the barrier after completing the adjacent work. Delay removal until removing and disposing of accumulated soils and other suspended materials, and all suspended materials settle. Minimize disturbing the streambed and banks during removal operations.

If the CO approves, the contractor may substitute sheet pile installed as a part of their construction operation for all or part of the turbidity barrier the plans show.

Measurement

Measure Boat Launch pay item by the lump sum.

Payment

The accepted quantity will be paid at the contract price per unit of measurement for Boat Launch. Payment will be full compensation for the work prescribed in this Section.

Special Provisions Page 3