Wanoka Campground Host Site Improvements.pdf
PDF 3 MB Posted
- Solicitation number
- 12445523R0006
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for recreation site improvements across multiple campgrounds and recreation areas within the Chequamegon-Nicollet National Forest. Work includes trail realignment and site upgrades at Valhalla Recreation Area, road reconditioning and repaving at Wanoka Campground and Picnic Point Campground, installation of electrical service and a wastewater holding tank at a host site in Wanoka Campground, replacement of a vault toilet at Picnic Point Campground, and road reconditioning and repaving at Luna-White Deer Campground. Optional work includes relocating a vault toilet, constructing an overflow parking area, and reconstructing a boat ramp. The estimated value of the project is between $1 million and $2 million. It is a total small business set-aside under NAICS code 237310 with a size standard of $40.5 million. The soliciting agency is the Department of Agriculture Forest Service.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Map data ©2018 Google 2000 ft
Wanoka Lake Campground
PROJECT SITE
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A
WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4.
THE ELECTRICAL SERVICE SHALL BE PROVIDED BY PROPOSED SOLAR ARRAY
INSTALLATION.
THE WASTEWATER HOLDING TANK WILL BE A NOMINAL 1500 GALLON CONCRETE TANK
WITH TWO POLYPROPYLENE ACCESS RISERS. THE HOLDING TANK WILL BE PROVIDED
WITH A RED LED HIGH WATER ALARM LIGHT. THE ALARM SHALL BE ENERGIZED WITH
POWER FROM THE PROPOSED HOST ELECTRICAL PEDESTAL. AN ADA ACCESSIBLE SEWER
DROP WITH FOUR INCH THREADED PVC CAP INLET IS ALSO PART OF THIS PROJECT.
THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, AND EQUIPMENT NECESSARY FOR
THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH LOCAL, STATE AND
NATIONAL CODES AND COMPLETE THE PROJECT IN AN ACCEPTABLE MANNER, READY
FOR USE, OCCUPANCY OR OPERATION BY THE OWNER.
THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS WITH THE DRAWING
DIMENSIONS. IF A CONFLICT IS FOUND OR IF FIELD CHANGES ARE MADE THAT DEVIATE
FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE IMMEDIATELY, PRIOR TO CONSTRUCTION OR THE ORDERING OF ANY
MATERIALS.
ALL LOCATIONS TO BE REVIEWED/APPROVED BY CONTRACTING OFFICER'S
REPRESENTATIVE.
T-01 COVER SHEET 03/22/2019
E-01 HOST SITE SOLAR ELECTRICAL SERVICE PLAN 03/22/2019
E-02 SOLAR ENCLOSURE 03/22/2019
P-01 HOST SITE HOLDING TANK 03/22/2019
FOREST ENGINEER DATE
DISTRICT RANGER DATE
TRAVEL DIRECTIONS:
FROM THE WASHBURN RANGER STATION, HEAD SOUTH ON HWY 13 FOR 7.6 MILES. HEAD WEST ONTO US-2 FOR
16.2 MILES. HEAD SOUTH ONTO FR234 FOR 1 MILE AND WANOKA CAMPGROUND WILL BE ON THE RIGHT.
LAT: 46.54317
LONG: -91.283531
WANOKA LAKE
CAMPGROUND
IMPROVEMENTS
WASHBURN
RANGER DISTRICT
DATENO.
REVISION / ISSUE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
(R9)
EASTERN REGION
CHEQUAMEGON-NICOLET
NATIONAL FOREST
03/22/2019
CJM/JS
JS
CJM
190322
United States Department of Agriculture Forest Service
190322
D or al an d S tre et
U ni ve rs ity A ve nu e, S ui te
K in gs fo rd
, M ic hi ga n
W ill is to n, N or th
D ak ot a
P ho ne
6)
-5
P ho ne
1)
-5
Fa x:
(9
) 7
-5
E m ai l:
m tn en gi ne er in g@ m tn en g.
ne t
M O
U N
TA
IN
E N
G
IN
EE
R
IN
G
, I N
C
DRAWING TITLE
TH
E
O W
N E
R A
G R
E E
S T
O
IN
D E
M N
IF
Y
A N
D H
O
LD
M O
U N
TA
IN
E N
G
IN
E E
R
IN
G , I
N C
. H A
R M
LE
S
S F
R O
M A
N Y
D A
M A
G E
, L
IA
B
IL
IT
Y
O R
C O
S T, IN
C
LU
D
IN
G
A
TT
O R
N E
Y 'S
F E
E S
A N
D C
O S
T O
F D
E
FE
N S
E A
R
IS
IN
G
F R
O M
A N
Y C
H A
N G
E S
O R
A
LT
E R
A
TI
O N
S M
A D
E B
Y A
N Y
O N
E O
TH
E
R T
H A
N M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
O R
F R
O M
A N
Y R
E U
S E
O F
TH
E
D R
A W
IN
G
S A
N D
D A
TA
W
IT
H
O U
T
TH
E P
R
IO
R W
R
IT
TE
N
C O
N S
E N
T O
F M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
ELECTRICAL PEDESTAL DETAIL3
PROVIDE 15 AMP BREAKER
FOR ALARM LIGHT
SITE PLAN
Scale: 1" = 200'-0"1
SITE 4
HOST SITE
FOREST ROAD 234
PROPOSED SOLAR
POWER ARRAY. SEE
DETAIL 2.
CONCRETE DIAMETER
MOUNTING POST SHALL BE
12" SCHEDULE 40, ASTM 53
STEEL POST. POST SHALL
BE HOT-DIPPED
GALVANIZED. DIRECT SET
POST IN CONCRETE.
9'-0" BY 9'-0" CONCRETE
FOOTING, 5'-0" DEEP.
PANEL ARRAY TO BE
ATTACHED TO MOUNTING
POST PER MANUFACTURERS
SPECIFICATIONS.
SOLAR MOUNTING POST DETAIL
Scale: 1/2" = 1'-0"4
SOLAR
BATTERY
ENCLOSURE.
SEE SHEET
E-02
4' -9
P
O
LE
D E
P
TH
'-0
P
O
LE
H E
IG
H
T
MOUNT PANELS TO FACE SOLAR
SOUTH, AWAY FROM GROUND,
AND ANGLED 70 DEGREES FROM
FACE OF POLE.
70°
MOUNT PANELS IN
LANDSCAPE
ORIENTATION. 4
PANELS HIGH AND 2
PANELS WIDE.
MAINTAIN 3" CLEARENCE
(8) SUNMOBILE PLUS SWA 300 MONO SOLAR PANELS
(8) CROWN CR-430 GROUP 903 6-VOLT
430AHr BATTERIES ARRAYED IN SERIES FOR 48Vdc/430AHr CAPACITY. MOUNT
BATTERIES ON NON-CONDUCTING,
CORROSION RESISTANT RACK IN
STACKS OF 2 WITH 8" CLARENCE.
OUTBACK POWER VENTED
VFXR2812A 2800W 12VDC HYBRID
SERIES SINE WAVE INVERTER.
FIELD FIT.
OUTBACK MATE3S SYSTEM DISPLAY AND FLEX MAX 80
CHARGE CONTROLLER. FIELD FIT.
50 AMP PV OVERLOAD BREAKER. FIELD FIT.
CENTRAL WIRING TERMINAL. FIELD FIT.
SOLAR ARRAY ELECTRICAL SCHEMATIC DETAIL
N.T.S.5
SOLAR ENCLOSURE ELECTRIC SERVICE
MANUAL
DISCONNECT
SWITCH. 4 TYP.
NOTE: SOLAR ARRAY
DESIGNED TO
SUPPLY 10KWH AT
50% BATTERY DRAW
SITE 4
HOST SITE
HOST SITE UTILITY LAYOUT PLAN
Scale: 1" = 20'-0"2
PROPOSED NOMINAL 1500 GALLON
HOLDING TANK.
HOLDING TANK TO BE LOCATED IN
EAST OF SITE MIN. 3' FROM EDGE
OF SITE. FIELD FIT TO MINIMIZE
DISTURBED AREA.
PROPOSED ELECTRICAL PEDESTAL.
PEDESTAL TO BE LOCATED 20' FROM
SITE DRIVE-IN. CONTRACTOR TO
ENSURE NO CONFLICTS WITH
PROPOSED SEWER LINE
PROPOSED 4" SCHEDULE 40
PVC SEWER LINE
SEWER DROP. SEE SHEET P-01, DETAIL 3
ALARM LIGHT.
PROPOSED SOLAR ARRAY INSTALLATION
OPTION #1
INSTALLATION TO BE LOCATED AT EAST SIDE OF "T" INTERSECTION
APPROXIMATELY 130' FROM PROPOSED ELECTRICAL PEDESTAL. CONTRACTOR
TO VERIFY BEST OPTION FOR INSTALLATION LOCATION WITH RANGER AND
ARRAY MANUFACTURER. FIELD FIT TO ENSURE INSTALLATION HAS CLEAR VIEW
OF SKY AND TO MINIMIZE DISTURBED AREA AND TREE REMOVAL
FIELDFIT
PROPOSED ELECTRICAL LINE.
PROPOSED LINE TO RUN SOUTH PARALLEL TO SITE TO
MAIN ROAD, THEN FOLLOW ROAD WEST TO PROPOSED
SOLAR ARRAY INSTILLATION. SIZE ELECTRICAL LINE PER
CODE AND FINAL LENGTH OF RUN.
20'-0
10'-0 " 11'-0
FIELD
FIT
5'-0"
PROPOSED SOLAR ARRAY INSTALLATION
OPTION #2
INSTALLATION TO BE LOCATED AT WEST SIDE OF
"T" INTERSECTION APPROXIMATELY 160' FROM
PROPOSED ELECTRICAL PEDESTAL.
CONTRACTOR TO VERIFY BEST OPTION FOR
INSTALLATION LOCATION WITH RANGER AND
ARRAY MANUFACTURER. FIELD FIT TO ENSURE
INSTALLATION HAS CLEAR VIEW OF SKY AND TO
MINIMIZE DISTURBED AREA AND TREE REMOVAL
NEW ELECTRIC LINE TO ALARM LIGHT. LINE TO
BE 12-2 DIRECT BURIAL CABLE WITH GROUND
@ 24" BELOW GRADE. CONNECT LINE AT NEW
BREAKER AND CIRCUIT AT EXISTING
ELECTRICAL PEDESTAL.
PATCH PAVEMENT WHERE
PROPOSED ELECTRIC LINE
RUNS ACROSS EXISTING
PAVED ROAD
ELECTRICAL DESIGN NOTES
1. THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS EQUIPMENT AND
TRANSPORTATION NECESSARY FOR THE PROPER
EXECUTION OF THE WORK IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS AND ALL INCIDENTAL
WORK NECESSARY TO COMPLETE THE PROJECT IN
AN ACCEPTABLE MANNER, READY FOR USE,
OCCUPANCY OR OPERATION BY THE OWNER.
2. ALL ELECTRICAL WORK SHALL BE IN
COMPLIANCE WITH ALL NATIONAL, STATE AND
LOCAL CODES, ORDINANCES. ANY MODIFICATIONS
AND/OR ADDITIONS TO THESE PLANS REQUIRED
FOR PROPER COMPLIANCE TO ANY APPLICABLE
CODES SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. THE ELECTRICAL CONTRACTOR SHALL
COORDINATE UTILITY RUNS WITH OTHER TRADES.
4. FURNISH AND INSTALL WIRING, DEVICES,
PANELS, AND BREAKERS AS REQUIRED. WHERE
AN ELECTRICAL DEVICE AND/OR DISCONNECT IS
REQUIRED BY CODE BUT NOT SHOWN, IT SHALL BE
FURNISHED AND INSTALLED BY THE ELECTRICIAN.
5. THE ELECTRICAL CONTRACTOR SHALL INSTALL
CIRCUIT DIRECTORY WITH TYPED CIRCUIT
DESIGNATION CARD ON THE INSIDE OF EACH
PANEL BOARD DOOR.
6. ELECTRICAL WORK SHALL BE DONE BY A
LICENSED ELECTRICIAN WITH AN ELECTRICAL
PERMIT AND INSPECTION.
HOST SITE
SOLAR ELECTRICAL
SERVICE PLAN
E-01 002 004
SOLAR ENCLOSURE ROOF FRAMING
Scale: 1/2" = 1'-0"10
SOLAR ENCLOSURE FRONT/DOOR FRAMING
Scale: 1/2" = 1'-0"12
SOLAR ENCLOSURE FRAMING
Scale: 1/2" = 1'-0"11
9" CONCRETE SLAB
4'-0"
4'-0"
4' -3
/4
2' -8
4' -0
SOLAR ENCLOSURE SIDE FRAMING
Scale: 1/2" = 1'-0"13
BOERBOEL GATE
SOLUTIONS 24" HEAVY
DUTY DROP ROD.
FASTEN SECURELY TO
DOOR.
TREATED 2x4 SPF
FRAMING MEMBER.
TREATED 2x2 SPF FRAMING
MEMBER @ 16" O.C.
HEAVY DUTY
COMERCIAL 3 1/2" ZINC
PLATED DOOR HINGE.
ATTACH SECURELY TO
DOOR AND ENCLOSURE
WALL SUCH THAT SIDING
DOES NOT IMPEDE
DOOR SWING.
LOCKABLE DOOR/
ROOF LATCH
TREATED 2x4
SPF STUD @
24" O.C.
TREATED 2x6 SPF CENTERED OVER BOTTOM FRAME 2x4s
TREATED 2x4 SPF BOTTOM FRAME.
TREATED 2x4 SPF STUDS @ 24" O.C.
HEAVY DUTY COMMERCIAL 6" ZINC
PLATED STRAP HINGE. FASTEN
SECURELY TO BOTTOM FRAME OF ROOF
AND TOP PLATE OF ENCLOSURE WALL
TREATED 2x4 SPF BOTTOM PLATE TREATED 2x4 SPF STUD FRAMING. SEE DETAIL 5.
TREATED DOUBLE 2x4 SPF TOP PLATE TREATED 2x4 SPF STUDS @ 2'-0" O.C.
HEAVY DUTY COMMERCIAL 6" ZINC PLATED STRAP HINGE
1 LAYER 6" CMU BLOCK
1 LAYER 6"
CMU BLOCK
DOUPER 200N/44LB HEAVY DUTY GAS SPRING LID
SUPPORT HINGE. BOTH SIDES. FIELD FIT.
TREATED 2x4 BLOCKING FOR HEAVY DUTY GAS
SPRING LID SUPPORT HINGE. ATTACH
SECURELY TO FRAME. SEE DETAIL 8.
TREATED 2x4 SPF BOTTOM FRAME. LAID FLAT.
1/2" DIA. ANCHOR BOLTS. MIN. 4 PER
SIDE. BOLT SHALL EXTEND THROUGH
THE CMU BLOCKS INTO THE SLAB.
9" THICK CONCRETE SLAB
#4 REBAR. 12 x 12 L. MAINTAIN 3"
COVER. MIN 4 PER SIDE.
7"
4' -0
/8
NOTE: ALL FASTENERS TO BE
GALVANIZED
NOTE: ALL FASTENERS TO BE GALVANIZED
NOTE: ALL
FASTENERS TO BE
GALVANIZED
NOTE: ALL FASTENERS
TO BE GALVANIZED
ROOF
REQUIRES
APPROX. 20
POUNDS OF
FORCE TO
LIFT
1/2" TREATED PLYWOOD AND METAL ROOFING. 1 1/2" MAX.
OVERHANG. USE HEX HEAD SCREWS TO SECURE METAL
ROOFING.TREATED 2x6 SPF ROOF FRAME. CENTERED ON BOTTOM FRAME 2x4s. SEE DETAIL 5.
SOLAR ENCLOSURE PLAN DETAIL
Scale: 1/2" = 1'-0"1
4'-0"
3' -1
1/
8"
NOTE: ALL WIRING TO BE 1" PVC
CONDUIT.
DESIGN BASED OFF NOMINAL SIZES
OF PROPOSED EQUIPMENT. FIELD
VERIFY EQUIPMENT SIZES .
(8) CROWN CR-430 GROUP 903 6-VOLT 430AHr BATTERIES ARRAYED IN SERIES FOR 48Vdc/430AHr CAPACITY. MOUNT
BATTERIES ON NON-CONDUCTING, CORROSION RESISTANT
RACK IN STACKS OF 2 WITH 8" CLEARANCE. SEE DETAIL 2.
SOLAR ENCLOSURE WALL.
2x4 SPF STUDS @ 24" O.C.
TREATED 2x4 SPF BOTTOM PLATE.
1/2" TREATED OSB SHEATHING.
HARDIEPLANK LAP SIDING.
9" CONCRETE SLAB.
SLOPE 1/4" PER FOOT
(MIN 2% SLOPE) AWAY
FROM ENCLOSURE.
8" TALL, 16" WIDE
WALL VENT.
FIELD FIT.
ELECTRICAL SERVICE FLOOR PENETRATION.
RUN ELECTRICAL LINE FROM SOLAR PANELS
AND ELECTRICAL SERVICE LINE TO HOST
SITE UNDER SLAB THROUGH 4" FLOOR
PENETRATION. PENETRATION TO BE 4" PVC
SLEEVE INSTALLED IN SLAB. FIELD FIT AND
VERIFY PENETRATION LOCATION WITH
CONTRACTING OFFICER'S REPRESENTATIVE.
BI-PARTING DOORS WITH
HEAVY DUTY DOOR SWEEP
BOERBOEL GATE SOLUTIONS 24"
HEAVY DUTY DROP ROD MODEL
NO. 73014305 OR EQUAL. FASTEN
SECURELY TO DOOR.
WELL ENCLOSURE PROFILE DETAIL
Scale: 1/2" = 1'-0"2
4' -0
2' -8
OUTBACK POWER VENTED
VFXR2812A 2800W 12VDC HYBRID
SERIES SINE WAVE INVERTER.
FIELD FIT.
OUTBACK MATE3S SYSTEM DISPLAY AND FLEX
MAX 80 CHARGE CONTROLLER. FIELD FIT.
50 AMP PV OVERLOAD BREAKER.
FIELD FIT.
CENTRAL WIRING TERMINAL.
FIELD FIT. 2"
8"
9" CONCRETE SLAB. SLOPE 1/4" PER
FOOT AWAY FROM ENCLOSURE.
ELECTRICAL SERVICE FLOOR PENETRATION.
RUN ELECTRICAL LINE FROM SOLAR PANELS
AND ELECTRICAL SERVICE LINE TO HOST SITE
UNDER SLAB THROUGH 4" FLOOR PENETRATION.
PENETRATION TO BE 4" PVC SLEEVE INSTALLED
IN SLAB. FIELD FIT AND VERIFY PENETRATION
LOCATION WITH LOCAL RANGER.
(8) CROWN CR-430 GROUP 903 6-VOLT
430AHr BATTERIES ARRAYED IN SERIES FOR 48Vdc/430AHr CAPACITY. MOUNT
BATTERIES ON NON-CONDUCTING,
CORROSION RESISTANT RACK IN
STACKS OF 2 WITH 8" CLARENCE.
NOTE: PROVIDE BLOCKING
WHERE REQUIRED TO MOUNT
ELECTRICAL EQUIPMENT.
ENCLOSURE SLAB REBAR DETAIL
Scale: 1/2" = 1'-0"3
#4 REBAR @ 24" O.C.
EACH WAY. MAINTAIN 3"
COVER.
#4 PERIMETER REBAR.
MAINTAIN 3" COVER.
#4 REBAR. 12 x 12 L.
MAINTAIN 3" COVER.
1 LAYER 6" CMU
BROOM FINISH
CONCRETE SLAB
BIRCH GROVE
CAMPGROUND
IMPROVEMENTS
WASHBURN
RANGER DISTRICT
DATENO.
REVISION / ISSUE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
(R9)
EASTERN REGION
CHEQUAMEGON-NICOLET
NATIONAL FOREST
03/22/2019
CJM/JS
Forest Service
190322
D or al an d S
U ni ve rs ity A ve nu e, S ui te gs fo rd
, M ic hi ga n is to n, N or th
D ak ot a
P ho ne
6)
-5 ne
1)
-5
Fa x:
(9
) 7
-5 ai l:
m tn en gi ne er in g@ m tn en g.
ne t
M O
U N
TA
IN
E N
G
IN
EE
R
IN
G
, I N
C
DRAWING TITLE
TH
E
O W
N E
R A
G R
E E
S T
O
IN
D E
M N
IF
Y
A N
D H
O
LD
M O
U N
TA
IN
E N
G
IN
E E
R
IN
G , I
N C
. H A
R M
LE
S
S F
R O
M A
N Y
D A
M A
G E
, L
IA
B
IL
IT
Y
O R
C O
S T, IN
C
LU
D
IN
G
A
TT
O R
N E
Y 'S
F E
E S
A N
D C
O S
T O
F D
E
FE
N S
E A
R
IS
IN
G
F R
O M
A N
Y C
H A
N G
E S
O R
A
LT
E R
A
TI
O N
S M
A D
E B
Y A
N Y
O N
E O
TH
E
R T
H A
N M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
O R
F R
O M
A N
Y R
E U
S E
O F
TH
E
D R
A W
IN
G
S A
N D
D A
TA
W
IT
H
O U
T
TH
E P
R
IO
R W
R
IT
TE
N
C O
N S
E N
T O
F M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
CMU SLAB DETAIL
Scale: 1/2" = 1'-0"4
#4 REBAR. 12 x 12 L.
MAINTAIN 3" COVER.
1 LAYER 6" CMU
SLAB OPTION #2 - MONO-POUR SLAB DETAIL
Scale: 1/2" = 1'-0"5
8" THICK CONCRETE CURB. 5" WIDE.
1/2" DIA. ANCHOR BOLTS. MIN. 4 PER
SIDE. BOLT SHALL EXTEND THROUGH
THE CONCRETE CURB INTO THE SLAB.
9" THICK CONCRETE SLAB
#4 REBAR. 12 x 12 L. MAINTAIN 3"
COVER. MIN 4 PER SIDE.
#4 REBAR @ 24" O.C. BOTH
WAYS. MAINTAIN 3" COVER.
4'-0"
8"7"
SLAB OPTION #2 - MONO-POUR SLAB
Scale: 1/2" = 1'-0"6
9" THICK CONCRETE SLAB
8" THICK CONCRETE
CURB. 5" HIGH.
#4 REBAR. CENTER IN CURB.
MAINTAIN 3" COVER FROM
TOP.
#4 REBAR. 12 x 12 L.
MAINTAIN 3" COVER.
#4 REBAR @ 24" O.C.
EACH WAY. MAINTAIN 3"
COVER.
#4 PERIMETER REBAR.
MAINTAIN 3" COVER.
#4 REBAR. 12 x 12 L.
MAINTAIN 3" COVER.
5" 3'-2" 5"
4' -0
3' -9
4'-0"
5"
BROOM FINISH
CONCRETE SLAB
6" CMU UNIT OR
CONCRETE CURB.
#4 REBAR. CONCRETE CURB
OPTION ONLY. CENTER IN CURB.
MAINTAIN 3" TOP COVER.
4"
PERIMETER
REBAR.
MAINTAIN 3"
COVER.
#4 REBAR @
24" O.C. EACH
WAY.
MAINTAIN 3"
COVER.
SLAB OPTION 2 - SECTION DETAIL
Scale: 1" = 1'-0"7
9" 8"
DETAIL PROVIDED FOR SIDING ONLY
DETAILS PROVIDED BY JAMESHARDIE, HARDIEPLANK LAP SIDING DETAILS, DATED MARCH 1, 2010.
DETAIL PROVIDED FOR SIDING ONLY
GENERAL
1. ALL MATERIALS, CONSTRUCTION, AND DETAILS SHALL CONFORM WITH
THE FOLLOWING:
THESE PLANS
INTERNATIONAL BUILDING CODE 2015
ASCE/SEI 7-10 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES
ACI 318-08 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
2. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE FAMILIAR
WITH THE ENTIRE SET OF CONSTRUCTION DOCUMENTS (CIVIL, ELECTRICAL,
PLUMBING, STRUCTURAL, ETC.) IN ORDER TO PROVIDE ALL CONSTRUCTION
AND MATERIALS FOR THIS PROJECT.
3. THE CONTRACTOR SHALL REFER TO OTHER DRAWINGS CONTAINED IN
THE CONSTRUCTION DOCUMENTS FOR ADDITIONAL SPECIFIED MEMBERS,
DIMENSIONS, ELEVATIONS, DETAILS, OPENINGS, INSERTS, SLEEVES,
DEPRESSIONS, ETC. NOT SHOWN ON THE STRUCTURAL DRAWINGS REQUIRED
TO CONSTRUCT THIS PROJECT.
4. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER
GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS.
5. DO NOT SCALE PLANS.
6. IN NO CASE SHALL STRUCTURAL ALTERATIONS OR WORK AFFECTING A
STRUCTURAL MEMBER BE MADE UNLESS APPROVED BY THE CONTRACTING
OFFICER REPRESENTATIVE.
7. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE
ERECTION PROCEDURE AND CONSTRUCTION SEQUENCE IN ORDER TO ENSURE
THE SAFETY OF THE BUILDING AND WORKMEN DURING CONSTRUCTION (MEANS
& METHODS OF CONSTRUCTION). THIS INCLUDES, BUT IS NOT LIMITED TO:
SHORING, UNDERPINNING, TEMPORARY BRACING, ETC.
8. CONSTRUCTION DOCUMENTS SHOW DIMENSIONS AND ELEVATIONS TO
SIGNIFICANT WORKING POINTS (COLUMN CENTERLINES, OUTSIDE FACE OF
WALLS, TOP OF FRAMING MEMBERS, ETC.) MATERIAL SUPPLIERS AND
DESIGNERS ARE RESPONSIBLE FOR ALL OTHER INFORMATION IN ORDER TO
DETAIL/FABRICATE THEIR WORK. CONTACT THE CONTRACTING OFFICER
REPRESENTATIVE WITH ANY DISCREPANCIES.
9. IN THE EVENT OF ANY DISCREPANCIES BETWEEN THE FOUNDATION
DRAWINGS AND ANY OTHER PLANS CONTAINED IN THE SET OF CONSTRUCTION
DOCUMENTS, THE CONTRACTOR SHALL BRING THE DISCREPANCY TO THE
CONTRACTING OFFICER REPRESENTATIVE'S ATTENTION IN WRITING
IMMEDIATELY.
MATERIAL STRENGTHS CAST-IN-PLACE CONCRETE
1. EXTERIOR SLABS ON GRADE
MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS Fc = 4000 psi
MAXIMUM WATER CEMENTITIOUS RATIO 0.48
MAXIMUM AGGREGATE SIZE 3/4"
SLUMP LIMIT 4” +/- 1”
AIR CONTENT YES 4% TO 6%
CAST-IN-PLACE REINFORCED CONCRETE
1. CONCRETE WORK SHALL CONFORM TO THE CURRENT EDITION OF ACI 318 “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE” AND ACI 302 “GUIDE
FOR CONCRETE FLOOR AND SLAB CONSTRUCTION”
2. STEEL REINFORCING BARS SHALL CONFORM TO ASTM A615 (GRADE 60). DEFORMED WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
3. CONTRACTOR SHALL PROVIDE SUITABLE WIRE SPACERS, CHAIRS, TIES ETC FOR SUPPORTING REINFORCING STEEL IN THE PROPER POSITION WHILE PLACING
CONCRETE.
4. PROVIDE A 1” CHAMFER ON EXPOSED CORNERS OF CONCRETE UNLESS NOTED OTHERWISE.
5. SLEEVES, CONDUITS OR PIPING PASSING THROUGH CONCRETE SLABS AND WALLS SHALL BE PLACED SO THAT THEY ARE NOT CLOSER THAN THREE DIAMETERS ON CENTER AND SO THAT THEY DO NOT DISPLACE REINFORCING. BANKS OF OPENINGS GREATER THAN 18” TOTAL WIDTH OF ALL OPENINGS EDGE-TO-EDGE MUST BE
COORDINATED WITH STRUCTURAL ENGINEER.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY IRREGULARITIES OR DEFECTS IN CONCRETE SLABS (CRACKS, BUMPS, FLOOR CURLING ETC.) BEFORE
ANY FLOOR FINISHES ARE APPLIED.
7. ALL LAPS IN REINFORCING STEEL SHALL BE CLASS “B” LAP SPLICES UNLESS OTHERWISE NOTED.
8. ADDITION OF JOB SITE WATER TO CONCRETE SHALL BE PER ASTM C94.
9. TIME BETWEEN CONCRETE BATCHING AND PLACEMENT SHALL BE IN ACCORDANCE WITH ASTM C94.
10. CLASS C FLY ASH OR SLAG MAY BE SUBSTITUTED FOR CEMENT ON A POUND TO POUND BASIS UP TO 10% OF THE TOTAL CEMENTITIOUS CONTENT.
11. ALL CONCRETE SLABS SHALL BE CURED PER ACI RECOMMENDATIONS FOR NO LESS THAN SEVEN DAYS OR AN APPROPRIATE CURING COMPOUND MAY BE
APPLIED.
12. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE ARE NOT PERMITTED IN ANY CONCRETE MIX.
13. PROVIDE THE FOLLOWING CLEAR COVER DISTANCES FOR REINFORCEMENT IN CONCRETE.
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH - 3”
CONCRETE EXPOSED TO EARTH OR WEATHER
NO. 6 THROUGH NO 18 BARS - 2”
NO. 5 BAR AND SMALLER - 1 1/2"
CONCRETE EXPOSED TO WEATHER OR IN CONTACT WITH GROUND SLABS, WALLS, JOISTS NO 11 BAR OR SMALLER - 1”
BEAMS AND COLUMNS - 1 1/2"
14. CONTRACTOR SHALL USE SMOOTH FORMS FOR EXPOSED CONCRETE SURFACES ANY CONCRETE SURFACE REPAIRS SHALL BE PERFORMED BY THE CONTRACTOR AS REQUIRED. REPAIR AND PATCH DEFECTIVE AREAS WITH PROPRIETARY PATCHING COMPOUND IMMEDIATELY AFTER REMOVAL OF FORMS.
DESIGN NOTES
1. THE SOIL IS ASSUMED TO BE A WELL DRAINED SAND, GRAVEL MIXTURE
WITH AN ALLOWABLE SOIL BEARING PRESSURE OF 2000 PSF. ALL TOPSOIL AND
ORGANIC MATERIAL SHALL BE REMOVED FROM UNDER THE PROPOSED SLAB.
MAINTAIN 3'-0" MIN. UNDISTURBED SOIL AROUND AND UNDER SLAB. IF SLAB IS
TO BE PLACED ON FILL, FILL SHALL BE CLEAN GRANULAR MATERIAL,
COMPACTED WITH A VIBRATING PLATE COMPACTOR IN 6" LAYERS TO 95%
MAXIMUM DENSITY AS DETERMINED BY A MODIFIED PROCTOR OR APPROVED
EQUIVALENT. IF SOILS OR SITE CONDITIONS ARE DISCOVERED THAT ARE
SUSCEPTIBLE TO FROST HEAVE, CONTACT THE CONTRACTING OFFICER
REPRESENTATIVE IMMEDIATELY FOR ADDITIONAL DESIGN INFORMATION FOR A
SHALLOW FROST PROTECTED FOUNDATION.
2. REINFORCING STEEL SHALL BE FREE OF RUST AND SCALE WITH MIN.
YIELD STRESS OF 60,000 PSI. IT SHOULD BE NOTED THAT REINFORCING STEEL
AND OR FIBER MESH REINFORCEMENT WILL NOT PREVENT CRACKS IN THE
SLAB, BUT IT WILL HOLD CRACKS TIGHT, MAINTAIN AGGREGATE INTERLOCK
AND PREVENT FAULTING OF THE SLAB. THE BEST WAY TO PREVENT
SHRINKAGE CRACKING IS TO PAY CLOSE ATTENTION TO THE SMOOTHNESS OF
THE BASE, QUALITY OF THE CONCRETE, WATER CONTENT CURING PROCESS
AND JOINT SPACING. A CURING AND SEALING COMPOUND SHALL BE APPLIED
TO THE CONCRETE SURFACE. THE CURING COMPOUND SHALL BE EQUAL TO
CS-309 AS MANUFACTURED BY W.R. MEADOWS SEALTIGHT AND MEETING THE
SPECIFICATIONS OF ASTM C 1315, TYPE I, CLASS A.
3. POLYMERIC (SYNTHETIC) FIBERS SHALL BE ADDED AT A RATE OF 1.5 LBS
PER CUBIC YARD.
4. HEATING, VENTILATION OR AIR CONDITIONING EQUIPMENT, PLUMBING
SYSTEMS OR ELECTRICAL SYSTEMS SHALL NOT BE INSTALLED IN THE BUILDING
WITHOUT OBTAINING PROPER PERMITS.
FASTENING SCHEDULE, IBC 2015, TABLE 2304.9.1
CONNECTIONS FASTENING LOCATION
TOP PLATE TO STUD 2 - 16D COMMON
3 - 3" x 0.131" NAILS END NAIL
STUD TO SILL PLATE 4 - 8D COMMON
4 - 3" x 0.131" NAILS TOE NAIL
2 - 16D COMMON
3 - 3" x 0.131" NAILS END NAIL
DOUBLE TOP PLATES 16D AT 16" O.C. TYPICAL FACE
3" x 0.131" NAIL AT 12" O.C NAIL
DOUBLE TOP PLATES 8 - 16D COMMON
AT END JOINTS 12 - 3" x 0.131" NAILS LAP SPLICE
CONT. HEADER TO STUD 4 - 8D COMMON TOENAIL
APA PANEL ROOF SHEATHING:
6D 6" MAX. SPACING ON SUPPORTED PANEL EDGE. FASTENERS SHALL BE
LOCATED 3/8 INCH FROM PANEL EDGES. FOR SPANS 48 INCHES OR GREATER,
SPACE NAILS 6 INCHES AT ALL SUPPORTS. MAXIMUM INTERMEDIATE SPACING
SHALL BE 12 INCHES.
APA PANEL WALL SHEATHING:
6D 6" MAX. SPACING ON SUPPORTED PANEL EDGE. FASTENERS SHALL BE
LOCATED 3/8 INCH FROM PANEL EDGES. FOR SPANS 48 INCHES OR GREATER,
SPACE NAILS 6 INCHES AT ALL SUPPORTS.
MAXIMUM INTERMEDIATE SPACING SHALL BE 12 INCHES
DETAILS PROVIDED BY JAMESHARDIE, HARDIEPLANK
LAP SIDING DETAILS, DATED MARCH 1, 2010.
E-02 003 004
SOLAR ENCLOSURE
WANOKA LAKE
CAMPGROUND
IMPROVEMENTS
6"
SLOPE TO
HOLDING TANK
MIN. 1/4" PER FOOT
(MIN. 2% SLOPE)
5'-0" MIN.
3' -0
" M
IN
SEWER DROP NOTES:
1. MIN. CLEAR MANEUVERING
SPACE NEEDED. DO NOT
BLOCK WITH GUARD POSTS,
TIRE STOP, OR ANY OTHER
FEATURES.
2. FINISHED GRADE SLOPE IS
NOT TO EXCEED 1.5% IN ANY
DIRECTION THROUGHOUT
THE CLEAR MANEUVERING
SPACE. CAN BE SLOPED UP
TO 2.5% IF NEEDED FOR
DRAINAGE, ONLY IF SURFACE
IS OTHER THAN CONCRETE,
ASPHALT, OR BOARDS.
3. PIPING TO BE SCHEDULE 40
PVC. PVC CEMENT GLUE ALL
PIPE JOINTS.
ACCESSIBLE CAMPSITE SEWER DROP DETAIL
Scale: 1/2" = 1'-0"3
SECTION
PLAN
FINISHED GRADE
CLEAR
MANEUVERING
SPACE
FI
E
LD
4" SCHEDULE
40 PVC
THREADED
CAP
4" SCHEDULE 40
PVC 90° LONG
SWEEP ELBOW
FI
T
SITE PLAN
Scale: 1" = 200'-0"1
SITE 4
HOST SITE
PROPOSED SOLAR
POWER ARRAY. SEE
DETAIL 2.
Drainage and Septic Products Tuf-Tite, Inc.
1200 Flex Court Lake Zurich, Illinois 60047
TELEPHONE: 847.550.1011
TOLL FREE: 800.382.7009
FAX: 847.550.8004
PART NAME:
PART #:
Material: Copolymer Polypropylene Color: Green
AA
25.00
24.60
4.50 3.10
25.90
24" RISER LID
24 - RISL - GREEN
THIS AREA MAY BE FILLED WITH
CONCRETE FOR ADDITIONAL WEIGHT
A-ASECTION
PERMANENT FOAMED-IN
POLYURETHANE GASKET
• • • © TUF·TITE® RISER LID DETAIL8
Drainage and Septic Products Tuf-Tite, Inc.
1200 Flex Court Lake Zurich, Illinois 60047
TELEPHONE: 847.550.1011
TOLL FREE: 800.382.7009
FAX: 847.550.8004
PART NAME:
PART #:
Material: Copolymer Polypropylene Color: Green
BB
24.20
24.65
25.60
6.00
26.00 7.10
24" RISER
24- RIS - GREEN
B-BSECTION
n~ll ~n
-Pl
- -:::1
I
_ ,. _ I ··+--··- - - -I
1-=::- I 1w
JI
~I-,
• • • © TUF·TITE®
Drainage and Septic Products Tuf-Tite, Inc.
1200 Flex Court Lake Zurich, Illinois 60047
TELEPHONE: 847.550.1011
TOLL FREE: 800.382.7009
FAX: 847.550.8004
PART NAME:
PART #:
Material: Copolymer Polypropylene Color: Green
A A
1.60
30.00
24.60
24" TAR
24 - TAR - GREEN
A-ASECTION 0 0~
r -- ------------------·- -l
• • • © TUF·TITE®
RISER DETAIL9
RISER TAR DETAIL10
RISER NOTES:
1. RISER LID SHALL HAVE A CONFINED SPACE SIGN (SETON MODEL M7073
SIGN) OR HAVE THE WORDS "DANGER - CONFINED SPACE - DO NOT ENTER"
CAST INTO THE LID.
2. NOTE: SECURE LID TO RISER WITH HEX HEAD SCREWS
HOLDING TANK PLAN VIEW
Scale: 1" = 1'-0"4
MAX WATER
LEVEL
HOLDING TANK SECTION DETAIL
Scale: 1" = 1'-0"5
NOTE: ALL SEWER PIPING TO BE 4" SCHEDULE 40 PVC.
ALL PIPE JOINTS SHALL BE PVC CEMENT GLUED.
LOCATE TANK MIN. 10' FROM ALL WATERLINES.
FI
T
24" DIA SECURED
MANHOLE COVER
24" TUF-TITE RISER. SEE DETAIL
7, 8, AND 9. FIELD FIT DEPTH.
WEIGHTED FLOAT
SWITCH ASSEMBLY.
MOUNT WEIGHT AND
SWITCH TO ACTIVATE
WHEN WATER LEVEL
IS 18" FROM TOP OF
INSIDE OF TANK.
FLOAT SWITCH
CABLE PROVIDED
WITH FLOAT (TYP)
INLET PIPE.
SLOPE 1/4" PER FOOT
(MIN. 2% SLOPE)
FROM SEWER DROP.
24" DIA SECURED
MANHOLE COVER
FLOAT SWITCH GROUND
CONDUCTOR SHALL BE
SOLIDLY GROUNDED.
BAFFLE
4x4 TREATED
WOOD POST. FIELD
LOCATE PER
RANGER WITHIN
10'-0" OF TANK
1" PVC COVERED
RIGID CONDUIT
AC-POWERED RED
LED ALARM LIGHT.
ATTACH SECURELY
TO POST.
PROPOSED ELECTRICAL
LINE FROM ELECTRICAL
PEDESTAL. LINE SHALL
NOT CROSS OVER ANY
OTHER UTILITY LINE.
FINISHED GRADE
12'-0"
11'-6"
6' -0
5' -6
4" 4'
-0
3"
2 1/2" TAPER (TYP)
5" 3'
-9
6"
4' -1
1"
3"
3"
4"
2'-0" 2'-0"
3"
4' -0
1' -6
" M
IN
3'-0" MIN
3"
" M
IN
FI
E
LD
F
IT
3"
3' -0
9" M
IN
FI
E
LD
HOLDING TANK CAPACITY
1500 GALLON NOMINAL CAPACITY
1600 GALLON ULTIMATE CAPACITY
EYELET
FITTING
CARABINER
NEMA 3R JUNCTION
BOX. ATTACH
SECURELY TO POST.
SITE 4
HOST SITE
HOST SITE UTILITY LAYOUT PLAN
Scale: 1" = 20'-0"2
PROPOSED NOMINAL 1500 GALLON
HOLDING TANK.
HOLDING TANK TO BE LOCATED IN
EAST OF SITE MIN. 3' FROM EDGE
OF SITE. FIELD FIT TO MINIMIZE
DISTURBED AREA.
PROPOSED ELECTRICAL PEDESTAL.
PEDESTAL TO BE LOCATED 20' FROM
SITE DRIVE-IN. CONTRACTOR TO
ENSURE NO CONFLICTS WITH
PROPOSED SEWER LINE
PROPOSED 4" SCHEDULE 40
PVC SEWER LINE
SEWER DROP. SEE DETAIL 3
ALARM LIGHT.
PROPOSED SOLAR ARRAY INSTALLATION
OPTION #1
INSTALLATION TO BE LOCATED AT EAST SIDE OF "T" INTERSECTION
APPROXIMATELY 130' FROM PROPOSED ELECTRICAL PEDESTAL. CONTRACTOR
TO VERIFY BEST OPTION FOR INSTALLATION LOCATION WITH RANGER AND
ARRAY MANUFACTURER. FIELD FIT TO ENSURE INSTALLATION HAS CLEAR VIEW
OF SKY AND TO MINIMIZE DISTURBED AREA AND TREE REMOVAL
FIELDFIT
20'-0
10'-0 " 11'-0
FIELD
FIT
5'-0"
PROPOSED SOLAR ARRAY INSTALLATION
OPTION #2
INSTALLATION TO BE LOCATED AT WEST SIDE OF "T" INTERSECTION
APPROXIMATELY 160' FROM PROPOSED ELECTRICAL PEDESTAL.
CONTRACTOR TO VERIFY BEST OPTION FOR INSTALLATION LOCATION WITH
RANGER AND ARRAY MANUFACTURER. FIELD FIT TO ENSURE INSTALLATION
HAS CLEAR VIEW OF SKY AND TO MINIMIZE DISTURBED AREA AND TREE
REMOVAL
NEW ELECTRIC LINE TO ALARM LIGHT. LINE TO
BE 12-2 DIRECT BURIAL CABLE WITH GROUND
@ 24" BELOW GRADE. CONNECT LINE AT NEW
BREAKER AND CIRCUIT AT EXISTING
ELECTRICAL PEDESTAL.
PROPOSED ELECTRICAL LINE.
PROPOSED LINE TO RUN SOUTH PARALLEL TO SITE TO
MAIN ROAD, THEN FOLLOW ROAD WEST TO PROPOSED
SOLAR ARRAY INSTILLATION. SIZE ELECTRICAL LINE PER
CODE AND FINAL LENGTH OF RUN.
PATCH PAVEMENT
WHERE PROPOSED
ELECTRIC LINE RUNS
ACROSS EXISTING
PAVED ROAD
WANOKA LAKE
CAMPGROUND
IMPROVEMENTS
WASHBURN
RANGER DISTRICT
DATENO.
REVISION / ISSUE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
(R9)
EASTERN REGION
CHEQUAMEGON-NICOLET
NATIONAL FOREST
03/22/2019
CJM/JS
Forest Service
190322
D or al an d S
U ni ve rs ity
A ve nu e, S ui te gs fo rd , M ic hi ga n is to n, N or th
D ak ot a
P ho ne
6)
-5 ne
1)
-5
Fa x:
(9
) 7
-5 ai l:
m tn en gi ne er in g@ m tn en g.
ne t
M O
U N
TA
IN
E N
G
IN
EE
R
IN
G
, I N
C
DRAWING TITLE
TH
E
O W
N E
R A
G R
E E
S T
O
IN
D E
M N
IF
Y
A N
D H
O
LD
M O
U N
TA
IN
E N
G
IN
E E
R
IN
G , I
N C
. H A
R M
LE
S
S F
R O
M A
N Y
D A
M A
G E
, L
IA
B
IL
IT
Y
O R
C O
S T, IN
C
LU
D
IN
G
A
TT
O R
N E
Y 'S
F E
E S
A N
D C
O S
T O
F D
E
FE
N S
E A
R
IS
IN
G
F R
O M
A N
Y C
H A
N G
E S
O R
A
LT
E R
A
TI
O N
S M
A D
E B
Y A
N Y
O N
E O
TH
E
R T
H A
N M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
O R
F R
O M
A N
Y R
E U
S E
O F
TH
E
D R
A W
IN
G
S A
N D
D A
TA
W
IT
H
O U
T
TH
E P
R
IO
R W
R
IT
TE
N
C O
N S
E N
T O
F M
O U
N
TA
IN
E
N G
IN
E
E R
IN
G
, I N
C
Scale: 1/2" = 1'-0"
FINISHED
GRADE
V A
R
IE
S . S
E E
D E
TA
IL
A
N D
4"
M
IN
" M
IN
4"
SEWER LINE TRENCH DETAIL
Scale: 1/2" = 1'-0"6
2'-0" MIN.
NOTE: MAINTAIN MIN. 10' CLEARANCE BETWEEN
WATER LINE AND SEWER LINE.
FINISHED
GRADE
" M
IN
D E
P
TH
4" 4"
M
IN
" M
IN
ELECTRICAL LINE
ELECTRICAL LINE TRENCH DETAIL
Scale: 1/2" = 1'-0"7
2'-0" MIN.
4" TOPSOIL OR WISDOT
1-1/4" DENSE GRADED
BASE. MATCH EXISTING.
SELECT OR
EXISTING BACKFILL
SELECT BACKFILL WITH
NO COBBLES AND
BOULDERS (>2"DIA.)
SEWER LINE.
4" TOPSOIL OR WISDOT
1-1/4" DENSE GRADED
BASE. MATCH EXISTING.
SELECT OR
EXISTING BACKFILL
SELECT BACKFILL WITH
NO COBBLES AND
BOULDERS (>2"DIA.)
P-02 004 004
HOST SITE POTABLE
WATER SERVICE
HOLDING TANK NOTES:
1. HOLDING TANK SHALL BE CONCRETE. ALL ADDITIONAL HOLES FOR PIPING
SHALL BE EITHER FILLED DURING MANUFACTURE OR GROUTED INSIDE AND OUT
WITH NO PLASTIC, RUBBER OR NYLON PLUGS.
2. RISER SHALL BE ATTACHED SO AS TO FORM A WATER TIGHT SEAL BETWEEN
THE RISER AND THE TANK. FOR NON-LOCKABLE LIDS HEX HEAD SCREWS SHALL BE
USED FOR SECURING LID TO RISER. PHILLIPS, TORX, SLOTTED, SQUARE, OR
SIMILAR STYLE HEADS MAY NOT BE USED. THE RISER LID SHALL HAVE A CONFINED
SPACE SIGN (PRE-APPROVED SIGN - SETON'S M7073 SIGN WWW.SETON.COM) OR
HAVE THE WORDS “DANGER CONFINED SPACE DO NOT ENTER” CAST INTO THE
LID.
3. TANK SHALL MEET WI CONSTRUCTION SPECIFICATIONS.
4. TANK SHALL BE SET LEVEL.
5. TANK TO BE FILLED WITH WATER TO THE TOP OF THE TANK AND ALLOWED TO
SET FOR 24 HOURS AND CHECKED FOR LEAKS BEFORE BACKFILLING. IF WATER
LEVEL CHANGES, FIND AND REPAIR LEAK AND RETEST FOR 24 HOURS. TANK TO BE
BACKFILLED AFTER SUCCESSFUL WATER TESTING. TANK MAY BE PUMPED OUT
ONTO THE GROUND (AVOIDING EROSION) AFTER BACKFILLING.
6. BACK FILL SHALL NOT HAVE ANY ORGANIC MATERIAL, NOR 3” OR LARGER
STONES. BACK FILL TO BE COMPACTED IN 12” LIFTS.
7. PIPE INLETS AND OUTLETS SHALL BE SUPPLIED WITH A CAST-IN-PLACE
FLEXIBLE BOOT. GROUTING OF THE PIPE IN PLACE AT THE TANK IS NOT
PERMITTED.
| Sht-1-Title Sheet / Drawing Index |
| Viewport-17 |
| Viewport-4 |
| Sht-2-Host Site Solar Electrical Servcie Plan |
| Viewport-6 |
| Viewport-1 |
| Viewport-2 |
| Viewport-14 |
| Viewport-20 |
| Viewport-24 |
| Sht-3-Solar Battery Enclosure |
| Sht-4-Host Site Holding Tank |
| Viewport-15 |
| Viewport-16 |
| Viewport-18 |
| Viewport-21 |
| Viewport-13 |
| Viewport-23 |
| Viewport-22 |
| Viewport-19 |
| Signature1: | |
| 2022-07-14T08:59:20-0500 | |
| JUSTIN BLAKE |
| 2022-07-21T14:22:54-0500 | |
| MICHAEL MATTMILLER |
File details come from the government source that posted it. Updated .