Wanoka Campground Improvements Specifications.docx
DOCX document 102 KB Posted
- Solicitation number
- 12445523R0006
- Issued by
-
Department of Agriculture Forest Service
About this file
This document describes a federal solicitation for recreation site improvements projects on the Chequamegon-Nicollet National Forest. The scope of work includes trail realignment and site upgrades at Valhalla Recreation Area, including clearing, culverts, aggregate surfaces, fencing, signage and landscaping. At Wanoka Campground, work involves road reconditioning, culverts, asphalt, ditching and erosion control. Optional work includes relocating a vault toilet and an overflow parking area. Improvements are also specified for an electrical service and holding tank at Wanoka Campground. Further scope covers road reconditioning, culverts and repaving at Picnic Point Campground and Luna-White Deer Campground. An optional boat ramp reconstruction is included for Picnic Point. Replacing a vault toilet at Picnic Point Campground is also outlined. The projected magnitude is estimated between $1-2 million and it is a total small business set-aside under NAICS 237310.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
DIVISION 03 – CONCRETE
SECTION 033053 – CAST-IN-PLACE CONCRETE
DIVISION 22 – PLUMBING
SECTION 220500 – COMMON WORK RESULTS FOR PLUMBING
SECTION 221353 – HOLDING TANK SYSTEM
DIVISION 26 – ELECTRICAL
SECTION 260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
DIVISION 31 – EARTHWORK
SECTION 312000 - EARTHwork
DIVISION 32 – EXTERIOR IMPROVEMENTS
SECTION 329024 – SEEDING
SECTION 329060 – PROTECTION OF EXISTING TREES
DIVISION 03 – CONCRETE
SECTION 033053 – CAST-IN-PLACE CONCRETE
SECTION 033053
CASTINPLACE CONCRETE
GENERAL
SUMMARY
Section Includes:
Castinplace structural concrete.
Slab on grade.
Footings.
Equipment pads.
Preparation of existing surfaces to receive concrete.
Preparation of existing surface to received concrete topping.
APPLICABLE PUBLICATIONS
Comply with references to extent specified in this Section.
American Concrete Institute (ACI):
11715 - Tolerances for Concrete Construction, Materials and Commentary.
117M10(R2015) - Tolerances for Concrete Construction, Materials and Commentary.
211.191(R2009) - Proportions for Normal, Heavyweight, and Mass Concrete.
211.298(R2004) - Selecting Proportions for Structural Lightweight Concrete.
301/310M10 - Structural Concrete.
305.114 - Hot Weather Concreting.
306.190(R2002) - Cold Weather Concreting.
318/318M14 - Building Code Requirements for Structural Concrete and SP6604ACI Detailing Manual.
34704 - Guide to Formwork for Concrete.
ASTM International(ASTM):
A615/A615M15ae1 - Deformed and Plain CarbonSteel Bars for Concrete Reinforcement.
A1064/A1064M15 - CarbonSteel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
C33/C33M13 - Concrete Aggregates.
C94/C94M15a - ReadyMixed Concrete.
C150/C150M15 - Portland Cement.
C17107 - Sheet Material for Curing Concrete.
C260/C260M10a - AirEntraining Admixtures for Concrete.
C494/C494M15 - Chemical Admixtures for Concrete.
C61815 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
C989/C989M14 - Slag Cement for Use in Concrete and Mortars.
C124015 - Silica Fume Used in Cementitious Mixtures.
SUBMITTALS
Certificates: Certify products comply with specifications.
Each ready-mix concrete batch delivered to site.
DELIVERY
Deliver each readymixed concrete batch with mix certification in duplicate according to ASTM C94/C94M.
PRODUCTS
MATERIALS
Portland Cement: ASTM C150/C150M, Type I or II.
Coarse Aggregate: ASTM C33/C33M.
Size 467 for footings and walls over 300 mm (12 inches) thick.
Size 7 for coarse aggregate for applied topping and metal pan stair fill.
Size 67 for other applications.
Fine Aggregate: ASTM C33/C33M.
Mixing Water: Fresh, clean, and potable.
AirEntraining Admixture: ASTM C260/C260M.
Chemical Admixtures: ASTM C494/C494M.
Vapor Barrier: ASTM E1745, Class A with a minimum puncture resistance of 2200 g (3000 lbs.); minimum 0.38 mm (15 mil) thick.
Reinforcing Steel: ASTM A615/A615M or ASTM A996/A996M, deformed. See Structural Drawings for grade.
Forms: Wood, plywood, metal, or other materials, approved by Contracting Officer, of grade or type suitable to obtain type of finish specified.
Plywood: Exterior grade, free of defects and patches on contact surface.
Lumber: Sound, grademarked, S4S stress graded softwood.
Form coating: As recommended by Contractor.
Welded Wire Fabric: ASTM A1064/A1064M, plain; Grade 65; sized as indicated.
Sheet Materials for Curing Concrete: ASTM C171.
CONCRETE MIXES
Design concrete mixes according to ASTM C94/C94M, Option C.
Compressive strength at 28 days: minimum 3,000 psi.
Maximum Slump for Vibrated Concrete: 4 inches tested according to ASTM C143.
Cement and Water Factor (See Table I):
TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE
| Concrete: Strength |
| NonAirEntrained |
| AirEntrained |
Min. 28 Day Comp. Str.
psi Min. Cement lbs./cu. yd.
| Max. Water Cement Ratio |
| Min. Cement |
lbs./cu. yd.
Max. Water Cement Ratio
| 5000 1,3 |
| 630 |
| 0.45 |
| 650 |
| 0.40 |
| 4000 1,3 |
| 550 |
| 0.55 |
| 570 |
| 0.50 |
| 3000 1,3 |
| 470 |
| 0.65 |
| 490 |
| 0.55 |
| 3000 1,2 |
| 500 |
| * |
| 520 |
| * |
Footnotes:
1. If trial mixes are used, achieve a compressive strength 1,200 psi in excess of f'c. For concrete strengths greater than 5,000 psi, achieve a compressive strength 1,400 psi in excess of f’c.
2. Lightweight Structural Concrete: Pump mixes may require higher cement values as specified in ACI 318/318M.
3. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.
* Laboratory Determined according to ACI 211.1 for normal weight concrete or ACI 211.2 for lightweight structural concrete.
Airentrainment as specified, and conform with the following for air content table:
TABLE II - TOTAL AIR CONTENT
FOR VARIOUS SIZES OF COARSE AGGREGATES
Nominal Maximum Size of Coarse Aggregate Total Air Content, percent
| 3/8 inches |
| 6 Moderate exposure; 7.5 severe exposure |
| 1/2 inches |
| 5.5 Moderate exposure; 7 severe exposure |
| 3/4 inches |
| 5 Moderate exposure; 6 severe exposure |
| 1 inch |
| 4.5 Moderate exposure; 6 severe exposure |
| 1 1/2 inches |
| 4.5 Moderate exposure; 5.5 severe exposure |
BATCHING AND MIXING
Store, batch, and mix materials according to ASTM C94/C94M.
JobMixed: Batch mix concrete in stationary mixers as specified in ASTM C94/C94M.
ReadyMixed Concrete: Comply with ASTM C94/C94M, except use of nonagitating equipment for transporting concrete to Site is not acceptable.
When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer’s Representative (COR) consideration.
EXECUTION
FORMWORK
Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.
Design and construct forms to prevent bowingout of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.
When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.
Treating and Wetting: Treat or wet concrete contact surfaces:
Coat plywood and lumber forms with nonstaining form sealer.
Wet wood forms thoroughly when they are not treated with form release agent.
Prevent water from accumulating and remaining within forms.
Clean and coat removable metal forms with light form oil before reinforcement is placed.
In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.
Prevent water from accumulating and remaining within forms.
Inserts, Sleeves, and Similar Items: Install flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor hinges, and other castin items specified in other Sections. Place where indicated, square, flush and secured to formwork.
Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.
Adjust or replace completed work exceeding specified tolerances before placing concrete.
REINFORCEMENT
Install concrete reinforcement according to ACI 318 and ACI SP66.
Support and securely tie reinforcing steel to prevent displacement during placing of concrete.
Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.
VAPOR BARRIER
Except where membrane waterproofing is required, place interior concrete slabs on a continuous vapor barrier.
Lap joints 150 mm (6 inches) and seal with a compatible pressuresensitive tape.
Patch punctures and tears.
PLACING CONCRETE
Remove water from excavations before concrete is placed. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval from COR before placing concrete.
Install screeds at required elevations for concrete slabs.
Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.
Blowout areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.
Place structural concrete according to ACI 301 and ACI 318.
Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than 900 mm (3 feet) in exposed work.
Place and consolidate concrete in horizontal layers not exceeding 12 inches in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement. Continuously vibrate during placement of concrete.
Hot Weather Concrete Placement: As recommended by ACI 305.1 to prevent adversely affecting properties and serviceability of hardened concrete.
Cold Weather Concrete Placement: As recommended by ACI 306.1, to prevent freezing of thin sections less than 12 inches and to permit concrete to gain strength properly.
Do not use calcium chloride without written approval from COR.
TOLERANCES
Slab on Grade Finish Tolerance: Comply with ACI 117, FFnumber and FLnumber method.
Paragraph 4.8.3, Class A 1/8 inches for offset in formwork.
Table R4.8.4, "Flat" 1/4 inch in 10 feet for slabs.
PROTECTION AND CURING
Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.
Curing Methods: Cure concrete with curing compound using wet method with sheets.
Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.
If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.
Concrete Flatwork Curing:
Install sheet materials according to the manufacturer's instructions.
When manufacturer's instructions deviate from specifications, submit proposed resolution for COR consideration.
FORM REMOVAL
Maintain forms in place until concrete is selfsupporting, with construction operation loads.
Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.
Finish to match adjacent surfaces.
FINISHES
Slab Finishes:
Allow bleed water to evaporate before surface is finished. Do not sprinkle dry cement on surface to absorb water.
Broom Finish: Finish exterior slabs, ramps, and stair treads with bristle brush moistened with clear water after surfaces have been floated.
Finished Slab Flatness (FF) and Levelness (FL):
Slab on Grade: Specified overall value FF 25/FL 20. Minimum local value FF 17/FL 15.
Test flatness and levelness according to ASTM E1155.
- E N D OF SECTION -
Cast-In-Place Concrete 033053-2
DIVISION 22 – PLUMBING
SECTION 220500 – COMMON WORK RESULTS FOR PLUMBING
SECTION 221353 – HOLDING TANK SYSTEM
SECTION 220500
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
| A. | The requirements of this Section shall apply to all sections of Division 22. |
| B. | Abbreviations/Acronyms: |
| 1. | ABS: Acrylonitrile Butadiene Styrene |
| 2. | AISI: American Iron and Steel Institute |
| 3. | AWG: American Wire Gauge |
| 4. | COR: Contracting Officer’s Representative |
| 5. | CPVC: Chlorinated Polyvinyl Chloride |
| 6. | CWP: Cold Working Pressure |
| 7. | DN: Diameter Nominal |
| 8. | DWV: Drainage, Waste and Vent |
| 9. | EPDM: Ethylene Propylene Diene Monomer |
| 10. | EPT: Ethylene Propylene Terpolymer |
| 11. | FNPT: Female National Pipe Thread |
| 12. | GPM: Gallons Per Minute |
| 13. | HDPE: High Density Polyethylene |
| 14. | ID: Inside Diameter |
| 15. | IPS: Iron Pipe Size |
| 16. | lb: Pound |
| 17. | MAWP: Maximum Allowable Working Pressure |
| 18. | MAX: Maximum |
| 19. | MFG: Manufacturer |
| 20. | NPTF: National Pipe Thread Female |
| 21. | NPS: Nominal Pipe Size |
| 22. | NPT: Nominal Pipe Thread |
| 23. | OD: Outside Diameter |
| 24. | PP: Polypropylene |
| 25. | PPM: Parts per Million |
| 26. | PSIG: Pounds per Square Inch |
| 27. | PTFE: Polytetrafluoroethylene |
| 28. | PVC: Polyvinyl Chloride |
| 29. | PVDF: Polyvinylidene Fluoride |
| 30. | SPEC: Specification |
| 31. | STD: Standard |
| 32. | TFE: Tetrafluoroethylene |
| 33. | THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire |
| 34. | THWN: Thermoplastic Heat & Water-Resistant Nylon Coated Wire |
| 35. | T/P: Temperature and Pressure |
1.2 APPLICABLE PUBLICATIONS
| A. | The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. |
| B. | American Society for Testing and Materials (ASTM): |
| F1760-01(R2011) | Standard Specification for Coextruded Poly (Vinyl Chloride) (PVC) Non-Pressure Plastic Pipe Having Reprocessed-Recycled Content |
| D2737 - 12 | Standard Specification for Polyethylene Pipe (HDPE) |
| C. | International Code Council, (ICC): |
| IBC-2015 | International Building Code |
| IPC-2015 | International Plumbing Code |
| D. | Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry, Inc: |
| E. | National Fire Protection Association (NFPA): |
| 70-2014 | National Electrical Code (NEC) |
| F. | NSF International (NSF): |
| 14-2012 | Plastic Piping System Components and Related Materials |
| G. | American Water Works Association (AWWA): |
| C901-17 | Polyethylene (PE) Pressure Pipe and Tubing ¾ in. Through 3 in., for Water Service |
| M55 | Manual for the Design and Installation of Polyethylene Pipe in Water Applications |
1.3 QUALITY ASSURANCE
| A. | Products Criteria: |
| 1. | Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture, supply and servicing of the specified products for at least 5 years. However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least 5 years. |
| 2. | All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly. |
| 3. | The products and execution of work specified in Division 22 shall conform to the referenced codes and standards as required by the specifications. Local codes and amendments enforced by the local code official shall be enforced. If the local codes are more stringent, then the local code shall apply. Any conflicts shall be brought to the attention of the COR. |
| 4. | Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer. |
| B. | Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the COR prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material. |
| C. | Execution (Installation, Construction) Quality: |
| 1. | All items shall be applied and installed in accordance with manufacturer's written instructions. Conflicts between the manufacturer's instructions and the contract documents shall be referred to the COR for resolution. |
| 2. | All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level. Prior to commencing installation work, refer conflicts between this requirement and contract documents to COR for resolution. |
| 3. | Installer Qualifications: Installer shall be licensed and shall upon request from the COR provide evidence of the successful completion of at past projects of equal or greater size and complexity. Provide tradesmen skilled in the appropriate trade. |
| 4. | If an installation does not meet the requirements of the contract documents, the Contractor shall correct the installation at no additional cost. |
| D. | Plumbing Systems: IPC, International Plumbing Code. Unless otherwise required herein, perform plumbing work in accordance with the latest version of the IPC. For IPC codes referenced in the contract documents, advisory provisions shall be considered mandatory, the word “should” shall be interpreted as “shall”. Reference to the “code official” or “owner” shall be interpreted to mean the COR. |
| E. | Cleanliness of Piping and Equipment Systems: |
| 1. | Care shall be exercised in the storage and handling of equipment and piping material to be incorporated in the work. Debris arising from cutting, threading and welding of piping shall be removed. |
| 2. | Piping systems shall be flushed, blown or pigged as necessary to deliver clean systems. |
| 3. | Contractor shall be fully responsible for all costs, damage, and delay arising from failure to provide clean systems. |
1.4 DELIVERY, STORAGE AND HANDLING
| A. | Protection of Equipment: |
| 1. | Equipment and material placed on the job site shall remain in the custody of the Contractor until phased acceptance, whether or not the Government has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage. |
| 2. | Damaged equipment shall be replaced with an identical unit as determined and directed by the COR. Such replacement shall be at no additional cost or additional time to the Government. |
| 3. | Interiors of new equipment and piping systems shall be protected against entry of foreign matter. Both inside and outside shall be cleaned before painting or placing equipment in operation. |
| 4. | Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work. |
PART 2 - PRODUCTS
2.1 MATERIALS FOR VARIOUS SERVICES
| A. | Plastic pipe, fittings and solvent cement shall meet NSF 14 and shall bear the NSF seal “NSF-PW”. Polypropylene pipe and fittings shall comply with NSF 14 and NSF 61. Solder or flux containing lead shall not be used with copper pipe. |
| B. | Material or equipment containing a weighted average of greater than 0.25 percent lead shall not be used in any potable water system intended for human consumption and shall be certified in accordance with NSF 61 or NSF 372. |
| C. | In-line devices such as water meters, building valves, check valves, stops, valves, fittings, tanks and backflow preventers shall comply with NSF 61 and NSF 372. |
| D. | End point devices such as faucets used to dispense drinking water must meet requirements of NSF 61 and NSF 372. |
2.2 FACTORY-ASSEMBLED PRODUCTS
| A. | Standardization of components shall be maximized to reduce spare part requirements. |
| B. | Manufacturers of equipment assemblies that include components made by others shall assume complete responsibility for final assembled unit. |
| 1. | Components shall be compatible with each other and with the total assembly for intended service. |
| C. | Components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a name plate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment. |
| D. | Major items of equipment, which serve the same function, shall be the same make and model. |
2.3 COMPATIBILITY OF RELATED EQUIPMENT
A. Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a complete and fully operational system that conforms to contract requirements.
2.4 PIPE PENETRATIONS
| A. | Pipe penetration sleeves shall be installed for all pipe. |
| B. | Sheet metal, plastic, or moisture resistant fiber sleeves shall be provided for pipe passing through floors, interior walls, and partitions, unless brass or steel pipe sleeves are specifically called for below. |
| C. | Sleeve clearance through floors, walls, partitions, and beam flanges shall be 25 mm (1 inch) greater in diameter than external diameter of pipe. Sleeve for pipe with insulation shall be large enough to accommodate the insulation plus 25 mm (1 inch) in diameter. Interior openings shall be caulked tight with firestopping material and sealant to prevent the spread of fire, smoke, water and gases. |
2.5 TOOLS
A. Furnish and turn over to the COR any special tools not readily available commercially, that are required for disassembly or adjustment of equipment and machinery furnished.
PART 3 - EXECUTION
3.1 ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING
| A. | Location of piping, sleeves, inserts, hangers, and equipment, access provisions shall be coordinated with the work of all trades. Piping, sleeves, inserts, hangers, and equipment shall be located clear of windows, doors, openings, light outlets, and other services and utilities. |
| B. | Manufacturer's published recommendations shall be followed for installation methods not otherwise specified. |
| C. | Operating Personnel Access and Observation Provisions: All equipment and systems shall be arranged to provide clear view and easy access, without use of portable ladders, for maintenance, testing and operation of all devices including, but not limited to: all equipment items, valves, backflow preventers, filters, strainers, transmitters, sensors, meters and control devices. All gages and indicators shall be clearly visible by personnel standing on the floor or on permanent platforms. Maintenance and operating space and access provisions that are shown on the drawings shall not be changed nor reduced. |
| D. | Structural systems necessary for pipe and equipment support shall be coordinated to permit proper installation. |
| E. | Location of pipe sleeves, trenches and chases shall be accurately coordinated with equipment and piping locations. |
| F. | Cutting Holes: |
| 1. | Holes shall be located to avoid interference with structural members such as beams or grade beams. Holes shall be laid out in advance and drilling done only after approval by COR. If the Contractor considers it necessary to drill through structural members, this matter shall be referred to COR for approval. |
| 2. | Holes through concrete and masonry shall be cut by rotary core drill. Pneumatic hammer, impact electric, and hand or manual hammer type drill will not be allowed, except as permitted by COR where working area space is limited. |
| G. | Protection and Cleaning: |
| 1. | Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations and as approved by the COR. Damaged or defective items in the opinion of the COR shall be replaced at no additional cost or time to the Government. |
| H. | Gages, thermometers, valves and other devices shall be installed with due regard for ease in reading or operating and maintaining said devices. Thermometers and gages shall be located and positioned to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work. |
3.2 OPERATION AND MAINTENANCE MANUALS
| A. | All new and temporary equipment and all elements of each assembly shall be included. |
| B. | Data sheet on each device listing model, size, capacity, pressure, speed, horsepower, impeller size, and other information shall be included. |
| C. | Manufacturer’s installation, maintenance, repair, and operation instructions for each device shall be included. Assembly drawings and parts lists shall also be included. A summary of operating precautions and reasons for precautions shall be included in the Operations and Maintenance Manual. |
E N D OF SECTION
Common Work Results for Plumbing 220500-2
SECTION 221353
HOLDING TANK SYSTEM
PART I GENERAL
1.1 SECTION INCLUDES:
| A. | Holding tank. |
| B. | Sewer piping to holding tank system. |
1.2 REFERENCES
| A. | ASTM D 2729 - Standard Specification for Polyvinyl Chloride (Vinyl Chloride) (PVC) Sewer Pipe and Fittings; 1996a. |
| B. | ASTM D 3034 - Standard Specification for Type PSM Polyvinyl Chloride (Vinyl Chloride) (PVC) Sewer Pipe and Fittings; 2000. |
| C. | ASTM D 698 12e2 – Test Methods for Laboratory Compaction Characteristics of Soil using Standard Effort. |
1.3 QUALITY ASSURANCE
A. Conform to applicable State and Local codes and regulations for work of this section.
PART 2 PRODUCTS
2.1 HOLDING TANK
| A. | Holding Tank: Reinforced precast concrete construction, 4,000 psi 28-day minimum strength, concrete lid with lift rings, inlet inspection holes and pipe inlet. Per project drawings. |
| B. | Tank Capacity: Per project drawings. |
2.2 ACCESSORIES
A. Provide inspection holes with risers per project drawings.
B. Provide high level alarm system per project drawings.
2.3 CONNECTING PIPE MATERIALS
| A. | Plastic Pipe (PVC): ASTM D 1785 Type PVC, DWV, Schedule 40 nominal inside diameter of 4-inch, solvent sealed joints. |
| B. | Fittings: Same material as pipe, tee bends, elbows, cleanouts, reducers, ends to suit pipe joint. |
2.4 BEDDING AND BACKFILL MATERIALS
A. Provide bedding and backfill materials as specified in Section 312000 Earthwork and as follows:
1. Tank Bedding Material: Non-organic fill with no stone greater than 2 inches.
2. Tank Backfill Material: Non organic fill with no stone greater than 2 inches.
3. Connecting Piping Bedding Material: Native backfill with no stones greater than 2 inches.
4. Connecting Piping Backfill Material: Native or existing fill.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that building or site sanitary sewer connection, size, location and invert are as indicated on the plans.
3.2 PREPARATION
| A. | Ream pipe ends and remove burrs. |
| B. | Remove scale and dirt from components before assembly. |
| C. | Establish invert elevations and/or slope for all components in the system. |
3.3 EXCAVATING AND TRENCHING
A. See Section 312000 Earthwork for general requirements.
3.4 TANK INSTALLATION
| A. | Hand trim excavation for accurate placement of tank to elevations indicated. |
| B. | Place bedding material level in one continuous layer not exceeding 6 inches compacted depth, compact to 95 percent of Maximum Density as determined by ASTM D 698. |
| C. | Install septic tank and related components on bedding in accordance with manufacturers’ instructions. |
| D. | Backfill around sides of tank, tamped in place in maximum 12 inch lifts and compacted to 95 percent of Maximum Density as determined by ASTM D 698. |
3.5 CONNECTING PIPING INSTALLATION
| A. | Install system components as shown on plans. |
| B. | Connect outlet between building sanitary piping and septic tank, with Type PVC Schedule 40 pipe and fittings. |
| C. | Place pipe and fittings on clean excavated subsoil. |
| D. | Slope piping to each successive component, minimum of 0.125 inch per foot. |
END OF SECTION
Holding Tank System 221353-3
DIVISION 26 – ELECTRICAL
SECTION 260511 – REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
SECTION 260511
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
PART 1 - GENERAL
1.1 DESCRIPTION
| A. | This section applies to all sections of Division 26. |
| B. | Furnish and install electrical systems, materials, equipment, and accessories in accordance with the specifications and drawings. Capacities and ratings of transformers, conductors and cable, switchboards, switchgear, panelboards, and other items and arrangements for the specified items are shown on the drawings. |
| C. | Electrical service entrance equipment and arrangements for temporary and permanent connections to the electric utility company’s system shall conform to the electric utility company's requirements. Coordinate fuses, circuit breakers and relays with the electric utility company’s system, and obtain electric utility company approval for sizes and settings of these devices. |
| D. | Conductor ampacities specified or shown on the drawings are based on copper conductors, with the conduit and raceways sized per NEC. Aluminum conductors are prohibited for 20 amp or below unless noted on the plans. Aluminum conductors can be used for pedestals if the contractor supplies the calculations showing the wire size and voltage drop are equal to the specified copper conductor. |
1.2 MINIMUM REQUIREMENTS
| A. | The latest International Building Code (IBC), Underwriters Laboratories, Inc. (UL), Institute of Electrical and Electronics Engineers (IEEE), and National Fire Protection Association (NFPA) codes and standards are the minimum requirements for materials and installation. |
| B. | The drawings and specifications shall govern in those instances where requirements are greater than those stated in the above codes and standards. |
1.3 TEST STANDARDS
| A. | All materials and equipment shall be listed, labeled, or certified by a Nationally Recognized Testing Laboratory (NRTL) to meet Underwriters Laboratories, Inc. (UL), standards where test standards have been established. Materials and equipment which are not covered by UL standards will be accepted, providing that materials and equipment are listed, labeled, certified or otherwise determined to meet the safety requirements of a NRTL. Materials and equipment which no NRTL accepts, certifies, lists, labels, or determines to be safe, will be considered if inspected or tested in accordance with national industrial standards, such as ANSI, NEMA, and NETA. Evidence of compliance shall include certified test reports and definitive shop drawings. |
| B. | Definitions: |
| 1. | Listed: Materials and equipment included in a list published by an organization that is acceptable to the Authority Having Jurisdiction and concerned with evaluation of products or services, that maintains periodic inspection of production or listed materials and equipment or periodic evaluation of services, and whose listing states that the materials and equipment either meets appropriate designated standards or has been tested and found suitable for a specified purpose. |
| 2. | Labeled: Materials and equipment to which has been attached a label, symbol, or other identifying mark of an organization that is acceptable to the Authority Having Jurisdiction and concerned with product evaluation, that maintains periodic inspection of production of labeled materials and equipment, and by who’s labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner. |
| 3. | Certified: Materials and equipment which: |
| a. | Have been tested and found by a NRTL to meet nationally recognized standards or to be safe for use in a specified manner. |
| b. | Are periodically inspected by a NRTL. |
| c. | Bear a label, tag, or other record of certification. |
| 4. | Nationally Recognized Testing Laboratory: Testing laboratory which is recognized and approved by the Secretary of Labor in accordance with OSHA regulations. |
1.4 QUALIFICATIONS (PRODUCTS AND SERVICES)
| A. | Manufacturer’s Qualifications: The manufacturer shall regularly and currently produce, as one of the manufacturer's principal products, the materials and equipment specified for this project, and shall have manufactured the materials and equipment for at least three years. |
| B. | Product Qualification: |
| 1. | Manufacturer's materials and equipment shall have been in satisfactory operation, on three installations of similar size and type as this project, for at least three years. |
| 2. | The Government reserves the right to require the Contractor to submit a list of installations where the materials and equipment have been in operation before approval. |
1.5 APPLICABLE PUBLICATIONS
| A. | Applicable publications listed in all Sections of Division 26 shall be the latest issue, unless otherwise noted. |
| B. | Products specified in all sections of Division 26 shall comply with the applicable publications listed in each section. |
1.6 MANUFACTURED PRODUCTS
| A. | Materials and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacture of such items, and for which replacement parts shall be available. Materials and equipment furnished shall be new and shall have superior quality and freshness. |
| B. | When more than one unit of the same class or type of materials and equipment is required, such units shall be the product of a single manufacturer. |
| C. | Equipment Assemblies and Components: |
| 1. | Components of an assembled unit need not be products of the same manufacturer. |
| 2. | Manufacturers of equipment assemblies, which include components made by others, shall assume complete responsibility for the final assembled unit. |
| 3. | Components shall be compatible with each other and with the total assembly for the intended service. |
| 4. | Constituent parts which are similar shall be the product of a single manufacturer. |
| D. | Factory wiring and terminals shall be identified on the equipment being furnished and on all wiring diagrams. |
1.7 variations from contract requirements A. Where the Government or the Contractor requests variations from the contract requirements, the connecting work and related components shall include, but not be limited to additions or changes to branch circuits, circuit protective devices, conduits, wire, feeders, controls, panels and installation methods.
1.8 MATERIALS AND EQUIPMENT PROTECTION
| A. | Materials and equipment shall be protected during shipment and storage against physical damage, vermin, dirt, corrosive substances, fumes, moisture, cold and rain. |
| 1. | Store materials and equipment indoors in clean dry space with uniform temperature to prevent condensation. |
| 2. | During installation, equipment shall be protected against entry of foreign matter, and be vacuum-cleaned both inside and outside before testing and operating. Compressed air shall not be used to clean equipment. Remove loose packing and flammable materials from inside equipment. |
| 3. | Damaged equipment shall be repaired or replaced, as determined by the CONTRACTING OFFICER’S REPRESENTATIVE (COR). |
| 4. | Painted surfaces shall be protected with factory installed removable heavy kraft paper, sheet vinyl or equal. |
| 5. | Damaged paint on equipment shall be refinished with the same quality of paint and workmanship as used by the manufacturer so repaired areas are not obvious. |
1.9 WORK PERFORMANCE
| A. | All electrical work shall comply with requirements of the latest NFPA 70 (NEC), NFPA 70B, NFPA 70E, NFPA 99, NFPA 110, OSHA Part 1910 subpart J – General Environmental Controls, OSHA Part 1910 subpart K – Medical and First Aid, and OSHA Part 1910 subpart S – Electrical, in addition to other references required by contract. |
| B. | Job site safety and worker safety is the responsibility of the Contractor. |
| C. | Electrical work shall be accomplished with all affected circuits or equipment de-energized. However, energized electrical work may be performed only for the non-destructive and non-invasive diagnostic testing(s), safety, or physical security. In such case, all aspects of energized electrical work, such as the availability of appropriate/correct personal protective equipment (PPE) and the use of PPE, shall comply with the latest NFPA 70E, as well as the following requirements: |
| 1. | Only Qualified Person(s) shall perform energized electrical work. Supervisor of Qualified Person(s) shall witness the work of its entirety to ensure compliance with safety requirements and approved work plan. |
| 2. | At least two weeks before initiating any energized electrical work, the Contractor and the Qualified Person(s) who is designated to perform the work shall visually inspect, verify and confirm that the work area and electrical equipment can safely accommodate the work involved. |
| 3. | Energized electrical work shall begin only after the Contractor has invited and received acknowledgment from the COR, or his/her designee to witness the work. |
| D. | For work that affects existing electrical systems, arrange, phase and perform work to assure minimal interference with normal functioning of the facility. |
| E. | New work shall be installed and connected to existing work neatly, safely and professionally. Disturbed or damaged work shall be replaced or repaired to its prior conditions. |
| F. | Coordinate location of equipment and conduit with other trades to minimize interference. |
1.10 EQUIPMENT INSTALLATION AND REQUIREMENTS
| A. | Equipment location shall be as close as practical to locations shown on the drawings. |
| B. | Working clearances shall not be less than specified in the NEC. |
| C. | Inaccessible Equipment: |
| 1. | Where the Government determines that the Contractor has installed equipment not readily accessible for operation and maintenance, the equipment shall be removed and reinstalled as directed at no additional cost to the Government. |
| 2. | "Readily accessible” is defined as being capable of being reached quickly for operation, maintenance, or inspections without the use of ladders, or without climbing or crawling under or over obstacles such as, but not limited to, motors, pumps, belt guards, transformers, piping, ductwork, conduit and raceways. |
| D. | Electrical service entrance equipment and arrangements for temporary and permanent connections to the electric utility company’s system shall conform to the electric utility company's requirements. Coordinate fuses, circuit breakers and relays with the electric utility company’s system and obtain electric utility company approval for sizes and settings of these devices. |
1.11 EQUIPMENT IDENTIFICATION
A. In addition to the requirements of the NEC, install an identification sign which clearly indicates information required for use and maintenance of items such as switchboards and switchgear, panelboards, cabinets, motor controllers, fused and non-fused safety switches, separately enclosed circuit breakers, individual breakers and controllers in switchboards, switchgear and motor control assemblies, control devices and other significant equipment.
| B. | Identification signs for Normal Power System equipment shall be laminated black phenolic resin with a white core with engraved lettering. Identification signs for Essential Electrical System (EES) equipment, as defined in the NEC, shall be laminated red phenolic resin with a white core with engraved lettering. Lettering shall be a minimum of 12 mm (1/2 inch) high. Identification signs shall indicate equipment designation, rated bus amperage, voltage, number of phases, number of wires, and type of EES power branch as applicable. Secure nameplates with screws. |
| C. | Install adhesive arc flash warning labels on all equipment as required by the latest NFPA 70E. Label shall show specific and correct information for specific equipment based on its arc flash calculations. Label shall show the followings: |
| 1. | Nominal system voltage. |
| 2. | Equipment/bus name, date prepared, and manufacturer name and address. |
| 3. | Arc flash boundary. |
| 4. | Available arc flash incident energy and the corresponding working distance. |
| 5. | Minimum arc rating of clothing. |
| 6. | Site-specific level of PPE. |
1.12 SINGULAR NUMBER
A. Where any device or part of equipment is referred to in these specifications in the singular number (e.g., "the switch"), this reference shall be deemed to apply to as many such devices as are required to complete the installation as shown on the drawings.
1.13 Acceptance Checks and Tests
| A. | The Contractor shall furnish the instruments, materials, and labor for tests. |
| B. | Where systems are comprised of components specified in more than one section of Division 26, the Contractor shall coordinate the installation, testing, and adjustment of all components between various manufacturer’s representatives and technicians so that a complete, functional, and operational system is delivered to the Government. |
| C. | When test results indicate any defects, the Contractor shall repair or replace the defective materials or equipment and repeat the tests for the equipment. Repair, replacement, and re-testing shall be accomplished at no additional cost to the Government. |
- - - END OF SECTION - - -
Requirements for Electrical Installations 260511-2
DIVISION 31 – EARTHWORK
SECTION 312000 - EARTHwork
SECTION 312000
EARTHwork
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK:
| A. | This section specifies the requirements for furnishing all equipment, materials, labor, tools, and techniques for earthwork including, but not limited to, the following: |
| 1. | Site preparation. |
| 2. | Excavation. |
| 4. | Filling and backfilling. |
| 5. | Grading. |
| 6. | Soil Disposal. |
| 7. | Clean Up. |
1.2 DEFINITIONS:
| A. | Unsuitable Materials: |
| 1. | Fills: Topsoil; frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 2 inches; organic material, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable and any material with a liquid limit and plasticity index exceeding 40 and 15 respectively. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction, as defined by ASTM D 698. |
| 2. | Existing Subgrade (Except Footing Subgrade): Same materials as 1.2.A.1, that are not capable of direct support of slabs, pavement, and similar items with possible exception of improvement by compaction, proofrolling, or similar methods. |
| 3. | Existing Subgrade (Footings Only): Same as paragraph 1, but no fill or backfill. If materials differ from design requirements, excavate to acceptable strata subject to Contracting Officer’s Representative (COR) approval. |
| B. | Building Earthwork: Earthwork operations required in area enclosed by a line located 1500 mm (5 feet) outside of principal building perimeter. It also includes earthwork required for auxiliary structures and buildings. |
| C. | Trench Earthwork: Trenchwork required for utility lines. |
| D. | Degree of compaction: Degree of compaction is expressed as a percentage of maximum density obtained by laboratory test procedure. This percentage of maximum density is obtained through use of data provided from results of field test procedures presented in ASTM D1556, ASTM D2167, and ASTM D6938. |
| E. | Fill: Satisfactory soil materials used to raise existing grades. In the Construction Documents, the term “fill” means fill or backfill as appropriate. |
| F. | Backfill: Soil materials or controlled low strength material used to fill an excavation. |
| G. | Subgrade: The undisturbed earth or the compacted soil layer immediately below granular sub-base, drainage fill, or topsoil materials. |
| H. | Structure: Buildings, foundations, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface. |
| I. | Borrow: Satisfactory soil imported from off-site for use as fill or backfill. |
| J. | Drainage course: Layer supporting slab-on-grade used to minimize capillary flow of pore water. |
| K. | Bedding course: Layer four (4) inches thick placed over the excavated sub-grade in a trench before laying pipe. Bedding course shall extend to ten (10) inches over the top of the pipe or utility. |
| L. | Sub-base Course: Layer placed between the sub-grade and base course for asphalt paving or layer placed between the sub-grade and a concrete pavement or walk. |
| M. | Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings. |
| N. | Debris: Debris includes all materials located within the designated work area not covered in the other definitions and shall include but not be limited to items like vehicles, equipment, appliances, building materials or remains thereof, tires, any solid or liquid chemicals or products stored or found in containers or spilled on the ground. |
PART 2 - PRODUCTS
2.1 MATERIALS:
| A. | General: Provide borrow soil material when sufficient satisfactory soil materials are not available from excavations. |
| B. | Fills and Trench Backfills: Material in compliance with ASTM D2487 Soil Classification Groups GW, GP, GM, SW, SP, SM, SC, and ML, or any combination of these groups; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter. Material approved from on site or off-site sources having a minimum dry density of 110 pcf, a maximum Plasticity Index of 15, and a maximum Liquid Limit of 40. |
| C. | Engineered Fill: Naturally or artificially graded mixture of compliance with ASTM D2487 Soil Classification Groups GW, GP, GM, SW, AND SP or any combination of these groups, or as approved by the Engineer or material with at least 90 percent passing a 1 1/2-inch sieve and not more than 12 percent passing a No. 200 sieve, per ASTM D2940;. |
| D. | Native Backfill for Pipe/Utility Bedding and Cover: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940; except with 100 percent passing a 2-inch sieve and not more than 8 percent passing a No. 200 sieve. |
E. Buried Warning and Identification Tape: Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3-inch minimum width, color coded as specific below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, “CAUTION, BURIED (intended service) LINE BELOW” or similar wording. Color and printing shall be permanent, Unaffected by moisture or soil. Warning tape color codes:
| Red | Electrical Lines |
| Blue: | Water Systems |
| Green | Sewer Systems |
PART 3 - EXECUTION
3.1 SITE PREPARATION:
| A. | Clearing: Clear within limits of earthwork operations as shown. Work includes removal of trees, shrubs, fences, foundations, incidental structures, paving, debris, trash, and other obstructions. |
| B. | Grubbing: Remove stumps and roots 3 inch and larger diameter. Undisturbed sound stumps roots up to 3-inch diameter, and nonperishable solid objects a minimum of 3 feet below subgrade or finished embankment may be left. |
| C. | Trees and Shrubs: Trees and shrubs, not shown for removal, may be removed from areas within 15 feet of new construction and 7.5 feet of utility lines when removal is approved in advance by Contract Officer Representative (COR) |
| D. | Stripping Topsoil: Strip topsoil from within limits of earthwork operations as specified. Topsoil shall be a fertile, friable, natural topsoil of loamy character and characteristic of locality. T topsoil shall be capable of growing healthy horticultural crops of grasses. Stockpile topsoil and protect as directed by COR. Eliminate foreign materials, such as weeds, roots, stones, subsoil, frozen clods, and similar foreign materials larger than 1/2 cubic foot in volume, from soil as it is stockpiled. Retain topsoil on station. Remove foreign materials larger than 2 inches in any dimension from topsoil used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work shall not, under any circumstances, be carried out when soil is wet so that the composition of the soil will be destroyed. |
| E. | Concrete Slabs and Paving: Score deeply or saw cut to insure a neat, straight cut, sections of existing concrete slabs and paving to be removed where excavation or trenching occurs. Extend pavement section to be removed a minimum of 12 inches on each side of widest part of trench excavation and insure final score lines are approximately parallel unless otherwise indicated. |
| F. | Disposal: All materials removed from the property shall be disposed of off of Government property at a legally approved site for the specific materials, and all removals shall be in accordance with all applicable Federal, State and local regulations. |
3.2 EXCAVATION:
| A. | Shoring, Sheeting and Bracing: Shore, brace, or slope, its angle of repose or to an angle banks of excavations to protect workmen, banks, adjacent paving, structures, and utilities. |
| 1. | Design of the temporary support of excavation system is the responsibility of the Contractor. |
| B. | Subgrade Protection: Protect subgrades from softening, undermining, washout, or damage by rain or water accumulation. Reroute surface water runoff from excavated areas and not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches. When subgrade for foundations has been disturbed by water, remove disturbed material to firm undisturbed material after water is brought under control. Replace disturbed subgrade in trenches with concrete or material approved by the COR. |
| C. | Proofrolling: |
| 1. | After rough grade has been established in cut areas and prior to placement of fill in fill areas under building and pavements, proofroll exposed subgrade with a fully loaded dump truck to check for pockets of soft material. |
| 2. | Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. |
| D. | Building Earthwork: |
| 1. | Excavation shall be accomplished as required by drawings and specifications. |
| 2. | Excavate foundation excavations to solid undisturbed subgrade. |
| 3. | Remove loose or soft materials to a solid bottom. |
| 4. | Fill excess cut under footings or foundations with 3000 psi concrete poured separately from the footings. |
| 5. | Do not tamp earth for backfilling in footing bottoms, except as specified. |
| 6. | Slope grades to direct water away from excavations and to prevent ponding. |
| 7. | Capillary water barrier (granular fill) under concrete floor and area-way slabs on grade shall be placed directly on the subgrade and shall be compacted with a minimum of two passes of a hand-operated plate-type vibratory compactor. |
| 8. | Ensure that footing subgrades have been inspected and approved by the COR prior to concrete placement. Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the COR. Backfill and compact over excavations and changes in grade due to pile driving operations to 95 percent of ASTM D698 maximum density. |
| E. | Trench Earthwork: |
| 1. | Utility trenches (except sanitary and storm sewer): |
| a. | Excavate to a width necessary proper performance of the work but not less than 24 inches. |
| b. | Grade bottom of trenches flat. |
| c. | Unstable material removed from the bottom of the trench or excavation shall be replaced with suitable native or existing backfill placed in layers not exceeding 150 mm (6 inches) loose thickness. |
| d. | Length of open trench in advance of piping laying shall not be greater than is authorized by COR. |
| e. | Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 9 inches below top of subgrade |
This is the start of the file's text. The full file is on GovTribe.