Railroad Construction Single Award Task Order (SATOC) Military Ocean Terminal Sunny Point, North Carolina - (MOTSU)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912PM-21-R-0004
Agency
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

Place of performance
Wilmington, North Carolina 28403, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This acquisition is being offered as 8(a).  For this procurement only 8(a) Small Businesses are eligible to submit for this solicitation. 

All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, state codes, Manual on Uniform Traffic Control Devices (MUTCD), UFC 4-460-03 Railroad Track Maintenance and Safety Standards, UFC 4-860-01FA Railroad Design and Rehabilitation, UFGS 34 11 00 Railroad Track and Accessories and American Railway Engineering and Maintenance-of-way Association’s (AREMA) Manual for Railway Engineering.  Reference North Carolina Department of Transportation (NCDOT), and American Society for Testing and Materials (ASTM) requirements for construction and testing of materials.

There are approximately 120 miles of jointed track in the railroad network at MOTSU. In August 2020, U.S. Army Engineer Research and Development Center (ERDC) personnel conducted a detailed track inspection of the entire rail network for deficiencies. This SATOC Contract shall repair defects identified in ERDC’s initial inspection summary as well include continued on-going rail maintenance, as required.

Update #1 ·

This acquisition is being offered as 8(a).  For this procurement only 8(a) Small Businesses are eligible to submit for this solicitation. 

All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, state codes, Manual on Uniform Traffic Control Devices (MUTCD), UFC 4-460-03 Railroad Track Maintenance and Safety Standards, UFC 4-860-01FA Railroad Design and Rehabilitation, UFGS 34 11 00 Railroad Track and Accessories and American Railway Engineering and Maintenance-of-way Association’s (AREMA) Manual for Railway Engineering.  Reference North Carolina Department of Transportation (NCDOT), and American Society for Testing and Materials (ASTM) requirements for construction and testing of materials.

There are approximately 120 miles of jointed track in the railroad network at MOTSU. In August 2020, U.S. Army Engineer Research and Development Center (ERDC) personnel conducted a detailed track inspection of the entire rail network for deficiencies. This SATOC Contract shall repair defects identified in ERDC’s inspection report as well include continued on-going rail maintenance, as required.

Files

File Type Posted
HOLD DOWN DEVICES IMAGES.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 2APR21.xlsx XLSX spreadsheet
GROUND THROW LEVER IMAGE ISO BI_9136142.pdf PDF
01 00 04 Amendment 0006.pdf PDF
SATOC BID SCHEDULE A 2APR21 REVISION.xlsx XLSX spreadsheet
W912PM21R0004-0006.pdf PDF
MOTSU SOW Rail SATOC SEED Project-AMDT0004.pdf PDF
Copy of SATOC BID SCHEDULE A 24MAR REVISION.xlsx XLSX spreadsheet
SF24 (blank).pdf PDF
W912PM21R0004 AMENDMENT 0004 BIDDER INQUIRY RESPONSES.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 30MAR.xlsx XLSX spreadsheet
W912PM21R0004 0004.pdf PDF
SATOC BID SCHEDULE A revised.xlsx XLSX spreadsheet
W912PM21R0004-0003.pdf PDF
2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Post Inspection Memo (1).pdf PDF
REVISED SECTION 01 00 04 Amendment 0002 .pdf PDF
W912PM21R0004-0002.pdf PDF
SATOC BID SCHEDULE A.xlsx XLSX spreadsheet
SATOC SEED PROJECT BID SCHEDULE B.xlsx XLSX spreadsheet
MOTSU SOW Rail SATOC SEED Project-RTA.pdf PDF
RAIL SATOC RTA.pdf PDF
W912PM21R0004 ATTACHMENT 2 PAST PERFORMANCE SUMMARY.pdf PDF
W912PM21R0004 ATTACHMENT 3 PAST PERFORMANCE QUESTIONANAIRE PPQ.pdf PDF
W912PM21R0004 ATTACHMENT 6 DFARS 215.215-7009 PROPOSAL ADEQUACY CHECKLIST (JAN 2014).pdf PDF
A21 - W912PM-21-R-0004-0001(Amendment 0001).pdf PDF
Questions and Answers 0001.pdf PDF
W912PM21R0004 ATTACHMENT 1 PAST EXPERIENCE.pdf PDF
A21 -W912PM-21-R-0004.pdf PDF
Show all 28

Notice history

Notice Type Posted
Railroad Construction Single Award Task Order (SATOC) Military Ocean Terminal Sunny Point, North Carolina - (MOTSU) Award Award Notice
This notice Latest solicitation Solicitation
Railroad SATOC Pre-Solicitation
Railroad SATOC Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors