View the file

Other files

File Type Posted
HOLD DOWN DEVICES IMAGES.pdf PDF
W912PM21R0004-0006.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 2APR21.xlsx XLSX spreadsheet
01 00 04 Amendment 0006.pdf PDF
SATOC BID SCHEDULE A 2APR21 REVISION.xlsx XLSX spreadsheet
GROUND THROW LEVER IMAGE ISO BI_9136142.pdf PDF
W912PM21R0004 0004.pdf PDF
W912PM21R0004 AMENDMENT 0004 BIDDER INQUIRY RESPONSES.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 30MAR.xlsx XLSX spreadsheet
MOTSU SOW Rail SATOC SEED Project-AMDT0004.pdf PDF
SF24 (blank).pdf PDF
Copy of SATOC BID SCHEDULE A 24MAR REVISION.xlsx XLSX spreadsheet
2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Post Inspection Memo (1).pdf PDF
SATOC BID SCHEDULE A revised.xlsx XLSX spreadsheet
RAIL SATOC RTA.pdf PDF
MOTSU SOW Rail SATOC SEED Project-RTA.pdf PDF
SATOC BID SCHEDULE A.xlsx XLSX spreadsheet
W912PM21R0004-0002.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B.xlsx XLSX spreadsheet
REVISED SECTION 01 00 04 Amendment 0002 .pdf PDF
W912PM21R0004 ATTACHMENT 6 DFARS 215.215-7009 PROPOSAL ADEQUACY CHECKLIST (JAN 2014).pdf PDF
Questions and Answers 0001.pdf PDF
A21 - W912PM-21-R-0004-0001(Amendment 0001).pdf PDF
W912PM21R0004 ATTACHMENT 1 PAST EXPERIENCE.pdf PDF
W912PM21R0004 ATTACHMENT 3 PAST PERFORMANCE QUESTIONANAIRE PPQ.pdf PDF
W912PM21R0004 ATTACHMENT 2 PAST PERFORMANCE SUMMARY.pdf PDF
A21 -W912PM-21-R-0004.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to

1) Correct Administrative error - chane ERDC Inspection Report to ERDC Initial Summary memorandum,

2) Publish revision to SATOC Bid Schedule A - formatting changes and instructions added,

3) Publuish the 2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Memo Note: The final inspection report is not required to generate unit cost in response to this solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM21R0004

X 9B. DATED (SEE ITEM 11)

04-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Mar-2021

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM21R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

Amendment 0003

PURPOSE:

1. Publish revised SATOC BID SCHEUDLE A -changes made to formatting and instructions added.

2. Publish 2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Post Inspection Memorandum

3. Correct Administrative Error - Change "ERDC Inspection report" to “ERDC initial summary memorandum".

NOTE 1: A copy is of the memorandum is attached to this amendment.

ATTACHMENT(S) UPLOADED:

SATOC BID SCHEUDLE A revised Notes:

1. Changes are formatting and instructional, there are no changes to CLINS

2. Offerors are to calculate the pricing for option years by multiplying the prior year unit price by the current year escalation factor, i.e., OY1 Price =Base Year Unit price x OY1 escalation factor

2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Post Inspection Memorandum

CHANGES TO SOLICITATION:

A. Throughout the solicitation STRIKE "ERDC Inspection report" and REPLACE WITH: “ERDC initial summary memorandum".

NOTE:

1. A copy of the summary MOTSU visual and ultrasonic railroad track inspection memorandum has been attached to Amendment 0003

2. The final inspection report is not required to generate unit cost in response to this solicitation.

B. In section 1) of Attachment 1 Scope of Work, the following changes are made to MOTSU SOW Rail SATOC SEED Project-RTA

In the first paragraph STRIKE: “…ERDC Inspection Report,” REPLACE WITH: “…ERDC Inspection Spreadsheet,”

In the second paragraph STRIKE: “…results of ERDC’s inspection can…” REPLACE WITH: “…results of ERDC’s inspection (Priorities #1-#18) can…”

In the third paragraph STRIKE: “…ERDC Inspection Report,”

W912PM21R0004

REPLACE WITH: “…ERDC Inspection Spreadsheet,” C. BLOCK 10 is changed SECTION 00 10 00 - SOLICITATION

The required performance has changed FROM: RAIL ROAD CONSTRUCTION SINGLE AWARD TASK ORDER (SATOC) MILITARY OCEAN TERMINAL SUNNY POINT, NORTH CAROLINA - (MOTSU)This acquisition is being offered as a 8(a). For this procurement, only 8(a) Small Businesses are eligible to submit offers for this solicitation. This solicitation is Firm Fixed Price using All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, state codes, Manual on Uniform Traffic Control Devices (MUTCD), UFC 4-460-03 Railroad Track Maintenance and Safety Standards, UFC 4-860-01FA Railroad Design and Rehabilitation, UFGS 34 11 00 Railroad Track and Accessories and American Railway Engineering and Maintenance-of-way Association’s (AREMA) Manual for Railway Engineering. Reference North Carolina Department of Transportation (NCDOT), and American Society for Testing and Materials (ASTM) requirements for construction and testing of materials. There are approximately 120 miles of jointed track in the railroad network at MOTSU. This SATOC Contract shall repair defects identified in ERDC’s inspection report dated August 2020 as well include continued on-going rail maintenance, as required.

TO: RAILROAD CONSTRUCTION SINGLE AWARD TASK ORDER (SATOC) MILITARY OCEAN TERMINAL SUNNY

POINT, NORTH CAROLINA - (MOTSU)

This acquisition is being offered as a 8(a). For this procurement, only 8(a) Small Businesses are eligible to submit offers for this solicitation. This solicitation is Firm Fixed Price.

All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, state codes, Manual on Uniform Traffic Control Devices (MUTCD), UFC 4-460-03 Railroad Track Maintenance and Safety Standards, UFC 4-860-01FA Railroad Design and Rehabilitation, UFGS 34 11 00 Railroad Track and Accessories and American Railway Engineering and Maintenance-of-way Association’s (AREMA) Manual for Railway Engineering. Reference North Carolina Department of Transportation (NCDOT), and American Society for Testing and Materials (ASTM) requirements for construction and testing of materials.

There are approximately 120 miles of jointed track in the railroad network at MOTSU. This SATOC Contract shall repair defects identified in ERDC’s initial summary memorandum as well include continued on-going rail maintenance, as required.

(End of Summary of Changes)