RAIL ROAD CONSTRUCTION SINGLE AWARD TASK ORDER (SATOC) MILITARY OCEAN TERMINAL SUNNY POINT, NORTH CAROLINA - (MOTSU)
This acquisition is being offered as a 8(a). For this procuement , only 8(a) Small Businesses are eligible to submit offers for this solicitation.
This solicitation is Firm Fixed Price using
All w ork shall be performed in accordance w ith the contract specif ications, manufacturer’s recommendations, state codes, Manual on Uniform
Traff ic Control Devices (MUTCD), UFC 4-460-03 Railroad Track Maintenance and Safety Standards, UFC 4-860-01FA Railroad Design and
Rehabilitation, UFGS 34 11 00 Railroad Track and Accessories and American Railw ay Engineering and Maintenance-of-w ay Association’s
(AREMA) Manual for Railw ay Engineering. Reference North Carolina Department of Transportation (NCDOT), and American Society for
Testing and Materials (ASTM) requirements for construction and testing of materials.
There are approximately 120 miles of jointed track in the railroad netw ork at MOTSU. This SATOC Contract shall repair defects identif ied in
ERDC’s inspection report dated August 2020 as w ell include continued on-going rail maintenance, as required.
ANDREA GREEN 910-251-4700
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
04-Mar-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4700 TEL: FAX:
W912PM21R0004 90
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOTSU RR SATOC - BASE YEARFFP
In accordance with the Scope of Work, Bid Schedule, Supplementary Conditions, and Statement of Work attached hereto and incorporated by reference. The
Contractor will furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform service and repair of deficient rail and associated appurtenances at Military Ocean
Terminal, Sunny Point (MOTSU), as well on-going rail maintenance, as required.
FOB: Destination
PSC CD: 2230
NET AMT
1001 1 Job OPTION MOTSU RR SATOC - Option Year 1FFP
In accordance with the Scope of Work, Bid Schedule, Supplementary Conditions, and Statement of Work attached hereto and incorporated by reference. The
Contractor will furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform service and repair of deficient rail and associated appurtenances at Military Ocean
Terminal, Sunny Point (MOTSU), as well on-going rail maintenance, as required.
2001 1 Job OPTION MOTSU RR SATOC - Option Year 2FFP
In accordance with the Scope of Work, Bid Schedule, Supplementary Conditions, and Statement of Work attached hereto and incorporated by reference. The
Contractor will furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform service and repair of deficient rail and associated appurtenances at Military Ocean
Terminal, Sunny Point (MOTSU), as well on-going rail maintenance, as required.
3001 1 Job OPTION MOTSU RR SATOC - Option Year 3FFP
In accordance with the Scope of Work, Bid Schedule, Supplementary Conditions, and Statement of Work attached hereto and incorporated by reference. The
Contractor will furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform service and repair of deficient rail and associated appurtenances at Military Ocean
Terminal, Sunny Point (MOTSU), as well on-going rail maintenance, as required.
4001 1 Job OPTION MOTSU RR SATOC - Option Period 4FFP
In accordance with the Scope of Work, Bid Schedule, Supplementary Conditions, and Statement of Work attached hereto and incorporated by reference. The
Contractor will furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform service and repair of deficient rail and associated appurtenances at Military Ocean
Terminal, Sunny Point (MOTSU), as well on-going rail maintenance, as required.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-AUG-2021 TO
31-JUL-2022
N/A ARMY CORPS OF ENGINEERS MOTSU
OFFICE
JEREMIAH L SMITH
6280 SUNNY POINT ROAD
SOUTHPORT NC 28461
910-251-4464
W912PM
1001 POP 01-AUG-2022 TO
31-JUL-2023
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-AUG-2023 TO
31-JUL-2024
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-AUG-2024 TO
31-JUL-2025
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 31-JUL-2025 TO
01-AUG-2026
N/A (SAME AS PREVIOUS LOCATION)
MOTSU RAILROAD REPAIR SATOC BI
SCHEDULE A MOTSU Railroad Repair SATOC Bid Schedule
WORK ACTION ITEMS (PRICE PER EACH) COST PER ONE UNIT
Add Ballast (Crib/Shoulder) $ CY
Clean Ballast (Undercut) $ TF
Reconstruct Ballast Section $ TF
Regulate and Dress Ballast $ TF
Repair/Fill Sink Hole $ CY
Surface, Align, and Dress Ballast (Skim Lift/Surf Smoothing) $ TF
Tamp Ballast Around Tie & Tighten Hold Down $ EA
Clean Flangeway $ LF
Eliminate End Gap $ EA
Eliminate Rail Mismatch (including transition and compromise joints, as required)
EA
Install or Replace Shoulder Tie Plate(s) $ EA
Install/Replace Bolts $ EA
Install or Replace Hold Down Device(s) $ EA
Install or Replace Pair of Joint Bars (varying holes) $ EA
Install or Replace Spike(s) $ EA
Plug/Treat Hole and Redrive Spike(s) $ EA
Repair Rail Bond (Thermite) $ EA
Replace Gauge Rod(s) $ EA
Tighten Bolts $ EA
Tighten Guage Rod(s) $ EA
Redrive Spike(s) $ EA
Reposition Bolts $ EA
Build Up Top of Rail and Grind $ EA
Drill Holes and Install Joint Bars $ EA
Replace Rail with New Rail/Longer Length Rail (including transition and compromise joints, as required)
Install/Replace Ties (7"x9"x8.5') $ EA
Regauge Track Portion $ TF
Reposition Tie $ EA
Adjust and Lubricate Switch $ EA
Build Up Frog Point and Grind $ EA
Build Up Frog Surface and Grind $ EA
Build Up Switch Point and Grind $ EA
Clean Crib Areas $ EA
Clean Flangeways $ EA
Correct Gauge $ EA
Grind and Dress Frog $ EA
Install Cotter Key $ EA
Install or Replace Frog Bolt Assembly $ EA
Install or Replace Ground Throw Lever $ EA
Install or Replace Guard Rail Bolt Assembly $ EA
Install or Replace Heel Bolt Assembly $ EA
Install or Replace Heel Filler (Heel Block) $ EA
WORK ACTION ITEMS (PRICE PER EACH) COST PER ONE UNIT
Install or Replace Reinforcing Bar Bolts/Rivets $ EA
Install or Replace Switch Clip Bolt Assembly $ EA
Install or Replace Switch Rod $ EA
Install or Replace Switch Rod Bolt Assembly $ EA
Install or Replace Target/Lamp $ EA
Install/Replace Head Block $ EA
Rebuild Frog $ EA
Reposition and Tighten Twin Tie Plates (Hook Plates) $ EA
Surface, Align, and Dress Turnout (General) $ EA
Tighten (Respike) Rail Brace (Fixed) $ EA
Tighten All Bolts in Turnout $ EA
Tighten Connecting Rod Bolts $ EA
Tighten Frog Bolt $ EA
Tighten Guard Rail $ EA
Tighten Guard Rail Bolt $ EA
Tighten Heel Bolts $ EA
Tighten Rail Brace (Adjustable) $ EA
Tighten Reinforcing Bar Bolts/Rivets $ EA
Tighten Switch Clip Bolts $ EA
Tighten Switch Rod Bolts $ EA
Tighten/Adjust Guard Rail Filler (Separator Block) $ EA
Tighten/Adjust Heel Joint Bar $ EA
Tighten/Adjust Switch Clip $ EA
Tighten/Respike/Adjust Lock/Lever Latch $ EA
Tighten/Respike/Adjust Switch Stand $ EA
Install/Replace 10' Switch Tie $ EA
Install/Replace 11' Switch Tie $ EA
Install/Replace 12' Switch Tie $ EA
Install/Replace 13' Switch Tie $ EA
Install/Replace 14' Switch Tie $ EA
Install/Replace 15' Switch Tie $ EA
Install/Replace 16' Switch Tie $ EA
Install/Replace 9' Switch Tie $ EA
Anticipated Salvage Value of Rail Components $ TON
COEFFICIENT SCHEDULE
Design‐Build (DB) Coeff
ENGINEER PRICE SCHEDULE (EPS):
*Rates shall be fully loaded to include all OH, Profit, and Bond.
Electrical Engineer $ HR
Structural Engineer $ HR
Civil Engineer $ HR
Surveyor $ HR
2‐man Survey Crew $ HR
Geotechnical Engineer $ HR
The EPS will only be used if authorized in the delivery order or by the contracting office, unless stated it is to be assumed that the EPS is not to be utilized. Profit shall be based on weighted guidelines, and included in the coefficient.
PRICE PER EACH:
Reproduction Copies: 22x34 $ EA
Reproduction Copies: 8.5x11 $ EA
Reproduction Copies Color: 8.5x11 $ EA
Reproduction Copies: 11x17 $ EA
Reproduction Copies Color: 11x17 $ EA
CD‐ROM (Material Only) $ EA
FIELD OFFICE STAFFING PRICE SCHEDULE (FOSPS):
*Rates shall be fully loaded to include all OH, Profit, and bond.
Superintendent $ HR
Quality Control Manager $ HR
Project Manager $ HR
Qualified Rail Inspector $ HR
Safety $ HR
Office Assistant $ HR
Laborer $ HR
Note: These rates will only be used if a staff is required for a field office per task order or agreed upon by the Contracting Officer. All other field office overhead requirements, unless excluded by this contract, are to be applied within the Design‐Bid coefficients, the fees will not be negotiated separately. Profit shall be based on weighted guidelines and included in the coefficient.
MOTSU RAILROAD REPAIR SEED
MOTSU Railroad Repair ATOC SEED Project Bid Schedule B
CLIN # SUMMARY QUANTITY U/I UNIT $ TOTAL
CLIN 0001 Add Ballast (Crib/Shoulder) 1747 CY $
CLIN 0002 Clean Ballast (Undercut) 66738 TF $
CLIN 0003 Reconstruct Ballast Section 41 TF $
CLIN 0004 Regulate and Dress Ballast 73 TF $
CLIN 0005 Repair/Fill Sink Hole 35 CY $
CLIN 0006
Surface, Align, and Dress Ballast (Skim Lift/Surf Smoothing)
18301
TF
CLIN 0007 Tamp Ballast Around Tie & Tighten Hold Down 1 EA $
CLIN 0008 Clean Flangeway 4 LF $
CLIN 0009 Eliminate End Gap 3 EA $
CLIN 0010
Eliminate Rail Mismatch (including transition and compromise joints, as required)
CLIN 0011 Install or Replace Shoulder Tie Plate(s) 29 EA $
CLIN 0012 Install/Replace Bolts 2668 EA $
CLIN 0013 Install or Replace Pair of Joint Bars (varying holes) 80 EA $
CLIN 0014 Install or Replace Spike(s) 8 EA $
CLIN 0015 Plug/Treat Hole and Redrive Spike(s) 401 EA $
CLIN 0016 Repair Rail Bond (Thermite) 27 EA $
CLIN 0017 Replace Gauge Rod(s) 2 EA $
CLIN 0018 Tighten Bolts 903 EA $
CLIN 0019 Tighten Guage Rod(s) 11 EA $
CLIN 0020 Redrive Spike(s) 13 EA $
CLIN 0021 Reposition Bolts 8 EA $
CLIN 0022 Drill Holes and Install Joint Bars 3 EA $
CLIN 0023
Replace Rail with New Rail/Longer Length Rail (including transition and compromise joints, as required)
CLIN 0024 Install/Replace Ties (7"x9"x8.5') 11251 EA $
CLIN 0025 Regauge Track Portion 1413 TF $
CLIN 0026 Reposition Tie 4 EA $
CLIN 0027 Adjust and Lubricate Switch 36 EA $
CLIN 0028 Build Up Frog Point and Grind 3 EA $
CLIN 0029 Build Up Frog Surface and Grind 4 EA $
CLIN 0030 Build Up Switch Point and Grind 1 EA $
CLIN 0031 Clean Crib Areas 12 EA $
CLIN 0032 Clean Flangeways 1 EA $
CLIN 0033 Correct Gauge 138 EA $
CLIN 0034 Grind and Dress Frog 70 EA $
CLIN 0035 Install Cotter Key 26 EA $
CLIN 0036 Install or Replace Guard Rail Bolt Assembly 6 EA $
CLIN 0037 Install or Replace Heel Bolt Assembly 6 EA $
CLIN 0038 Install or Replace Heel Filler (Heel Block) 4 EA $
CLIN 0039 Install or Replace Switch Rod 1 EA $
CLIN 0040 Install or Replace Switch Rod Bolt Assembly 1 EA $
CLIN 0041 Install or Replace Target/Lamp 3 EA $
CLIN 0042 Install/Replace Head Block 7 EA $
CLIN 0043 Rebuild Frog 9 EA $
CLIN 0044 Reposition and Tighten Twin Tie Plates (Hook Plates)
1 EA $
CLIN 0045 Surface, Align, and Dress Turnout (General) 7 EA $
CLIN 0046 Tighten (Respike) Rail Brace (Fixed) 219 EA $
CLIN 0047 Tighten All Bolts in Turnout 11 EA $
CLIN 0048 Tighten Connecting Rod Bolts 1 EA $
CLIN 0049 Tighten Frog Bolt 15 EA $
CLIN 0050 Tighten Guard Rail 1 EA $
CLIN 0051 Tighten Guard Rail Bolt 34 EA $
CLIN 0052 Tighten Heel Bolts 123 EA $
CLIN 0053 Tighten Rail Brace (Adjustable) 3 EA $
CLIN 0054 Tighten Reinforcing Bar Bolts/Rivets 2 EA $
CLIN 0055 Tighten Switch Clip Bolts 9 EA $
CLIN 0056 Tighten Switch Rod Bolts 1 EA $
CLIN 0057 Tighten/Adjust Guard Rail Filler (Separator Block) 21 EA $
CLIN 0058 Tighten/Adjust Heel Joint Bar 2 EA $
CLIN 0058 Tighten/Adjust Switch Clip 7 EA $
CLIN 0060 Tighten/Respike/Adjust Lock/Lever Latch 4 EA $
CLIN 0061 Tighten/Respike/Adjust Switch Stand 22 EA $
CLIN # SUMMARY QUANTITY U/I UNIT $ TOT
AL
CLIN 0062 Install/Replace 10' Switch Tie 127 EA $
CLIN 0063 Install/Replace 11' Switch Tie 71 EA $
CLIN 0064 Install/Replace 12' Switch Tie 76 EA $
CLIN 0065 Install/Replace 13' Switch Tie 93 EA $
CLIN 0066 Install/Replace 14' Switch Tie 60 EA $
CLIN 0067 Install/Replace 15' Switch Tie 61 EA $
CLIN 0068 Install/Replace 16' Switch Tie 96 EA $
CLIN 0069 Install/Replace 9' Switch Tie 127 EA $
CLIN 0070 Performance and Payment Bonds $
CLIN 0071 Anticpated Salvage Value of Rail Components 170 TON $
CLIN 0072 eCMRA:
Please refer to the ECMRA user guide at the website provided to assess the level of effort that will be required to comply with this requirement. Inputs may be reported anytime during the fiscal year, all data shall be reported no later than (NLT) October 31 of each calendar year. Invoicing for this CLIN shall not be submitted for payment until completion of reporting as indicated. Please utilize this website: https://www.ecmra.mil/default.aspx. If there is no cost associated with this requirement, ensure you input “not separately priced” (NSP) in the line item.
TOTAL Proposed FEE:
http://www.ecmra.mil/default.aspx
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.216-27 Single or Multiple Awards OCT 1995
52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
20.7% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Brunswick
County, North Carolina
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers – Wilmington District, ATTN: Contracting Division, 69 Darlington Avenue, Wilmington, North Carolina 28403
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
12 March 2021 at 9:00am
(c) Participants will meet at— 8:00am
Pass & ID Office
Military Ocean Terminal at Sunny Point (MOTSU)
6280 Sunny Point Road SE
Southport,28461-5000
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
Section 00 21 13 - Instructions to Bidders
INSTRUCTIONS TO PROPOSERS
INSTRUCTIONS TO PROPOSERS
GENERAL INSTRUCTIONS & PROPOSAL FORMAT
1. OVERVIEW
1.1. This Request for Proposal (RFP) solicits for a Single Award Task Order Contract (SATOC) under which task orders for general repair and maintenance service of a 120-mile railroad terminal track system services a part of the rail right of way at one location. at Military Ocean Terminal Sunny Point (MOTSU), South Port, NC.
This RFP is a 100% 8(a) Small Business concern using competitive 8(a) procedures Small Business set-aside.
Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either of a
Construction or SRM nature. A project requiring use of civil funds is not authorized under this contract.
1.2. The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best
Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal
Acquisition Regulation 15.101-1). The proposal shall describe the capability of the Offeror to perform any resulting contract, and task orders issued there under, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract and task orders issued thereafter.
1.3. For the purposes of this solicitation, the Government will utilize a Best Value evaluation process. This will result in an award with a target of one (1) or more 8(a) Small Business Contractor based on Best Value to the
Government, price and other factors considered. The contract is for five (5) years. The total estimated value for the contract will is estimated at d $24,500,000.00. Projects will vary in size but are not expected to exceed $6,000,000.00.
1.4. Each offeror must submit both a Price Proposal and Technical Proposal, in addition to Past Performance
Questionnaires. The Price Proposal, Technical Proposal, and Past Performance Questionnaires must be submitted as separate volumes/files. All information intended to be evaluated as part of the Technical
Proposal must be submitted as part of the Technical Proposal. Do not cross reference similar material in the Price Proposal, or vice versa. The Price and the Technical Proposals in addition to the Past
Performance Questionnaires must be received by the closing date and time set for receipt of proposals. No dollar amounts from the Price Proposal are to be included in the Technical proposal. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.
The technical data criteria specified for each factor identified herein, shall be submitted as part of the proposal.
The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.
Failure to submit all the data required by the RFP and its Attachments, may be cause for determining a proposal incomplete and therefore may not considered for award.
1.5. Offers received for less than the stated number of items listed in the Bid Schedule will be considered ineligible for award. As set forth in FAR 52.215-1 (f)(4), the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR
15.306(a), Clarifications and award without discussions). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary. In the event that discussions are held, a competitive range determination will be made. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals
1.6. The Government will evaluate the performance capability proposals, both technical capability and price proposals in accordance with the criteria described herein and will select the highest rated Offeror for award.
2. GENERAL INSTRUCTIONS
2.1. In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the
Government reserves the right to make award without discussions. Therefore, offerors should submit their best past performance questionnaires and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the
Government. In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors –
Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Firms that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. A firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal. All executed teaming arrangements shall be submitted under
Volume 1, Tab D.
2.2. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the
Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor
Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The
Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. Any narrative provided should be incorporated into the Offeror’s proposal at Volume 1, Tab E.
2.3. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.4, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned
CAGE Code.
2.4. The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned
CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.
2.5. Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether an affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default. Successor entities shall clearly demonstrate in their proposal the official legal means performed to transform the former Predecessor Company to its Successor, legal business entity.
Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint
Venture Agreements, Novation Agreements, and Merger Documentation. Any narrative provided should be incorporated into the Offeror’s proposal at Volume 1, Tab E.
“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).
Note: The term “successor” does not include new offices/divisions of the same company or a company that only changes its name.
2.6. Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph
3.4.
2.7. Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.
2.8. Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT
3.1. Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2. Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one
Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3. All information intended to be evaluated as part of the Past Performance Volume must be submitted as part of the Past Performance Volume. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Past Performance Volume.
3.4. Electronic Submission. All Offerors must submit both a Price Proposal and a Technical Proposal via email, delivery and receipt requested, to the Wilmington District Contracting Division at SAW-CT-
MILITARYPROPOSALS@USACE.ARMY.MIL. Ensure the subject line of the email is formatted/contains the full solicitation number and the Offeror’s legal name, i.e., W912PM21R0004 John Q Public Contractor.
Note that attachments exceeding 15 MB may not be accepted by the email server. No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
3.5. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II, for both phases. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II), for each phase.
These two files should be named in a specific format: Solicitation Number, Offerors Company, and the volume (i.e. W912PM-20-R-0004_COMPANY NAME_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal and may result in the Offeror’s proposal being determined ineligible for award.
3.6. Offerors shall submit bid bonds (Standard Form 24) in both electronic and hard copy format. Electronic copies of bid bonds shall be included in Volume 1: Offerors Certifications and Price under Tab G. Hard copies of bid bonds shall be submitted via USPS, UPS, FedEx or DHL. Hand carried bid bonds will not be accepted. Bid bond submissions shall be due by the proposal due date and time to the following address:
mailto:SAW-CT-MILITARYPROPOSALS@USACE.ARMY.MIL mailto:SAW-CT-MILITARYPROPOSALS@USACE.ARMY.MIL
USACE-Wilmington
Contracting Division
Attn: Ms. Andrea Green
RFP# W912PM21R0004
69 Darlington Avenue
Wilmington, NC 28403
Proposal due Date and Time:
Request for Proposal No: W912PM21R0004
Due Date of Proposal: 5 April 2021
Time by which Proposals are due: 4:00 P.M. (Eastern Time)
Title of Project: Repair and Maintenance of Railroad Terminal Track System, MOTSU, South Port, NC
3.7. Submission Acceptance. The date and time of delivery will be established by the time of receipt by the email server (time stamped by the system), not by the date and time the offeror submits the proposal through their email account. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or more in some cases. Please make allowances for delays in transmittal. If an electronic submission is sent minutes before the deadline, but notification is not actually received in the recipients’ email inbox until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf.
Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals as identified herein. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
Proposals are due as specified on the solicitation document (as amended if applicable). The time & date of proposal receipt will be the upload completion/delivery time & date recorded by the email server. Do not assume that electronic communication is instantaneous. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. If an electronic submission is uploaded minutes before the deadline but the upload doesn’t complete until after the deadline, the submission will be considered late. Offerors are encouraged to keep a copy of the upload confirmation for their records.
3.8. Number of Copies. Offerors shall submit one (1) copy of Volume I and one (1) copy of Volume II, for both phases.
3.9. The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.
3.10. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.
3.11. Exceptions: Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.
3.12. PROPOSAL TABBING REQUIREMENTS. Proposals shall be organized and tabbed as follows:
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal. The total number of Pages for Volume I shall not exceed 100 Pages and Volume
II shall not exceed 200 Pages. The offerors submission for Solicitation W912PM20R0004 shall not exceed
300 pages in total.
3.12.1. VOLUME I OFFEROR’S CERTIFICATION AND PRICE (FACTOR 3)
TAB CONTENTS
A Cover Sheet
B Standard Form 1442
C Acknowledgement of Amendments (If Applicable)
D Proposal Adequacy Checklist
E Section 00 45 00 – Representations and Certifications
F Factor 3 Price
G Teaming Agreement
H Bid Guarantee (Bid Bond)
I Financial Information and Bonding Capability
TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:
PROPOSAL COVER
SHEET
1. The solicitation number;
2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System
(CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.
TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB C - If applicable - ALL amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.
TAB D – DFARS 252.215-7009 PROPOSAL ADEQUACY CHECKLIST (JAN 2014): The offeror shall complete the following checklist (attachment 6), providing location of requested information, or an explanation of why the requested information is not provided. In preparation of the offeror's checklist, offerors may elect to have their prospective subcontractors use the same or similar checklist as appropriate
TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.
NOTE: The offeror must submit either: a) evidence that they have a bona fide business determination from the SBA, or If they do not possess an existing determination, b) the offeror must submit a request for a bona fide business determination to the SBA district office servicing the offeror within 10 days of the solicitation date and include that submission as part of their proposal.
TAB F – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 -Solicitation, Contract Line Item
Number (CLIN) Schedule. Proposal Pricing Schedule, Section 00 10 00— Schedule A, Bid Schedule &
Schedule B, Seed Task Order Pricing.
TAB G – Teaming Agreements and Narratives, if applicable. See paragraph 2.2 and 2.3. Note to 8(a)—
SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.
TAB H - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid
Guarantee in both Hard copy and electronically in Tab H. Hard copies of Bid Guarantees (submitted via
UPS, FedEx, USPS, etc.) shall be addressed to the Contract Office at:
USACE – Wilmington District
Attention: Ms. Andrea Green
W912PM21R0004
69 Darlington Ave
Wilmington NC 28403
For the purposes of this Request for Proposal, please note that in accordance with
(IAW) FAR 28.001:
“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond.
If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”
Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership, or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.
TAB I - TAB F –Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. Submit originals;
photocopied or scanned copies are not acceptable. Contractors MUST have a minimum bonding capability of
$7,000,000.00 single and $25M aggregate.
3.12.2. VOLUME II TECHNICAL PROPOSAL (FACTORS 1 & 2)
One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.
TAB CONTENTS
A Factor 1, Sub-Factor 1 Management Approach
B Factor 1, Sub-Factor 2 Technical Solution
C Factor 2 Past Performance/Past Experience
D Technical Solution Seed Project
E Proposed Project Summary Schedule (Seed Project)
Page Limitations: The following page limitations are established for each factor described above: The total number of Pages for Volume II shall not exceed 200 Pages.
Factor 1: Past Experience, Construction – Limited to 25 pages
Factor 3: Past Performance – Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed five (5) pages; Government evaluators will review and evaluate only the information contained on the first five (5) pages
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
VOLUME II PROPOSAL TECHNICAL DETAILS
TAB A – FACTOR 1; SUB-FACTOR 1: Management Approach (Staffing/Key Personnel)
TAB B – FACTOR 1; SUB-FACTOR 2: Technical Solution (Scheduling/Communication/Quality
Control/Safety)
TAB C – FACTOR 2: Past Performance/Past Experience: Each project submitted by the offeror and other sources will receive a relevancy rating based upon experience and a performance confidence rating based upon past performance. These ratings will then be combined, and one final past Past Performance/Past Experience rating will be assigned to each offeror using the ratings in this section.
Element 1: Past Experience
Element 2: Past Performance
TAB D – Technical Solution (Seed Project)
TAB E – Proposed Project Summary Schedule (Seed Project)
SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS VOLUME II, TAB A – FACTOR 1 –
TECHNICAL SUB-FACTOR 1 – Management Approach (Staffing/Key Personnel)
4.1. SUBMISSION REQUIREMENTS: The Offeror shall provide information that describes the offeror’s organization and intended management approach to executing the repairs/maintenance work items in the contract per the detailed requirements herein. Concisely and clearly, describe the organizational and technical approach to project management and execution using the following format.
4.1.1. Organization: Describe what firms and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Identify the design firm chosen, if not to be self-performed. Clearly describe any teaming or joint venture arrangements, including a clear description of each Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities to be performed throughout the life of the contract. Describe any items to be self-performed and any prior experience performing related activities. Identify any items to be subcontracted, proposed subcontractor(s), and any past experience working with the respective subcontractor(s). The Offeror shall document unequivocal teaming arrangements with its subcontractors, using the format in spelled out in the proposal instructions. Include an organizational chart illustrating the organization, including key positions, their firm affiliation, the title of the position and its function within the organization. Describe the proposed management structure for the team, describing how the work items and construction process will be managed and the authorities and delegations of authority will function within the team/organization
4.1.2. Management Approach (Staffing/Key Personnel): Identify Key…