W912PM21R0004-0006.pdf
PDF 826 KB Posted
- Solicitation number
- W912PM-21-R-0004
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
ADMINISTRATIVE NOTE: The amendment immediately preceding this amendment is W912PM21R0004-0004. There w ill be no Amendment # 0005 to the solicitation.
The solcitation response date and time is reset to April 12, 2021 04:00PM Changes to the Schedule A and Schedule B bids schedules are attached Changes are made to the RFP as indicated on the SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM21R0004
X 9B. DATED (SEE ITEM 11)
04-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0006
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Apr-2021
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM21R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
ADMINISTRATIVE NOTE: The amendment immediately preceding this amendment is W912PM21R0004-0004.
There will be no Amendment # 0005 to the solicitation, this amendement number has been removed from the amendment sequencing.
The response date has been extended to April 12, 2021 04:00 PM
NOTE: PROJNET has been closed. No further Bidder Inquiries may be submitted through PROJNET. There is no guarantee that the Government will respond to further questions submitted after April 2, 2021.
A. QUESTIONS OF GENERAL INTEREST
1. Are the Task Orders going to be priced the same way as the seed project in that there will be a coefficient and then profit and bond applied after the coefficient?
Answer: Pricing on Task Orders in that there will be a coefficient and then profit and bond applied after the coefficient, will be the same as the first Task Order (Seed Project) unless changed during negotiations.
2. The RFP states in Section 5.1.4, a proposed summary schedule is to be provided and in Section 9.1.1, another proposed summary schedule. Will the Government clarify if two separate proposed summary schedules are being required or that if only one proposed summary schedule for the seed project only is required? If only one, will the Government clarify if this schedule is to be provided under Tab B or E?
Answer: A summary schedule is required under both TAB B and TAB E.
B. CHANGES TO RFP
1. SECTION 01 00 04 2.4.2.5 Field Office Staffing Price Schedule (FOSPS) is Changed:
“Qualified Rail Inspector: is added to the table”
2. In the RFP at “Volume II TAB B - FACTOR 1 – TECHNICAL SUB-FACTOR 2 – TECHNICAL SOLUTION (Scheduling/Communication/Quality Control/Safety)”
5.2.3. PART 2:
STRIKE: “Strike The Government will evaluate the strength of understanding of events associated with coordinating design submittals, reviews and incorporating review comments and the realism of the schedule. The Government will evaluate the design packaging plan for logic, reasonableness, how it facilitates meeting the proposed contract duration and how it facilitates the Government’s ability to timely perform its design reviews. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction may receive additional consideration. The technical rating will consider the offeror’s technical solution. The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirements but will also include an assessment of the risk associated with its technical approach.”
REPLACE WITH:
“The Government will evaluate the strength of understanding of events associated with coordinating submittals, reviews and incorporating review comments and the realism of the schedule. The Government will evaluate the schedule/plan for logic, reasonableness, how it facilitates meeting the proposed contract duration and how it facilitates the Government’s ability to timely perform its submittal reviews. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction may receive additional consideration. The technical rating will consider the offeror’s technical solution. The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirements but will also include an assessment of the risk associated with its technical approach.”
3. In the RFP at “Volume II TAB E – Proposed Project Summary Schedule (Seed Project)
Paragraph 9.1.2.1.
STRIKE: “The Government will evaluate the summary schedule for the seed project. The Government will evaluate the schedule to assess the strength of understanding of the project scope and restrictions which must be considered in the schedule, e.g., permitting, long lead items, etc. The Government will evaluate the strength of understanding of events associated with coordinating design submittals, reviews and incorporating review comments and the realism of the schedule. The Government will evaluate the design packaging plan for logic, reasonableness, how it facilitates meeting the proposed contract duration and how it facilitates the Government’s ability to timely perform its design reviews. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction may receive additional consideration.”
REPLACE WITH: “The Government will evaluate the summary schedule for the seed project. The Government will evaluate the schedule to assess the strength of understanding of the project scope and restrictions which must be considered in the schedule, e.g., permitting, long lead items, etc. The Government will evaluate the strength of understanding of events associated with coordinating submittals, reviews and incorporating review comments and the realism of the schedule. The Government will evaluate the schedule/plan for logic, reasonableness, how it facilitates meeting the proposed contract duration and how it facilitates the Government’s ability to timely perform its reviews. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction may receive additional consideration.”
C. ATTACHMENTS:
1. SATOC SEED PROJECT BID SCHEDULE B RVZD 2APR21
FOSPS Worksheet has been added and is linked to the bid schedule
2. SATOC BID SCHEDULE A 2APR21 REVISION
Under FIELD OFFICE STAFF PRICING SCHEDULE (FOSPS), “Qualified Rail Inspector” has been added as a line
3. 01 00 04 Amendment 0006
2.4.2.5 Field Office Staffing Price Schedule (FOSPS) is Changed:
“Qualified Rail Inspector: is added to the table” added to table at 2.4.2.5
The following have been deleted:
AMENDMENT 0005
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 05-Apr-2021 04:00 PM to 12-Apr-2021 04:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .