View the file

Other files

File Type Posted
HOLD DOWN DEVICES IMAGES.pdf PDF
W912PM21R0004-0006.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 2APR21.xlsx XLSX spreadsheet
01 00 04 Amendment 0006.pdf PDF
SATOC BID SCHEDULE A 2APR21 REVISION.xlsx XLSX spreadsheet
GROUND THROW LEVER IMAGE ISO BI_9136142.pdf PDF
W912PM21R0004 0004.pdf PDF
W912PM21R0004 AMENDMENT 0004 BIDDER INQUIRY RESPONSES.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B RVZD 30MAR.xlsx XLSX spreadsheet
MOTSU SOW Rail SATOC SEED Project-AMDT0004.pdf PDF
SF24 (blank).pdf PDF
Copy of SATOC BID SCHEDULE A 24MAR REVISION.xlsx XLSX spreadsheet
2020 MOTSU Detailed Visual and Ultrasonic Railroad Inspection Post Inspection Memo (1).pdf PDF
W912PM21R0004-0003.pdf PDF
SATOC BID SCHEDULE A revised.xlsx XLSX spreadsheet
MOTSU SOW Rail SATOC SEED Project-RTA.pdf PDF
SATOC BID SCHEDULE A.xlsx XLSX spreadsheet
W912PM21R0004-0002.pdf PDF
SATOC SEED PROJECT BID SCHEDULE B.xlsx XLSX spreadsheet
REVISED SECTION 01 00 04 Amendment 0002 .pdf PDF
W912PM21R0004 ATTACHMENT 6 DFARS 215.215-7009 PROPOSAL ADEQUACY CHECKLIST (JAN 2014).pdf PDF
Questions and Answers 0001.pdf PDF
A21 - W912PM-21-R-0004-0001(Amendment 0001).pdf PDF
W912PM21R0004 ATTACHMENT 1 PAST EXPERIENCE.pdf PDF
W912PM21R0004 ATTACHMENT 3 PAST PERFORMANCE QUESTIONANAIRE PPQ.pdf PDF
W912PM21R0004 ATTACHMENT 2 PAST PERFORMANCE SUMMARY.pdf PDF
A21 -W912PM-21-R-0004.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTSU SATOC - Railroad Repair W912PM21R0004

DOCUMENT 00 73 00

SUPPLEMENTARY CONDITIONS

01/13

PART 1 GENERAL

1.1 (S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE

WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.

When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

DOCUMENT 00 73 00 Page 1

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

(End of special contract requirement)

1.2 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)

a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(End of special contract requirement)

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used -- End of Document --

DOCUMENT 00 73 00 Page 2

SECTION 01 00 02

STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS

12/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

USACE EM 385-1-1 (2014) Safety and Health Requirements Manual , latest edition

UFC 4-860-03 Railroad Track Maintenance and Safety Standards, latest edition

UFC 4-860-01FA Railroad Design and Rehabilitation, latest edition

American Railway Engineering and Maintenance-of-Way Association (AREMA) Manual for Railway Engineering (MRE), latest edition

(AR) 420-1, Army Facilities Management, latest edition

Department of the Army Technical Manual 4-14.21 Rail Safety, latest edition

North Carolina Department of Transporation (NCDOT)Standard Speficiations for Roads and Structures, latest edition

Manual of Uniform Traffic Control Devices (MUTCD), latest edition

American Society for Testing and Materials (ASTM)

1.2 DESCRIPTION

All work shall be in conformance with the requirements of the contract including, but not limited to, furnishing all materials, labor, plant, tools, equipment, transportation, supervision, management, and other services , items, and incidentals necessary for the successful completion of each issued delivery order. The contract is a firm fixed price, Indefinite Delivery, Indefinite Quantity (IDIQ) for Single Award Task Order Contract (SATOC) . The contract consists of four major elements as follows:

1.2.1 Delivery Orders

Detailed delivery orders specifications encompassing most aspects of Public Works responsibilities

1.2.2 Prices

Units of measure and corresponding prices for each of the specifications and delivery order.

SECTION 01 00 02 Page 1

1.2.3 General and Special Provisions

No monetary amount shall be obligated by the award of the contract.

Monetary amounts are obligated by the issuance of delivery orders only.

1.2.4 Types of Construction

This contract is for General Construction for a broad range of routine maintenance and sustainment repairs on the Military Ocean Terminal Sunny Point (MOTSU) rail network . The type of construction may consist of but not be limited to:

Rail Line Repair

Thermite Rail Welding and Electric Arc Welding

Roadbeds and Ballast Repair

Ties and Tie Plates Repair

Rails and Rail Fastenings, Joints, and Anchors Repair

Gauge Rods Repair

Turnouts and Switches Repair

Road Crossings Repair

Sign and Traffic Signal Safety Devices Repair

Vegetation Control

Repair or Replace Slide Plates, Riser plates, and Tie Plates Repair

Geometry Repairs

The Contractor shall be responsible for obtaining permits required for work under each task order including but not limited the NC Division of Water Resources (NCDWR) Section 401 Water Quality Certification, USACE Section 404/10 Permit, NC Department of Environmental Quality (NCDEQ) Erosion and Sediment Control Permit, US Coast Guard (USCG) Section 9 Permit, and the NC Division of Coastal Management (CAMA) Federal Consistency.

The Contractor is responsible for conducting the required or necessary environmental assessments and compliance, and determining and funding any necessary compliance,restoration, or remediation that could have been reasonably anticipated at the time the project was approved. This includes any permit requirements and disposal of all waste and discarded materials, including potentially toxic or hazardous materials, in an environmentally safe manner.

The Contractor shall operate in accordance with Department of the Army Technical Manual 4-14.21 (Rail Safety).

TM 4-14.21 Excerpt Chapter 4:

On-track safety training will be conducted annually for all U.S. Army MOW personnel. Personnel who are required to provide protection for themselves

SECTION 01 00 02 Page 2 or others will be GCOR and Army rail safety rules qualified annually. The personnel must be familiar with the installation's operations and track layout.

All MOW contractors working on or around tracks on the installation, who do not have the appropriate qualifications, or whose qualifications have lapsed, will be accompanied by a GCOR and Army rail safety rules qualified pilot. The pilot must be familiar with the installation's operations and track layout.

1.3 SCOPE OF WORK

1.3.1 Commencement of Work

Within thirty (30) calendar days after contract award, the Contractor shall be fully operational and capable of responding to requirements for proposals. Within thirty (30) calendar days after contract award, the Contractor shall be capable of performing work on delivery orders.

Contractor shall schedule all work to include subcontract work in a manner that minimizes downtime at each project site. At no time shall a construction project be abandoned unless approved by the Contracting Officer or his/her authorized representative. All Mainline Track construction work associated with each Task Order scope of work shall be planned, executed, and coordinated with MOTSU through the COR to permit weekly railroad operations along the Mainline Track.

Within one (1) calendar day after commencement of work under this contract, the Contractor shall provide at the job site a weatherproof, glass-covered bulletin board for displaying the Fair Employment poster, wage rates, posters and safety bulletins as noted in Section 01 35 26 , paragraph DISPLAY OF SAFETY INFORMATION. The bulletin board shall be located in a conspicuous place, easily accessible to all employees, and legible copies of the aforementioned data shall be displayed until work under the contract is complete. No direct payment will be made for the bulletin board.

1.3.2 Performance of Work by Contractor

The Contractor shall maintain an organizational chart showing the total organization, onsite staff, and engineering support team. The onsite staff shall include a site superintendent and the quality control/site safety health officer. A final organizational chart shall be provided to the Government at the start of the contract, or after personnel changes.

The organization chart shall provide clear, logical lines of authority from Program Manager to subcontracting management, demonstrating technical sufficiency, including site superintendents and quality control.

The Contractor shall provide a position description of the onsite staff.

This shall include a brief job description, qualifications, responsibilities and decision making authority of each member.

The Contractor shall provide an onsite superintendent and CQCSM. The superintendent and CQCSM must provide on-site decision making authority.

SECTION 01 00 02 Page 3

1.4 TECHNICAL SPECIFICATIONS

The SATOC Technical Specifications shall be the Unified Facilities Guide Specifications (UFGS). The Technical Specifications are to be done in SpecsIntact format. The Designer of Record (DOR) shall include as a minimum Division 01 General Requirements specification sections listed below. UFGS Guide Specifications will be edited as applicable by the Designer of Record during design as required to conform to the project, installation requirements and Delivery Order.

DIVISION 01 - GENERAL REQUIREMENTS

01 14 00.10 WORK RESTRICTIONS - MOTSU

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVSION 34 - TRANSPORTATION

34 11 00 RAILROAD TRACK AND ACCESSORIES

1.4.1 MOTSU General Requirements (Installation Standards)

The SATOC Technical Specifications shall incorporate the requirements of MOTSU General Requirements ( Installation Standards ) as applicable.

The Attachment 1 - MOTSU General Requirements include:

MOTSU Electrical Standard

MOTSU Security Requirements dated 10 March 2017

MOTSU Utility Standard dated 2 February 2015

MOTSU Energy Standard 20 October 2014

MOTSU Environmental Specification dated 5 November 2015)

MOTSU Concrete Washout SOP

1.5 REGULATIONS

The Contractor shall comply with all applicable Federal, State, local and Army regulations, including supplements pertaining to safety, traffic control, and fire prevention.

The work under the delivery orders shall be constructed in accordance with the latest edition design and construction standards contained in UFC 4-860-03, UFC 4-860-01FA, (AR) 420-1, the AREMA Manual for Railway Engineering, MUTCD, NCDOT and other applicable Department of Defense (DOD) and Army regulations, federal regulations, State of North Carolina

SECTION 01 00 02 Page 4 regulations, manuals, engineering technical letters, energy conservation criteria, MOTSU specific policies, EM 385-1-1 USACE Safety Manual (latest version), and Department of the Army Technical Manual 4-14.21 Rail Safety (latest edition) .

The Government will not furnish the Contractor reference materials, codes, regulations, or guide specifications. These may be acquired from the Government Printing Office or from other federal agencies.

The Contractor shall have a copy of each of these documents available for use during the term of this contract.

If there is a conflict between these codes, regulations, and specifications, the most stringent requirements shall apply at all times.

1.6 STANDARD PRODUCTS

Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products, which are of a similar material, design, and workmanship. The standard products shall have been in satisfactory commercial and/or industrial use for two (2) years prior to use. The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size.

The 2-years of use must be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures. Products having less than a 2-year field service record will be acceptable, if a certified record of satisfactory field operation, for not less than 6,000 hours exclusive of the manufacturer's factory or laboratory tests, can be shown. The Contractor shall not purchase "close-out" products that are being discontinued by the manufacturer.

1.7 EQUIPMENT/SUPPLIES

The Contractor awarded this contract shall be required to provide to the Government and to maintain the following equipment and programs at the Contractor's expense: All required equipment and supplies.

1.7.1 Electronic Format

All electronic correspondence of information outside of e-mail shall be done in Microsoft Office Word, or Microsoft Excel, or Adobe.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 LOCATION OF STAFF

3.1.1 MOTSU

The Contractor will be provided with a space for an office trailer along "Contractor Row" on MOTSU. Required on-site staff and any required additional engineering and support staff will be determined and negotiated for each individual Task Order.

SECTION 01 00 02 Page 5

3.2 QUALITY CONTROL

See Sections 01 45 00.00 10 QUALITY CONTROL and 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM), which provide specific requirements for quality control.

3.3 ENVIRONMENTAL PROTECTION

The Contractor shall perform all work in such a manner as to minimize the pollution of air, water, or land and to control noise and dust within reasonable limits and in accordance with all applicable U.S. and local Government environmental laws, regulations and programs of installations that relate to the performance of this contract or individual Task Orders.

Where there is conflict between U.S. and local law, the requirements more protective of the environment will be used. In no case will the requirement be less stringent than those required by U.S. law and regulation.

3.4 SITE SECURITY

The Contractor shall provide site security (fencing, lighting, or guard service) as required by each Task Order. However, at a minimum, the Contractor shall maintain the site and all other Contractor controlled areas in such manner as to minimize the risk of theft, vandalism, injury, or accident. The Contractor shall comply with site security regulations.

3.5 PUBLIC AFFAIRS

The Contractor shall not publicly disclose any data generated or reviewed under this contract. The Contractor shall refer all requests for information concerning site conditions to the Contracting Officer, or his/her designated representative for comment.

3.6 SAFETY

3.6.1 Compliance

Compliance with the current U.S. Army Corps of Engineers "Safety and Health Requirements Manual", ( EM 385-1-1 ); Occupational Safety and Health Act (OSHA) standards, and current MOTSU safety regulations is mandatory.

The prime Contractor shall be held responsible to ensure that his/her workforce and any subcontractor or supplier workforce comply with the above safety requirements.

3.6.2 Personal Safety

Adequate protection of all persons (regardless of who they are employed with) shall be provided at all times. Work shall proceed in a manner to prevent hazard.

3.6.3 Special Safety Requirements

The Contractor shall comply with Army and local fire regulations and NFPA 241 "(2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations." Fire extinguishers rated and approved by the National Fire Protection Association, of sufficient size, type, and quantity to cope with all known hazards, shall be provided by the Contractor at the construction site during the execution of this contract;

SECTION 01 00 02 Page 6 the extinguishers shall be removed upon acceptance of the project.

3.7 PRESERVING HISTORICAL AND ARCHAEOLOGICAL FINDS

All items having any apparent historical or archaeological interests which are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall leave the archaeological find undisturbed and shall immediately report the find to the Contracting Officer or his/her designated representative, and MOTSU PWE, so that the proper authorities may be notified. Refer to Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION for additional details.

3.8 APPLICATION OF WAGE RATES AND FRINGE BENEFITS

For the application of the wage rates and fringe benefits contained in the Decision of the Secretary of Labor; attached to and a part of this contract, all work shall be considered Heavy and Highway Construction, Building Construction, or Residential and the specific wage determination will be identified on each individual delivery order.

3.9 PARTNERING

The Government intends to encourage the formation of a cohesive partnership with the Contractor. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. The objective is effective contract performance in achieving completion within budget, on schedule and in accordance with plans and specifications. This partnership between the Contractor and the Government will be voluntary and its implementation will not be part of the contract requirements nor will it result in a change to contract price or terms.

3.10 CONTRACTOR MANPOWER REPORT (CMR)

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https:// www.ecmra.mil

The required information includes:

(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Estimated direct labor hours (including sub-contractor);

(6) Estimated direct labor dollars paid this reporting period (including sub-contractor);

(7) Total payments (including subcontractor);

SECTION 01 00 02 Page 7

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website);

(11) Presence of deployment or contingency contract language, and,

(12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.

Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.

The Contracting Officer's Representative (COR) or Technical Representative (COTR) creates the contract record and the contractor completes it.

Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site. If you need assistance or have questions about CMR, please contact the CMR Helpdesk by phone at 703-377-6199 or E-mail contractormanpower@hqda.army.mil.

*Note:

For in-theater contracts, requiring activities have the option of requiring more frequent reporting. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data. For internal Army analysis, the reports and queries from the database shall not contain proprietary data.

-- End of Section --

SECTION 01 00 02 Page 8 k7ecphw9 Text Box Enclosure #1 MOTSU General Requirements

i. MOTSU Electrical Standard

24 May 2012

SUBJECT: Military Ocean Terminal, Sunny Point (MOTSU) Electrical Standard

1. In addition to the contents of the latest edition of the National Electrical Code (NFPA 70) and the National Electrical Safety Code, the following items form the minimum electrical requirements for facilities located on MOTSU.

A. General:

1) All secondary electrical work done on MOTSU shall be performed by personnel authorized to engage in electrical contracting within the state of North Carolina and shall hold a North Carolina electrical license (suitable for the costs and voltages of the project). An electrical license from another state may be acceptable if it qualifies under North Carolina's reciprocity process. Submittal of a certified copy of the electrical license shall be required. This requirement does not apply to primary electrical distribution, street lights, generator work up to the transfer switch and area lights.

2) The construction contractor shall be responsible for obtaining a digging permit from DPW, prior to performing any digging on MOTSU. A digging permit shall also be required for any work on the wharfs. See attachment 3, titled “Application for Digging Permit“ for a digging permit request form. When properly completed, this permit will locate underground utilities which may be affected by the project. Markings for underground utilities are considered approximately only. The actual location of the utility shall be considered within a band ± 36 inches from either side of the painted mark or flag. The contractor shall be totally responsible for repairs to marked utilities that he may damage. Any damaged Utility shall immediately be reported to DPW at 910-457-8292. Any damaged utilities shall be repaired within eight hours of the initial damage, or the Government (at its option) may have the utility repaired and then charge the contractor. If an unmarked utility is damaged by the contractor, the Government will have it repaired, if all aspects to the Digging Permit have been followed. Typically, once a digging permit is submitted by the contractor, DPW shall have five business days to complete the application process and have utilities marked.

3) Any non-metallic conduit or inner-duct installed underground for installation of fiber optic cable, gas, or any other non-electrical conductive materials shall have a tracer wire installed. This tracer wire may be either part of the conduit, preinstalled or blown in after conduit or inner-duct installation. Tracer wire shall be accessible at least every two hundred feet.

Access points to the tracer wire may include valve boxes, hand-holes, manholes, vaults, marker posts, or other covered access devices. Access point covers should be clearly marked with the type of facility. Additionally, all fiber optic cable shall be clearly marked with a white marker post (minimum of 66 inches in length, with at least four feet above grade) by 3-1/2 inch minimum diameter which shall be located at least every two hundred feet along the length of the cable run (if no other access point to the tracer wire is available). The making post shall have an orange top (at least 18 inches in length) which states, as a minimum, “WARNING FIBER OPTIC CABLE” and shall have a graphic warning with a contact number. The contact number shall be 457-8292. Marker posts shall have a peg through the embedded portion of the marker post and into the surrounding soil for pullout resistance. An orange “Marker Tape” (with the words “BURRIED FIBER OPTIC CABLE BELOW” shall be install 12 to 24 inches below the surrounding grade. Fiber optic cable shall be installed four feet below final grade. Additional information can be found at MOTSU Utility Line Marking Specification, which is attached to this document.

4) Utility line marking shall be IAW the attached “MOTSU Utility Line Marking Specification”. See Attachment 4.

5) Typically, for new or rehabbed facilities, the following two electrical inspections (all projects under Corps of Engineer (COE) control will normally be inspected by COE; all other work requiring an inspection will be performed by DPW) are required prior to receiving approval to have BEMC energize electrical power at the site:

a. Rough-In Inspection: A rough-in inspection shall be required after all electrical conduit, wire, panels, outlet boxes, switch boxes, equipment boxes, isolation switch boxes, etc.

have been properly installed. Except for the final connection to switches, receptacles, and lighting fixtures, all ground wires and other wires in boxes must be spliced and pigtailed for the rough-in inspection. The rough-in inspection shall be conducted before insulation, sheet-rock, paneling, or other materials cover any wiring is installed. Underground wiring and under-slab wiring must be inspected before the trench is back-filled. Where wiring is concealed before rough-in inspection, the prime contractor shall be responsible for all costs associated with uncovering and replacing the covering material so all wiring can be inspected. A written report identifying any observed errors or defects will be provided to the contractor and DPW. Any faults identified by the inspector will be corrected before additional electrical work shall be allowed.

b. Final Inspection: A final inspection shall be required after all final connections for wiring, panels, lights, switches, receptacles, outlet boxes, switch boxes, equipment boxes, isolation switch boxes, etc. have been properly installed. All overcurrent protection, front covers, fixture lens, etc shall be completely installed prior to a final inspection. A written report identifying any observed errors or defects will be provided to the contractor and DPW. Any faults identified by the inspector shall be corrected before an approved final inspection is awarded. Upon completion of a successful final inspection, DPW will direct BEMC to make the facility service hot.

c. Request for inspection: A request for inspection (rough-in or final) can be obtained from COE for projects under their control and from DPW (910-457-8292; see subparagraph “d” below) for all other projects; the request should be submitted five (5) working days prior to the needed inspection date.

d. Use Attachment 1 for application to request an electrical inspection through DPW.

6) Electrical panels, disconnects, or other switchgear mounted in mechanical rooms are allowed to be surface mounted; however, they shall be mounted flush against the supporting wall; in most cases, they shall not extend over eight (8) inches from the wall or purlin face. In metal buildings, they may be installed on uni-strut (or equal) directly fastened to purlins supporting the walls. Building bracing (tie cables) shall not run behind the panels or within the NEC required panel clearance. Typically, the upper edge of the panel shall be at 6-1/2 feet above the finished grade and the lower edge of the panel shall not be lower than 18 inches above the finished grade. Panels over 600 amperes may have the bottom edge of the panel closer to the floor; however, effort will be made to keep it at least two inches above finished grade. If these requirements cannot be met, then coordination prior to installation is required with DPW.

7) Main exterior building disconnect switches are allowed to be surface mounted;

however, the back edge of the disconnect shall be placed flush against the building (for its entire length). On new facilities, brickwork or other siding materials (on two tone structures, for example metal above brick) may require special attention to recess the disconnect switch in order to keep the back flush with the building. The top of the disconnect switch shall be 6 -1/2 feet above ground level. If these requirements cannot be met, then coordination prior to installation is required with DPW.

8) On new construction projects, temporary utilities (electricity, potable water, and sewage) will be made available to the contractor at no costs (if they are available in the work area or after site work is completed). This should not be misinterpreted as permanent electrical connection to the facility. A permanent electrical connection to the facility shall only be accomplished after a successful final electrical inspection has been obtained. The contractor shall perform all connections and disconnections (other than primary electrical; this shall be accomplished by BEMC) and shall supply any required temporary service pole, reducing valves, piping, etc... required to make such a temporary connection. All such connections shall be done by personnel licensed and qualified to perform such connections. The term "temporary utilities" shall specifically not include heat and/or air conditioning. If heat and/or air conditioning are required by the contractor prior to acceptance of the project by the Government, he shall provide it at no expense to the Government. Temporary electrical service shall not be utilized for heat and/or air conditioning. Fuel oil shall not be provided by the Government. If excessive or wasteful usage of utilities is detected, they shall be turned off.

9) If temporary electrical power is required at the site (especially on new construction projects), the prime contractor shall negotiate directly with BEMC to have the power run and connected to a contractor supplied temporary service pole. The prime contractor shall pay BEMC directly for this service. This shall be an agreement between the prime contractor and BEMC; the Government shall not be involved in these negotiations or subject to any financial obligations between the prime contractor and BEMC. All requirements within this MOTSU Electrical Standard shall be maintained. The contractor shall also pay BEMC to have the temporary electrical service removed. The Government will provide the electricity; however, if energy waste is detected the electricity shall be turned off.

10) On maintenance or rehab type projects, once the building envelope is closed in, the contractor may utilize existing electrical utilities. If heat or air conditioning is available, the heat shall not be set above 50 degrees and the air conditioning shall not be set lower than 80 degrees.

However, prior to turning on the HVAC, checks shall be made to ensure clean filters are in place (new filters will be installed by the contractor, based upon debris and dust in the air). Any locations where over 80 square feet of sheetrock or any other operation where large amounts of debris or dust are made/encountered shall have the ductwork professionally cleaned to a “clean system” level. If windows and doors are continually open or if excessive or wasteful usage of heating/air conditioning is detected, they shall be turned off.

11) The Fire Alarm Control Panel (FACP) shall be installed in the mechanical room of all new/rehab facilities. Only UL listed and UL labeled FACP and devices shall be allowed.

The FACP shall be on a separate electrical circuit controlled from a lockable circuit breaker (circuit breaker shall be red in color). There shall be a smoke detector install in the ceiling directly over the FACP. The MOTSU fire alarm system carrier frequency is 465.9625 and

469.8125 MHZ. The fire alarm system shall be a Class A, addressable system. Initiating Device Circuits (IDC) shall be Class A, Style Eα. Signaling Line Circuits (SLC) shall be Class A, Style 6α. All newly installed fire alarm systems shall be 100% compatible with the existing MOTSU fire alarm system and NFPA-72. This specifically means that all devices, signals, software, and hardware shall be capable of being used with the existing fire alarm systems and devices without the need for special modifications or conversions of the existing or newly installed system/device. MOTSU currently utilizes an EST/Keltron fire alarm system and devices. There shall be no proprietary fire alarm systems, FACP, or other fire alarm devices installed on MOTSU. Prior to ordering any fire alarm system or component, the contractor shall submit equipment/software submittals of the product to the authority having jurisdiction (Fire Department Fire Inspector) for approval; items not receiving a written approval shall not be ordered. Fire alarm systems on MOTSU shall be installed, tested, and certified by a NICET Level IV (minimum) Fire Alarm Technician. Prior to acceptance, any newly installed fire alarm system shall be completely tested (from each device in the new/rehabbed facility back to the Fire Command Center located in building 44). The contractor shall provide all hardware and software required for 100% communications linkage between the newly installed fire alarm system and the Fire Command Center located in building 44. A “Record of Completion” shall be completed by the contractor and provided to DPW and the MOTSU Fire Inspector for all installed fire alarm systems, IAW NFPA-72. Any maintenance and/or repairs done on any MOTSU Fire Alarm system shall be done by a certified NICET Level IV (minimum) Fire Alarm Technician.

12) To satisfy requirements of Public Law 104-133, National Technology Transfer and Advancement Act, the DOD Fire Engineering Committee has determined Military Handbook (MILHDBK) 1008 is the implementing document for this requirement. All fire protection designs on MOTSU shall use this consensus standard.

13) In HAZADROUS locations, INTRINSICALLY safe devices SHALL NOT be allowed. This specifically includes overhead door operating devices and controls.

14) As a minimum, a properly sized Surge Protective Device (SPD) which meets the minimum requirements of the “3rd Edition” of UL 1449 shall be provided at all new or modified panels. The SPD shall be UL listed and labeled as having been tested IAW UL 1449 and shall be marked for lightning protection system (LPS) application. Fuses shall not be used as surge suppression.

15) SPD suitable (shall meet UL 1449 3rd Edition and be installed IAW UL 96A) for the application shall be provided for all electrical, conductive signal, data, and communication lines at the point of entrance to all new or modified buildings. The protection provided shall be installed IAW Articles 800, 810, 820, or 830 (as applicable) of the NEC and shall comply with UL-452, UL-497, and UL-497C (as applicable).

16) All power lines entering an ammunition pad area shall require surge arresters IAW

DA PM 385-64, paragraphs 6-5.a/b and 12-2. Additionally, surge protection devices shall meet the minimum requirements of UL 1449, third edition and shall be marked for Lightning Protection System (LPS) use.

17) Graphical symbols for electrical wiring and layout diagrams used in architecture and building construction shall conform to ANSI Y32.9-1972. Graphic symbols for electrical and electronic diagrams shall conform to ANSI Y32.2-1975 and IEEE Standard 315-1975.

18) A short circuit analysis shall be performed on any new facility and a complete power coordination analysis shall be conducted. Proper power coordination shall be maintained. Short circuit amperage available shall be considered "unlimited".

19) On Military Construction projects, run underground telephone copper cabling to the nearest pedestal. Cable shall be run in four inch RNC (PVC) conduit buried a minimum of 24" below grade. Where it goes under roads, sidewalks, parking lots, etc., it shall be encased in concrete (4" minimum). Run 100% spare communication conduits (i.e... if it requires one duct, run two; if it requires two ducts, run four; etc....).

20) Local Area Networks and Voice Communications shall follow the standards provided by MOTSU DOIM. This standard is attached as attachment 2.

21) The construction contractor shall provide a minimum five (5) days notice to the Contracting Officer and receive written notice to proceed before interrupting any base utility.

22) Typically, all new underground utilities (electrical, telephone, fiber optic, water line, etc) shall be located within a “right-of-way” boundary of three feet to 15 feet parallel to roadways and parking lots. All utilities, signal, control, and security system circuits entering ammunition pads shall comply fully with DA PAM 385-64. Underground electrical, telephone, fiber optic, water lines, and other utilities shall not be run through open spaces or wooded areas without the specific written approval of DPW.

23) Typically, underground fiber optic conduit/cable shall be buried a minimum of 48 inches below final grade, except for the following situations:

a) 60 inches below the bottom of culverts

b) 42 inches (minimum) below the bottom of railroad tracks

c) 24 inches under (vertically) existing signal or communication wires

d) In ditches, 60 inches (minimum) below the bottom of the existing flow line

24) All new and rehabbed buildings on MOTSU shall fully comply with the requirements of UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.

Appendix B (B-4), DoD Minimum Antiterrorism Standards for New and Existing Buildings;

specifically addresses electrical and mechanical design, utility distribution and installation, and Mass Notification Systems requirements.

B. LONWORKS:

1) All new and rehabbed facilities on MOTSU shall be wired for a Utility Monitoring and Control System (UMCS). All design and construction shall be based upon a Direct Digital Control (DDC) design. The installation shall be LonWorks based (ANSI/EIA 709.1) meeting the design intent of a “Flat-LON,” peer-to-peer architecture, in accordance with the UFC 3-410- 02FA, LONWORKS. The Direct Digital Control for HVAC and other local building systems (to include electric hot water heater and facility lights, as a minimum) shall meet UFGS 23-09-23 for the building level controls, and be compatible with a UMCS that meets UFC 3-401-01FA, LONWORKS. Additionally, the UMCS shall meet UFGS 25-10-10 for the front-end automation device controlling the HVAC and all other local building systems equipment. These devices shall be open, non-proprietary, and interoperable multi-vendor DDC systems that fully integrate with MOTSU’s UMCS. Unless otherwise directed, the systems shall be controlled at the building level with the capability to connect to MOTSU’s UMCS in the future via a simple plug and play connector. All LONWORKS devices shall have control wiring leading back to a wall mounted backer-board located in the mechanical room of the new or rehabbed facility.

2) All new or rehadded facilities shall have an Advanced Metering Device (AMD) installed on the secondary side (within the Main Distribution Panel – MDP). This AMD shall have a Direct Digital Control (DDC) device installed (to provide connections for future terminal UMCS). If one transformer feeds multiple facilities, each facility shall have its own separate AMD. Each sub-panel in a facility shall have an AMD installed. Any panel (600 amperes or larger) with an electrical load equal to 25% or greater of the rated panel capacity shall also have an AMD installed on that load. Unless otherwise directed, these AMD systems shall be controlled at the building level with the capability to be connected to MOTSU’s UMCS in the future via a simple plug and play connector. All AMD devices shall have control wiring leading back to the wall mounted LONWORKS backer-board located in the mechanical room.

Specifications for the advanced meter are:

a. Quantities measured:

1) Power (kilowatt), average demand over 15 minute intervals

2) Energy (kilowatt – hours)

3) Phase voltage, amps, frequency, true power, reactive power, apparent power, and power factor

b. Measurement configuration:

1) For single phase application, 120 – 240 VAC

2) For three phase application, 208 – 600 VAC, 3 wire delta or 4 wire wye

c. Operating temperatures:

1) -20 degrees C to +60 degrees C

2) For exterior mounting; use moisture proof enclosures

d. Humidity operating range: 5% to 90% (non-condensing)

e. Accuracy: Revenue grade:

1) ±0.5% at unity power factor

2) ±0.5% at 0.5 power factor

f. Frequency: 60 HZ, ±5%

g. Meter shall meet all LonWorks applications: ANSI/CEA-709.1b protocol

(LonTalk) output for communications using Standard Network Variable Types (SNVTs) for measured values.

h. Suggested manufacturer includes:

1) Continental Control Systems, LLC WattNode Plus http://www.ccontrolsys.com/products/wnp_for_lon.html

(888) 928-8663

2) Other manufacturers make similar products and should also be considered.

The above specifications for an AMD should be considered minimum requirements.

C. Electrical:

1) All low voltage (600 volts or less) electrical equipment furnished shall be listed and labeled by Underwriters Laboratories, Inc. (UL).

2) New construction will use pad-mounted transformers (22,800/13,200 grounded WYE primary), the secondary voltage depends on each facility requirement, however it normally will be a WYE connection. The transformer shall have dead front type primary construction (no high voltage wiring exposed with the enclosure doors open). Phase rotation for new three phase systems shall be clockwise. Phase rotation for rehab work shall match the existing rotation.

3) Each facility shall have a digital electrical service meter. Normally, this meter will be provided and installed by BEMC. The facility contractor shall install the meter base and conduit on new buildings or on rehabbed buildings. If the service meter is installed on a servicing pad mounted transformer, BEMC shall provide the meter base, meter and installation.

4) Each facility shall have a disconnecting means conveniently located on the outside wall readily accessible to fire department personnel. The disconnecting means device shall typically remove all electrical power to the facility.

http://www.ccontrolsys.com/products/wnp_for_lon.html

5) The exterior of pad mounted transformers and all other exterior switchgear shall be factory primed and painted brown (Federal Specification number 20059 or Sherman William's number 1049), minimum of three mil's thick.

6) There shall be no high leg DELTA circuits allowed on MOTSU.

7) Underground electrical cables shall be buried within conduit. Riser conduit shall be rigid metal conduit (RMC) unless otherwise approved. Minimum burial depths will be as required in NEC 300 and 710. Use only clean backfill and use a marking tape 6 to 12 inches below the surface and 6 to 12 inches above the conduit (if the conduit is buried over 24 inches deep). Rigid Nonmetallic Conduit (RNC) (types DZYR and DZKT) conduit may be allowed underground (with DPW approval) up to the turn-up joint. No RNC conduit shall be allowed above ground level.

8) For secondary voltages and communication cables, a maximum of 270 degrees of bend shall be allowed in one length of underground conductor. If more degrees of bend are required, a manhole or handhold shall be required. All manhole/handhold boxes shall be level and flush with the surrounding ground, no protrusions above ground level shall be allowed. The manhole/handhold shall meet the requirements for TIER 15 (as a minimum) as defined in ANSI/SCTE 77-202. The manhole/handhold cover shall have the word "ELECTRICAL" embossed in the top. A maximum cable length of 600 feet shall be allowed. All cables shall be pulled at the same time. Pulling of individual cables shall not be allowed. Splices shall only be allowed within manhole/handholds (as required). Underground duct shall have a 4-inch slope per 100 feet toward the manhole/handhold.

9) All secondary wiring (under 600 volts) shall be run in conduit. Minimum conduit size shall be ¾ inch. Conduits allowed include: IMC, RMC, EMT, RNC (underground use only – not allowed under concrete, however it is allowed if embedded within concrete), Sheet Metal Auxiliary Gutters, Busways, Cablebus, Cellular Concrete Floor Raceways, Cellular Metal Floor Raceways, Metal Wireways, Strut-Type Channel Raceways, Underfloor Raceways (unless described conduits are specifically not allowed by this document), and Cable Trays. Liquidtight Flexible Metal Conduit (LFMC), FMC, and FMT shall only be allowed where flexibility is a concern and for connections to luminaries (maximum length six feet). The following types of conduit shall not be allowed: HDPE, NUCC, LFNC, ENT, Nonmetallic Wireways (Wiremold and Plugmold), Multioutlet Assembly, Nonmetallic Extensions, Surface Metal Raceways, and Surface Nonmetallic Raceways.

10) Minimum wire size used shall be #12. The normal wire type is THWN/THHW with a 90 degree “C” temperature rating of conductor. Conductors for #8 and larger shall be stranded. Conductors over 500 KCMIL shall not be used, use parallel runs if higher ampere ratings are required. Wire splices shall only be allowed within suitable junction boxes or electrical fixtures. Nonmetallic-Sheathed cable (NM or NMC) shall not be allowed (unless specifically stated as acceptable by DPW). All secondary wiring (low voltage side of transformers) shall be copper.

11) Normally, three-phase power is required in facilities, with a minimum panel size of 225 amperes and 42 slots. This panel size may be reduced with DPW approval. Each facility shall have one main disconnect (one movement of the hand). The length of the Service–Entrance conductors (from the outside point of entrance of the facility to the “disconnecting means”) shall be kept to a minimum (maximum length shall be 36 inches).