Nez Perce-Clearwater NFs - Crooked River Valley Restoration Phase 4
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12363N21R4001
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Elk City ID 83525, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks restoration services along the Crooked River Valley in Idaho to address impacts from historical dredge mining. The U.S. Forest Service Nez Perce-Clearwater National Forests is procuring these services for Phase 4 of the Crooked River Valley Rehabilitation Project, which requires moving the river into a newly constructed channel, constructing approximately four acres of floodplain, removing a temporary bridge, grading tailings piles and levee/haul roads, and installing instream habitat features and riparian plantings. Evaluation will consider technical qualifications, past performance, and price, with responses due by June 1, 2021.
The set-aside is for total small business concerns. The primary NAICS code is 238990 and PSC code R499 covers restoration services. Work is to be performed in Elk City, Idaho for an estimated cost between $500,000 and $1,000,000, with performance from July 10 to October 10, 2021. Sixteen acres will be replanted with over 4,700 native trees and shrubs. Material may be hauled from lower floodplain work areas and a south staging area to complete grading of approximately four acres of tailings piles and twelve acres of levee/haul roads.
Notice text
2 versions
Update #2 · Latest ·
The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in multiple phases over 6 years. The phases completed to date have accomplished construction of a bypass channel and levee/haul road, rebuilding floodplain and river channel, add large wood structures to the newly constructed channel and plant riparian plants on the newly constructed floodplain and streambanks. In general, during Phase 4, Crooked River shall be moved from the bypass channel into the new channel constructed during previous phases, floodplain shall be constructed and instream habitat features and riparian plants shall be installed.
This contract requires a temporary bridge to be removed and hauled to Grangeville. Approximately 4 acres of tailings piles and 12 acres of levee/haul road shall be graded to complete floodplain construction and fill the temporary bypass channel. Material may be hauled from the lower 4 acres of floodplain work and from the south staging area to fill the bypass channel (<0.25 miles). Large wood structures shall be installed at the top and bottom of the new channel where the bypass channel is decommissioned. This work will be in the wet and water management shall be required. Approximately 5,000 CY of soil shall be hauled/spread and large wood shall be added to the new floodplain for microtopography. Wood and soil for the microtopography are stored along the levee road and at the south staging area.
Planting government-furnished riparian plants is also required in this phase. The contractor shall coordinate and transport the plants from the nursery in Princeton, Idaho to the site. Approximately 4,350 2-gallon plants and 280 8-gallon plants will be planted in single holes throughout the floodplain and approximately 1,500 linear feet of 18” deep by 12-18” wide trenches shall be dug along the existing channel and side channel for 2-gallon and 5-gallon plant installation.
The contractor shall furnish all labor, equipment, operating supplies, supervision, transportation, materials (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
One optional item requiring construction of high terrace floodplain may be awarded if funding is available and award is determined to be in the best interest of the government. This work requires hauling/grading approximately 400 CY of material.
The project is being performed on the Red River Ranger District of the Nez Perce-Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. In addition, US Forest Service stewardship funds are also planned for use to accomplish watershed restoration while stimulating the local economy. The project area is located approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.
The Government’s construction estimate is between $500,000 and $1,000,000. Construction work shall commence approximately July 10, 2021; all work shall be completed by October 10, 2021.
An organized site visit is planned for May 12, 2021. See provision L-8. All offer documents shall be emailed to karen.ruklic@usda.gov including a scanned copy of the fully executed Bid Bond and Power of Attorney. See Sections L and M for further instructions.
The site visit was held as advertised. Amendment 1 was issued 5/19/2021 to provide the site visit notes and attendance list, answer questions posed following the meeting and make small adjustments to the solicitation language. Offerors shall acknowledge the amendment in accordance with the instruction on the SF-30. The offer deadline was not extended.
Update #1 ·
The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in multiple phases over 6 years. The phases completed to date have accomplished construction of a bypass channel and levee/haul road, rebuilding floodplain and river channel, add large wood structures to the newly constructed channel and plant riparian plants on the newly constructed floodplain and streambanks. In general, during Phase 4, Crooked River shall be moved from the bypass channel into the new channel constructed during previous phases, floodplain shall be constructed and instream habitat features and riparian plants shall be installed.
This contract requires a temporary bridge to be removed and hauled to Grangeville. Approximately 4 acres of tailings piles and 12 acres of levee/haul road shall be graded to complete floodplain construction and fill the temporary bypass channel. Material may be hauled from the lower 4 acres of floodplain work and from the south staging area to fill the bypass channel (<0.25 miles). Large wood structures shall be installed at the top and bottom of the new channel where the bypass channel is decommissioned. This work will be in the wet and water management shall be required. Approximately 5,000 CY of soil shall be hauled/spread and large wood shall be added to the new floodplain for microtopography. Wood and soil for the microtopography are stored along the levee road and at the south staging area.
Planting government-furnished riparian plants is also required in this phase. The contractor shall coordinate and transport the plants from the nursery in Princeton, Idaho to the site. Approximately 4,350 2-gallon plants and 280 8-gallon plants will be planted in single holes throughout the floodplain and approximately 1,500 linear feet of 18” deep by 12-18” wide trenches shall be dug along the existing channel and side channel for 2-gallon and 5-gallon plant installation.
The contractor shall furnish all labor, equipment, operating supplies, supervision, transportation, materials (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
One optional item requiring construction of high terrace floodplain may be awarded if funding is available and award is determined to be in the best interest of the government. This work requires hauling/grading approximately 400 CY of material.
The project is being performed on the Red River Ranger District of the Nez Perce-Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. In addition, US Forest Service stewardship funds are also planned for use to accomplish watershed restoration while stimulating the local economy. The project area is located approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.
The Government’s construction estimate is between $500,000 and $1,000,000. Construction work shall commence approximately July 10, 2021; all work shall be completed by October 10, 2021.
An organized site visit is planned for May 12, 2021. See provision L-8. All offer documents shall be emailed to karen.ruklic@usda.gov including a scanned copy of the fully executed Bid Bond and Power of Attorney. See Sections L and M for further instructions.
Files
| File | Type | Posted |
|---|---|---|
| Amendment1_Attachment_J10_QA.docx | DOCX document | |
| Amendment1_Attachment_J9_SiteVisitNotes.docx | DOCX document | |
| Amendment1_SF30.doc | DOC document | |
| Attachment_J7_SWPPP_Template.docx | DOCX document | |
| Attachment_J5_PlantingDesign.pdf | ||
| Final_RFP.pdf | ||
| Attachment_J4_DrawingAddendum.pdf | ||
| Attachment_J3_TempBridgeDrawings.pdf | ||
| Attachment_J8_PastPerformanceQuestionaire.doc | DOC document | |
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets6.0Thru7.3.pdf | ||
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets4.1Thru5.3.pdf | ||
| Attachment_J6_TechSpecs.docx | DOCX document | |
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets1Thru4.pdf | ||
| Attachment_J1_WageDecision.pdf |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Nez Perce-Clearwater NFs - Crooked River Valley Restoration Phase 4 | Award Notice | |
| This notice | Solicitation | |
| Nez Perce-Clearwater NFs - Crooked River Valley Restoration Phase 4 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| Gusg habitat hydro-logic restoration 202 | Colorado Region | Total Small Business | |
| GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho | Forest Service | Total Small Business | |
| Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity