Attachment_J3_TempBridgeDrawings.pdf

PDF 1 MB Posted

Attached to
Nez Perce-Clearwater NFs - Crooked River Valley Restoration Phase 4
Solicitation number
12363N21R4001
Issued by

About this file

This federal contract opportunity solicitation requests restoration services for the Nez Perce-Clearwater National Forests' Crooked River Valley Phase 4 project. The solicitation seeks a contractor to remove a temporary bridge and haul it to Grangeville, grade approximately 4 acres of tailings piles and 12 acres of levee/haul road to complete floodplain construction and fill a temporary bypass channel. Material may be hauled from lower floodplain work areas and a south staging area. The objective of the multi-phase Crooked River Valley Rehabilitation Project is to address impacts of historical dredge mining on aquatic habitat conditions through actions such as moving the river into a new constructed channel, building additional floodplain, and installing in-stream structures and riparian plantings.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .