This document consists of a planting design plan and related federal contract opportunity for riparian habitat restoration along the Crooked River in Oregon. The planting design plan provides specifications for replanting approximately 16 acres of floodplain with over 4,700 native trees, shrubs, and willow cuttings. Planting zones include trenches, low and upper floodplain, high terraces, and side channels. Depressions will be planted with low floodplain species. The plan identifies staging areas, construction sequencing, existing site conditions, and responsibilities of the contractor. The related federal contract opportunity is soliciting bids for the Crooked River Valley Rehabilitation Phase 4 project. Work will include removing a temporary bridge, grading tailings piles and levee/haul roads to complete floodplain construction and fill the temporary bypass channel. The objective is to further address impacts of historical dredge mining on aquatic habitat in the area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1_Attachment_J9_SiteVisitNotes.docx | DOCX document | |
| Amendment1_Attachment_J10_QA.docx | DOCX document | |
| Amendment1_SF30.doc | DOC document | |
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets1Thru4.pdf | ||
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets4.1Thru5.3.pdf | ||
| Attachment_J3_TempBridgeDrawings.pdf | ||
| Attachment_J4_DrawingAddendum.pdf | ||
| Attachment_J6_TechSpecs.docx | DOCX document | |
| Attachment_J1_WageDecision.pdf | ||
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets6.0Thru7.3.pdf | ||
| Attachment_J8_PastPerformanceQuestionaire.doc | DOC document | |
| Attachment_J7_SWPPP_Template.docx | DOCX document | |
| Final_RFP.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CROOKED RIVER VALLEY REHABILITATION PLANTING PLAN PHASE 4
C ro o ke d R iv e r V al le y P la n ti n g D e si gn
TI
TL
E
SH
EE
T
DRAWING INDEX
1.0 TITLE SHEET
2.0 REHABILITATION/STAGING PLAN
3.0 SUMMARY OF QUANTITIES/SPECIFICATIONS
4.0 SITE PLAN
4.1 SITE PLAN
4.3 SITE PLAN
5.2 FLOODPLAIN/SIDE CHANNEL PLANTING TYPCIAL
CROOKED RIVER VICINITY MAP
PROJECT DESCRIPTION
THE PURPOSE OF THE CROOKED RIVER VALLEY PLANTING IS TO REPLANT APPROXIMATELY 16 ACRES OF FLOODPLAIN THAT WAS RESTORED BETWEEN 2015-2019 AS A PART OF THE CROOKED RIVER VALLEY REHABILITATION PROJECT. THE OVERALL PROJECT PURPOSE IS TO ADDRESS THE IMPACTS OF HISTORIC MINING ON HABITAT FOR SALMON AND STEELHEAD, AND OTHER FISH SPECIES IN CROOKED RIVER. THE CROOKED RIVER PLANTING PLAN WILL BE COMPLETED IN CONJUNCTION WITH THE CROOKED RIVER VALLEY REHABILITATION PHASE 4 CONTRACT, BUT THE WORK WILL OCCUR AFTER PHASE 4 IS COMPLETE.
THIS PROJECT SPECIFICALLY INVOLVES PLANTING APPROXIMATELY 16 ACRES OF FLOODPLAIN WITH
ROOTED-STOCK PLANTS RANGING FROM 8-GALLON TO 2-GALLON IN SIZE.
PROJECT PARTNERS
Bonneville Power Administration 905 NE 11th Ave Portland, OR 97208
USDA Nez Perce- Clearwater National Forests 903 3rd Street Kamiah, ID 83536
Nez Perce Tribe DFRM-Watershed PO Box 365 Lapwai, ID 83540
GENERAL NOTES
1. DIMENSIONS ARE IN FEET AND ACRES.
2. BASEMAPS ARE AERIAL IMAGERY TAKEN IN OCTOBER 2019 (POST CONSTRUCTION PHASE 3) AND OCTOBER
2020 (POST CONSTRUCTION PHASE 4).
3. LENGTHS OF BANK PLANTING IN BANK TREATMENTS ARE BASED ON THE CROOKED RIVER VALLEY REHAB.
PHASE 3 LENGTHS (Sheets 5.0-5.3).
4. ALL EXISTING CONDITIONS ARE TO BE VERIFIED IN THE FIELD PRIOR TO PLANTING. OVERALL AREAS MAY VARY POST CONSTRUCTION OF PHASE 4 AND ANY ADJUSTMENTS TO THE DRAWINGS SHALL BE MADE AS
DIRECTED BY THE CONTRACTING OFFICER.
5. THE CONTRACTOR IS RESPONSIBLE FOR NOTING THE CONDITIONS OF THE PLANTS WHEN THEY ARRIVE ON
SITE, AND SHALL PROTECT ALL PLANTS FROM BREAKAGE AND DRYING OUT.
6. THE CONTRACTOR SHALL WATER THE PLANTS, AS NEEDED, IN THE POTS WHEN THEY ARRIVE ON SITE. ALL PLANTS SHALL BE WATERED WITHIN 24 HOURS OF PLANTING IN THE GROUND IF THEIR ROOTS ARE NOT IN
DIRECT CONTACT WITH WATER.
7. PLANTS SHALL NOT BE PLANTED TO WHERE THE EXISTING SOIL LEVEL IN THE CONTAINER EXCEEDS THE SURROUNDING SUBSTRATE AND SUBSTRATE SHALL NOT EXCEED 1” ABOVE THE PLANT ROOT COLLAR.
8. THE CONTRACTOR SHALL PROTECT ALL EXISTING NATIVE VEGETATION WITHIN THE PROJECT EXTENTS.
9. THE CONTRACTOR SHALL PROCURE AND COMPLY WITH PERMITS, INCLUDING FEDERAL, STATE, COUNTY, AND LOCAL PERMITS.
10. PLANTING PLAN IS TO BE FULLY COORDINATED WITH THE CROOKED RIVER VALLEY REHABILITATION PHASE 4.
11. Access routes shall be decommissioned upon completion of the planting. Large rocks and boulders shall be placed along the south end of the project area to deter access to the floodplain.
Sheet 1.0
To Hwy 14 ro o ke d R iv er
V al le y
P la n ti n g
D es ig n
R
EH
A B
IL
IT
A
TI
O N
P
LA
N
LEGEND
SCOPE
1. COORDINATION AND DELIVERY OF PLANTS FROM NURSERY TO
PROJECT SITE BY CONTRACTOR.
2. PLANT CARE AND WATERING.
3. PLANTING WITHIN 2 DAYS OF DELIVERY TO THE PROJECT SITE.
4. COORDINATE WITH ALL CROOKED RIVER VALLEY PHASE 4
REHABILITATION OPERATIONS.
CONSTRUCTION SEQUENCING
1. MOBILIZE EQUIPMENT
2. ESTABLISH STAGING AREAS AND SITE ACCESS
3. PICK UP PLANTS AT NURSERY, DELIVER TO THE SITE, OFF-LOAD IN STAGES
4. INSTALL PLANTS
5. WATER PLANTS IN POTS, AS NEEDED AND WITHIN 24 HOURS OF PLANTING,
6. STACK POTS AND LEAVE AT STAGING AREA
7. ROUGHEN ACCESS AREAS AND MOVE BOULDERS WHERE NEEDED TO PREVENT
FUTURE FLOODPLAIN ACCESS
8. DEMOBILIZE EQUIMENT
ACCESS AND STAGING
Access is provided to the planting area at the south end of the project site. The Contractor will be able to traverse the floodplain where the floodplain was left less roughened.
EXISTING CONDITIONS
THE CROOKED RIVER VALLEY PROJECT AREA WAS HISTORICALLY DREDGE MINED, WHICH LEFT THE RIVER IN A TORTURED MEANDER PATTERN, WITH TAILING PILES AND PONDS THROUGHOUT THE FLOODPLAIN. CONSTRUCTION IN THE PROJECT AREA BEGAN IN 2015 AND CONTINUED THROUGH 2019. APPROXIMATELY 32 ACRES OF FLOODPLAIN WAS RE-GRADED AND 7,500 FEET OF NEW RIVER CHANNEL WAS CONSTRUCTED TO FORM A MORE NATURAL MEANDER PATTERN. THE FLOODPLAIN WAS CONSTRUCTED TO BE INUNDATED AT THE 1.5 YEAR FLOW RETURN INTERVAL. A BYPASS CHANNEL WAS CONSTRUCTED ALONG THE WEST SIDE OF THE PROJECT AREA TO HOLD THE RIVER DURING CONSTRUCTION. PHASE 4 IS THE REMOVAL OF THE BYPASS CHANNEL AND CONSTRUCTION OF THE UPPER FLOODPLAIN. THE PHASE 4 AREA IS APPROXIMATLEY 16 ACRES.
THE PURPOSE OF THE PROJECT IS TO RESTORE HABITAT FOR CHINOOK SALMON AND STEELHEAD, ALONG WITH OTHER RESIDENT FISH SPECIES AND AQUATIC ORGANISMS. THE RIPARIAN PLANTING PORTION OF THE PROJECT WILL BE IMPLEMENTED IN CONJUNCTION WITH THE INSTALLATION OF BANK STABILITY STRUCTURES AND FLOODPLAIN ROUGHNESS. LARGE PLANTS WILL BE PLANTED TO PROMOTE QUICKER RECOVERY OF THE RIPARIAN AREAS AND PROVIDE STREAM SHADE WITHIN THE NEXT 5 YEARS.
2.0
3.0
CONTAINER SIZE AND WEIGHT PLANT QUANTITIES
C ro o ke d R iv e r V al le y P la n ti n g D e si gn
SU
M
M A
R Y
O F
Q U
A N
TI
TI
ES
NOTES:
1. The side channel and channel along the new stream shall be planted with 591 5-gallon and 2- gallon thin leaf alders (A. incana) and Drummond willows (S. drummondiana) per specification on Sheet 5.0, using the trench planting method. A maximum bucket size of 1-foot wide shall be used to dig side channel trenches.
2. The floodplain shall be planted with mechanical equipment, digging 4,129 single holes for 8- and 2-gallon plants. Backfilling shall be done by hand to prevent damage to the plants.
3. All plants shall be tamped in and watered to eliminate air around the roots.
4. All plants shall have their roots planted vertically. Substrate shall not exceed 1” above the root collar and soil from the pots shall not exceed the height of the surrounding substrate. Small wells around the plants on the floodplain are acceptable, but not in trench planting.
5. Metal trays and plant containers shall be maintained in good conditions and returned to the Nursery. Wood pallets shall be stockpiled at the staging area to be disposed of by the Government.
GENERAL:
The Crooked River Valley Rehabilitation Planting Design shall be used in conjunction with the Crooked River Valley Rehabilitation Phase 4 Design (RDG 2019). Floodplain areas were delineated with GIS based on aerial imagery and in conjunction with the Phase 4 designs.
The plants for the Crooked River Valley Rehabilitation planting project have been pre-purchased through Wildland Habitat Nursery and are Government Furnished Property. The pots remain the property of Wildland Habitat Nursery and shall be returned in good condition. The Contractor shall arrange pickup and delivery of the plants. It is the responsibility of the Contractor to ensure plants are handled with care upon pickup and until the project is complete.
The Contractor will be planting in large cobble substrate. Soil has been stockpiled on the floodplain that will be spread in conjunction with micro-topography. Plants shall arrive on site a maximum of 2 days prior to planting Plants not planted within 48 hours shall be watered at their staging area. A minimum of 2, 1” pumps are required on site for watering plants. All plants shall be watered thoroughly within 2 days of planting. Additional pumps may be required to ensure all plants are adequately watered.
Wildland Habitat Nursery Denny Dawes 1025 E. Hatter Creek Rd Princeton, ID 83857 Office- 208-875-2500 Cell- 208-669-1050 Email- wild@potlatch.com
NURSERY INFORMATION
Example of 8-gallon plants Example of floodplain roughness
Container Size
Plant Per Tray/Pallet*
Root Dimension
Volume Fluid Oz
Weight Filled H20
2- Gallon 42 6” x 16” 2 gal 256 16 lbs
Tall 5 -Gallon 25 10” x 18” 4.7 gal 602 37.6 lbs
Tall 8-Gallon 19 11” x 24” 8.0 gal 1024 64 lbs
* Spruce per pallet will be less
Container Size Quantity
2- Gallon 4342
5 gallon 100
8 Gallon 278
Total 4,720
Species and Size Total
Thin-leaf Alder 2G 522
Thin-leaf Alder 5G 100
Thin-leaf Alder 8G 205
Black Cottonwood 8G 73
Drummond Willow 2G 470
Geyer Willow 2G 500
MacKenzie Willow 2G 250
Snowberry 2G 200
Engleman spruce 2G 500
Douglas Fir 2G 550
Grand Fir 2G 550
Lodgepole Pine 2G 200
Rocky Mnt Maple 2G 200
Hawthorn 2G 400
Total 4,720
PLANT SPECIES
mailto:wild@potlatch.com ro o ke d R iv e r V al le y P la n ti n g D e si gn
SI
TE
P
LA
N
Zo n e
Sheet 3.0
Sheet 4.0
NOTE:
Depressions, high terraces, and edges of project area are dependent upon final construction of Phase 4. The areas are approximations in size and location.
Plants shall clumped into natural groups rather than spaced evenly. Depressions, 2.5 feet deep or less, can be planted with Low Floodplain plants throughout.
Depression greater than 2.5 feet deep shall only be planted around the edges.
Plant Zone Area Species
Trench Planting 459 ft Alder, Drummond willow
Low Floodplain 2.83 Alder, Cottonwood, Spruce, Geyer willow
Upper Floodplain 1.9
Doug fir, MacKenzie willow, Grand Fir, Rocky Mountain
Maple, Hawthorn
High Terrace 0.41 Lodgepole pine, Snowberry, Douglas fir
Preservation 0.3 NA
Total 5.44
PLANT SCHEDULE
Area Species SIZE # Notes
Trench Alder 5-gallon 100 Approx 2.3 ft spacing
Drummond Willow 2-gallon 100 Approx 2.3 ft spacing
Total 200
Low
Floodplain/Depre ssion
Geyer Willow 2 gallon 175 Areas without flowing water
Alder 2 gallon 200
Cottonwood 8 gallon 50
Alder 8 gallon 125
Spruce 2 gallon 175
Grand Fir 2 gallon 75 Floodplain away from river edge
Total 800
Upper Floodplain
Doug Fir 2 gallon 100
MacKenzie Willow 2 gallon 100 Drier areas without flowing water
Grand Fir 2 gallon 75
Rocky Mountain Maple 2 gallon 75
Hawthorne 2 gallon 150
Total 500
High Terrace
Lodgepole pine 2 gallon 60
Snowberry 2 gallon 60
Doug Fir 2 gallon 50
Total 170 o ke d R iv e r V al le y P la n ti n g D e si gn
SI
TE
P
Zo n e
Sheet 3.0
Sheet 4.1
Plant Zone Area Species
Trench Planting 1026 ft Alder, Drummond willow
Low Floodplain 2 Alder, Cottonwood, Spruce, Geyer willow
Upper Floodplain 2.2
Doug fir, MacKenzie willow, Grand fir, Rocky
Mountain Maple, Hawthorn
High Terrace 0.4 Lodgepole pine, Snowberry
Total 4.6
PLANT SCHEDULE
Area Species SIZE # Notes
Trench Alder 2-gallon 171 Apprx 2.5 ft spacing
Drummond
Willow 2-gallon 220 Apprx 2.5 ft spacing
Total 391
Low
Floodplain/Depr ession
Geyer Willow 2 gallon 155 Areas without flowing water
Alder 2 gallon 79
Spruce 2 gallon 150
Grand Fir 2 gallon 80
Floodplain away from river edge
Total 454
Upper floodplain
Doug Fir 2 gallon 170
MacKenzie
Willow 2 gallon 125
Drier areas without flowing water
Grand Fir 2 gallon 100
Rocky
Mountain Maple 2 gallon 60
Hawthorne 2 gallon 150
Total 605
High Terrace
Lodgepole pine 2 gallon 70
Snowberry 2 gallon 70
Total 140
NOTE:
Depressions, high terraces, and edges of project area are dependent upon final construction of Phase 4. The areas are approximations in size and location.
Plants shall clumped into natural groups rather than spaced evenly. Depressions, 2.5 feet deep or less, can be planted with Low Floodplain plants throughout. Depression greater than 2.5 feet deep shall only be planted around the edges.
o ke d R iv e r V al le y P la n ti n g D e si gn
SI
TE
P
3.0
Sheet 4.2
M A
TC
H
L
IN
E
Plant Zone Area Species
Low Floodplain 2 Alder, Cottonwood, Spruce, Grand fir, Geyer willow
Upper Floodplain 1.6
Doug fir, MacKenzie willow, Grand fir, Rocky Mountain Maple, Hawthorn
High Terrace 0.85 Lodgepole pine, Snowberry, Doug fir
Total 4.45
PLANT SCEHDULE
Area Species SIZE # Notes
Low
Floodplain/Depressi on
Geyer Willow 2 gallon 170 Areas without flowing water
Alder 2 gallon 80
Cottonwood 8 gallon 23
Alder 8 gallon 80
Spruce 2 gallon 175
Grand Fir 2 gallon 75 Floodplain away from river edge
Drummond willow 2gallon 150 River edge and lower floodplain areas
Total 753
Upper floodplain
Doug Fir 2 gallon 170
MacKenzie Willow 2 gallon 25 Drier areas without flowing water
Grand Fir 2 gallon 145
Rocky Mountain
Maple 2 gallon 65
Hawthorne 2 gallon 100
Total 505
High Terrace Lodgepole pine 2 gallon 70
Snowberry 2 gallon 70
Doug fir 2 gallon 60
Total 200
NOTE:
Depressions, high terraces, and edges of project area are dependent upon final construction of Phase 4. The areas are approximations in size and location.
Plants shall clumped into natural groups rather than spaced evenly. Depressions, 2.5 feet deep or less, can be planted with Low Floodplain plants throughout. Depression greater than 2.5 feet deep shall only be planted around the edges.
o ke d R iv e r V al le y P la n ti n g D e si gn
FL
O
O D
P
LA
IN
/S
ID
E
C H
A N
N
EL
P
LA
N
TI
N G
T Y
P
IC
A L
Sheet 5.0
Water Line
TRENCH PLANTING DETAILFLOODPLAIN PLANT SPACING TYPICAL
*not to scale *Example of plant spacing. Not to scale. Species do not need to be grouped in order shown in typical.
Note:
A 1 foot bucket shall be used to excavate trench. Place fill on backside of channel. Place plant along channel side of trench.
Backfill with excavated material.
Tamp down fill material and water in plant to remove all air pockets.
Excavated Material
18”
*Floodplain typical from Crooked River Valley Rehabilitation Phase 3 Designs (RDG 2019). Example for plant spacing only.
NOTES:
1. Single hole planting with a 12” auger shall be used on the floodplain.
2. Plants shall be planted so the roots are vertical.
3. Excavated material shall be backfilled by hand, tamped down, and each plant within 48 hours of planting watered to ensure interstitial spaces are filled.
4. Substrate shall not exceed 1” above root collar on plant and height, with the exception of willow species, and soil from the pot shall not exceed the surrounding substrate. Shallow “wells” around the plants are acceptable.
5. Single hole plant spacing is approximately XX feet, however plants are not to be spaced evenly. See plant spacing typical for example. This spacing does not take into consideration the planting along the river banks or side channel.
6. Floodplain micro-topography is included in Phase 4 plans. Refer to Phase 4, Sheet 6.4 for additional detail.
24”
Furrow
Ridge