Attachment_J2_Crooked River Phase 4 Drawings_Sheets1Thru4.pdf
PDF 19 MB Posted
- Solicitation number
- 12363N21R4001
- Issued by
-
Department of Agriculture Forest Service
About this file
This federal contract opportunity solicitation seeks restoration services for the Crooked River Valley in the Nez Perce-Clearwater National Forests. The objective is to address impacts from historical dredge mining by completing Phase 4 of the Crooked River Valley Rehabilitation Project. Phase 4 involves moving the Crooked River from the bypass channel constructed in previous phases into the new channel, constructing approximately 4 acres of floodplain, grading 12 acres of levee/haul road, installing instream habitat features and riparian plants, removing a temporary bridge and hauling it to Grangeville, and hauling material from the lower floodplain work and staging area to fill the bypass channel. Offerors must submit responses by the deadline of 12363N21R4001 to the Department of Agriculture Forest Service to be considered for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1_Attachment_J9_SiteVisitNotes.docx | DOCX document | |
| Amendment1_Attachment_J10_QA.docx | DOCX document | |
| Amendment1_SF30.doc | DOC document | |
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets4.1Thru5.3.pdf | ||
| Attachment_J3_TempBridgeDrawings.pdf | ||
| Attachment_J4_DrawingAddendum.pdf | ||
| Attachment_J6_TechSpecs.docx | DOCX document | |
| Attachment_J1_WageDecision.pdf | ||
| Attachment_J2_Crooked River Phase 4 Drawings_Sheets6.0Thru7.3.pdf | ||
| Attachment_J8_PastPerformanceQuestionaire.doc | DOC document | |
| Attachment_J5_PlantingDesign.pdf | ||
| Attachment_J7_SWPPP_Template.docx | DOCX document | |
| Final_RFP.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part1
| 2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part2 |
| 2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part3 |
| 2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part4 |
File details come from the government source that posted it. Updated .