This federal contract solicitation seeks construction services for Crooked River Valley Restoration Phase 4. The objective is to address impacts of historical dredge mining by moving Crooked River from the temporary bypass channel into the newly constructed channel, constructing approximately 4 acres of floodplain and grading 12 acres of levee/haul road to complete floodplain construction and fill the bypass channel. Work will also include installing instream habitat features and riparian plantings. The temporary bridge must be removed and hauled to Grangeville. Material may be hauled from lower floodplain work areas and a south staging area to fill the bypass channel. The solicitation was issued by the USDA Forest Service Nez Perce-Clearwater National Forests.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- CONSTRUCTED CHANNEL ALIGNMENT

CONSTRUCTED SIDE CHANNEL ALIGNMENT

LEGEND

BANK STRUCTURES

LARGE WOOD STRUCTURE TYPE 1 (LWST 1)

LARGE WOOD STRUCTURE TYPE 2 (LWST 2)

CHANNEL STRUCTURES

CONSTRUCTED RIFFLE

FLOODPLAIN STRUCTURES

C FLOODPLAIN ROUGHNESS

NOTES

1. FLOODPLAIN FEATURES WERE ALL FIELD FIT AND WILL BE IN LOCATIONS

DIFFERENT THAN THOSE SHOWN.

2. APPROXIMATELY 1,500 CY OF VEGETATIVE FILL WILL BE SALVAGED FROM

THE BYPASS CHANNEL TO BE MIXED IN WITH THE MICROTOPOGRAPHY.

3. MICROTOPOGRAPHY CONSTRUCTION SHALL NOT DISTURB PLANTINGS,

EXISTING CHANNELS, OR SIDE CHANNEL CONSTRUCTION.

JOH-oo

Joo+oo

RIGHT BANK

STRUCTURE SCHEDULE

START

104+75

105+15

105+45

105+25

END

105+15

105+45

106+ 00

107+25

STRUCTURE

LWST2

LWST1

LWST2

CR

RELATED DRAWINGS

ITEM

LWST 1

LWST2

CR

SHEET#

7.0 7.1 7.2

3862 / ti I "'

5Bt00

- EXISTING BYPASS CHANNEL ALIGNMENT

BANKFULL PROFILE

MAIN CHANNEL

THALWEG PROFILE -

-0 (X) C')

PLAN VIEW

CONTOUR INTERVAL= 1 FOOT I

o· 50'

CONSTRUCT RIFFLE TO TIE

INTO EXISTING BED ELEVATION 3860

. <�1

3%___ 0. ,,_

-......1 __ �-- ......... _

EXISTING GROUND PROFILE -

I I I

103+00 103+50 104+00 104+50 105+00

105+50 106+00 106+50 107+00 107+50 108+00

PROFILE VIEW

ALONG MAIN CHANNEL ALIGNMENT

D' 50' JOO'

JOO'

1-u w A.

z e(1-

....I

<( V ::c w � � <( >- ::c � A.

....I

�w

Cw u

Ill

0 -w

LI.

a.=:

a..

C z z a..

w 1-

PROJECT NUMBER

RDG-15-009

SHEET NUMBER

5.2

2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part1
2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part2
2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part3
2019-12-9 Crooked River Phase 4 Drawings_FINAL_Part4

File details come from the government source that posted it. Updated .