This is Amendment 0003 to a federal solicitation for an upgrade to the steam distribution system at Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The amendment, issued by the Department of Veterans Affairs Network Contracting Office 9, provides the Government's responses to eleven outstanding Requests for Information (RFIs) submitted by offerors. The solicitation number is 36C24926R0017, with a requisition number of 626-26-3-4225-0005 and project number 626A4-22-202. The amendment is effective May 18, 2026, and offerors must acknowledge receipt prior to the specified offer deadline or their submissions may be rejected.
The RFI responses address technical and logistical requirements for the project, including: thrust block construction per section 33 63 00 with manufacturer-specific details provided by Perma-Pipe; mandatory brazing for all copper piping with no soldering permitted; safety railing requirements for Building 118; VFD retrofit specifications for Building 107 pumps using Sterlco manufacturer recommendations; a designated contractor lay-down area on the VA property's north side with specific utility access requirements; steam trap body material specifications requiring steel or stainless-steel per section 23 22 13; contractor responsibility to anticipate rock at four-foot depth and utilize Ground Penetrating Radar (GPR) to identify underground utilities; floor drain requirements on the mezzanine level with coordination requirements; and alarm specifications for CR-1 requiring one high-water probe alarm and one low-water float alarm. All other terms, conditions, and requirements of the original solicitation remain unchanged.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0003 05-18-2026 626-26-3-4225-0005 626A4-22-202
90C
Department of Veterans Affairs Network Contracting Office 9 (90C) John L. Mccomas, Contracting Officer 1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs
Jen Jamieson, Contract Specialist jen.jamieson@va.gov
To all Offerors/Bidders
36C24926R0017
X
X X
626-36X0162-4225-854200-3220 23NR2JA26
X 1
Amendment 0003 is issued to provide the Government’s responses to all outstanding Requests for Information (RFIs). The RFI responses are included on page?2 of this amendment for offeror review and consideration. Offerors are advised to carefully review this information, as it may affect proposal development.
Except as provided herein, all other terms, conditions, provisions, and requirements of the solicitation remain unchanged and in full force and effect.
John L. Mccomas Contracting Officer
RFI Questions and Answers 626A4-22-202 AJP-Upgrade Steam Distribution System
Project Location: Alvin C. York VA Medical Center 3400 Lebanon Road, Murfreesboro, TN 37129-1237
1. How are the Thrust blocks supposed to be built? Please provide applicable details.
Refer to 33 63 00 for thrust block requirements. On our drawings, we show the direct buried portion of this piping as delegated design. In this case, we worked with Perma-Pipe who manufactures the pre-insulated direct-buried steam piping called Multi-Therm. We included their detail for thrust blocks on sheet M504. I have attached a snip of the detail below as well.
Based on the piping manufacturer, the details and piping dynamics may be different which is why we opted for this to be delegated design. For this section of direct-buried piping, we call this out as a delegated design in our keynotes on sheet MS201.10. (See following tab.)
2. Can any copper be soldered or does it have to be brazed.
No soldering will be permitted. All copper piping must be brazed.
3. Is Bldg 118 going to need any safety barricades after install?
Provide Osha yellow, metal safety railing with midrail with a 2 foot distance away from the equipment and pit. Utilize mounting sockets on the floor.
4. BLDG 107 (G11) - How do you put a VFD on a skid package?
Retrofit pumps to manufacturer's recommended control panel. Sterlco is the manufacturer.
5. Where is the contractor lay-down area?
The location will be on the north side of the VA property with the other contractors. The COR and Facility Manager will designate the area. The contractor can pull their own wire from the 208V feed with a meter from MTE. Contractor wire must be underground. All subs and primes of the project are to use one lot. No other locations can be used as a laydown area. If an existing sub is utilized, they will have to move their connex to this area.
6. Steam Trap BOD calls for SPIRAX B1H-125. This has a cast body. This contradicts specs that say "steel" bodies. What do we utilize?
Specifications will be followed. Provide steel or stainless-steel trap bodies as specified in section 23 22 13.
7. There is no Geotech, should we expect any rock?
Contractor to anticipate rock at 4' depth. Geotech report from adjacent areas may be provided upon request.
8. Are we expected to GPR?
Contractor is expected to utilize GPR to identify underground utilities prior to digging or trenching.
9. S104 says MH-13: Is this really supposed to be MH 12?
MH-13 and MH-12 are the same. Refer to location on the drawings.
10. Does there need to be a floor drain on the upper mezzeanie in case of a leak?
Yes, Provide a floor drain on the upper level of the mezzanine. Piping will be connected to the sanitary riser from below. Contractor to GPR mezzanine floor prior to drilling through slab.
Coordinate with A/E and COR on floor drain placement.
11. How many overflow alarms are needed on CR-1? What types?
One high-water alarm (probe) and one low water alarm (float) will be required.