Attachment 9 Price Breakout Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
J045--626A4-22-202 - AJP-Upgrade Steam Distribution System
Solicitation number
36C24926R0017
Issued by

About this file

This is a Price Breakout Schedule template required for construction proposals submitted to the VA Network Contracting Office 9 for the Steam Distribution System upgrade project at Tennessee Valley Healthcare System, VA Medical Center in Murfreesboro, Tennessee (Project #626A4-22-202, Solicitation #36C24926R0017).

The template mandates that contractors provide detailed price breakdowns organized by construction divisions, with line items separated into Labor, Material, and Equipment columns. All proposals must include general conditions costs with itemized breakdowns covering superintendent, project manager, field office engineer, builder's risk insurance, site maintenance, travel, lodging, and other overhead items. The schedule spans 33 divisions including General Requirements, Concrete, Masonry, Metals, Wood and Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Steam Energy Distribution. Contractors must break down costs to the greatest degree possible for each division rather than submitting lump sum pricing. The template includes calculations for material tax (6 percent), overhead (10 percent), profit (10 percent), and bonds/fees/permits/licenses (3 percent). All proposals must include the applicable VA Medical Center, proposal date, job title, project number, and solicitation number. Lump sum pricing for entire divisions or subdivisions will not be accepted, and the Government reserves the right to request further price breakdowns beyond initial submissions.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown LOCATION: Solicitation Number: Project Number Project Title Proposal Date

PRICE BREAKOUT SCHEDULE
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTDIVISION TOTALS
General Conditions$0.00
Superintendent
Project Manager
Field Office Engineer
Builder's Risk Insurance
Other Project Specific Liability Insurance
Site Maintenance and Protection
Progress Photos (per contract specifications)
Dumpsters
Office Trailer
Storage Trailer/POD/CONEX
Telephone (Cell and/or Landline)
Signage (per contract specifications and/or drawings)
Travel (must comply with Federal Travel Regulations)
Lodging (must comply with Federal Travel Regulations)
Record Document Preparation
As-builts (per contract specifications)
Weather Protection (per contract specifications)
Infection Control (per contract specifications)
Information Technology (Internet, etc.)
DIVISION 1GENERAL REQUIREMENTS$0.00
Shop Drawings, Product Data, & Samples
Safety Requirements
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Environmental Controls
Construction Waste Management
General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
Site Survey
Demolition
Traditional Asbestos Abatement
DIVISION 3CONCRETE$0.00
Cast in Place Concrete
Cast in Place Concrete (short form)
DIVISION 4MASONRY$0.00
Masonry Mortaring
DIVISION 5Metals$0.00
Structrural Steel Framing
Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
Rough Carpentry
Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
Thermal Insulation
Flashing and Sheet Metal
Roof Specialties
Roof Accessories
Firestopping
Joint Sealants
DIVISION 8Openings$0.00
Hollow Metal Doors & Frames
Interior Wood Doors
Intensive Care Unit Entrances
Door Hardware
Low Energy Power Assist Door Operators
Glazing
DIVISION 9FINISHES$0.00
Subsurface Prep for Floor Finishing
Schedule for Finishes
Non Struct Metal Framing
Gypsum Board
Ceramic/Porcelain Tiling
Acoustical Ceilings
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tiling Flooring
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
Carpeting
Painting
High-Build Glazed Coatings
DIVISION 10Specialties$0.00
Chalkboards and Markerboards
Signage
Cubicle Curtain Tracks
Wall & Door Protection
Toilet, Bath, & Laundry Accessories
Fire Extinguisher Cabinets

DIVISION 11 EQUIPMENT $0.00

DIVISION 12Furnishings$0.00
Window Shades
Manufactured Metal Casework
Manufactured Wood Casework
Countertops
DIVISION 13Special Construction$0.00
Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
Common Work Results for Plumbing
Meters and Gages for Plumbing piping
General-Duty Valves for Plumbing Piping
General Motor Requirements for Plumbing Equipment
Meters and Gauges for Plumbing Piping
General Duty Valves for Plumbing Piping
Plumbing Insulation
Facility Water Distribution
Facility Sanitary & Vent Piping
Facility Storm Drainage
Packaged Pedestal Drainage Pump Units
Plumbing Fixtures
Vacuum Systems for Laboratory & Healthcare Facilities
Gas Systems for Laboratory & Healthcare Facilities
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
Common work results for Boiler and Steam Generation
Common Work Results for HVAC
Testing, Adjusting and Balancing for HVAC
General Motor Requriments for HVAC and Steam Generation Equipment
Noise and Vibration Control for HVAC Piping and Equipment
Testing, Adjusting and Balancing for HVAC
HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Instrumentation and Control for Boiler Plant
Boiler Plant Piping System
Direct Digital Control System for HVAC
Hydronic Piping
Hydronic Pumps
Steam & Condensate Heating Piping
Steam Condensate Pumps
HVAC Water Treatment
HVAC Ducts and Casing
HVAC Fans
Air Terminal Units
Air Outlets & Inlets
HVAC Air Cleaning Devices
Indoor Central Station Air Handling units
DIVISION 26ELECTRICAL$0.00
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway & Boxes for Electrical Systems
Overcurrent Protective Device Coordination Study
Low-voltage Bussed Junction Box
Commissioning of Electrical Systems
DVA/USACE Projects Commissioning of Electrical Systems
Motor Control Centers
Motor Controllers
Lighting Controls
Wiring Devices
Enclosed Switches & Circuit Breakers
Facility Lightening Protection
Interior Lighting
DIVISION 27COMMUNICATIONS$0.00
Requirements for Communications Installations
Raceways & Boxes for Communications Systems
Commissioning of Communications Systems
Control, Communication and Signal Wiring
Communications Equipment Room Fittings
Communications Structured Cabling
Nurse Call & Code Blue Systems
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
Common Work Results for Electronic Safety and Security
Conductors and Cables for Electronic Safety and Security
Conduits & Backboxes for Electronic Safety & Security
Physical Access Control System
Fire Detection & Alarm
DIVISION 31EARTHWORK$0.00
Earthwork
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
Cement & Concrete for Exterior Improvements
DIVISION 33$0.00
Steam Energy Distribution
TOTALS
TOTAL LABOR$0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT $0.00

DIVISION GRAND TOTALS $0.00

DIVISION GRAND TOTALS$0INSTRUCTIONS
TAX FOR MATERIALS$0
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
PROFIT10%$0
SUBTOTAL$0
3. Divisions must still be listed even if not applicable to the construction requirement;
BOND/FEE
PERMITS/LICENSES3%$04. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

GRAND TOTAL $0

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.