Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
Award Notice Posted
- Solicitation number
- W91238-17-R-0006
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Awarded
- to Flatiron-Dragados-Sukut Joint Venture
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91238-17-C-0025 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Lake Isabella, California, United States
Notice details come from SAM.gov. Updated .
Notice text
9 versions
Update #9 · Latest ·
AMENDMENT 0006 - This amendment incorporates revised specifications and drawings and re-issues some drawings that had formatting issues. Please see attachment entitled, "1966 Amendment 0006 Summary" for a full listing of revisions. Additionally, three attachments will be revised and re-issued: Attachment 3 - GDR; Attachment 9 - Supplemental Info - GIR; and a new Attachment 17 - Utility Poles. A new/updated Price Schedule will be provided as well. Use this Price Schedule, dated 1 May 2017, for your Price Proposal.
Update #8 ·
AMENDMENT 0005 - This amendment incorporates changes to the CLINs/Price Schedule; a sample format for the price breakout; updates to the Subsurface Information; a current Wage Determination dated 21 April 2017; and changes in sections 00 22 16, 00 72 00 and 00 73 00.
Amendment 0006 will be issued no later than 2 May and will incorporate the revised specifications and plan sheets in response to the RFI's.
Update #7 ·
AMENDMENT 0004 - This amendment replaces spec sections 01 14 00.10, 02 41 00, 31 09 13 and updates the Subsurface Information on the continuation page. The proposal due date will remain unchanged.
Update #6 ·
AMENDMENT 0003 - This amendment includes the replacement of spec sections 01 22 00 and 02 82 13; update to section 00 22 16, paragraph 3.3; provides SEA #3; and provides the native forms included in the solicitation. The proposal due date is extended until 16 May 2017.
Update #5 ·
AMENDMENT 0002 - This amendment includes the sign-in sheet and presentation from the site visit held 6 April 2017. Additionally, the date to submit RFI's has been extended from 17 April to 24 April 2017.
Update #4 ·
AMENDMENT 0001 - The plan sheets will be sent via AMRDEC. If you have previously emailed me, you should have received the plan sheets already. All others please email me at Melissa.A.DeNigris@usace.army.mil.
The correct bidder inquiry key is 2ACFNU-A2PCQW.
Thank you for your patience.
Update #3 ·
Currently the site visit is scheduled for 6 April 2017 at 9am in Lake Isabella, California.
Update #2 ·
Currently the site visit is scheduled for 6 April 2017 at 10am in Lake Isabella, California. Further information will be available and confirmed once the solicitation is posted.
Update #1 ·
The Government anticipates awarding a Firm-Fixed-Price contract to construct the Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway in Lake Isabella, California.
The Request for Proposal will be posted no earlier than 24 March 2017. An unrestricted/full and open competition Best Value Tradeoff procurement has been determined. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov). The estimated due date for proposals will be on or about 3 May 2017. Once issued, the RFP will identify a firm due date/time for receipt of proposals.
In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $250,000,000 and $500,000,000. This proposed contract action will be conducted using NAICS code 237990, with a size standard of $36,500,000.00 and the Federal Supply Code (FSC) is Y1KA, Construction of Dams.
PROJECT DESCRIPTION: The Contractor shall furnish everything necessary, including but not limited to all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform this project. The Phase II contract is divided into a base contract for the Main Dam and an option for the Auxiliary Dam. The base Phase II contract will include excavation of the new Emergency Spillway, modifications to the existing Service Spillway, a 16 foot raise of the Main Dam and corresponding raise of the Main Dam Control Tower, modifications to California State Route 155 at the Main Dam right abutment, site work and modifications at several recreation facilities north of the Auxiliary Dam, stockpiling of material for modifications to the Auxiliary Dam, and the disposal of waste material on Engineers' Point. The contractor will excavate approximately 2.95 million cubic yards (CY) of material from the Emergency Spillway, process the necessary volume of this material into differing sizes, and use these materials to produce on-site concrete aggregates, concrete, filter/drain materials and rockfill for raising the embankments. Also included in the base contract is construction of a 28-foot tall labyrinth weir using approximately 56,000 CY of concrete. Processed materials for use in modifications to the Auxiliary Dam will be stockpiled until the award of the Phase II option. Excess excavated material will be placed on Engineers Point.
The Auxiliary Dam will be included as an option and will be exercised once the Government acquires the Borel easement through the Auxiliary Dam. This option will include demolition of several downstream monoliths in the Borel Outlet Works through the Auxiliary Dam, filling the Borel Outlet Works conduit through the Auxiliary Dam with lightweight concrete, and modifications to the Auxiliary Dam to meet the requirements of the Plans and Specifications.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Ordering Solicitation: Plans and specifications will NOT be provided in hard paper copy or CD format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. To register, click on the Register Now button in the Vendors Block and follow the instruction. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. Due to volume, some documents (Geotechnical Data Report and the As-builts) may be sent via AMRDEC. The Offeror will need to contact the Government in order to obtain this information. Further, information will be provided with the RFP.
The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity