Price_Schedule_-_Isabella_Ph_II_1_May_2017.pdf
PDF 52 KB Posted
- Attached to
- Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
- Solicitation number
- W91238-17-R-0006
About this file
Please use this price schedule when submitting your price proposal.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/1/20179:06 PM
Description Qty UOM $/Unit Total Cost Notes
0001AA EQUIPMENT MOB, DEMOB & PREP WORK 1 JOB
0001AB TEMPORARY SITE POWER 1 JOB
0001AC NEW WATER WELLS 1 EA
0001AD MOB/DEMOB CONCRETE BATCH PLANT 1 JOB
0001AE MOB/DEMOB ROCK CRUSHING PLANT 1 JOB
0001AF CONSTRUCT GOVERNMENT TESTING LABORATORY 1 JOB
Subtotal Mobilization/Demobilization & Prep Work
0002 SWPPP & ENVIRONMENTAL REQUIREMENTS 1 JOB
0003 SITE PREPARATION 1 JOB
0004 DEMOLITION OF EXISTING FACILITIES 1 JOB
0005 POST CONSTRUCTION EROSION CONTROL/STABILIZATION
0005AA EROSION CONTROL SEEDING 115 AC
0005AB SEEDING MAINTENANCE 3 MO
Subtotal Post Construction Erosion Control/Stabilization
0006 INSTRUMENTATION 1 JOB
0007 EMERGENCY SPILLWAY EXCAVATION
0007AA EMERGENCY SPILLWAY - COMMON EXCAVATION 325,000 BCY
0007AB EMERGENCY SPILLWAY - ROCK EXCAVATION 2,500,000 BCY
0007AC EMERGENCY SPILLWAY - PRESPLITTING 45,000 SY
0007AD
EMERGENCY SPILLWAY - FOUNDATION ROCK CLEANING FOR
GEOLOGIC MAPING 18,100 SY
0007AE EMERGENCY SPILLWAY - EXCAVATION OF AREA 1 5,200 BCY
0007AF EMERGENCY SPILLWAY - EXCAVATION OF AREA 2 2,200 BCY
0007AG EMERGENCY SPILLWAY - DENTAL CONCRETE 7,500 CY
0007AH EMERGENCY SPILLWAY - ROCK ANCHORS (PATTERN) 535 EA
0007AJ EMERGENCY SPILLWAY - ROCK ANCHORS (SPOT BOLTS) 100 EA
0007AK EMERGENCY SPILLWAY - SPOT SHOTCRETE 16,000 SF
0007AL EMERGENCY SPILLWAY - DTM MESH NETTING 154,000 SF
0007AM EMERGENCY SPILLWAY - PATTERN DRAINS 80 EA
0007AN EMERGENCY SPILLWAY - SHEET/STRIP DRAINS 400 LF
0007AP
EMERGENCY SPILLWAY - LABYRINTH WIER FOUNDATION &
ABUTMENT WALL CLEANING 20,000 SY
Subtotal Emergency Spillway Excavation
PRICE SCHEDULE
Kern County, California Isabella Lake
ISABELLA DAM SAFETY MODIFICATION PROJECT
0001 MOBILIZATION/DEMOBILIZATION & PREP WORK
0008 LABYRINTH WEIR
0008AA LABYRINTH WEIR - FOUNDATION LEVELING CONCRETE 7,200 CY
0008AB LABYRINTH WEIR - FOUNDATION ANCHORS 828 EA
0008AC LABYRINTH WEIR - FOUNDATION CONCRETE 23,400 CY
0008AD LABYRINTH WEIR - FOUNDATION BACKFILL 10,200 ECY
0008AE LABYRINTH WEIR - WALL CONCRETE 11,600 CY
0008AF LABYRINTH WEIR - ABUTTMENT WALLS - CONCRETE 760 CY
0008AG LABYRINTH WEIR - ABUTTMENT WALLS - SHOTCRETE 7,500 SF
Subtotal Labyrinth Weir
0009 AUXILIARY DAM (BASE CONTRACT)
0009AA AUX DAM (BASE) - TEST FILL 1 JOB
0009AB AUX DAM (BASE) - STOCKPILE FILTER SAND (Zone 2a) 333,000 LCY 0009AC AUX DAM (BASE) - STOCKPILE DRAIN ROCK (Zone 2b) 232,000 LCY 0009AD AUX DAM (BASE) - STOCKPILE TRANSITION (Zone 3) 185,000 LCY 0009AE AUX DAM (BASE) - STOCKPILE ROCK FILL (Zone 4a/4b) 1,075,000 LCY 0009AF AUX DAM (BASE) - STOCKPILE 8-INCH MINUS ROCK (Zone 6) 22,000 LCY
0009AG AUX DAM (BASE) - STOCKPILE BEDDING STONE 13,900 LCY
0009AH AUX DAM (BASE) - STOCKPILE RIPRAP STONE 60,000 LCY
0009AJ AUX DAM (BASE) - STOCKPILE FILTER LAYER STONE 8,300 LCY
Subtotal Auxiliary Dam (Base Contract)
0010 MAIN DAM
0010AA MAIN DAM - DEWATERING 1 JOB
0010AB MAIN DAM - COMMON EXCAVATION 215,700 BCY
0010AC MAIN DAM - ROCK EXCAVATION 4,500 BCY
0010AD MAIN DAM - CORE (Zone 1) 37,400 ECY 0010AE MAIN DAM - FILTER SAND (Zone 2a) 52,500 ECY 0010AF MAIN DAM - DRAIN ROCK (Zone 2b) 56,500 ECY 0010AG MAIN DAM - TRANSITION (Zone 3) 111,500 ECY 0010AH MAIN DAM - ROCK FILL (Zone 4a/4b) 351,500 ECY 0010AJ MAIN DAM - ROAD BASE (Zone 5) 4,000 ECY 0010AK MAIN DAM - 8-INCH MINUS ROCK (Zone 6) 4,000 ECY
0010AL MAIN DAM - BEDDING STONE 6,700 ECY
0010AM MAIN DAM - RIPRAP STONE 44,900 ECY
0010AN MAIN DAM - DERRICK STONE 1,700 ECY
0010AP MAIN DAM - FILTER LAYER STONE 3,300 ECY
0010AQ MAIN DAM - TOE DRAIN SYSTEM & DOWNSTREAM FILL 1 JOB
0010AR MAIN DAM - DAM CREST SURFACE FEATURES 1 JOB
0010AS MAIN DAM - DENTAL CONCRETE AT TOWER 35 CY
Subtotal Main Dam
0011 MAIN DAM RIGHT WALL AT HWY 155
0011AA MAIN DAM RIGHT WALL - COMMON EXCAVATION 4,340 BCY
0011AB MAIN DAM RIGHT WALL - ROCK EXCAVATION 4,910 BCY
0011AC MAIN DAM RIGHT WALL - LEVELING CONCRETE 4,000 CY
0011AD
MAIN DAM RIGHT WALL - TEMPORARY DETOUR & TRAFFIC
CONTROL 1 JOB
0011AE MAIN DAM RIGHT WALL - TEMPORARY DETOUR FILL (Zone 1) 65,750 CY
0011AF MAIN DAM RIGHT WALL - SR 155 ROAD WORK 1 JOB
0011AG MAIN DAM RIGHT WALL - WALL CONSTRUCTION 1 JOB
0011AH MAIN DAM RIGHT WALL - DTH MESH NETTING 2,000 SF
Subtotal Main Dam Right Wall at Hwy 155
0012 MAIN DAM CONTROL TOWER JOB
0013 SERVICE SPILLWAY
0013AA SERVICE SPILLWAY - COMMON EXCAVATION 2,500 BCY
0013AB SERVICE SPILLWAY - ROCK EXCAVATION 14,000 BCY
0013AC SERVICE SPILLWAY - DTH MESH NETTING 4,000 SF
0013AD SERVICE SPILLWAY - WALLS 1 JOB
0013AE SERVICE SPILLWAY - PEDESTRIAN BRIDGE & STAIRS 1 JOB
0013AF
SERVICE SPILLWAY - ACCESS GALLERY AND STAIRS
DEMOLISION & ABANDONMENT 1 JOB
Subtotal Service Spillway
0014 PERMANENT OPERATIONS BUILDING PAD
0014AA PERMANENT OPERATIONS BUILDING - COMMON EXCAVATION 20,000 BCY
0014AB PERMANENT OPERATIONS BUILDING - ROCK EXCAVATION 19,000 BCY
0014AC PERMANENT OPERATIONS BUILDING - FILL 42,000 ECY
Subtotal Permanent Operations Building Pad
0015 ROADS, ACCESS CONTROL, MISC
0015AA PONDEROSA DR & BARLOW ROAD - COMMON EXCAVATION 30,150 BCY
0015AB PONDEROSA DR & BARLOW ROAD - ROCK EXCAVATION 5,750 BCY
0015AC PONDEROSA DR & BARLOW ROAD - FILL 50,800 ECY
0015AD PONDEROSA DR & BARLOW ROAD - ROAD BASE 3,000 ECY
0015AE PONDEROSA DR & BARLOW ROAD - PAVING 2,500 TON
0015AF PONDEROSA DR & BARLOW ROAD - DRAINAGE FEATURES 1 JOB
0015AG PONDEROSA DR & BARLOW ROAD - SIGNAGE & STRIPING 1 JOB
0015AH GUARD RAIL 1,450 LF
0015AJ GATES - PIPE 2 EA
0015AK GATES - CRASH RATED 9 EA
0015AL BOULDER BARRIER 4,950 LF
0015AM CHAINLINK FENCE 7,280 LF
0015AN DRAIN INLET RELOCATION AT SR 178 1 JOB
Subtotal Roads, Access Controls, Misc
0016 PERMANENT SITE POWER & COMMUNICATION 1 JOB
0017 USFS RECREATION MITIGATION
0017AA AUXILIARY DAM RECREATION AREA 1 JOB
0017AB OLD ISABELLA RECREATION AREA 1 JOB
0017AC SOUTH FORK RECREATION AREA 1 JOB
0017AD MAIN DAM CAMPGROUND GRADE RESTORATION & CLEAN UP 1 JOB
0017AE BOAT LAUNCH 19 RESTORATION 1 JOB
Subtotal USFS Recreation Mitigation
TOTAL BASE PRICE
OPTION 1
1001 INSTRUMENTATION FOR AUX DAM 1 JOB
1002 DEMOLITION OF BOREL CONDUIT & TOWER
1002AA DEMOLITON OF BOREL CONDUIT & TOWER 1 JOB
1002AB BOREL CANAL UPSTREAM BACKFILL 1 JOB
1002AC BOREL CANAL DOWNSTREAM BACKFILL 1 JOB
Subtotal Demolition of Borel Conduit & Tower
1003 AUXILIARY DAM
1003AA AUX DAM - DEMOLITION 1 JOB
1003AB AUX DAM - DEWATERING 1 JOB
1003AC AUX DAM - COMMON EXCAVATION 586,000 BCY
1003AD AUX DAM - ROCK EXCAVATION 25,000 BCY
1003AE AUX DAM - DENTAL CONCRETE 200 CY
1003AF AUX DAM - DENTAL MORTAR 70 CY
1003AG AUX DAM - CORE (Zone 1) 189,000 ECY 1003AH AUX DAM - FILTER SAND (Zone 2a) 252,000 ECY 1003AJ AUX DAM - DRAIN ROCK (Zone 2b) 191,500 ECY 1003AK AUX DAM - TRANSITION (Zone 3) 159,300 ECY 1003AL AUX DAM - ROCK FILL (Zone 4a/4b) 921,000 ECY 1003AM AUX DAM - ROAD BASE (Zone 5) 11,500 ECY 1003AN AUX DAM - 8-INCH MINUS ROCK (Zone 6) 18,200 ECY
1003AP AUX DAM - BEDDING STONE 11,900 ECY
1003AQ AUX DAM - RIPRAP STONE 50,800 ECY
1003AR AUX DAM - FILTER LAYER STONE 6,750 ECY
1003AS AUX DAM - TOE DRAIN & PUMP HOUSE SYSTEM 1 JOB
1003AT AUX DAM - DAM CREST SURFACE FEATURES 1 JOB
Subtotal Auxiliary Dam
1004 DELETE STOCKPILING REQUIREMENT 1 JOB
1005 ROADS, ACCESS CONTROL, MISC
1005AA AUX DAM - GATES (CRASH RATED) 2 EA
1005AB AUX DAM - BOULDER BARRIER 1,940 LF
1005AC AUX DAM - GUARDRAIL 430 LF
1005AD AUX DAM - CHAINLINK FENCE 4,160 LF
Subtotal Option 1
1006 AUX DAM - PERMANENT SITE POWER & COMMUNICATION 1 JOB
OPTION 2
2001AA ADDITIONAL ROLLING FOR COMPACTION - 10 TON 100 HR EXERCISABLE UP TO 5 TIMES 2001AB ADDITIONAL ROLLING FOR COMPACTION - 20 TON 100 HR EXERCISABLE UP TO 5 TIMES 2001AC ADDITIONAL ROLLING FOR COMPACTION - FRONT END LOADER 100 HR EXERCISABLE UP TO 5 TIMES
Subtotal Option 2
OPTON 3
3001AA DENTAL MORTAR 50 CY EXERCISABLE UP TO 5 TIMES
3001AB DENTAL CONCRETE 100 CY EXERCISABLE UP TO 5 TIMES
Subtotal Option 3
OPTON 4
4001AA SPOT ANCHORS 25 EA EXERCISABLE UP TO 5 TIMES
4001AB COUPLED SPOT ANCHORS 25 EA EXERCISABLE UP TO 5 TIMES
Subtotal Option 4
OPTON 5 DOUBLE TWIST HEXAGONAL MESH NETTING 4,000 SF EXERCISABLE UP TO 2 TIMES
OPTON 6 SPOT SHOTCRETE 4,000 SF EXERCISABLE UP TO 2 TIMES
OPTON 7 SPOT DRAINS 25 EA EXERCISABLE UP TO 5 TIMES
OPTON 8 SHEET/STRIP DRAINS 100 LF EXERCISABLE UP TO 2 TIMES
OPTON 9 CLEANING/SURFACE PREPARATION 1,000 SY EXERCISABLE UP TO 5 TIMES
OPTON 10 MISC GRADING AT USFS RECREATION SITES 10,000 SF EXERCISABLE UP TO 5 TIMES
OPTON 11 UNDERWATER GRADING AT USFS RECREATION SITES 10,000 SF EXERCISABLE UP TO 2 TIMES
OPTON 12 MISC CONCRETE AT USFS RECREATION SITES 200 CY EXERCISABLE UP TO 2 TIMES
OPTON 13 ADDITIONAL BOULDER CLEARING AT RECREATION SITES 100 TON EXERCISABLE UP TO 5 TIMES