About this file

Amendment 0004

View the file

Other files

File Type Posted
KE1-09-0509 Electrical REPOSTED —
KEI-09-0507-CD102-CD112_AMENDMENTS_(11_Sheets).pdf PDF
KEI-09-0517-C-120_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0508 Instrumentation REPOSTED —
1966_AMENDMENT_0006__SUMMARY.pdf PDF
A0.1.10_Attachment_17_Utility_Poles_(17-R-0006)_ADDED-Attachment.pdf PDF
KE1-09-0510 Electrical REPOSTED —
KEI-09-0510 Instrumentation REPOSTED —
KEI-09-0525-SR502_AMENDMENT_(1_Sheet).pdf PDF
A01.10_Attachment_03_Geotechnical_Data_Report_(17-R-0006)_REVISED_PAGES_1-4_ONLY.pdf PDF
Price_Schedule_-_Isabella_Ph_II_1_May_2017.pdf PDF
KE1-09-0510-ST100_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0509-CD101-CD104_AMENDMENTS_(4_Sheets).pdf PDF
A01.10_Attachment_09_Suppelmental_Info_GIR_(17-R-0006)_REVISED-PAGES_1-5_ONLY.pdf PDF
Revised_Specifications.pdf PDF
KE1-09-0509-SD201_AMENDMENT_(1_Sheet).pdf PDF
KE1-09-0507-ES005_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0509 Instrumentation —
KEI-09-0524-A-111_to_A-113_AMENDMENT_(3_Sheets).pdf PDF
W91238-17-R-0006-0006.pdf PDF
Attachment_06_Wage_Determination_(CA_31)_-_Isabella_Ph_II_UPDATED.pdf PDF
Price_Schedule_-_Isabella_Ph_II_UPDATED_for_Amend_5.xlsx XLSX spreadsheet
W91238-17-R-0006-0005.pdf PDF
Sample_Breakout_Format.xlsx XLSX spreadsheet
31_09_13.pdf PDF
1966_AMENDMENT_0004__SUMMARY.pdf PDF
01_14_00.10.pdf PDF
02_41_00.pdf PDF
SEA_3_USFS_AdminandRec_Facilities_Relo_SEA_and_FONSI.pdf PDF
W91238-17-R-0006-0003.pdf PDF
Price_Schedule_-_Isabella_Ph_II_(17-R-0006).pdf PDF
Specification_02_82_13.pdf PDF
1966_AMENDMENT_0003__SUMMARY.pdf PDF
Attachment_C_-_Past_Performance_Questionnaire.pdf PDF
Attachment_B_-_Contractor's_Project_Experience.pdf PDF
Attachment_D_-_Small_Business_Participation_Commitment_Document.pdf PDF
Specification_01_22_00.pdf PDF
Attachment_A_-_Pre-Award_Survey_Info.pdf PDF
W91238-17-R-0006-0002.pdf PDF
Isabella-_Site_Vist_Presentation_6APR2017.pdf PDF
Isabella_Phase_II_Site_Visit_Sign_In_Roster.pdf PDF
W91238-17-R-0006-0001.pdf PDF
A01.10_Attachment_05_Stone_and_Aggregate_Report_(17-R-0006).pdf PDF
A01.10_Attachment_14_01_50_00_Isabella_Government_Testing_Laboratory_GER_(17-R-0006).pdf PDF
A01.10_Attachment_11_Supplemental_Info_-_Topo_and_Utility_Surveys_(17-R-0006).pdf PDF
A01.10_Attachment_07_Supplemental_Info_List_of_Isabella_Env_Docs_(17-R-0006)_.pdf PDF
W91238-17-R-0006,_Isabella_Lake_Dam_Safety_Modification_Project_(DSMP),_Phase_II__Dams_and_Spillway.pdf PDF
A01.10_Attachment_10_Supplemental_Info_As-Builts_(17-R-0006).pdf PDF
A01.10_Attachment_13_01_57_20_Isabella_Lake_Water_Quality_Baseline_2016_(17-R-0006).pdf PDF
A01.10_Attachment_04_Water_Testing_and_Evaluation_Report_(17-R-0006).pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Isabella Dam Safety Modification Project (DSMP), Phase II Dams and Spillw ay, Lake Isabella, California

1) The purpose of this amendment is to replace sections 01 14 00.10, 02 41 00, 31 09 13 and update the Subsurface Information on the continuation page.

2) The proposal due date w ill remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Apr-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-17-R-0006

X 9B. DATED (SEE ITEM 11)

30-Mar-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Apr-2017

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-17-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUBSURFACE INFORMATION

SUBSURFACE INFORMATION

PART 1 GENERAL

1.1 GENERAL

This section discusses subsurface information that has been collected at the site and is made available to the Contractor.

1.2 REFERENCES

1.2.1 Geologic Interpretation Report, USACE, 06 February 2017. (Attachment 8, 5.2 Supplemental Info)

1.2.2 Geotechnical Data Report, USACE, 06 February 2017. (Attachment 3, Geotechnical Data Report)

1.3 DESCRIPTION OF AVAILABLE SUBSURFACE INFORMATION

1.3.1 The Government has conducted subsurface investigations at the site. Subsurface information that was obtained during these investigations is being provided to bidders in the following two reports:

1.3.1.1 Geotechnical Data Report (GDR) — This data report contains actual subsurface information that was collected at or adjacent to the Site by the Government or for the Government for use in preparing the Contract Documents. The Technical Data contained in this report upon whose accuracy the Contractor may rely are logs of borings, logs of trenches/test pits, recorded measurements of subsurface water levels, and the results of field and laboratory testing. The GDR does not include any interpretation of the data. If opinions, or interpretive or speculative non-factual comments or statements appear in the GDR, such opinions, comments, or statements are not operative parts of the GDR and do not have contractual standing. Subject to that exception, the GDR is a Contract Document.

A. Limited Reliance by the Contractor on Technical Data Authorized: The Contractor may rely upon the general accuracy of the Technical Data contained in the GDR. Except for such reliance on this Technical Data, the Contractor may not rely upon or make any Claim against the Government with respect to:

a. the completeness of this report for the Contractor’s purposes, including but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by the Contractor, and safety precautions and programs incident thereto, or

b. other data interpretations, opinions, and information contained in this report or indicated on the Drawings;

or

c. any Contractor interpretation of or conclusion drawn from any Technical Data or any such other data, interpretations, opinions, or information.

1.3.1.2. Geologic Interpretation Report (GIR) — This interpretive report was prepared by the Government and contains Technical Data and specific geotechnical and geological interpretations that were used by the Government to prepare the design of this project. The Technical Data contained in this report upon whose accuracy Contractor may rely are logs of borings, logs of trenches/test pits, recorded measurements of subsurface water levels, and the results of field and laboratory testing. This report is provided to the bidders for informational purposes only and is not part of the Contract Documents.

The interpretations shown in this report reflect the judgment of the Government. The bidders must make their own interpretations of the information provided in this report and must not solely rely on the Government’s interpretations in preparation of their bids.

A. Reliance by Contractor on Technical Data Authorized:

The Contractor may rely upon the accuracy of the Technical Data contained in the GIR. Except for such reliance on Technical Data, the Contractor may not rely upon or make any Claim against the Government with respect to:

a. the completeness of this report for the Contractor’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or

b. other data, interpretations, opinions, and information contained in this report or shown or indicated on the Drawings; or

c. any Contractor interpretation of or conclusion drawn from any Technical Data or any such other data, interpretations, opinions, or information.

B. The descriptions of subsurface conditions provided in the GIR are based on geotechnical investigations, laboratory tests, interpretation, interpolation, extrapolation, and analyses. The Government does not warrant or guarantee that actual subsurface conditions will be as interpreted in the GIR, nor is the GIR intended to warrant or guarantee the use of specific means or methods of construction.

1.3 LIMITATIONS

1.3.1 The Government does not represent that the boring and test pit/trench logs, field and laboratory test results and other available geologic information show the conditions that will be encountered in performing the Work. The Government represents only that such information shows conditions at the locations of the borings and test pits/trenches at the time that these explorations were performed. Each bidder must form its own opinion of the character of the Work and of the materials to be excavated, make their own interpretations, and satisfy themselves by their own interpretations and research regarding all conditions affecting the Work to be performed. The Contractor must assume all responsibility for deductions and conclusions as to the nature or condition of all earth, rock and other materials to be excavated and the difficulties of making and maintaining the required excavations, and of performing other work affected by the geology and subsurface conditions at the Site.

1.3.2 The Contractor must assume that any kind of rock and soil may be encountered in excavations, including mud, quicksand, very hard rock, or other materials that are difficult to handle.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

(End of Summary of Changes)

File details come from the government source that posted it. Updated .