KEI-09-0508 Instrumentation REPOSTED
302 KB Posted
- Attached to
- Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
- Solicitation number
- W91238-17-R-0006
About this file
Plan Sheets Re-posted due to formatting
Text of this file
NOTES
1. BOREHOLES SHOWN ON THIS PLAN WILL BE ABANDONED.
EXPLORATORY BOREHOLES
ABANDONED INSTRUMENTATION/BOREHOLE
LEGEND
SCALE: 1''=80'-0"
80'80' 0
SAD - SEISMIC ALARM DEVICE (SEE OTHER SHEETS FOR TABLES)
EXISTING OPEN DRILL HOLES TO BE GROUTED
EMERGENCY SPILLWAY
IDENTIFICATION NORTHING EASTING
TOP OF HOLE ELEVATION (FT,
NAVD 88)
BOTTOM OF HOLE ELEVATION
(FT, NAVD 88)
HOLE INCLINATION
(DEGREES)
LENGTH OF OPEN
HOLE (FT)
1F-13-18 2421469.1 6419932.2 2684.5 2558.9 45 177.7
1F-13-19 2421265.0 6420364.5 2647.7 2525.6 55 149.1
1F-13-20 2421424.4 6420186.3 2642.3 2512.8 60 149.6
1F-13-21 2421514.0 6420259.5 2633.3 2547.1 60 99.6
1F-13-22 2421600.5 6420043.1 2655.0 2525.8 60 149.2
1F-13-23 2421494.4 6420144.0 2658.4 2546.0 60 129.8
1F-13-24 2421517.2 6419929.7 2682.3 2552.9 60 149.4
1F-13-25 2421399.2 6420386.6 2608.7 2539.4 60 80.0
1F-13-26 2421059.4 6420058.4 2693.1 2589.5 60 119.6
1F-13-27 2421030.7 6419811.5 2676.0 2572.3 60 119.7
1F-13-28 2421198.7 6420117.1 2685.1 2581.3 60 119.9
1F-13-29 2421671.0 6420098.0 2648.0 2573.0 60 86.6
1F-13-29B 2421678.1 6420103.7 2648.8 2571.7 60 89.0
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .