KEI-09-0509 Instrumentation

813 KB Posted

Attached to
Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
Solicitation number
W91238-17-R-0006
Issued by

About this file

Plan Sheet Re-posted due to formatting

Text of this file

C

A

N

A

L

AD-A-9

CONTROL POINT

CONTROL POINT

PC-3, PC-4

PC-6, PC-7

66-04N

66-90S

PC-8, PC-9

P-9

TP-9

AD-TP-1

58-311S

AD-TP-2

AD-TP-5

AD-P-12

AD-GW

PC-1, PC-2

NEW STATION MARKER

(TYP)

NEW MEASUREMENT POINT

(TYP)

NEW MEASUREMENT POINT

AND SURVEY POINT TOGETHER

ON A STATION MARKER

(TYP)

66-155S

5' WIDE GRAVEL WALKWAY ON

HORIZONTAL (TYP), SEE SHEET

0507/BI501 FOR DETAIL

2' WIDE CONCRETE WALKWAY

ON VERTICAL SLOPES (TYP)

2' WIDE CONCRETE WALKWAY

ON VERTICAL SLOPES (TYP)

NOTES

1. SURVEY MEASUREMENT POINTS MUST BE INSTALLED EVERY 250 FT ALONG

THE CREST.

2. EXISTING PIEZOMETERS SHOWN ON THIS PLAN SHALL BE PRESERVED DURING

CONSTRUCTION AND EXTENDED TO FINAL GRADE. REFER TO 507/BI501 FOR

PIEZOMETER DETAILS

3. SURVEY CONTROL POINTS TO BE INSTALLED AS DIRECTED BY THE

CONTRACTING OFFICER.

4. ACCELEROGRAPH AD-A-9 MUST BE ON ROCK. LOCATION OF THIS

ACCELEROGRAPH SHALL BE AS DIRECTED BY THE CONTRACTING OFFICER.

5. REFER TO 509/BI602 FOR LIST OF NEW AND TO BE PRESERVED INSTRUMENTS.

6. FLUME AD-F-1, AD-F-2, AND AD-F-3 SHALL BE INSTALLED INSIDE MANHOLES

MH-AD2, MH-AD3, AND MH-AD4, RESPECTIVELY.

7. INSTALL STATION MARKERS PER 31 09 13 GEOTECHNICAL INSTRUMENTATION.

NEW STATION MARKER

NEW OPEN TUBE PIEZOMETER FOR LONG TERM MONITORING

EXISTING PIEZOMETER FOR LONG TERM MONITORING

NEW FLUME

NEW ACCELEROGRAPH

NEW SURVEY CONTROL POINT

NEW MEASUREMENT POINT

MANHOLE

INSTRUMENTATION LEGEND

SCALE: 1''=130'-0"

130130 0

NOTES

8. GUIDE POSTS MUST BE INSTALLED EVERY 20 ' ON 20'

STATIONING (I.E. 0+20, 0+40, ...) SEE DETAIL 1/C-501.

9. STATION MARKERS MUST BE MOUNTED EVERY 100' ON GUIDE

POSTS AND ON DOWNSTREAM TOE, EVERY 100', ON GUIDE POSTS

L

E

V

T

O

E

R E T

W A L L

H

W

L

A

K

I

S

A

B

E

L

B

V

D

H

I

G

H

W

Y

H

I

G

H

W

Y

B

A

R

L

W

D

R

I

V

E

G

A

T

E

L

E

V

E

L

E

V

E

L

E

V

E

GATE

GATE

L

E

V

E

G

A

T

E

L

E

V

E

GATE

G

A

T

E

G

A

T

E

L

E

V

E

H

W

H

W

H

W

H

W

H

W

H

W

G A T E

C

H

A

N

N

E

L

W/L = 2547.3'

G

A

T

E

C

A

N

A

L

G

A

T

E

H

W

A-10

OW-BR1

OW-BR2

TP-3

OW-BL1

OW-BL-3

TP-4

TP-5

TP-6

TP-7

TP-1

57-940S

57-640S

57-490S

RP-1

GROIN WELL

57-10S

57-70S

57-130S

57-190S

58-280S P-8

P-6

P-7

P-11

P-12

P-13

TP-8

67-125S

58-60S

CPT-05-28

SETTLEMENT GAUGE 54-18s

SETTLEMENT GAUGE

57-14S

67-48S

57-80N

58-04N

NOTES

1. EXISTING PIEZOMETERS AND BOREHOLES SHOWN ON THIS PLAN

MUST BE ABANDONED PER SPECIFICATIONS.

2. REFER TO 0509/BI601 FOR INSTRUMENTATION SCHEDULE.

3. REFER TO SHEETS: 0509 CD101 AND 0507 CD109 FOR BOREL

CANAL CONDUIT VIBRATING WIRE PEIZOMETER WIRING DIAGRAMS.

PIEZOMETER / OPEN BOREHOLE

ACCELEROGRAPH

ABANDONED INSTRUMENTATION/BOREHOLE

LEGEND

SCALE: 1''=125'-0"

125'125' 0

SAD - SEISMIC ALARM DEVICE

SETTLEMENT GAUGE

TYPE LB CONDUIT BODY

2" SCH 80

PVC RIGID CONDUIT

(NOTE 3)

6"

2'

18" SCH 40

GALVANIZED PIPE

GROUNDING ROD

4"X4" FLAT PANEL WIRE MESH

16" THICK, 3.5 FT SQUARE

CONCRETE PAD

(NOTE 3,4)

STILLING WELL INVERT 6"

MINIMUM BELOW FLUME INVERT

3" MIN

LADDER OPPOSITE SIDE OF STAFF GAGES

FLOAT WELLS

CONCRETE LEVEL WITH TOP OF THE FLUME

PER MANUFACTURER'S INSTRUCTIONS

(NOTE 3,4)

FLOW

APPROXIMATE LOCATION

OF FLUME STAFF GAUGES

1.5" SCH 80 PVC CONDUIT

TO FLOAT WELLS

DRAIN / FLUME MANHOLE

(TYP)

M

I N

I M

U

M

C

E

A

R

A

N

C

E

DATALOGGER FOR FLUME

ENCLOSURE SAME AS

PIEZOMETER ENCLOSURE

(TYP)

NOTES

1. REFER TO 509/BI602 FOR INSTRUMENTATION SCHEDULE.

2 FOR 2" PVC, SPECIAL THREADS MUST BE UNDERSIZED AT THE FEMALE END TO CREATE A WATERTIGHT CONNECTION

WITHOUT THE NEED FOR ANY SEALER.

3. ALL CONCRETE SHOWN ON THIS SHEET SHALL HAVE 3,000 PSI COMPRESSIVE STRENGTH IN 28 DAYS.

4. ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 3/4"UNLESS OTHERWISE NOTED.

5. VIBRATING WIRE FLOAT WELLS SENSOR, SURGE PROTECTOR, AND DATALOGGER SHALL BE INSTALLED BY THE

MANUFACTURER. ALL THE COMPONENTS SHALL FIT NEATLY INSIDE THE PIPE PROTECTIVE CASING, NOT TO BE SUBMERGED

IN WATER.

6. REFER TO CIVIL DRAWINGS 509 SERIES FOR MANHOLE DETAILS AND LOCATIONS, 3/C - 551 AND 4/C-551.

MANHOLE AND FLUME

DETAIL

SCALE: NTS

MANHOLE AND FLUME PLAN

SCALE: NTS

FLUME INSTALLATION

DETAIL

SCALE: NTS

0507-BI501
0507-BI502
0507-BI503
0507-BI504
0507-BI505
0507-BI506
0508-BI101
0509-BI101
0509-BI102
0509-BI501
0509-BI601
0509-BI602
0510-BI101
0510-BI102
0510-BI310
0510-BI501
0510-BI601
0510-BI602

Other files

File Type Posted
KE1-09-0509 Electrical REPOSTED —
KEI-09-0507-CD102-CD112_AMENDMENTS_(11_Sheets).pdf PDF
KEI-09-0517-C-120_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0508 Instrumentation REPOSTED —
1966_AMENDMENT_0006__SUMMARY.pdf PDF
A0.1.10_Attachment_17_Utility_Poles_(17-R-0006)_ADDED-Attachment.pdf PDF
KE1-09-0510 Electrical REPOSTED —
KEI-09-0510 Instrumentation REPOSTED —
KEI-09-0525-SR502_AMENDMENT_(1_Sheet).pdf PDF
A01.10_Attachment_03_Geotechnical_Data_Report_(17-R-0006)_REVISED_PAGES_1-4_ONLY.pdf PDF
Price_Schedule_-_Isabella_Ph_II_1_May_2017.pdf PDF
KE1-09-0510-ST100_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0509-CD101-CD104_AMENDMENTS_(4_Sheets).pdf PDF
A01.10_Attachment_09_Suppelmental_Info_GIR_(17-R-0006)_REVISED-PAGES_1-5_ONLY.pdf PDF
Revised_Specifications.pdf PDF
KE1-09-0509-SD201_AMENDMENT_(1_Sheet).pdf PDF
KE1-09-0507-ES005_AMENDMENT_(1_Sheet).pdf PDF
KEI-09-0524-A-111_to_A-113_AMENDMENT_(3_Sheets).pdf PDF
W91238-17-R-0006-0006.pdf PDF
Attachment_06_Wage_Determination_(CA_31)_-_Isabella_Ph_II_UPDATED.pdf PDF
Price_Schedule_-_Isabella_Ph_II_UPDATED_for_Amend_5.xlsx XLSX spreadsheet
W91238-17-R-0006-0005.pdf PDF
Sample_Breakout_Format.xlsx XLSX spreadsheet
31_09_13.pdf PDF
1966_AMENDMENT_0004__SUMMARY.pdf PDF
01_14_00.10.pdf PDF
02_41_00.pdf PDF
W91238-17-R-0006-0004.pdf PDF
SEA_3_USFS_AdminandRec_Facilities_Relo_SEA_and_FONSI.pdf PDF
W91238-17-R-0006-0003.pdf PDF
Price_Schedule_-_Isabella_Ph_II_(17-R-0006).pdf PDF
Specification_02_82_13.pdf PDF
1966_AMENDMENT_0003__SUMMARY.pdf PDF
Attachment_C_-_Past_Performance_Questionnaire.pdf PDF
Attachment_B_-_Contractor's_Project_Experience.pdf PDF
Attachment_D_-_Small_Business_Participation_Commitment_Document.pdf PDF
Specification_01_22_00.pdf PDF
Attachment_A_-_Pre-Award_Survey_Info.pdf PDF
W91238-17-R-0006-0002.pdf PDF
Isabella-_Site_Vist_Presentation_6APR2017.pdf PDF
Isabella_Phase_II_Site_Visit_Sign_In_Roster.pdf PDF
W91238-17-R-0006-0001.pdf PDF
A01.10_Attachment_05_Stone_and_Aggregate_Report_(17-R-0006).pdf PDF
A01.10_Attachment_14_01_50_00_Isabella_Government_Testing_Laboratory_GER_(17-R-0006).pdf PDF
A01.10_Attachment_11_Supplemental_Info_-_Topo_and_Utility_Surveys_(17-R-0006).pdf PDF
A01.10_Attachment_07_Supplemental_Info_List_of_Isabella_Env_Docs_(17-R-0006)_.pdf PDF
W91238-17-R-0006,_Isabella_Lake_Dam_Safety_Modification_Project_(DSMP),_Phase_II__Dams_and_Spillway.pdf PDF
A01.10_Attachment_10_Supplemental_Info_As-Builts_(17-R-0006).pdf PDF
A01.10_Attachment_13_01_57_20_Isabella_Lake_Water_Quality_Baseline_2016_(17-R-0006).pdf PDF
A01.10_Attachment_04_Water_Testing_and_Evaluation_Report_(17-R-0006).pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .