KEI-09-0509 Instrumentation
813 KB Posted
- Attached to
- Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
- Solicitation number
- W91238-17-R-0006
About this file
Plan Sheet Re-posted due to formatting
Text of this file
C
A
N
A
L
AD-A-9
CONTROL POINT
CONTROL POINT
PC-3, PC-4
PC-6, PC-7
66-04N
66-90S
PC-8, PC-9
P-9
TP-9
AD-TP-1
58-311S
AD-TP-2
AD-TP-5
AD-P-12
AD-GW
PC-1, PC-2
NEW STATION MARKER
(TYP)
NEW MEASUREMENT POINT
(TYP)
NEW MEASUREMENT POINT
AND SURVEY POINT TOGETHER
ON A STATION MARKER
(TYP)
66-155S
5' WIDE GRAVEL WALKWAY ON
HORIZONTAL (TYP), SEE SHEET
0507/BI501 FOR DETAIL
2' WIDE CONCRETE WALKWAY
ON VERTICAL SLOPES (TYP)
2' WIDE CONCRETE WALKWAY
ON VERTICAL SLOPES (TYP)
NOTES
1. SURVEY MEASUREMENT POINTS MUST BE INSTALLED EVERY 250 FT ALONG
THE CREST.
2. EXISTING PIEZOMETERS SHOWN ON THIS PLAN SHALL BE PRESERVED DURING
CONSTRUCTION AND EXTENDED TO FINAL GRADE. REFER TO 507/BI501 FOR
PIEZOMETER DETAILS
3. SURVEY CONTROL POINTS TO BE INSTALLED AS DIRECTED BY THE
CONTRACTING OFFICER.
4. ACCELEROGRAPH AD-A-9 MUST BE ON ROCK. LOCATION OF THIS
ACCELEROGRAPH SHALL BE AS DIRECTED BY THE CONTRACTING OFFICER.
5. REFER TO 509/BI602 FOR LIST OF NEW AND TO BE PRESERVED INSTRUMENTS.
6. FLUME AD-F-1, AD-F-2, AND AD-F-3 SHALL BE INSTALLED INSIDE MANHOLES
MH-AD2, MH-AD3, AND MH-AD4, RESPECTIVELY.
7. INSTALL STATION MARKERS PER 31 09 13 GEOTECHNICAL INSTRUMENTATION.
NEW STATION MARKER
NEW OPEN TUBE PIEZOMETER FOR LONG TERM MONITORING
EXISTING PIEZOMETER FOR LONG TERM MONITORING
NEW FLUME
NEW ACCELEROGRAPH
NEW SURVEY CONTROL POINT
NEW MEASUREMENT POINT
MANHOLE
INSTRUMENTATION LEGEND
SCALE: 1''=130'-0"
130130 0
NOTES
8. GUIDE POSTS MUST BE INSTALLED EVERY 20 ' ON 20'
STATIONING (I.E. 0+20, 0+40, ...) SEE DETAIL 1/C-501.
9. STATION MARKERS MUST BE MOUNTED EVERY 100' ON GUIDE
POSTS AND ON DOWNSTREAM TOE, EVERY 100', ON GUIDE POSTS
L
E
V
T
O
E
R E T
W A L L
H
W
L
A
K
I
S
A
B
E
L
B
V
D
H
I
G
H
W
Y
H
I
G
H
W
Y
B
A
R
L
W
D
R
I
V
E
G
A
T
E
L
E
V
E
L
E
V
E
L
E
V
E
GATE
GATE
L
E
V
E
G
A
T
E
L
E
V
E
GATE
G
A
T
E
G
A
T
E
L
E
V
E
H
W
H
W
H
W
H
W
H
W
H
W
G A T E
C
H
A
N
N
E
L
W/L = 2547.3'
G
A
T
E
C
A
N
A
L
G
A
T
E
H
W
A-10
OW-BR1
OW-BR2
TP-3
OW-BL1
OW-BL-3
TP-4
TP-5
TP-6
TP-7
TP-1
57-940S
57-640S
57-490S
RP-1
GROIN WELL
57-10S
57-70S
57-130S
57-190S
58-280S P-8
P-6
P-7
P-11
P-12
P-13
TP-8
67-125S
58-60S
CPT-05-28
SETTLEMENT GAUGE 54-18s
SETTLEMENT GAUGE
57-14S
67-48S
57-80N
58-04N
NOTES
1. EXISTING PIEZOMETERS AND BOREHOLES SHOWN ON THIS PLAN
MUST BE ABANDONED PER SPECIFICATIONS.
2. REFER TO 0509/BI601 FOR INSTRUMENTATION SCHEDULE.
3. REFER TO SHEETS: 0509 CD101 AND 0507 CD109 FOR BOREL
CANAL CONDUIT VIBRATING WIRE PEIZOMETER WIRING DIAGRAMS.
PIEZOMETER / OPEN BOREHOLE
ACCELEROGRAPH
ABANDONED INSTRUMENTATION/BOREHOLE
LEGEND
SCALE: 1''=125'-0"
125'125' 0
SAD - SEISMIC ALARM DEVICE
SETTLEMENT GAUGE
TYPE LB CONDUIT BODY
2" SCH 80
PVC RIGID CONDUIT
(NOTE 3)
6"
2'
18" SCH 40
GALVANIZED PIPE
GROUNDING ROD
4"X4" FLAT PANEL WIRE MESH
16" THICK, 3.5 FT SQUARE
CONCRETE PAD
(NOTE 3,4)
STILLING WELL INVERT 6"
MINIMUM BELOW FLUME INVERT
3" MIN
LADDER OPPOSITE SIDE OF STAFF GAGES
FLOAT WELLS
CONCRETE LEVEL WITH TOP OF THE FLUME
PER MANUFACTURER'S INSTRUCTIONS
(NOTE 3,4)
FLOW
APPROXIMATE LOCATION
OF FLUME STAFF GAUGES
1.5" SCH 80 PVC CONDUIT
TO FLOAT WELLS
DRAIN / FLUME MANHOLE
(TYP)
M
I N
I M
U
M
C
E
A
R
A
N
C
E
DATALOGGER FOR FLUME
ENCLOSURE SAME AS
PIEZOMETER ENCLOSURE
(TYP)
NOTES
1. REFER TO 509/BI602 FOR INSTRUMENTATION SCHEDULE.
2 FOR 2" PVC, SPECIAL THREADS MUST BE UNDERSIZED AT THE FEMALE END TO CREATE A WATERTIGHT CONNECTION
WITHOUT THE NEED FOR ANY SEALER.
3. ALL CONCRETE SHOWN ON THIS SHEET SHALL HAVE 3,000 PSI COMPRESSIVE STRENGTH IN 28 DAYS.
4. ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 3/4"UNLESS OTHERWISE NOTED.
5. VIBRATING WIRE FLOAT WELLS SENSOR, SURGE PROTECTOR, AND DATALOGGER SHALL BE INSTALLED BY THE
MANUFACTURER. ALL THE COMPONENTS SHALL FIT NEATLY INSIDE THE PIPE PROTECTIVE CASING, NOT TO BE SUBMERGED
IN WATER.
6. REFER TO CIVIL DRAWINGS 509 SERIES FOR MANHOLE DETAILS AND LOCATIONS, 3/C - 551 AND 4/C-551.
MANHOLE AND FLUME
DETAIL
SCALE: NTS
MANHOLE AND FLUME PLAN
SCALE: NTS
FLUME INSTALLATION
DETAIL
SCALE: NTS
| 0507-BI501 |
| 0507-BI502 |
| 0507-BI503 |
| 0507-BI504 |
| 0507-BI505 |
| 0507-BI506 |
| 0508-BI101 |
| 0509-BI101 |
| 0509-BI102 |
| 0509-BI501 |
| 0509-BI601 |
| 0509-BI602 |
| 0510-BI101 |
| 0510-BI102 |
| 0510-BI310 |
| 0510-BI501 |
| 0510-BI601 |
| 0510-BI602 |
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .