Indefinite-delivery, indefinite-quantity (IDIQ) multiple award construction contract (MACC) small business (SB) set aside for roofing services for facilities primarily in the NAVFAC washington, area of responsibility (AOR)
Closed Solicitation Posted
- Solicitation number
- N4008024R2401
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- Place of performance
- Washington Navy Yard, District of Columbia 20374, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Facilities Engineering Command seeks to award approximately five multiple-award IDIQ construction contracts for roofing services across the NAVFAC Washington Area of Responsibility, with Phase II proposals due July 1, 2026. This is a Total Small Business set-aside with an 8-year ordering period (2-year base plus two 3-year options) and a combined ceiling of $249 million across all awards.
Work encompasses new construction, demolition, repair, alteration, and renovation of roofing and roofing materials, with individual task orders projected between $150,000 and $15 million. Scope includes removal and reinstallation of roof-mounted equipment, demolition and installation of framing and curbing, patching around new equipment, disconnection and reconnection of electrical, gas, refrigeration, steam, condensate and other process services, roof demolition and debris disposal, new roofing installation, scheduled and emergency roof repair, repair or replacement of roof drains, connector piping, drain pans, gutters, leaders, parapet walls, flashing, roof decking, permanent fall protection systems, access ladders, hatches, expansion joints, and work involving asbestos or lead-containing materials with required abatement and disposal.
Place of performance is NAVFAC Washington Area of Responsibility facilities, which include administrative, industrial, maintenance, warehouse, communications, personnel support, recreation, lodging, medical, training, ranges, airfield, and hangar facilities. The demonstration project involves a roof garden design at the Uniformed Services University Building 76E in Bethesda, Maryland, with a baseline construction duration of 270 calendar days from October 1, 2026.
Phase II proposals must address Management Approach (eight pages maximum, excluding critical path schedule), and include technical proposal (Volume I) and price proposal (Volume II). Contractors must submit executed SF1442, bid bond of 20 percent of bid price or $3 million (whichever is less), bonding capacity letter confirming $15 million single award and $50 million aggregate capacity, SAM registration, and VETS-4212 documentation. ECATTS course certificates are required for contractors, subcontractors, and designers. Prevailing wage rates apply under Montgomery County, Maryland wage determination (effective June 4, 2026), with roofer/waterproofer at $52.21 per hour plus $14.91 fringe. Price evaluation will compare proposals against the Independent Government Cost Estimate, historical information, and market survey results. Evaluation criteria include technical approach, construction experience (minimum $250,000 single project value with at least 10,000 SF roofing area, and at least one project with 50,000 SF), management approach, safety, and past performance. The NAICS code is 238160 (Roofing Contractors); PSC is Y1JZ (Construction of Miscellaneous Buildings).
Notice text
4 versions
Update #4 · Latest ·
ONLY THOSE OFFERORS WHO HAVE BEEN NOTIFIED TO BE IN THE COMPETITIVE RANGE ARE INVITED TO SUBMIT A PHASE II PROPOSAL.
This acquisition will result in the award of a Design-Build (DB)/Design- Bid-Build (DBB), Indefinite-Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for various roofing projects within the NAVFAC Washington Area of Responsibility (AOR). The Government intends to award approximately five (5) contracts resulting from this solicitation to the responsible Offerors whose proposals represent the best values after evaluation in accordance with the factors and their relative importance, unless more or less than five (5) is determined to be the best value to the government by the Source Selection Authority.Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the NAVFAC Washington AOR. This MACC will encompass a variety of projects that include, but are not limited to the New Construction, Demolition, Repair, Alteration, and/or renovation of roofing or roofingmaterials (and may include minor general construction scope such as architectural, structural, mechanical or electrical items). Task Orders may include, but not limited to, removal and reinstallation of existing roof mounted equipment and enclosures, ?cut-out? demolition and installation of framing and curbing for new, and/or replacedequipment, ?patching-in? around new equipment, secure and disconnect electrical, gas, refrigeration, steam and condensate and other process services in conjunction with ?remove and reinstall? or ?install new? equipment during accomplishment roofing work, roofing demolition and debris handling and disposal, installation of new roofing,scheduled repair of existing roofs, emergency roof repair, repair or replacement of roof drains, connector piping, drain pans, gutters and leaders, parapet wall treatments, flashing, cap treatments, repair or replacement of roof decking materials, repair, replacement or installation of permanent fall protection, access ladders, access and smokehatches, roof expansion joints, and roof work which potentially involves asbestos containing material and/or lead containing material handling, abatement and disposal, as well as interior dust and debris containment and protection in accordance with applicable federal, state, and local safety and health regulations. Types of facilities may include, but not limited to, administrative, industrial, maintenance, warehouses, communications, personnel support, recreation, lodging, medical, training, ranges, airfields, hangars, etc.The completion date for the IDIQ contracts is eight (8) years from the date of contract award with a two-year base period, and two (2) three-year option periods, not to exceed 96 months. The total 8-year (base and 2 options) estimated construction cost for all contracts is not to exceed $249,000,000 for the life of the contract. Projects for the MACC have an estimated construction cost between $150,000 and $15,000,000; however, smaller and larger dollarvalue projects may be considered at the discretion of the Contracting Officer.The Government guarantees an award amount of $5,000 to successful offeror for the life of the contract.After award of the initial contracts and ?demonstration? project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for future task orders.
Update #3 ·
This acquisition will result in the award of a Design-Build (DB)/Design- Bid-Build (DBB), Indefinite-Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for various roofing projects within the NAVFAC Washington Area of Responsibility (AOR). The Government intends to award approximately five (5) contracts resulting from this solicitation to the responsible Offerors whose proposals represent the best values after evaluation in accordance with the factors and their relative importance, unless more or less than five (5) is determined to be the best value to the government by the Source Selection Authority.Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the NAVFAC Washington AOR. This MACC will encompass a variety of projects that include, but are not limited to the New Construction, Demolition, Repair, Alteration, and/or renovation of roofing or roofingmaterials (and may include minor general construction scope such as architectural, structural, mechanical or electrical items). Task Orders may include, but not limited to, removal and reinstallation of existing roof mounted equipment and enclosures, ?cut-out? demolition and installation of framing and curbing for new, and/or replacedequipment, ?patching-in? around new equipment, secure and disconnect electrical, gas, refrigeration, steam and condensate and other process services in conjunction with ?remove and reinstall? or ?install new? equipment during accomplishment roofing work, roofing demolition and debris handling and disposal, installation of new roofing,scheduled repair of existing roofs, emergency roof repair, repair or replacement of roof drains, connector piping, drain pans, gutters and leaders, parapet wall treatments, flashing, cap treatments, repair or replacement of roof decking materials, repair, replacement or installation of permanent fall protection, access ladders, access and smokehatches, roof expansion joints, and roof work which potentially involves asbestos containing material and/or lead containing material handling, abatement and disposal, as well as interior dust and debris containment and protection in accordance with applicable federal, state, and local safety and health regulations. Types of facilities may include, but not limited to, administrative, industrial, maintenance, warehouses, communications, personnel support, recreation, lodging, medical, training, ranges, airfields, hangars, etc.The completion date for the IDIQ contracts is eight (8) years from the date of contract award with a two-year base period, and two (2) three-year option periods, not to exceed 96 months. The total 8-year (base and 2 options) estimated construction cost for all contracts is not to exceed $249,000,000 for the life of the contract. Projects for the MACC have an estimated construction cost between $150,000 and $15,000,000; however, smaller and larger dollarvalue projects may be considered at the discretion of the Contracting Officer.The Government guarantees an award amount of $5,000 to successful offeror for the life of the contract.After award of the initial contracts and ?demonstration? project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for future task orders.
Update #2 ·
This acquisition will result in the award of a Design-Build (DB)/Design- Bid-Build (DBB), Indefinite-Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for various roofing projects within the NAVFAC Washington Area of Responsibility (AOR). The Government intends to award approximately five (5) contracts resulting from this solicitation to the responsible Offerors whose proposals represent the best values after evaluation in accordance with the factors and their relative importance, unless more or less than five (5) is determined to be the best value to the government by the Source Selection Authority.Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the NAVFAC Washington AOR. This MACC will encompass a variety of projects that include, but are not limited to the New Construction, Demolition, Repair, Alteration, and/or renovation of roofing or roofingmaterials (and may include minor general construction scope such as architectural, structural, mechanical or electrical items). Task Orders may include, but not limited to, removal and reinstallation of existing roof mounted equipment and enclosures, ?cut-out? demolition and installation of framing and curbing for new, and/or replacedequipment, ?patching-in? around new equipment, secure and disconnect electrical, gas, refrigeration, steam and condensate and other process services in conjunction with ?remove and reinstall? or ?install new? equipment during accomplishment roofing work, roofing demolition and debris handling and disposal, installation of new roofing,scheduled repair of existing roofs, emergency roof repair, repair or replacement of roof drains, connector piping, drain pans, gutters and leaders, parapet wall treatments, flashing, cap treatments, repair or replacement of roof decking materials, repair, replacement or installation of permanent fall protection, access ladders, access and smokehatches, roof expansion joints, and roof work which potentially involves asbestos containing material and/or lead containing material handling, abatement and disposal, as well as interior dust and debris containment and protection in accordance with applicable federal, state, and local safety and health regulations. Types of facilities may include, but not limited to, administrative, industrial, maintenance, warehouses, communications, personnel support, recreation, lodging, medical, training, ranges, airfields, hangars, etc.The completion date for the IDIQ contracts is eight (8) years from the date of contract award with a two-year base period, and two (2) three-year option periods, not to exceed 96 months. The total 8-year (base and 2 options) estimated construction cost for all contracts is not to exceed $249,000,000 for the life of the contract. Projects for the MACC have an estimated construction cost between $150,000 and $15,000,000; however, smaller and larger dollarvalue projects may be considered at the discretion of the Contracting Officer.The Government guarantees an award amount of $5,000 to successful offeror for the life of the contract.After award of the initial contracts and ?demonstration? project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for future task orders.
Update #1 ·
Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the NAVFAC Washington AOR. This MACC will encompass a variety of projects that include, but are not limited to the New Construction, Demolition, Repair, Alteration, and/or renovation of roofing or roofing materials (and may include minor general construction scope such as architectural, structural, mechanical or electrical items).
Task Orders may include, but not limited to, removal and reinstallation of existing roof mounted equipment and enclosures, “cut-out” demolition and installation of framing and curbing for new, and/or replaced equipment, “patching-in” around new equipment, secure and disconnect electrical, gas, refrigeration, steam and condensate and other process services in conjunction with “remove and reinstall” or “install new” equipment during accomplishment roofing work, roofing demolition and debris handling and disposal, installation of new roofing, scheduled repair of existing roofs, emergency roof repair, repair or replacement of roof drains, connector piping, drain pans, gutters and leaders, parapet wall treatments, flashing, cap treatments, repair or replacement of roof decking materials, repair, replacement or installation of permanent fall protection, access ladders, access and smoke hatches, roof expansion joints, and roof work which potentially involves asbestos containing material and/or lead containing material handling, abatement and disposal, as well as interior dust and debris containment and protection in accordance with applicable federal, state, and local safety and health regulations. Types of facilities may include, but not limited to, administrative, industrial, maintenance, warehouses, communications, personnel support, recreation, lodging, medical, training, ranges, airfields, hangars, etc.
The completion date for the IDIQ contracts is eight (8) years from the date of contract award with a two-year base period, and two (2) three-year option periods, not to exceed 96 months. The total 8-year (base and 2 options) estimated construction cost for all contracts is not to exceed $249,000,000 for the life of the contract. Projects for the MACC have an estimated construction cost between $150,000 and $15,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer.
Files
Show all 23
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Indefinite-Delivery/Indefinite-Quantity Small Business Multiple Award Construction Contract for Roofing, and Renovation of Various Facilities at Public Works Departments and NAVFAC Washington Area of Responsibility | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Building 434 Roof Repair | Naval Facilities Engineering Command | Competitive 8(a) | |
| Z2DA--657-27-103JB, FCA Replace Building 51 Roof, JB | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business | |
| Sources sought for indefinite delivery indefinite quantity (IDIQ) architect and engineering multidiscipline services for small projects in the hampton roads area of responsibility predominately for norfolk naval shipyard and naval weapons station yorktown | Naval Facilities Engineering Command | No set-aside | |
| Y1DA--replace roofs and repair facades building 6 and 7 at the northport VA medical center project number: 632-23-112 | Veterans Integrated Service Network 2 | No set-aside | |
| Roof Repair | Animal and Plant Health Inspection Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity