N4008024R2401 - AMENDMENT 0005.pdf
PDF 139 KB Posted
- Solicitation number
- N4008024R2401
About this file
This document is an amendment to a solicitation for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) for roofing services primarily in the Naval Facilities Engineering Command (NAVFAC) Washington Area of Responsibility (AOR). The MACC will have a base period of two years and two three-year option periods, for a total of eight years. The estimated total construction value for the MACC is not to exceed $249,000,000. Key details include:
The amendment provides responses to three Requests for Information (RFIs). The first clarifies that Phase I proposals should only include Factors 1, 2, 4, and 5 of the Technical Proposal, and those Offerors in the Competitive Range will be invited to submit a separate Phase II proposal with Factor 3. The second response states that contractors, subcontractors, and designers should possess ECATTS course certificates for Roofing. The third response indicates that a site visit will be held in Phase II. No other changes are made to the solicitation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
12-Nov-2024
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE N40080 7. ADMINISTERED BY (If other than item 6) CODE
COMNAVFACSYSCOM WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
N4008024R2401
X 9B. DATED (SEE ITEM 11)
30-Sep-2024
10A. MOD. OF CONT RACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILIT Y CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40080-24-R-2401 - INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) SMALL BUSINESS (SB) SET ASIDE FOR ROOFING SERVICES FOR FACILITIES PRIMARILY IN THE NAVFAC WASHINGTON, AREA OF
RESPONSIBILITY (AOR)
PLEASE SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
24-Oct-2024
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008024R2401
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of this amendment is to provide the following:
1. RFI Responses
All other items remain unchanged.
1. RFI RESPONSE
RFI 19: Amendment 003 indicated that "Volume I shall contain the Offerors entire technical proposal in a single pdf".
Recognizing that the Technical Proposal is evaluated in two separate phases, is the intent for Offerors to submit a Phase I Volume I:Technical Proposal (with Factors 1, 2, 4 & 5) and, if notified, a separate Phase II Volume II: Technical Proposal (with Factor 3). Or should all Phase I & Phase II factors be included in the Volume I: Technical Proposal due on 11/22/2024.
GOVERNMENT RESPONSE: Phase I proposals shall only contain Factors 1, 2, 4 and 5. Those Offerors identified to be in the Competitive Range after Phase I evaluation will be invited to submit a Phase II proposal. Please follow the PROPOSAL ORGANIZATION AND FORMAT when preparing your proposal.
RFI 20: What ECATTS course certificates should contractors, subcontractors, and designers possess for this contract?
GOVERNMENT RESPONSE: Roofing.
RFI 21: I would like to know if there have been a site visit for this opportunity.
GOVERNMENT RESPONSE: A site visit will be held in Phase II.
(End of Summary of Changes)