Guidance Subsystem Support Contract

Awarded Award Notice Posted

Solicitation number
FA8214-14-R-0004
Agency
AFLCMC Hill AFB Lifecycle Management Center, Department of Defense
Awarded
to The Boeing Company
Set-aside
No set-aside

Opportunity facts

Contract number
FA821415C0001 Federal contract award
NAICS code
541330 Engineering Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

12 versions

Update #12 · Latest ·

Added: Oct 13, 2015 3:30 pm  

The purpose of the Flight Test, Telemetry, and Termination (FT3) Program is to replace aging Minuteman (MM) III Intercontinental Ballistic Missile (ICBM) flight test unique equipment (FTUE).  The replacement systems/subsystems must meet 30th Space Wing (SW) Range Safety requirements to ensure the future reliability of MMIII ICBM Operational Test Launches (OTL) and developmental flight test programs.  The 576th Flight Test Squadron (576 FLTS) and Air Force Global Strike Command (AFGSC) will operate and maintain the replacement systems/subsystems in order to conduct OTLs.  In order to meet this objective, the FT3 Program combines the Instrumentation Wafer Replacement Program (IWRP), Flight Destruct System (FDS), and Launch Support System (LSS) into a single program.

Update #11 ·

Added: Apr 09, 2014 3:29 pm FA8214-14-R-0004 Amendment 4.
The attachment title may state that this is Amendment 3 but it is Amendment 4.

Update #10 ·

Added: Apr 09, 2014 2:29 pm FA8214-14-R-0004 Questions and Answers 4.

Update #9 ·

Added: Apr 03, 2014 6:10 pm FA8214-14-R-0004- The attachment title states Amendment 2 but it is Amendment 3.

Questions and Answers 3- The last comment dealing with CDRL delivery timelines will not be captured in Amendment 3 but will be addressed in Amendment 4.

Update #8 ·

Added: Apr 03, 2014 5:51 pm FA8214-14-R-0004 Amendment 3

Update #7 ·

Added: Apr 02, 2014 3:28 pm FA8214-14-R-0004 Questions and Answers 3

Update #6 ·

Added: Mar 14, 2014 3:53 pm FA8214-14-R-0004 Amendment 2

Update #5 ·

Added: Mar 14, 2014 3:05 pm

Guidance Questions and Answers 2

Update #4 ·

Added: Mar 04, 2014 4:45 pm

FA8214-14-R-0004 Amendment 1

Update #3 ·

Added: Feb 20, 2014 10:01 am Currently there is no information in the Classified Bidder's Library for the Guidance SSC.  If/when classified information is loaded into the library a notice will be posted on FBO informing industry of its inclusion.

Update #2 ·

Added: Feb 11, 2014 7:46 pm OFFICIAL REQUEST FOR PROPOSAL FOR THE GUIDANCE SUBSYSTEM SUPPORT CONTRACT

Update #1 ·

Added: Jan 21, 2014 4:44 pm This proposed effort is for sustainment and developmental engineering encompassing Guidance Subsystem Assessment, Sustaining Engineering, and Program Management Support. Support elements include: nuclear hardness and survivability, anomaly resolution, system engineering, nuclear surety, replacements, modifications, upgrades, service life extension, subsystem component design/redesign, and integration. Other activities include flight test support, Mod 7 Instrumentation Wafer, Instrumentation Wafer Replacement Program (IWRP), and Vandenberg Air Force Base (VAFB)-unique support.

This effort will be an 8 year contract with a basic period of performance and 7 option periods. FAR clause 52.217-8 Option to Extend Services will be included.


All responsible sources may submit a proposal which shall be considered by the agency.

This requirement was originally posted under FA8214-13-R-0004.

Attachments

Files attached to this notice, newest first
File Type Posted
FA821414R0004_______0004.pdf PDF
Sec_J_Attch_3a_Guidance_SSC_CDRL_Instructions_and_Master_Listing_8_Apr_14.pdf PDF
Sec_J_Attch_1_GRID_8_Apr_14.docx DOCX document
Guidance_SSC_Amendment_4_CRM.pdf PDF
Section_J_Attch_9_Combined_Guidance_GFE_Listing_8_APR_14.xlsx XLSX spreadsheet
Guidance_SSC_Question_and_Answer_4_8_APR_2014.pdf PDF
Sec_L_Attch_6_Guidance_Organizational_Manning_Matrix__19_Mar_14.xlsx XLSX spreadsheet
FA821414R0004_______0003.pdf PDF
Guidance_SSC_Amendment_3_CRM_Final.pdf PDF
Sec_J_Attch_1_GRID_31_Mar_14.docx DOCX document
Guidance_SSC_Question_and_Answer_3_31_MAR_2014.pdf PDF
Section_J_Attch_9_Combined_Guidance_GFE_Listing_5_Mar_14.xlsx XLSX spreadsheet
FA821414R0004_______0002.pdf PDF
Guidance_SSC_Section_L_10_Mar_14_updated.docx DOCX document
Sec_J_Attch_3b_IWRP_CDRL_Instructions_and_Master_Listing_10_Mar_14.pdf PDF
Sec_L_Attch_6_Guidance_Organizational_Manning_Matrix__10_Feb_14.xlsx XLSX spreadsheet
Guidance_SSC_Section_M_10_Mar_14_updated.docx DOCX document
Guidance_SSC_Amendment_2_CRM_Final.pdf PDF
Guidance_Sec_L_Attch_1_Cross_Reference_Matrix_13_Mar_2014.xlsx XLSX spreadsheet
Guidance_SSC_Q A_2_Final.pdf PDF
FA821414R0004_______0001.pdf PDF
Sec_J_Attch_3b_IWRP_CDRL_Instructions_and_Master_Listing_27_Feb_14.pdf PDF
Guidance_SSC_Amendment_1_Q_and_A.pdf PDF
Sec_J_Attch_2_Guidance_SSC_PWS_24_Feb_14.docx DOCX document
Sec_J_Attch_3a_Guidance_SSC_CDRL_Instructions_and_Master_Listing_3_Mar_14.pdf PDF
Guidance_SSC_Section_L_24_Feb_14.docx DOCX document
Sec_J_Attch_9_Combined_Guidance_SSC_and_IWRP_GFE_List_20_Feb_14.xlsx XLSX spreadsheet
Sec_J_Attch_8_IWRP_Incentive_Fee_Plan__24_Feb_14.docx DOCX document
Sec_L_Attch_3_Guidance_Consent_Form_31_Jan_14.docx DOCX document
Sec_L_Attch_6_Guidance_Organizational_Manning_Matrix__10_Feb_14.xlsx XLSX spreadsheet
PPI_Tool.mdb MDB file
Sec_L_Attch_9_Performance_Questionnaire_Cover_Letter_3_Feb_14.doc DOC document
Sec_J_Attch_6_Guidance_SSC_Labor_Category_Descriptions_5_Feb_14.docx DOCX document
Sec_J_Attch_1_GRID_11_Feb_14.docx DOCX document
Sec_J_Attch_7_Guidance_SSC_Award-Fee_Plan__4_Feb_14.docx DOCX document
Sec_L_Attch_2_Guidance_Past_Performance_Information_Sheet_31_Jan_14.docx DOCX document
Sec_J_Attch_5_Guidance_SSC_Mapping_Worksheet_5_Feb_14.xlsx XLSX spreadsheet
FA821414R0004.pdf PDF
Sec_L_Attch_5_Guidance_Roles_Responsibilities_Worksheet_31_Jan_14.docx DOCX document
Sec_J_Attch_9_Combined_Guidance_SSC_ _IWRP_GFE_List_11_Feb_14.xlsx XLSX spreadsheet
Sec_J_Attch_2_Guidance_SSC_PWS_11_Feb_14.docx DOCX document
Sec_J_Attch_4_Guidance_SSC_Labor_Rate_Matrix_5_Feb_14.xlsx XLSX spreadsheet
Guidance_SSC_Section_L_6_Feb_14.docx DOCX document
Sec_J_Attch_3a_Guidance_SSC_CDRL_Instructions_ _Master_Listing_5_Feb_14.pdf PDF
Guidance_SSC_Section_M_11_Feb_14.docx DOCX document
Sec_J_Attch_10_Guidance_SSC_DD_254_7_Feb_14.pdf PDF
Sec_L_Attch_7_Guidance_CLIN_Pricing_Matrix_3_Jan_14.xlsx XLSX spreadsheet
Guidance_Production_Labor_Category_Descriptions_DRAFT.docx DOCX document
Guidance_Sec_J_Attch_7_Guidance_Labor_Category_Descriptions_13_Jan_14.pdf PDF
Guidance_GFP_Questions.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity