Sec_L_Attch_1_Cross_Reference_Matrix_29_Jan_2014.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Guidance Subsystem Support Contract
- Solicitation number
- FA8214-14-R-0004
About this file
Sec L Attch 1 Cross Reference Matrix
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Guidance SSC CRM
| Section L Attachment 1 Cross Reference Matrix | ||||
| WORK REQUIREMENT | PWS | Section L | Section M | Proposal |
| 1.0 Guidance Subsystem Sustainment | 1.6.1 | |||
| 1.1 Technical Services | 1.6.3 | 4.2.3 | 2.1.1 | |
| 1.1.1 Guidance Subsystem Assessment | 1.6.3.2 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.1 Operational Readiness | 1.6.3.2.1 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.2 Nuclear Hardness & Survivability | 1.6.3.2.2 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.3 Accuracy | 1.6.3.2.3 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.4 Reliability | 1.6.3.2.4 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.5 Availablility | 1.6.3.2.5 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.6 Maintainability | 1.6.3.2.6 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.7 Anomaly Resolution | 1.6.3.2.7 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.8 Trend Analysis | 1.6.3.2.8 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.9 Mass Properties | 1.6.3.2.9 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.10 Subsystem System Component | 1.6.3.2.10 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.11 System Requirements Determination | 1.6.3.2.11 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.1.12 Determine Accomplishment of Specified Requirements | 1.6.3.2.12 | 4.2.3.2 | 2.1.1.2 | |
| 1.1.2 Sustaining Engineering | 1.6.3.3 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.1 Sustaining Engineering | 1.6.3.3.1 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.2 Integration | 1.6.3.3.2 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.3 Test And Evaluation | 1.6.3.3.3 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.4 Force Development Evaluation (FDE) Support | 1.6.3.3.4 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.5 Hardware Sustainment | 1.6.3.3.5 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.6 Software Sustainment | 1.6.3.3.6 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.7 Subsystem/End-item Specification | 1.6.3.3.7 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.8 OSS&E | 1.6.3.3.8 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.9 Determine Support Requirements | 1.6.3.3.9 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.10 Trade Studies | 1.6.3.3.10 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.11 Field Support | 1.6.3.3.11 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.12 Technical Order Support | 1.6.3.3.12 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.13 Maintenance Support | 1.6.3.3.13 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.14 Disposal | 1.6.3.3.14 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.15 Nuclear Surety | 1.6.3.3.15 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.2.16 Configuration Management | 1.6.3.3.16 | 4.2.3.3 | 2.1.1.3 | |
| 1.1.3 Transition | 1.6.3.1 | 4.2.3.1 | 2.1.1.1 | |
| 1.1.3.1 Transition Plan | 1.6.3.1 | 4.2.3.1 | 2.1.1.1 | |
| 1.2 Program Management | 1.6.4 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.1 Data Rights |
Pam.Christensen: Pam.Christensen:
| Would Data Rights be included in Labor categories? | 1.6.4.1 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.2 Team Structure | 1.6.4.2 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.3 Phase-Out/Follow-on | 1.6.4.3 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.4 Information Assurance | 1.6.4.4 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.5 Risk Management | 1.6.4.5 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.6 Quality Control | 1.6.4.6 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.7 Modification Replacement/New Requirements Oversight | 1.6.4.7 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.8 Response to Program Office Requests | 1.6.4.8 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.9 Nameplating/Product Marking | 1.6.4.9 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.10 Program Manangement Information | 1.6.4.10 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.11 System Security | 1.6.4.11 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.12 Periodic Meetings | 1.6.4.12 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.13 Potential Future Efforts and Programs | 1.6.4.13 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.14 Associate Contractor Agreements | 1.6.4.14 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.15 Travel | 1.6.4.15 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.16 Contractor Manpower Reporting | 1.6.4.16 | 4.2.3.5 | 2.1.1.5 | |
| 1.2.17 Logistics Support | 1.6.4.17 | 4.2.3.5 | 2.1.1.5 | |
| 1.3 Flight Test Unique Equipment | 1.6.5 | 4.2.3.1/2/3/5 | 2.1.1.1/2/3/5 | |
| 1.3.1 Program Management | 1.6.5.1 | 4.2.3.5 | 2.1.1.5 | |
| 1.3.2 FTUE Technical Assistance | 1.6.5.2 | 4.2.3.2 /3 | 2.1.1.2 /3 | |
| 1.3.2.1 Direct Flight Test Support | 1.6.5.2.1 | 4.2.3.3 | 2.1.1.3 | |
| 1.3.2.2 Flight Test Preparation | 1.6.5.2.2 | 4.2.3.3 | 2.1.1.3 | |
| 1.3.2.3 Flight Test Analysis | 1.6.5.2.3 | 4.2.3.2 | 2.1.1.2 | |
| 1.3.2.4 Anomaly and Range Safety Support | 1.6.5.2.4 | 4.2.3.2 | 2.1.1.2 | |
| 1.3.2.5 Anomaly and Range Safety Support- Mission Prep Specific | 1.6.5.2.5 | 4.2.3.2 | 2.1.1.2 | |
| 1.3.2.6 MOD 7 Wafer Test Support | 1.6.5.2.6 | 4.2.3.3 | 2.1.1.3 | |
| 1.3.2.7 IWRP Operations & Support Phase | 1.6.5.2.7 | 4.2.3.3 | 2.1.1.3 | |
| 1.3.2.8 FTUE ITT Support | 1.6.5.2.8 | 4.2.3.3 | 2.1.1.3 | |
| 1.3.2.9 MMIII Test Launch IPT | 1.6.5.2.9 | 4.2.3.5 | 2.1.1.5 | |
| 1.4 Instrumentation Wafer Replacement Program (IWRP) | 1.6.6 | 4.2.3.4 | 2.1.1.4 |