Fulton-Gibbs Refurbishment at the U. S. Merchant Marine Academy

Closed Solicitation Posted

Solicitation number
693JF723R000005
Agency
Maritime Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2CA Repair Or Alteration Of Schools
Place of performance
Kings Point, New York 11024, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to provide design-build services for the complete renovation of Fulton and Gibbs Halls at the U.S. Merchant Marine Academy located in Kings Point, New York. The Department of Transportation Maritime Administration seeks to procure construction services including roof and window replacement, upgrading hallway and classroom lighting, replacing emergency equipment, masonry repairs and painting, upgrading ventilation systems, and asbestos assessment and abatement. Proposals will be evaluated on technical merit, past performance, and price, with the award going to the offeror presenting the best value. The last day for questions is April 5, 2023, with proposals due by April 16, 2023.

The solicitation is set aside for total small businesses. The primary NAICS code is 238210 and PSC code S206. The period of performance is from May 1, 2023 to April 30, 2026 with an estimated value over $18 million to be awarded on a firm-fixed price basis. Work shall be performed at the U.S. Merchant Marine Academy campus located at 300 Steamboat Road, Kings Point, New York 11024 and must be completed according to the schedule in the statement of work.

Notice text

13 versions

Update #13 · Latest ·

AMENDMENT 0012 IS POSTED:

The purposes of this amendment are to:

1. Modify the type of contract resulting from this solicitation from fixed-price incentive (firm target) to firm-fixed price

2. Reduce the amount of liquidated damages required

3. Modify the anticipated award date

4. Extend proposal due dates to May 12, 2023.

5. Modify the contract line item (CLIN) structure to align phases of work with line items

6. Revise the language in the solicitation concerning invoicing procedures

7. Incorporate the amended Attachment 1 Fulton-Gibbs Refurbishment Statement of Work

   a. Scope related to fume hoods and exhaust systems in the welding and diesel labs has been removed

   b. Scope related to engineering studies has been removed

   c. Requirements for submission of cost data have been removed

   d. Brand name or equal language has been added (3.8 M)

   e. Language related to physical security has been updated (3.10)

   f. Language related to vehicle registration has been added (3.11)

   g. Scope related to the procurement of modular swing space has been removed

   h. Language related to roofing has been modified (4.1)

   i. Language related to flooring has been modified (4.2)

   j. Language related to windows has been modified (4.3)

   k. Language related to lighting has been modified (4.4)

   l. Language related to ceilings has been modified (4.6)

   m. Language related to painting has been modified (4.7)

   n. The attachments entitled "Ceiling-Floor Finishes" and “Material Specifications” are hereby added.

8. Incorporate the amended Attachment 2 Fulton-Gibbs Refurbishment Schedule Requirements

9. Incorporate the amended Attachment 3 Fulton-Gibbs Refurbishment Pricing

10. Modify other language in the solicitation to reflect the above changes

   a. Section E is added to require completion of each phase of work before final payment is issued for that phase.

All other terms and conditions remain in effect.

Update #12 ·

SOLICITATION 693JF723R000005 IS HEREBY RE-OPENED

The purpose of this amendment is to re-open the subject solicitation. An updated solicitation package, including updated attachments, are forthcoming. The contract type is hereby changed from fixed-price incentive (firm target) to firm-fixed price. Updated documents will be posted to SAM.gov by COB 28 April 2023 with proposals due 12 May 2023.

Update #11 ·

The purpose of this Amendment is to provide RFI Response 5.

All other terms and conditions remain unchanged.

Update #10 ·

The purpose of this Amendment is to provide an updated Attachment 3, Fulton-Gibbs Refurbishment Pricing 2.0.

All other terms and conditions remain unchanged.

Update #9 ·

The purpose of this Amendment is to:

1. CHANGE the last day to submit questions to 5 April 2023, no later than 11:00 PM.

2. PROVIDE Response 4 to Offeror RFI submissions.

3. PROVIDE updated Attachment 2 Fulton Gibbs Schedule Requirement V8.xls.

4. REMIND Offerors that the Awardee will need to complete mobilization by 23 June 2023.

All other terms and conditions remain unchanged.

Update #8 ·

The purpose of this Amendment is to:

1. Extend the closing date to submit proposals to 16 April 2023, no later than 11:00 PM.

2. Change the last day to submit questions to Sunday, 9 April 2023, no later than 11:00 PM.

3. Provide RFI Response 3 to Offeror RFI submissions.

4. Attach additional technical documents to the Solicitation.

5. Notify Offerors that Awardee will need to have completed mobilization no later than 23 June 2023.

6. Attach updated Statement of Work (SOW).

All other terms and conditions remain unchanged.

Update #7 ·

The purpose of this Amendment 0006 is to:

1. Provide fourteen (14) Zip File folders with technical documents regarding Fulton Hall and Gibbs Hall.

2. Change the last day to submit questions to Thursday, 30 March 2023, no later than 11:00 PM.

All other terms and conditions remain unchanged.

Update #6 ·

Amendment 0005 to solicitation 693JF723R000005 extends the proposal due date to Sunday, April 2, 2023 and informs offerors that  Attachments 7 through 11, which include drawings for both Fulton and Gibbs Halls, are available but will be posted in a future amendment.. 

All other terms and conditions remain unchanged.

Update #5 ·

Amendment 0004 to solicitation 693JF723R000005 incorporates the remaining answers from questions posed by industry not previously answered via amendment 0003.

All other terms and conditions remain unchanged.

Update #4 ·

Amendment 0003 to solicitation 693JF723R000005 incorporates answers from questions posed by industry thus far.

All other terms and conditions remain unchanged.

Update #3 ·

Amendment 0002 to solicitation 693JF723R000005 extends the proposal due date to March 29, 2023 at 11:00 AM Eastern Time.

All other terms and conditions remain unchanged.

Update #2 ·

Solicitation 693JF723R000005 is hereby amended as follows:
1. Due date for questions from industry is hereby extended to March 10, 2023
2. A second site visit is hereby scheduled for March 15, 2023.
3. Page 18 of Attachment 1 has been revised.
4. Attachment 6 is hereby included with the solicitation.

Update #1 ·

The contractor shall provide all labor, materials, equipment, supervision, transportation, and disposal required for the complete renovation of the Fulton and Gibbs Halls at the U.S.Merchant Marine Academy (USMMA), located at 300 Steamboat Road, Kings Point, NY 11024. Work tasks include, but are not limited to, the following:
• Roof and window replacement
• Upgrade of hallway and classroom lighting
• Replace emergency shower/eyewash stations
• Repoint/patch/paint CMU walls
• Upgrade ventilation and air distribution in diesel/welding labs
• Assessment/abatement of asbestos

Attachments

Files attached to this notice, newest first
File Type Posted
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD0012).pdf PDF
693JF723R000005 Fulton-Gibbs RFP (AMD0012).pdf PDF
Attachment 2 Fulton-Gibbs Schedule Requirements (AMD0012).xlsx XLSX spreadsheet
Attachment 3 Fulton-Gibbs Refurbishment Pricing (AMD0012).xlsx XLSX spreadsheet
693JF723R00000500011.pdf PDF
693JF723R0000050010.pdf PDF
Refurbish-693JF723000005 RFI Response 5.docx DOCX document
Attachment 3 Fulton-Gibbs Refurbishment Pricing 2.0.xlsx XLSX spreadsheet
693JF723R0000050009.pdf PDF
Attachment 2 Fulton Gibbs Schedule Requirement V8.xlsx XLSX spreadsheet
Refurbish-693JF723000005 RFI Response 4.docx DOCX document
693JF723R0000050008.pdf PDF
Ceiling-Floor Finishes.xlsx XLSX spreadsheet
Fume hoods.xlsx XLSX spreadsheet
Fulton-Gibbs Refurbishment SOW.pdf PDF
693JF723R0000050007.pdf PDF
Material Examples.zip ZIP file
Refurbish-693JF723000005 RFI Response 3 30MAR23.docx DOCX document
Fulton A10 -M5.zip ZIP file
Gibbs M1-7.zip ZIP file
Gibbs S1-6.zip ZIP file
Gibbs A10 - E11.zip ZIP file
Gibbs M8 - P10.zip ZIP file
Fulton A1-9.zip ZIP file
Fulton M6-15.zip ZIP file
Fulton M16 - P9.zip ZIP file
Fulton L1-SP1.zip ZIP file
693JF723R0000050006.pdf PDF
Fulton P10-S1.zip ZIP file
Fulton E11-20.zip ZIP file
Fulton E1-10.zip ZIP file
Gibbs A1-9.zip ZIP file
Gibbs E12 - L3.zip ZIP file
693JF723R0000050005.pdf PDF
693JF723R0000050004.pdf PDF
693JF723R0000050003.pdf PDF
693JF723R00000500002.pdf PDF
693JF723R000005 Fulton-Gibbs RFP (AMD1).pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD1).pdf PDF
Attachment 6 Reports Drawings and Other Docs.zip ZIP file
693JF723R000005001.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing.xlsx XLSX spreadsheet
Attachment 5 Question and Answer Response Form.docx DOCX document
Attachment 2 Fulton-Gibbs Schedule Requirements.xlsx XLSX spreadsheet
Attachment 1 Fulton-Gibbs Refurbishment SOW.pdf PDF
Attachment 4 Wage Determination Davis Bacon Act WD NY20230012.pdf PDF
693JF723R000005 Fulton-Gibbs RFP.pdf PDF