Fume hoods.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Fulton-Gibbs Refurbishment at the U. S. Merchant Marine Academy Federal contract opportunity
Solicitation number
693JF723R000005
Issued by
Department of Transportation Maritime Administration

About this file

This document contains a spreadsheet detailing specifications for chemistry fume hoods at a university laboratory and information on a related federal contract solicitation. The solicitation is for renovations to Fulton and Gibbs Halls at the U.S. Merchant Marine Academy, including roof and window replacement, lighting upgrades, emergency equipment replacements, wall repairs and painting, and lab ventilation system upgrades. Work will also include asbestos assessment and abatement. The solicitation was issued by the Department of Transportation Maritime Administration. The spreadsheet lists models, dimensions, installed accessories, and airflow test results for twelve fume hoods across five chemistry labs. Specifications cover hood exteriors, work areas, electrical and gas connections, ducting, and attached cabinets. Airflow readings taken in December 2022 show a range of average cubic feet per minute values with sashes raised to 14 inches.

View the file

Other files for this federal contract opportunity

Other files attached to Fulton-Gibbs Refurbishment at the U. S. Merchant Marine Academy, newest first.
File Type Posted
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD0012).pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing (AMD0012).xlsx XLSX spreadsheet
693JF723R000005 Fulton-Gibbs RFP (AMD0012).pdf PDF
Attachment 2 Fulton-Gibbs Schedule Requirements (AMD0012).xlsx XLSX spreadsheet
693JF723R00000500011.pdf PDF
Refurbish-693JF723000005 RFI Response 5.docx DOCX document
693JF723R0000050010.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing 2.0.xlsx XLSX spreadsheet
693JF723R0000050009.pdf PDF
Attachment 2 Fulton Gibbs Schedule Requirement V8.xlsx XLSX spreadsheet
Refurbish-693JF723000005 RFI Response 4.docx DOCX document
693JF723R0000050008.pdf PDF
Ceiling-Floor Finishes.xlsx XLSX spreadsheet
Fulton-Gibbs Refurbishment SOW.pdf PDF
693JF723R0000050007.pdf PDF
Material Examples.zip ZIP file
Refurbish-693JF723000005 RFI Response 3 30MAR23.docx DOCX document
Fulton A10 -M5.zip ZIP file
Gibbs M1-7.zip ZIP file
Gibbs S1-6.zip ZIP file
Gibbs A10 - E11.zip ZIP file
Gibbs M8 - P10.zip ZIP file
693JF723R0000050006.pdf PDF
Fulton P10-S1.zip ZIP file
Fulton E11-20.zip ZIP file
Fulton E1-10.zip ZIP file
Gibbs A1-9.zip ZIP file
Gibbs E12 - L3.zip ZIP file
Fulton A1-9.zip ZIP file
Fulton M6-15.zip ZIP file
Fulton M16 - P9.zip ZIP file
Fulton L1-SP1.zip ZIP file
693JF723R0000050005.pdf PDF
693JF723R0000050004.pdf PDF
693JF723R0000050003.pdf PDF
693JF723R00000500002.pdf PDF
693JF723R000005 Fulton-Gibbs RFP (AMD1).pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD1).pdf PDF
Attachment 6 Reports Drawings and Other Docs.zip ZIP file
693JF723R000005001.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing.xlsx XLSX spreadsheet
Attachment 5 Question and Answer Response Form.docx DOCX document
Attachment 2 Fulton-Gibbs Schedule Requirements.xlsx XLSX spreadsheet
693JF723R000005 Fulton-Gibbs RFP.pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW.pdf PDF
Attachment 4 Wage Determination Davis Bacon Act WD NY20230012.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Chemistry Fume Hoods December 2022 (Pamela Bryant)
Fume Hoods in Chemistry LabsG304G305G306G307G301
Model
Hamilton Vectaire PL183-11 hood5 hoods4 hoods2 hoods
Vent to roof1 roof vent3 roof vents1 roof vent2 roof vents1 roof vent
Fume Hood Exterior Dimensions
Width60"60"60"60"
Depth37 5/8 "37 5/8 "37 5/8 "37 5/8 "
Height54 1/4"54 1/4"54 1/4"54 1/4"
Height with cabinet90"90"90"90"
Work Area (Interior Dimensions)
Width51"51"51"51"
Depth25"25"25"25"
Height48 1/2"48 1/2"48 1/2"48 1/2"
Fume Hood Accessories/ per hood
Light on/off switch11011
Fluorescent light in hood11011
AC 110 Power Plugin 2-Outlet Wall Plate with ground11012
220 Power Plugin outlet 3 prong11010
vacuum valve outside, nozzle inside11011
air valve outside, nozzle inside11011
water valve outside (Tap water)11011
water faucet inside work area0
water drain (6" x 3" x 4") inside11011
gas valve outside, nozzle inside ( one on each side22022
Verticle sliding sash door11011
Fan motlor power on/off switch with indicator light10000
Connection to breaker switch where motor is turned on/off and was at one time linked to air handler so negative pressure would be in the labs01111
Fast/Slow speed01001
Acid cabinet under hood1
flamable cabinet under hood111
storage cabinet under hood05031
Connected to motor than provides air flow on roof. Generates an average CFM with a sash height of 14"
Last tested 2018 by RC testing Service (Last tested 8/2017)138177

133 329 143 149 181

Hood in G306 is ceiling mounted with no cabinet
tent shaped 63" x 37" by 20 " and bottom of hood is 78" from floor001 hood00
Tested with sash raised 14" using a Veneometer (Dwyer Instruments)
Vaneometer* sitting at front of working area 7 inches high 12/5/2022. measured front left/front middle/front right.400/75/1075/75/50

60/60/30 75/50/50 75/70/50 60/100/100 F

20/50/20 S100/100/150 24"
75/100/125 7"8/5/10

8/8/5 5/8/7 8/12/10 25/70/25 F 75/75/50 F Slow setting doesn't work *vaneometer is not very precise with wide fluctuations. The best estimate of the readings are given.

File details come from the government source that posted it. Updated .