About this file

This document contains an attachment with pricing details and a related federal contract opportunity notice. The attachment provides pricing for various phases of work for the Fulton-Gibbs Refurbishment project at the U.S. Merchant Marine Academy, with line items for roof and window replacement, work in three trimesters of the 2023-2024 school year, summer break 2024 work, three trimesters of the 2024-2025 school year, summer break 2025 work, and the entire period of performance, but lists the proposed price as $0 for each line item and the total.

The related federal contract opportunity is solicitation number 693JF723R000005 for the Fulton-Gibbs Refurbishment at the U.S. Merchant Marine Academy. The contractor shall provide all labor, materials, equipment, supervision, transportation, and disposal required for the complete renovation of Fulton and Gibbs Halls, including roof and window replacement, lighting upgrades, emergency equipment replacement, masonry repairs and painting, ventilation system upgrades, and asbestos assessment and abatement. The contracting agency is the Department of Transportation Maritime Administration.

View the file

Other files

File Type Posted
Attachment 2 Fulton-Gibbs Schedule Requirements (AMD0012).xlsx XLSX spreadsheet
693JF723R000005 Fulton-Gibbs RFP (AMD0012).pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD0012).pdf PDF
693JF723R00000500011.pdf PDF
693JF723R0000050010.pdf PDF
Refurbish-693JF723000005 RFI Response 5.docx DOCX document
693JF723R0000050009.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing 2.0.xlsx XLSX spreadsheet
693JF723R0000050008.pdf PDF
Attachment 2 Fulton Gibbs Schedule Requirement V8.xlsx XLSX spreadsheet
Refurbish-693JF723000005 RFI Response 4.docx DOCX document
693JF723R0000050007.pdf PDF
Fume hoods.xlsx XLSX spreadsheet
Material Examples.zip ZIP file
Ceiling-Floor Finishes.xlsx XLSX spreadsheet
Refurbish-693JF723000005 RFI Response 3 30MAR23.docx DOCX document
Fulton-Gibbs Refurbishment SOW.pdf PDF
Fulton L1-SP1.zip ZIP file
Fulton M6-15.zip ZIP file
Fulton A1-9.zip ZIP file
Fulton M16 - P9.zip ZIP file
693JF723R0000050006.pdf PDF
Fulton P10-S1.zip ZIP file
Fulton E11-20.zip ZIP file
Gibbs A1-9.zip ZIP file
Gibbs M1-7.zip ZIP file
Gibbs E12 - L3.zip ZIP file
Fulton E1-10.zip ZIP file
Gibbs S1-6.zip ZIP file
Fulton A10 -M5.zip ZIP file
Gibbs A10 - E11.zip ZIP file
Gibbs M8 - P10.zip ZIP file
693JF723R0000050005.pdf PDF
693JF723R0000050004.pdf PDF
693JF723R0000050003.pdf PDF
693JF723R00000500002.pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD1).pdf PDF
Attachment 6 Reports Drawings and Other Docs.zip ZIP file
693JF723R000005001.pdf PDF
693JF723R000005 Fulton-Gibbs RFP (AMD1).pdf PDF
Attachment 5 Question and Answer Response Form.docx DOCX document
693JF723R000005 Fulton-Gibbs RFP.pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing.xlsx XLSX spreadsheet
Attachment 4 Wage Determination Davis Bacon Act WD NY20230012.pdf PDF
Attachment 2 Fulton-Gibbs Schedule Requirements.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

Phases of Work
CLINNumberDescriptionProposed Price
00031Roof & Windows$ - 0
000421st Trimester 23/24$ - 0
000532nd Trimester 23/24$ - 0
000643rd Trimester 23/24$ - 0
00075Summer Break 24$ - 0
000861st Trimester 24/25$ - 0
000972nd Trimester 24/25$ - 0
001083rd Trimester 24/25$ - 0
00119Summer Break 25$ - 0
0012AllPeriod of Performance$ - 0
Total Proposed Price$ - 0

File details come from the government source that posted it. Updated .