Attachment 2 Fulton-Gibbs Schedule Requirements.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
Fulton-Gibbs Refurbishment at the U. S. Merchant Marine Academy Federal contract opportunity
Solicitation number
693JF723R000005
Issued by
Department of Transportation Maritime Administration

About this file

This document outlines the scope of work for the Fulton-Gibbs Refurbishment at the U.S. Merchant Marine Academy. The contractor shall provide all labor, materials, equipment, supervision, and disposal required to completely renovate Fulton and Gibbs Halls. Work includes roof and window replacement, upgrading hallway and classroom lighting, replacing emergency shower/eyewash stations, and repointing, patching and painting CMU walls. Additional tasks involve upgrading ventilation and air distribution in diesel and welding labs. The contractor must also assess and abate any asbestos. The solicitation was issued by the Department of Transportation Maritime Administration for the refurbishment located at the U.S. Merchant Marine Academy in Kings Point, New York. The schedule details ten phases of work to be completed over a three year period from March 2023 through March 2026, and estimates the total cost of the project to be $14,930,497.58.

View the file

Other files for this federal contract opportunity

Other files attached to Fulton-Gibbs Refurbishment at the U. S. Merchant Marine Academy, newest first.
File Type Posted
Attachment 3 Fulton-Gibbs Refurbishment Pricing (AMD0012).xlsx XLSX spreadsheet
693JF723R000005 Fulton-Gibbs RFP (AMD0012).pdf PDF
Attachment 2 Fulton-Gibbs Schedule Requirements (AMD0012).xlsx XLSX spreadsheet
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD0012).pdf PDF
693JF723R00000500011.pdf PDF
Refurbish-693JF723000005 RFI Response 5.docx DOCX document
693JF723R0000050010.pdf PDF
693JF723R0000050009.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing 2.0.xlsx XLSX spreadsheet
693JF723R0000050008.pdf PDF
Attachment 2 Fulton Gibbs Schedule Requirement V8.xlsx XLSX spreadsheet
Refurbish-693JF723000005 RFI Response 4.docx DOCX document
Ceiling-Floor Finishes.xlsx XLSX spreadsheet
Fume hoods.xlsx XLSX spreadsheet
Material Examples.zip ZIP file
Refurbish-693JF723000005 RFI Response 3 30MAR23.docx DOCX document
Fulton-Gibbs Refurbishment SOW.pdf PDF
693JF723R0000050007.pdf PDF
693JF723R0000050006.pdf PDF
Fulton P10-S1.zip ZIP file
Fulton E11-20.zip ZIP file
Fulton E1-10.zip ZIP file
Gibbs A1-9.zip ZIP file
Gibbs E12 - L3.zip ZIP file
Fulton A10 -M5.zip ZIP file
Gibbs M1-7.zip ZIP file
Gibbs S1-6.zip ZIP file
Fulton A1-9.zip ZIP file
Fulton M6-15.zip ZIP file
Fulton M16 - P9.zip ZIP file
Fulton L1-SP1.zip ZIP file
Gibbs A10 - E11.zip ZIP file
Gibbs M8 - P10.zip ZIP file
693JF723R0000050005.pdf PDF
693JF723R0000050004.pdf PDF
693JF723R0000050003.pdf PDF
693JF723R00000500002.pdf PDF
Attachment 6 Reports Drawings and Other Docs.zip ZIP file
693JF723R000005001.pdf PDF
693JF723R000005 Fulton-Gibbs RFP (AMD1).pdf PDF
Attachment 1 Fulton-Gibbs Refurbishment SOW (AMD1).pdf PDF
693JF723R000005 Fulton-Gibbs RFP.pdf PDF
Attachment 3 Fulton-Gibbs Refurbishment Pricing.xlsx XLSX spreadsheet
Attachment 5 Question and Answer Response Form.docx DOCX document
Attachment 1 Fulton-Gibbs Refurbishment SOW.pdf PDF
Attachment 4 Wage Determination Davis Bacon Act WD NY20230012.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FG Schedule Reqts

GovernmentProposed
IDTask NameDuration (Days)StartFinishResource NamesCostDuration (Days)StartFinish
1Fulton-Gibbs Refurbishment36.65 emoWed 3/1/23Wed 3/4/26$14,930,497.58
2Acquisition19 daysMon 5/1/23Fri 5/19/23$0.00
3Contract Awarded1 dayMon 5/1/23Mon 5/1/23$0.00
4Kick-Of Meeting1 dayWed 5/3/23Wed 5/3/23$0.00
5Mobilization12 daysMon 5/8/23Fri 5/19/23$0.00
6Phase 1 (Roof & Windows)1805/19/2311/14/23$4,613,121.171795/19/2311/14/23
7Roof Repairs1805/19/2311/14/23Roof Replacement[56,195 SF]$3,585,802.951795/19/2311/14/23
8Demo Solar Panels$0.00
9Execution$0.00
10Windows605/19/237/17/23$826,749.32595/19/237/17/23
11Window Caulking InteriorWindow-Caulking Interior[5,875 LF$16,097.50
12Window Caulking ExteriorWindow-Caulking Exterior[5,875 LF$100,462.50
13Window ReplacementWindow-Replacement[10 EA]$34,612.40
14Window RepairWindow-Repair[81 EA]$119,176.92
15Window Film-SolarWindow-Solar Film[10,000 SF]$556,400.00
16Eyewash Stations655/22/237/25/23Eyewash Station[6 EA]$134,544.60645/22/237/25/23
17Atomic Lab 212 (Swing Space)655/22/237/25/23$66,024.30645/22/237/25/23
18AbatementAsbestos Disposal[1 CY],Asbestos-Demo[683
SF],Industrial Hygienist[1 Day]$6,397.61
19Underlayment/EncapsulationUnderlayment-Epoxy[683 SF]$8,571.65
20Epoxy FlooringFlooring-Epoxy[683 SF]$25,182.21
21Paint CeilingCeiling-Paint[683 SF]$1,140.61
22LightingLighting[683 SF]$19,356.22
23PaintWall-Paint[1,050]$5,376.00
24Phase 2 (Summer Break)326/24/237/25/23$867,877.12316/24/237/25/23
25Advanced Chemistry Lab (305)326/24/237/25/23$117,108.26316/24/237/25/23
26AbatementAsbestos Disposal[1 CY],Asbestos-Demo[1,261 SF],Industrial Hygienist[1 Day]$8,703.83
27Underlayment/EncapsulationUnderlayment-Epoxy[1,261 SF]$15,825.55
28Epoxy FlooringFlooring-Epoxy[1,261 SF]$46,493.07
29LightingLighting[1,261 SF]$35,736.74
30Paint CeilingCeiling-Paint[1,261 SF]$2,105.87
31PaintWall-Paint[1,610]$8,243.20
32Fume Hoods$0.00
33Chem Prep (306)326/24/237/25/23$59,823.43316/24/237/25/23
34AbatementAsbestos Disposal[1 CY],Asbestos-D$3,248.57
35Underlayment/EncapsulationUnderlayment-Epoxy[642 SF]$8,057.10
36Epoxy FlooringFlooring-Epoxy[642 SF]$23,670.54
37LightingLighting[642 SF]$18,194.28
38Paint CeilingCeiling-Paint[642 SF]$1,072.14
39PaintWall-Paint[1,090]$5,580.80
40Fume Hoods$0.00
41Basic Chemistry Lab (307)326/24/237/25/23$129,485.33316/24/237/25/23
42AbatementAsbestos Disposal[1 CY],Asbestos-D$6,460.52
43Underlayment/EncapsulationUnderlayment-Epoxy[1,447 SF]$18,159.85
44Epoxy FlooringFlooring-Epoxy[1,447 SF]$53,350.89
45LightingLighting[1,447 SF]$41,007.98
46Paint CeilingCeiling-Paint[1,447 SF]$2,416.49
47PaintWall-Paint[1,580]$8,089.60
48Fume Hoods$0.00
49Machinery Lab (107)326/24/237/25/23$230,644.84316/24/237/25/23
50Underlayment/EncapsulationUnderlayment-Epoxy[2,728 SF]$34,236.40
51Epoxy FlooringFlooring-Epoxy[2,728 SF]$100,581.36
52LightingLighting[2,728 SF]$77,311.52
53Paint CeilingCeiling-Paint[2,748 SF]$4,589.16
54PaintWall-Paint[2,720]$13,926.40
551st Fl Hallways326/24/237/25/23$330,815.26316/24/237/25/23
56AbatementAsbestos-Removal[150 SF]$523.50
57FlooringFlooring-TCF[3,497 SF]$87,739.73
58LightingLighting[3,497 SF]$99,104.98
59CeilingCeiling-Acoustical[3,497 SF]$112,778.25
60PaintWall-Paint[5,990]$30,668.80
61Phase 3 (1st Trimester 23/24)937/26/2310/26/23$1,069,132.81927/26/2310/26/23
62Machine Shop (F-G18) Phase 1937/26/2310/26/23$208,688.08927/26/2310/26/23
63UnerlaymentUnderlayment-Epoxy[3,769 SF]$47,300.95
64Epoxy FloorFlooring-Epoxy[3,769 SF]$138,963.03
65Install Eyewash StationEyewash Station[1 EA]$22,424.10
66Welding Shop (F-G19)937/26/2310/26/23$417,593.08927/26/2310/26/23
67Duct Work$0.00
68LightingLighting[2,796 SF]$79,238.64
69Exhaust SystemsExhaust-Welding Lab[20 EA]$283,923.20
70LVT Floor in OfficeFlooring-VCT[160 SF]$4,624.00
71Paint Corugated CeilingCeiling-Paint[2,796 SF]$4,669.32
72Walls-PaintWall-Paint[6,180]$31,641.60
73Flooring-PaintWall-Paint[2,636]$13,496.32
74Controls Lab (110)937/26/2310/26/23$132,283.75927/26/2310/26/23
75Underlayment/EncapsulationFlooring-Epoxy[1,201 SF]$44,280.87
76Epoxy FlooringFlooring-Epoxy[1,201 SF]$44,280.87
77LightingLighting[1,201 SF]$34,036.34
78Paint CeilingCeiling-Paint[1,201 SF]$2,005.67
79PaintWall-Paint[1,500]$7,680.00
80Circuits Lab (111)937/26/2310/26/23$132,283.75927/26/2310/26/23
81Underlayment/EncapsulationFlooring-Epoxy[1,201 SF]$44,280.87
82Epoxy FlooringFlooring-Epoxy[1,201 SF]$44,280.87
83LightingLighting[1,201 SF]$34,036.34
84Paint CeilingCeiling-Paint[1,201 SF]$2,005.67
85PaintWall-Paint[1,500]$7,680.00
86Classroom (F-101)937/26/2310/26/23$51,955.18927/26/2310/26/23
87LightingLighting[762 SF]$21,595.08
88CeilingCeiling-Acoustical[762 SF]$24,574.50
89PaintWall-Paint[1,130]$5,785.60
90Classroom (F-102)937/26/2310/26/23$55,408.81927/26/2310/26/23
91LightingLighting[819 SF]$23,210.46
92CeilingCeiling-Acoustical[819 SF]$26,412.75
93PaintWall-Paint[1,130]$5,785.60
94Classroom (F-115)937/26/2310/26/23$70,920.16927/26/2310/26/23
95TCFFlooring-TCF[762 SF]$19,118.58
96LightingLighting[762 SF]$21,595.08
97CeilingCeiling-Acoustical[762 SF]$24,574.50
98PaintWall-Paint[1,100]$5,632.00
99Phase 4 (2nd Trimester 23/24)11211/14/233/4/24$377,615.5611111/14/233/4/24
100Classroom (G05)11211/14/233/4/24$37,849.4011111/14/233/4/24
101TCFFlooring-TCF[594 SF]$14,903.46
102LightingLighting[594 SF]$16,833.96
103Paint CeilingCeiling-Paint[594 SF]$991.98
104PaintWall-Paint[1,000]$5,120.00
105IME Storage (G12)11211/14/233/4/24$15,217.0811111/14/233/4/24
106AbatementAsbestos Disposal[1 CY],Asbestos-D$4,119.32
107UnderlaymentUnderlayment-Epoxy[112 SF]$1,405.60
108Epoxy FlooringFlooring-Epoxy[112 SF]$4,129.44
109LightingLighting[112 SF]$3,174.08
110Paint CeilingCeiling-Paint[112 SF]$187.04
111PaintWall-Paint[430]$2,201.60
112IME Lab (G14)11211/14/233/4/24$178,730.0711111/14/233/4/24
113AbatementAsbestos Disposal[1 CY],Asbestos-D$8,722.85
114UnderlaymentUnderlayment-Epoxy[2,014 SF]$25,275.70
115Epoxy FlooringFlooring-Epoxy[2,014 SF]$74,256.18
116LightingLighting[2,014 SF]$57,076.76
117Paint CeilingCeiling-Paint[2,014 SF]$3,363.38
118PaintWall-Paint[1,960]$10,035.20
119IME Office (G13)11211/14/233/4/24$12,249.3111111/14/233/4/24
120VCTFlooring-VCT[161 SF]$4,652.90
121LightingLighting[161 SF]$4,562.74
122Paint CeilingCeiling-Paint[161 SF]$268.87
123PaintWall-Paint[540]$2,764.80
124Nuclear Lab (F-G03)11211/14/233/4/24$51,189.6011111/14/233/4/24
125VCTFlooring-VCT[560 SF]$16,184.00
126LightingLighting[560 SF]$15,870.40
127Repair CeilingCeiling-Acoustical[560 SF]$18,060.00
128950Wall-Paint[210]$1,075.20
129Steering Lab (F-G22)11211/14/233/4/24$82,380.1011111/14/233/4/24
130Epoxy FlooringFlooring-Epoxy[897 SF]$33,072.39
131LightingLighting[897 SF]$25,420.98
132Paint CeilingCeiling-Paint[897 SF]$1,497.99
133PaintWall-Paint[1,200]$6,144.00
134UnivectorMechanical-Mini Slplit[1 EA]$16,244.74
135Phase 5 (3rd Trimester 23/24)893/18/246/14/24$420,424.03883/18/246/14/24
136Refrigertaion Lab (G08, G09, G09A)893/18/246/14/24$178,680.96883/18/246/14/24
137AbatementAsbestos-Demo[1,771 SF],Asbestos$10,055.23
138UnderlaymentUnderlayment-Epoxy[1,771 SF]$22,226.05
139Epoxy FlooringFlooring-Epoxy[1,771 SF]$65,296.77
140LightingLighting[1,771 SF]$50,190.14
141Paint CeilingCeiling-Paint[1,771 SF]$2,957.57
142PaintWall-Paint[5,460]$27,955.20
143Simulator Lab (F-105)893/18/246/14/24$35,949.32883/18/246/14/24
144VCT Over Univector SpaceFlooring-VCT[200 SF]$5,780.00
145LightingLighting[118 SF]$3,344.12
146CeilingCeiling-Acoustical[600 SF]$19,350.00
147PaintWall-Paint[1,460]$7,475.20
148Marine Proj Lab (F-114)893/18/246/14/24$80,877.43883/18/246/14/24
149UnderlaymentUnderlayment-Epoxy[209 SF]$2,622.95
150VCTFlooring-VCT[209 SF]$6,040.10
151LightingLighting[1,082 SF]$30,663.88
152Ceiling-ACTCeiling-Acoustical[1,082 SF]$34,894.50
153PaintWall-Paint[1,300]$6,656.00
154PLC Lab (F-109)893/18/246/14/24$124,916.32883/18/246/14/24
155AbatementAsbestos Disposal[1 CY],Asbestos-D$7,774.16
156Underlayment CarpetUnderlayment-Carpet[1,028 SF]$15,563.92
157TCFFlooring-TCF[1,028 SF]$25,792.52
158LightingLighting[1,028 SF]$29,133.52
159CeilingCeiling-Acoustical[1,028 SF]$33,153.00
160PaintWall-Paint[1,660]$8,499.20
161Crane DemoCrane Demo[1]$5,000.00
162Phase 6 (Summer Break)326/24/247/25/24$1,013,587.25316/24/247/25/24
163Steam Lab (F-G12) Phase 1326/24/247/25/24$460,512.78316/24/247/25/24
164CeilingsCeiling-Encapsulation Steam [4,975$222,581.50
165LightingLighting[4,975 SF]$140,991.50
166Exhaust SystemsExhaust-Diesel Lab[2 EA]$37,957.38
167PaintWall-Paint[11,520]$58,982.40
168Diesel Lab (F-G09) Phase 1326/24/247/25/24$338,964.17316/24/247/25/24
169CeilingsCeiling-Encapsulation Diesel[3,055$137,138.95
170LightingLighting[3,055 SF]$86,578.70
171PaintWall-Paint[8,800]$45,056.00
172ExhaustExhaust-Diesel Lab[2 EA]$37,957.38
173UnderlaymentUnderlayment-Epoxy[591 SF]$7,417.05
174Mezzanine FloorFlooring-Epoxy[591 SF]$21,790.17
175Mezzanine WallsWall-Paint[591]$3,025.92
176Gas Turbine (G09A)326/24/247/25/24$90,529.20316/24/247/25/24
177CeilingsCeiling-Encapsulation Diesel[634 SF$28,460.26
178LightingLighting[634 SF]$17,967.56
179PaintWall-Paint[1,200]$6,144.00
180ExhaustExhaust-Diesel Lab[2 EA]$37,957.38
181Lecture Hall (G06)326/24/247/25/24$123,581.10316/24/247/25/24
182TCFFlooring-TCF[1,637 SF]$41,072.33
183LightingLighting[1,637 SF]$46,392.58
184Paint CeilingCeiling-Paint[1,637 SF]$2,733.79
185PaintWall-Paint[6,520]$33,382.40
186Phase 7 (1st Trimester 24/25)937/26/2410/26/24$760,688.47927/26/2410/26/24
187Machine Shop Phase 2937/26/2410/26/24$228,363.71927/26/2410/26/24
188Duct Work$0.00
189Suspended CeilingCeiling-Acoustical[3,769 SF]$121,550.25
190LightingLighting[3,769 SF]$106,813.46
191Exhaust Systems$0.00
192Ventilation$0.00
193Graphics Classroom (F-201)937/26/2410/26/24$139,344.74927/26/2410/26/24
194TCFFlooring-TCF[400 SF]$10,036.00
195LightingLighting[1,966 SF]$55,716.44
196Suspended CeilingCeiling-Acoustical[1,966 SF]$63,403.50
197PaintWall-Paint[1,990]$10,188.80
198Classroom (F-208)937/26/2410/26/24$63,929.92927/26/2410/26/24
199TCFFlooring-TCF[684 SF]$17,161.56
200LightingLighting[684 SF]$19,384.56
201CeilingCeiling-Acoustical[684 SF]$22,059.00
202PaintWall-Paint[1,040]$5,324.80
203Classroom (F-209)937/26/2410/26/24$77,824.72927/26/2410/26/24
204TCFFlooring-TCF[839 SF]$21,050.51
205LightingLighting[839 SF]$23,777.26
206CeilingCeiling-Acoustical[839 SF]$27,057.75
207PaintWall-Paint[1,160]$5,939.20
208Classroom (F-210)937/26/2410/26/24$67,990.32927/26/2410/26/24
209TCFFlooring-TCF[729 SF]$18,290.61
210LightingLighting[729 SF]$20,659.86
211Ceiling-ACTCeiling-Acoustical[729 SF]$23,510.25
212PaintWall-Paint[1,080]$5,529.60
213Classroom (F-212)937/26/2410/26/24$66,533.76927/26/2410/26/24
214TCFFlooring-TCF[712 SF]$17,864.08
215LightingLighting[712 SF]$20,178.08
216Suspended CeilingCeiling-Acoustical[712 SF]$22,962.00
217PaintWall-Paint[1,080]$5,529.60
218Classroom (F-213)937/26/2410/26/24$67,904.64927/26/2410/26/24
219TCFFlooring-TCF[728 SF]$18,265.52
220LightingLighting[728 SF]$20,631.52
221Suspended CeilingCeiling-Acoustical[728 SF]$23,478.00
222PaintWall-Paint[1,080]$5,529.60
223Classroom (F-214)937/26/2410/26/24$48,796.66927/26/2410/26/24
224TCFFlooring-TCF[762 SF]$19,118.58
225LightingLighting[762 SF]$21,595.08
226Suspended CeilingCeiling-Acoustical[76 SF]$2,451.00
227PaintWall-Paint[1,100]$5,632.00
228Phase 8 (2nd Trimester 24/25)11111/14/243/4/25$742,231.3911011/14/243/4/25
229Classroom (204)11111/14/243/4/25$39,939.3011011/14/243/4/25
230TCFFlooring-TCF[631 SF]$15,831.79
231LightingLighting[631 SF]$17,882.54
232CeilingCeiling-Paint[631 SF]$1,053.77
233PaintWall-Paint[1,010]$5,171.20
234Special Projects Classroom (205)11111/14/243/4/25$118,718.1611011/14/243/4/25
235TCFFlooring-TCF[1,287 SF]$32,290.83
236LightingLighting[1,287 SF]$36,473.58
237CeilingCeiling-Acoustical[1,287 SF]$41,505.75
238PaintWall-Paint[1,650]$8,448.00
239Heat Treating/Materials Lab (206/2011111/14/243/4/25$119,894.9711011/14/243/4/25
240AbatementAsbestos Disposal[1 CY],Asbestos-D$4,465.52
241Underlayment/EncapsulationUnderlayment-Epoxy[1,143 SF]$14,344.65
242Epoxy FlooringFlooring-Epoxy[1,143 SF]$42,142.41
243LightingLighting[1,143 SF]$32,392.62
244CeilingCeiling-Paint[1,143 SF]$1,908.81
245PaintWall-Paint[2,040]$10,444.80
246Fume HoodsExhaust-Welding Lab[1 EA]$14,196.16
247Strength & Fluids Lab (215)11111/14/243/4/25$213,990.4011011/14/243/4/25
248Underlayment/EncapsulationUnderlayment-Epoxy[2,560 SF]$32,128.00
249Epoxy FlooringFlooring-Epoxy[2,560 SF]$94,387.20
250LightingLighting[2,560 SF]$72,550.40
251CeilingCeiling-Paint[2,560 SF]$4,275.20
252PaintWall-Paint[2,080]$10,649.60
253Thermodynamics (F-203)11111/14/243/4/25$139,630.3211011/14/243/4/25
254Underlayment/EncapsulationUnderlayment-Epoxy[1,154 SF]$14,482.70
255Epoxy FlooringFlooring-VCT[1,154 SF]$33,350.60
256LightingLighting[1,154 SF]$32,704.36
257CeilingCeiling-Acoustical[1,154 SF]$37,216.50
258PaintWall-Paint[1,500]$7,680.00
259Fume HoodsExhaust-Welding Lab[1 EA]$14,196.16
260Classroom (F-204)11111/14/243/4/25$54,883.3611011/14/243/4/25
261TCFFlooring-TCF[582 SF]$14,602.38
262LightingLighting[582 SF]$16,493.88
263CeilingCeiling-Acoustical[582 SF]$18,769.50
264PaintWall-Paint[980]$5,017.60
265Classroom (F-207)11111/14/243/4/25$55,174.8811011/14/243/4/25
266TCFFlooring-TCF[586 SF]$14,702.74
267LightingLighting[586 SF]$16,607.24
268CeilingCeiling-Acoustical[586 SF]$18,898.50
269PaintWall-Paint[970]$4,966.40
270Phase 9 (3rd Trimester 24/25)893/18/256/14/25$352,682.97883/18/256/14/25
271Instrument Lab (304)893/18/256/14/25$56,452.59883/18/256/14/25
272AbatementAsbestos Disposal[1 CY],Asbestos-D$6,190.13
273Underlayment/EncapsulationUnderlayment-Epoxy[631 SF]$7,919.05
274Flooring VCTFlooring-VCT[631 SF]$18,235.90
275LightingLighting[631 SF]$17,882.54
276CeilingCeiling-Paint[631 SF]$1,053.77
277PaintWall-Paint[1,010]$5,171.20
278Fume Hoods$0.00
279Physics (310)893/18/256/14/25$78,008.97883/18/256/14/25
280AbatementAsbestos-Demo[965 SF]$3,850.35
281Underlayment/EncapsulationUnderlayment-Epoxy[965 SF]$12,110.75
282Flooring VCTFlooring-VCT[965 SF]$27,888.50
283LightingLighting[965 SF]$27,348.10
284CeilingCeiling-Paint[1 SF]$1.67
285PaintWall-Paint[1,330]$6,809.60
286Physics Prep (311)893/18/256/14/25$28,002.90883/18/256/14/25
287AbatementAsbestos-Demo[306 SF]$1,220.94
288Underlayment/EncapsulationUnderlayment-Epoxy[306 SF]$3,840.30
289Flooring VCTFlooring-VCT[306 SF]$8,843.40
290LightingLighting[306 SF]$8,672.04
291CeilingCeiling-Paint[306 SF]$511.02
292PaintWall-Paint[960]$4,915.20
293Physics Lab (312)893/18/256/14/25$82,092.39883/18/256/14/25
294AbatementAsbestos Disposal[1 CY],Asbestos-D$4,629.11
295Underlayment/EncapsulationUnderlayment-Epoxy[988 SF]$12,399.40
296Flooring VCTFlooring-VCT[988 SF]$28,553.20
297LightingLighting[988 SF]$27,999.92
298CeilingCeiling-Paint[988 SF]$1,649.96
299PaintWall-Paint[1,340]$6,860.80
300Hazardous Materials (F-301)893/18/256/14/25$46,344.25883/18/256/14/25
301Underlayment/EncapsulationUnderlayment-Epoxy[535 SF]$6,714.25
302Epoxy FlooringFlooring-Epoxy[535 SF]$19,725.45
303LightingLighting[535 SF]$15,161.90
304CeilingCeiling-Acoustical[1 SF]$32.25
305PaintWall-Paint[920]$4,710.40
306Fume Hoods$0.00
307Science Storage (F-302)893/18/256/14/25$39,595.71883/18/256/14/25
308LightingLighting[569 SF]$16,125.46
309CeilingCeiling-Acoustical[569 SF]$18,350.25
310PaintWall-Paint[1,000]$5,120.00
311Seminar (F-303)893/18/256/14/25$22,186.16883/18/256/14/25
312LightingLighting[604 SF]$17,117.36
313PaintWall-Paint[990]$5,068.80
314Phase 10 (Summer Break)326/24/257/25/25$575,988.97316/24/257/25/25
315Steam Lab (F-G12) Phase 2326/24/257/25/25$251,095.40316/24/257/25/25
316UnderlaymentUnderlayment-Epoxy[4,975 SF]$62,436.25
317Epoxy FlooringFlooring-Epoxy[4,975 SF]$183,428.25
318Office FloorFlooring-VCT[181 SF]$5,230.90
319Diesel Lab (F-G09) Phase 2326/24/257/25/25$121,770.88316/24/257/25/25
320UnderlaymentUnderlayment-Epoxy[2,464 SF]$30,923.20
321Epoxy FlooringFlooring-Epoxy[2,464 SF]$90,847.68
322Zero Deck Hallway326/24/257/25/25$203,122.69316/24/257/25/25
323UnderlaymentUnderlayment-Epoxy[2,243 SF]$28,149.65
324FlooringFlooring-Epoxy[2,243 SF]$82,699.41
325LightingLighting[2,243 SF]$63,566.62
326CeilingCeiling-Paint[2,443 SF]$4,079.81
327PaintWall-Paint[4,810]$24,627.20
328Period of Performance10953/1/233/4/26$4,137,147.8410993/1/233/4/26
329Hallways10953/1/233/4/26$587,833.6010993/1/233/4/26
3302nd Fl Hallways10953/1/233/4/26$242,783.2310993/1/233/4/26
331AbatementAsbestos-Removal[247 SF]$862.03
332TCFFlooring-TCF[2,465 SF]$61,846.85
333LightingLighting[2,465 SF]$69,858.10
334CeilingCeiling-Acoustical[2,465 SF]$79,496.25
335PaintWall-Paint[6,000]$30,720.00
3363rd Fl Hallways10953/1/233/4/26$274,679.1010993/1/233/4/26
337AbatementAsbestos-Removal[270 SF]$942.30
338TCFFlooring-TCF[2,770 SF]$69,499.30
339LightingLighting[2,770 SF]$78,501.80
340CeilingCeiling-Acoustical[2,770 SF]$89,332.50
341PaintWall-Paint[7,110]$36,403.20
3424th Fl Hallways10953/1/233/4/26$70,371.2710993/1/233/4/26
343AbatementAsbestos-Removal[70 SF]$244.30
344TCFFlooring-TCF[689 SF]$17,287.01
345LightingLighting[689 SF]$19,526.26
346CeilingCeiling-Acoustical[698 SF]$22,510.50
347PaintWall-Paint[2,110]$10,803.20
348Fulton 3rd Fl Offices10953/1/233/4/26$417,019.2010993/1/233/4/26
349TCFFlooring-TCF[10,280 SF]$257,925.20
350CeilingCeiling-Paint[10,280 SF]$17,167.60
351PaintWall-Paint[27,720]$141,926.40
352Fulton 4th Fl Offices10953/1/233/4/26$124,974.0410993/1/233/4/26
353TCFFlooring-TCF[3,019 SF]$75,746.71
354CeilingCeiling-Paint[3,019 SF]$5,041.73
355PaintWall-Paint[8,630]$44,185.60
356Support Rooms10953/1/233/4/26$420,036.0410993/1/233/4/26
357Instrument Storage (104)$35,848.74
358AbatementAsbestos-Removal[40 SF]$139.60
359Underlayment/EncapsulationUnderlayment-Epoxy[398 SF]$4,994.90
360Epoxy FlooringFlooring-Epoxy[398 SF]$14,674.26
361LightingLighting[398 SF]$11,279.32
362CeilingCeiling-Paint[398 SF]$664.66
363PaintWall-Paint[800]$4,096.00
364Elect Shop (105)10953/1/233/4/26$39,341.0110993/1/233/4/26
365Underlayment/EncapsulationUnderlayment-Epoxy[477 SF]$5,986.35
366Epoxy FlooringFlooring-Epoxy[477 SF]$17,586.99
367LightingLighting[477 SF]$13,518.18
368CeilingCeiling-Paint[477 SF]$796.59
369PaintCeiling-Paint[870 SF]$1,452.90
370Sump Tank Rm (108)10953/1/233/4/26$18,244.9210993/1/233/4/26
371AbatementAsbestos-Demo[144 SF],Asbestos D$4,247.00
372Underlayment/EncapsulationUnderlayment-Epoxy[144 SF]$1,807.20
373Epoxy FlooringFlooring-Epoxy[144 SF]$5,309.28
374LightingLighting[144 SF]$4,080.96
375CeilingCeiling-Paint[144 SF]$240.48
376PaintWall-Paint[500]$2,560.00
377Acid Waste (G11)10953/1/233/4/26$8,356.4610993/1/233/4/26
378Underlayment/EncapsulationUnderlayment-Epoxy[82 SF]$1,029.10
379Epoxy FlooringFlooring-Epoxy[82 SF]$3,023.34
380LightingLighting[82 SF]$2,323.88
381CeilingCeiling-Paint[82 SF]$136.94
382PaintWall-Paint[360]$1,843.20
383Janitorial Lockers (F-G05)10953/1/233/4/26$30,712.4610993/1/233/4/26
384Underlayment/EncapsulationUnderlayment-Epoxy[332 SF]$4,166.60
385Epoxy FlooringFlooring-Epoxy[322 SF]$11,872.14
386LightingLighting[332 SF]$9,408.88
387CeilingCeiling-Paint[332 SF]$554.44
388PaintWall-Paint[920]$4,710.40
389Tech Shop (F-G20)10953/1/233/4/26$116,081.9210993/1/233/4/26
390Epoxy FlooringFlooring-Epoxy[1,604 SF]$59,139.48
391LightingLighting[1,604 SF]$45,457.36
392CeilingCeiling-Paint[1,604 SF]$2,678.68
393PaintWall-Paint[1,720]$8,806.40
394Faculty Lounge (405)10953/1/233/4/26$56,168.5610993/1/233/4/26
395TCFFlooring-TCF[597 SF]$14,978.73
396Ceiling-AcousticalCeiling-Acoustical[597 SF]$19,253.25
397LightingLighting[597 SF]$16,918.98
398PaintWall-Paint[980]$5,017.60
399A/V Telecom Closets10953/1/233/4/26$35,825.0910993/1/233/4/26
400Underlayment/EncapsulationUnderlayment-Epoxy[601 SF]$7,542.55
401Epoxy FlooringFlooring-Epoxy[601 SF]$22,158.87
402CeilingCeiling-Paint[601 SF]$1,003.67
403PaintWall-Paint[1,000]$5,120.00
404Janitorial Closets10953/1/233/4/26$79,456.8810993/1/233/4/26
405Underlayment/EncapsulationUnderlayment-Epoxy[274 SF]$3,438.70
406Epoxy FlooringFlooring-Epoxy[274 SF]$10,102.38
407PaintWall-Paint[1,980]$10,137.60
408CeilingCeiling-Paint[274 SF]$457.58
409LightingLighting[274 SF]$7,765.16
410Storage/Mechanical10953/1/233/4/26$47,555.4610993/1/233/4/26
411Underlayment/EncapsulationUnderlayment-Epoxy[1,158 SF]$14,532.90
412Epoxy FlooringFlooring-VCT[82 SF]$2,369.80
413PaintWall-Paint[200]$1,024.00
414CeilingCeiling-Paint[82 SF]$136.94
415Office (F-G11)10953/1/233/4/26$29,491.8210993/1/233/4/26
416Underlayment/EncapsulatiUnderlayment-Epoxy[82 SF]$1,029.10
417Epoxy FlooringFlooring-Epoxy[274 SF]$10,102.38
418PaintWall-Paint[1,980]$10,137.60
419CeilingCeiling-Paint[274 SF]$457.58
420LightingLighting[274 SF]$7,765.16
421Restrooms10953/1/233/4/26$95,212.2610993/1/233/4/26
422LightingLighting[1,946 SF]$55,149.64
423CeilingCeiling-Paint[1,946 SF]$3,249.82
424PaintWall-Paint[7,190]$36,812.80
425Stairwells10953/1/233/4/26$337,985.3610993/1/233/4/26
426AbatementAsbestos-Demo[3,644 SF],Asbestos$49,291.76
427TCFFlooring-TCF[3,644 SF]$91,427.96
428LightingLighting[3,644 SF]$103,270.96
429CeilingCeiling-Paint[3,644 SF]$6,085.48
430PaintWall-Paint[9,260]$47,411.20
431BullnoseBullnose[2,000 LF]$36,320.00
432RiserRiser[200 EA]$4,178.00
433Doors10953/1/233/4/26$245,549.0010993/1/233/4/26
434Replace/KeyingDoor-Replace[100 EA]$189,794.00
435RepairDoor-Repair[300 EA]$55,755.00
436Fume Hoods (Study Dependent)10953/1/233/4/26Fume Hoods-Laboratory[1 EA]$1,908,538.3410993/1/233/4/26
437Design$0.00
438Review$0.00
439Execution$0.00
440Retrofit Pneumatic Systems (Study D36.65 emoWed 3/1/23Wed 3/4/26$0.001795/19/2311/14/23
441Design$0.00
442Review$0.00
443Execution$0.00
444Ventilation Systems (Study Depende36.65 emoWed 3/1/23Wed 3/4/26$0.001795/19/2311/14/23
445Design$0.00
446Review$0.00
447Execution$0.00
448HVAC Upgrades (Study Dependent)36.65 emoWed 3/1/23Wed 3/4/26$0.001795/19/2311/14/23
449Design$0.00
450Review$0.00
451Execution$0.00
452Punch List36.65 emoWed 3/1/23Wed 3/4/26$0.001795/19/2311/14/23
453Walk Through$0.00
454Review$0.00
455Close$0.00