The Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base has issued a Special Notice for the F117 Engine Sustainment Support (ESS) Second Industry Day. The event is scheduled for August 5, 2024, from 9am to 3pm, and will be held at the Embassy Suites in Oklahoma City, with a virtual attendance option. The notice provides details about an upcoming procurement opportunity related to F117 engine maintenance, repair, and overhaul services. The industry day will serve as a platform for the Air Force to share critical information with potential contractors about the upcoming solicitation. The event is part of a broader effort to engage industry stakeholders and gather feedback on the proposed contract requirements.

Contractors interested in participating must register by email to Alexandra Crothers and Jessica Roberson by July 26, 2024. The Air Force will post preliminary documents, including the initial Performance Work Statement, Government-Furnished Property lists, and workscopes, by July 23, 2024. The event will feature a morning presentation followed by 20-minute one-on-one sessions with the contracting officer, allowing potential bidders to discuss specific aspects of the opportunity. Key objectives include addressing engine sustainment challenges, with a focus on achieving a Mean Time Between Removal (MTBR) of 5,500 hours and exploring potential improvements to engine performance. The opportunity appears to be a full and open competition, with no specific set-aside for small businesses, though the Air Force is seeking input on small business subcontracting goals. The anticipated timeline suggests a Request for Proposals will be released in April 2025, with a contract award expected in May 2026.

Notice text

19 versions

Update #19 · Latest ·

UPDATE: 2/26/2025: USAF has posted RFI questions in relations to licensing agreements. USAF requests responses from offerors by 4pm CT on Wednesday 5 Mar 2025.

UPDATE: 2/7/2025: USAF received questions from a contractor, those questions and USAF answers have been posted as an attachment. 

UPDATE 1/17/2025: USAF has posted RFI question clarifications related to supply chain management. USAF requests responses from offerors by 4pm CT on Wednesday 22 Jan 2025.  

UPDATE 1/6/2025: USAF has posted RFI questions related to supply chain management. USAF requests responses from offerors by 4pm CT on Friday 10 Jan 2025.  

UPDATE 12/19/2024: USAF has provided answer to additional questions from multiple contractors. This info can be found in attachments. 

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #18 ·

UPDATE: 2/7/2025: USAF received questions from a contractor, those questions and USAF answers have been posted as an attachment. 

UPDATE 1/17/2025: USAF has posted RFI question clarifications related to supply chain management. USAF requests responses from offerors by 4pm CT on Wednesday 22 Jan 2025.  

UPDATE 1/6/2025: USAF has posted RFI questions related to supply chain management. USAF requests responses from offerors by 4pm CT on Friday 10 Jan 2025.  

UPDATE 12/19/2024: USAF has provided answer to additional questions from multiple contractors. This info can be found in attachments. 

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #17 ·

UPDATE 1/17/2025: USAF has posted RFI question clarifications related to supply chain management. USAF requests responses from offerors by 4pm CT on Wednesday 22 Jan 2025.  

UPDATE 1/6/2025: USAF has posted RFI questions related to supply chain management. USAF requests responses from offerors by 4pm CT on Friday 10 Jan 2025.  

UPDATE 12/19/2024: USAF has provided answer to additional questions from multiple contractors. This info can be found in attachments. 

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #16 ·

UPDATE 1/6/2025: USAF has posted RFI questions related to supply chain management. USAF requests responses from offerors by 4pm CT on Friday 10 Jan 2025.  UPDATE 12/19/2024: USAF has provided answer to additional questions from multiple contractors. This info can be found in attachments. 

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #15 ·

UPDATE 12/19/2024: USAF has provided answer to additional questions from multiple contractors. This info can be found in attachments. 

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #14 ·

UPDATE 11/22/24: USAF has provided answers and additional Government Questions to GFP RFI responses. USAF requests responses from offerors by Wednesday 4 Dec 2024.

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #13 ·

UPDATE 11/1/24: USAF has posted GFP RFI questions and requests responses from offerors by 4pm CT on Friday 8 Nov 2024. 

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #12 ·

UPDATE 10/2/24:USAF received some questions from industry in response to information posted. Questions received and USAF responses have been posted in an attachment.

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #11 ·

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. An RFI regarding Small Business Opportunities has been uploaded, we ask that respondants provided responses by 4pm CT on Friday, 4 Oct 2024.  

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #10 ·

UPDATE: 9/19/24: An update to Q&A's received at the 2nd Industry day has been uploaded. 

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #9 ·

UPDATE: 8/23/24: Q&A's received at the 2nd Industry day and the attendance on August 5th has been uploaded to attachments. 

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #8 ·

UPDATE 8/15/24: USAF has uploaded a zip file under attachments. These are the same documents that were in the previous file "requirements documents" and have replaced that document. This zip file will be easier to navigate, correct issues with pages 151-156, and includes excels of the GFP/GFM. You will need to request access for these documents again. Next week USAF will post attendance from the Industry Day on August 5th and questions/answers that occured at the industry day as well. 

UPDATE 8/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #7 ·

UPDATE 68/9/24: USAF Questions for Contractors have been updated based on industry day interactions. They are uploaded in attachments. The reference to bidders library are labeled requirements documents. These documents will be reuploaded next week (8/12-8/16) in a manner that is easier to navigate and will correct issues with pages 151-156. USAF will also upload an excel version of GFP. 

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #6 ·

UPDATE 8/1/24: USAF Questions for Contractors have been uploaded. USAF requests written contractor responses to these questions be submitted via email NLT 6 Sept 2024. Should you have questions or inquires related to these questions they can be discussed at industry day at one-on-one sessions. 

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #5 ·

UPDATE 7/31/24: A typo of the date was found on the agenda, an updated agenda has been upladed with the correct date, August 5th, 2024

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #4 ·

UPDATE 7/29/24: Presentation and requirements documents have been update

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #3 ·

UPDATE 7/23/24: Industry/USAF one-on-one 30-minute meeting ro further discuss and clarify follow-on contract issues, concerns, and asks. Please pick only one of the following times, as available: 10:30am, 11:00am, 12:00pm, 12:30pm, 1:15pm, 1:45pm, 2:30pm, or 3:00pm. Please sign up here: https://calendly.com/tonibkaplan13/30min?month=2024-08

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #2 ·

UPDATE 7/22/24: The agenda has been uploaded. Tomorrow morning at 9am CT there will be a link posted to sign up for one-on-one sessions. The one-on-one sessions will be 30 minutes each and can be done in person or virtually. The F117 team is working to release requirements documents discussed below, but may not be able to post them as promised on 23 July 24. The documents are being reviewed for public release and will be posted as soon as possible. 

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Update #1 ·

F117 Engine Sustainment Support 2nd Industry Day

Date: 5 August 2024

Time: 9am- 3pm

Location: Embassy Suites, 741 N. Phillips Avenue, OKC, OK 73104, (with Virtual attendance Option)

Agenda will be posted July 9th, 2024

Presentation, initial PWS, GFP Lists, Workscopes, and other pertinent information will be posted NLT 23 July 2024.

We will be holding one-on-one sessions after the morning presentation. The sign up for 20 minute one-on-one sessions will be posted NLT 23 July 2024. The sign up link will be posted on the same day as the presentation documents are uploaded. The Contracting Officer would like bidders to have an opportunity to review the documents prior to deciding if they would like a one-on-one session. 

To register to attend please email the contracting officer, Alexandra Crothers, and copy the contract specialist, Jessica Roberson at Alexandra.crothers@us.af.mil and jessica.roberson.3@us.af.mil. Please register by email NLT 26 July 2024

Files

File Type Posted
Licensing RFI.docx DOCX document
Flight Data Questions.pdf PDF
Supply Chain RFI Clarification.pdf PDF
Supply Chain RFI.pdf PDF
USAF responses to questions.pdf PDF
GFP RFI Responses with Additional Questions.pdf PDF
GFP RFI Questions.pdf PDF
Small Business RFI.docx DOCX document
Industry Day 2 Question Clarification.docx DOCX document
Industry Day 2 QA.pdf PDF
F117 Industry Day 2 Attendance.pdf PDF
F117 ESS Industry Day 2 Slide Deck PA Approved.pptx PPTX presentation
OFFEROR QUESTIONS Industry Day 2 Updated.pdf PDF
OFFEROR QUESTIONS .pdf PDF
Agenda .pdf PDF
2nd Industry Day Agenda.pdf PDF
Show all 16

Notice history

Notice Type Posted
F117 Engine Performance Restoration (EPR) Latest pre-solicitation Pre-Solicitation
This notice Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
Hill Industry Day Quad Charts Tinker AFB, Oklahoma 73145, United States Air Force No set-aside
F138-100 engine sustainment Tinker AFB, Oklahoma 73145, United States · NAICS 336412 AFLCMC Tinker AFB No set-aside
F108 Outer Nozzle Support Repair Tinker AFB, OK 73145 73145 · NAICS 336412 Air Force Sustainment Center No set-aside
Engineering Services for the B-52H Stratofortress Oklahoma City, Oklahoma 73113, United States · NAICS 541330 AFLCMC Tinker AFB No set-aside
SUPPORT, TURBINE COM_End_Item_F100_NSN_2840012783281NZ_PN_4074639 NAICS 336412 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity