Design Build - Edinburg Pump Station

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
191BWC21R0004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Edinburg, Texas, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The International Boundary and Water Commission is seeking proposals through solicitation 191BWC21R0004 for design-build rehabilitation of approximately 800 linear feet of levee at the Edinburg Pump Station in Hidalgo County, Texas. The scope of work includes analyzing the existing levee, conducting geotechnical testing and investigations, designing and constructing earthen embankment and concrete floodwalls, installing two new sections of floodwall with bollard walls and floodwall foundations, replacing a gatewell structure, backfilling and grading levee embankment material, installing an aggregate roadway surface, replacing chain link fencing, and revegetation. Proposals are due in two phases by June 30, 2021 and will be evaluated based on design approach, past performance, and price.

There is no set-aside designation for this solicitation. The primary NAICS code is 237990 and PSC code is V244, covering levee, dam, and flood control work. The place of performance is Edinburg, Texas. The contract will be a firm-fixed-price award with a period of performance of 960 calendar days from notice to proceed, including 415 days for design and 365 days for construction.

Notice text

6 versions

Update #6 · Latest ·

Amendment A00005

The purpose of Amendment 00005 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to June 30, 2021 at 2:00 PM MDT. See Solicitation SF-1442.

-----------------------------------------------

Amendment A00004

The purpose of Amendment 00004 is to notify all potential Offerors of the changes listed below:
    1. Revisions to DB Solicitation, see Solicitation pages 7 and 63 (Section L) which replaced FAR Clause 52.215-1 Alt I with FAR Clause 52.215-1.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

--------------------------------------------------

Amendment A00003

The purpose of Amendment A00003 is to notify all potential Offerors of the changes listed below:
    1. Post the final additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.
    2. Revisions to DB Solicitation, see Solicitation pages 49 (J.01 updated) and 69 (L.02 D.d.4.(a)).
    3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

--------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential Offerors of the changes listed below:

1. Post the additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.

2. Revisions to DB Solicitation.

a. 52.245-2 deleted, see Solicitation pages 6 and 45.

b. J.01 updated, see Solicitation page 49.

c. L.02 D. d. & d.2.(a)i. revised, see Solicitation page 68.

d. L.02 D. e.1. revised, see Solicitation page 69.

e. L.06 B.b.4. revised, see Solicitation page 74.

f. L.07 B.b. revised, see Solicitation page 77.

g. M.05 A. & C. revised, see Solicitation page 84 & 85.

3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

-------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of amendment A00001 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to June 23, 2021 at 2:00 PM MDT. See Solicitation SF-1442.
  2. Attached "Questions and Answers Received Against Solicitation 191BWC21R0004"
  3. Attached "Edinburg Prebid Sign-In Sheet 20210503"
  4. Attached "Edinburg Prebid Agenda 20210503"
  5. Revisions to DB Solicitation. 
    1. CLIN 003 revised, see Solicitation page 8.
    2. 52.245-2 revised, see Solicitation page 45.
    3. L.01 B revised, see Solicitation page 65.  
    4. L.02 D.d.2.(a) revised, see Solicitation page 68.
    5. L.02 F. revised, see Solicitation page 70.
    6. L.06 B.f.1.(c) revised, see Solicitation page 75.
    7. L.08 revised, see Solicitation page 77.
    8. M.02 A. and B. revised, see Solicitation page 81.
    9. M.04 A. revised, see Solicitation page 82.
    10. M.04 B. revised, see Solicitation page 83.
    11. M.05 B. revised, see Solicitation page 84.
  6. Revisions to DB SOW. See DB SOW page 2 for list of changes.
  7. Addition of Solicitation attachment. See Solicitation Section J (page 49) for updated list.
    1. HCID1-USIBWC MOA_20160926

No further changes are noted at this time.

--------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Update #5 ·

Amendment A00004

The purpose of Amendment 00004 is to notify all potential Offerors of the changes listed below:
    1. Revisions to DB Solicitation, see Solicitation pages 7 and 63 (Section L) which replaced FAR Clause 52.215-1 Alt I with FAR Clause 52.215-1.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

--------------------------------------------------

Amendment A00003

The purpose of Amendment A00003 is to notify all potential Offerors of the changes listed below:
    1. Post the final additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.
    2. Revisions to DB Solicitation, see Solicitation pages 49 (J.01 updated) and 69 (L.02 D.d.4.(a)).
    3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

--------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential Offerors of the changes listed below:

1. Post the additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.

2. Revisions to DB Solicitation.

a. 52.245-2 deleted, see Solicitation pages 6 and 45.

b. J.01 updated, see Solicitation page 49.

c. L.02 D. d. & d.2.(a)i. revised, see Solicitation page 68.

d. L.02 D. e.1. revised, see Solicitation page 69.

e. L.06 B.b.4. revised, see Solicitation page 74.

f. L.07 B.b. revised, see Solicitation page 77.

g. M.05 A. & C. revised, see Solicitation page 84 & 85.

3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

-------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of amendment A00001 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to June 23, 2021 at 2:00 PM MDT. See Solicitation SF-1442.
  2. Attached "Questions and Answers Received Against Solicitation 191BWC21R0004"
  3. Attached "Edinburg Prebid Sign-In Sheet 20210503"
  4. Attached "Edinburg Prebid Agenda 20210503"
  5. Revisions to DB Solicitation. 
    1. CLIN 003 revised, see Solicitation page 8.
    2. 52.245-2 revised, see Solicitation page 45.
    3. L.01 B revised, see Solicitation page 65.  
    4. L.02 D.d.2.(a) revised, see Solicitation page 68.
    5. L.02 F. revised, see Solicitation page 70.
    6. L.06 B.f.1.(c) revised, see Solicitation page 75.
    7. L.08 revised, see Solicitation page 77.
    8. M.02 A. and B. revised, see Solicitation page 81.
    9. M.04 A. revised, see Solicitation page 82.
    10. M.04 B. revised, see Solicitation page 83.
    11. M.05 B. revised, see Solicitation page 84.
  6. Revisions to DB SOW. See DB SOW page 2 for list of changes.
  7. Addition of Solicitation attachment. See Solicitation Section J (page 49) for updated list.
    1. HCID1-USIBWC MOA_20160926

No further changes are noted at this time.

--------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Update #4 ·

Amendment A00003

The purpose of Amendment A00003 is to notify all potential Offerors of the changes listed below:
    1. Post the final additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.
    2. Revisions to DB Solicitation, see Solicitation pages 49 (J.01 updated) and 69 (L.02 D.d.4.(a)).
    3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

--------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential Offerors of the changes listed below:

1. Post the additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.

2. Revisions to DB Solicitation.

a. 52.245-2 deleted, see Solicitation pages 6 and 45.

b. J.01 updated, see Solicitation page 49.

c. L.02 D. d. & d.2.(a)i. revised, see Solicitation page 68.

d. L.02 D. e.1. revised, see Solicitation page 69.

e. L.06 B.b.4. revised, see Solicitation page 74.

f. L.07 B.b. revised, see Solicitation page 77.

g. M.05 A. & C. revised, see Solicitation page 84 & 85.

3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

-------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of amendment A00001 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to June 23, 2021 at 2:00 PM MDT. See Solicitation SF-1442.
  2. Attached "Questions and Answers Received Against Solicitation 191BWC21R0004"
  3. Attached "Edinburg Prebid Sign-In Sheet 20210503"
  4. Attached "Edinburg Prebid Agenda 20210503"
  5. Revisions to DB Solicitation. 
    1. CLIN 003 revised, see Solicitation page 8.
    2. 52.245-2 revised, see Solicitation page 45.
    3. L.01 B revised, see Solicitation page 65.  
    4. L.02 D.d.2.(a) revised, see Solicitation page 68.
    5. L.02 F. revised, see Solicitation page 70.
    6. L.06 B.f.1.(c) revised, see Solicitation page 75.
    7. L.08 revised, see Solicitation page 77.
    8. M.02 A. and B. revised, see Solicitation page 81.
    9. M.04 A. revised, see Solicitation page 82.
    10. M.04 B. revised, see Solicitation page 83.
    11. M.05 B. revised, see Solicitation page 84.
  6. Revisions to DB SOW. See DB SOW page 2 for list of changes.
  7. Addition of Solicitation attachment. See Solicitation Section J (page 49) for updated list.
    1. HCID1-USIBWC MOA_20160926

No further changes are noted at this time.

--------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Update #3 ·

Amendment A00002

The purpose of Amendment 00002 is to notify all potential Offerors of the changes listed below:

1. Post the additional/revised Questions and Answers Received Against Solicitation 191BWC21R0004.

2. Revisions to DB Solicitation.

a. 52.245-2 deleted, see Solicitation pages 6 and 45.

b. J.01 updated, see Solicitation page 49.

c. L.02 D. d. & d.2.(a)i. revised, see Solicitation page 68.

d. L.02 D. e.1. revised, see Solicitation page 69.

e. L.06 B.b.4. revised, see Solicitation page 74.

f. L.07 B.b. revised, see Solicitation page 77.

g. M.05 A. & C. revised, see Solicitation page 84 & 85.

3. Revisions to DB SOW. See DB SOW page 2 for list of changes.

The proposal due date remains unchanged at 23 June 2021 at 2:00 pm MST.

-------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of amendment A00001 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to June 23, 2021 at 2:00 PM MDT. See Solicitation SF-1442.
  2. Attached "Questions and Answers Received Against Solicitation 191BWC21R0004"
  3. Attached "Edinburg Prebid Sign-In Sheet 20210503"
  4. Attached "Edinburg Prebid Agenda 20210503"
  5. Revisions to DB Solicitation. 
    1. CLIN 003 revised, see Solicitation page 8.
    2. 52.245-2 revised, see Solicitation page 45.
    3. L.01 B revised, see Solicitation page 65.  
    4. L.02 D.d.2.(a) revised, see Solicitation page 68.
    5. L.02 F. revised, see Solicitation page 70.
    6. L.06 B.f.1.(c) revised, see Solicitation page 75.
    7. L.08 revised, see Solicitation page 77.
    8. M.02 A. and B. revised, see Solicitation page 81.
    9. M.04 A. revised, see Solicitation page 82.
    10. M.04 B. revised, see Solicitation page 83.
    11. M.05 B. revised, see Solicitation page 84.
  6. Revisions to DB SOW. See DB SOW page 2 for list of changes.
  7. Addition of Solicitation attachment. See Solicitation Section J (page 49) for updated list.
    1. HCID1-USIBWC MOA_20160926

No further changes are noted at this time.

--------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Update #2 ·

Amendment A00001

The purpose of amendment A00001 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to June 23, 2021 at 2:00 PM MDT. See Solicitation SF-1442.
  2. Attached "Questions and Answers Received Against Solicitation 191BWC21R0004"
  3. Attached "Edinburg Prebid Sign-In Sheet 20210503"
  4. Attached "Edinburg Prebid Agenda 20210503"
  5. Revisions to DB Solicitation. 
    1. CLIN 003 revised, see Solicitation page 8.
    2. 52.245-2 revised, see Solicitation page 45.
    3. L.01 B revised, see Solicitation page 65.  
    4. L.02 D.d.2.(a) revised, see Solicitation page 68.
    5. L.02 F. revised, see Solicitation page 70.
    6. L.06 B.f.1.(c) revised, see Solicitation page 75.
    7. L.08 revised, see Solicitation page 77.
    8. M.02 A. and B. revised, see Solicitation page 81.
    9. M.04 A. revised, see Solicitation page 82.
    10. M.04 B. revised, see Solicitation page 83.
    11. M.05 B. revised, see Solicitation page 84.
  6. Revisions to DB SOW. See DB SOW page 2 for list of changes.
  7. Addition of Solicitation attachment. See Solicitation Section J (page 49) for updated list.
    1. HCID1-USIBWC MOA_20160926

No further changes are noted at this time.

--------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Update #1 ·

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas.  The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1).  The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913.

The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, remove and replace of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation.

See associated documents for further information.

Files

File Type Posted
191BCW21R0004 A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00004_final.pdf PDF
191BCW21R0004 A00004.pdf PDF
191BWC21R0004 A00003.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00003.pdf PDF
Final QA Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210609.pdf PDF
Additional and Revised Questions - Answers Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210526.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00002.pdf PDF
191BWC21R0004 Amendment A00002.pdf PDF
191BWC21R0004 Amendment A00001.pdf PDF
Questions and Answers Received Against Solicitation 191BWC21R0004.pdf PDF
Edinburg Prebid Agenda 20210503.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210519.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00001.pdf PDF
HCID1-USIBWC MOA_ 20160926.pdf PDF
Edinburg Prebid Sign-In Sheet 20210503.pdf PDF
06_Geotech Report DHS Segment O-4(Special) 20080606.pdf PDF
19_IBWC Form 110.pdf PDF
25_Wage Determination 2015-5245.pdf PDF
01_Edinburg PS Design Report 20151118 woA.pdf PDF
07_Easement Metes - Bounds Drawings 20160330.pdf PDF
11_IBM10C0014 Selected Drawings 2010.pdf PDF
12_HCID1 Penitas PS Bid Package - Specs 20180509.pdf PDF
15_USIBWC LRGFCP Hydraulic Model Report 200306.pdf PDF
20_IBWC Form 116.pdf PDF
21_IBWC Form 117.pdf PDF
26_191BWC21R0004 Edinburg Levee Design Build.pdf PDF
02_Edinburg PS Geotech Report 20151118.pdf PDF
05_Geotech Report DHS Segment O-4B 20091109.pdf PDF
09_191BWC19R0004 Edinburg Specs 20190816.pdf PDF
14_Asbestos - Lead Paint Survey 20160125.pdf PDF
17_S-B Model 2008.zip ZIP file
18_S-B LRGFCP Hydraulic Model Update Report 200807.pdf PDF
22_191BWC21R0004 Client Authorization Letter (Phase 2).docx DOCX document
23_191BWC21R0004 Past Performance Questionnaire (Phase 2).docx DOCX document
24_General Decision Number TX20210003.pdf PDF
16_USIBWC Model 2003.zip ZIP file
191BWC21R0004 Design Build.pdf PDF
03_Final Mission EA 200702.pdf PDF
04_Final Mission SEA and FONSI 20111031.pdf PDF
08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf PDF
10_IBM14T0012 URS Structural Calculations.pdf PDF
13_HCID1 Penitas PS AS BUILTS April 2020.pdf PDF
Show all 46

Notice history

Notice Type Posted
Design Build - Edinburg Pump Station Award Award Notice
This notice Latest solicitation Solicitation
Design Build - Edinburg Pump Station Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity