13_HCID1 Penitas PS AS BUILTS April 2020.pdf
PDF 14 MB Posted
- Attached to
- Design Build - Edinburg Pump Station
- Solicitation number
- 191BWC21R0004
About this file
This document provides details on a federal solicitation for design-build services. The United States Section of the International Boundary and Water Commission is seeking proposals to design and construct rehabilitation improvements to approximately 800 linear feet of levee and associated structures at the Edinburg Pump Station in Hidalgo County, Texas. The proposed work includes analysis and investigations of the existing levee, geotechnical testing, assessing structures for rehabilitation, preparing right-of-way, removing and stockpiling excavated material, widening the levee, installing erosion controls, constructing two new sections of floodwall and bollard walls, replacing a gatewell structure, backfilling, installing an aggregate roadway and fencing, and revegetation. Interested offerors should review the associated documents for additional requirement information. The agency issuing this solicitation is the International Boundary and Water Commission United States-Mexico.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING, INC.
OYD
CONSTRUCTION PLANS FOR PROPOSED
HCID #1 PENITAS PUMP STATION
& LEVEE REHABILITATION
IN
EDINBURG, TEXAS
APRIL 2020
AS-BUILT
PROJECT
LOCATION
N
SITE PLAN
N
PROJECT
LOCATION
VICINITY MAP
AutoCAD SHX Text
HOUSTON TEXAS USA (832) 426-4656 LICENSE NUMBER #2846
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text B83
AutoCAD SHX Text
PENITAS UNIT
AutoCAD SHX Text
WMA
AutoCAD SHX Text
LOS PALOMAS
AutoCAD SHX Text
REFUGE
AutoCAD SHX Text
NATIONAL WILDLIFE
AutoCAD SHX Text
RIO GRANDE VALLEY
AutoCAD SHX Text
LOWER
AutoCAD SHX Text Pop 1,077
AutoCAD SHX Text
PENITAS
AutoCAD SHX Text
CHIHUAHUA
AutoCAD SHX Text
NWR
AutoCAD SHX Text
LRGV
AutoCAD SHX Text
NATIONAL WILDLIFE REFUGE
AutoCAD SHX Text
LOWER RIO GRANDE VALLEY
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text Golf Course
AutoCAD SHX Text Cem
AutoCAD SHX Text Park
AutoCAD SHX Text Antonio
AutoCAD SHX Text San
AutoCAD SHX Text 2.4
AutoCAD SHX Text 2.4
AutoCAD SHX Text 3.2
AutoCAD SHX Text 1.1
AutoCAD SHX Text 2.6
AutoCAD SHX Text 0.5
AutoCAD SHX Text 1.1
AutoCAD SHX Text
LA ESTRELLA
AutoCAD SHX Text
CARLOS
AutoCAD SHX Text
NUEVO CHITHU
AutoCAD SHX Text
NUEVA CHITHU
AutoCAD SHX Text
DUSTY
AutoCAD SHX Text
ARROW
AutoCAD SHX Text
APACHE
AutoCAD SHX Text
WAGON TRALI
AutoCAD SHX Text
VILLA RAMA S
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
SHAR-
AutoCAD SHX Text
CAMELOT
AutoCAD SHX Text
SQUIRE
AutoCAD SHX Text
CLAVELES
AutoCAD SHX Text
TRIPLE J
AutoCAD SHX Text
RAM
AutoCAD SHX Text
VILLA RAMA
AutoCAD SHX Text
AZUCENAS
AutoCAD SHX Text
TULIPAN
AutoCAD SHX Text
BOUGAINVILLEA
AutoCAD SHX Text
SHOWER
AutoCAD SHX Text
PALM
AutoCAD SHX Text
LA JOYA
AutoCAD SHX Text
PENITAS
AutoCAD SHX Text
MESQUITE
AutoCAD SHX Text
PALM
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text
RVSC
AutoCAD SHX Text
BANCO
AutoCAD SHX Text
CABALLERO
AutoCAD SHX Text
RIO
AutoCAD SHX Text
SETTLING BASIN
AutoCAD SHX Text
EDINBURG
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
WALKER
AutoCAD SHX Text
INDEX
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G100
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text C100
AutoCAD SHX Text
EXISTING OVERALL SITE & DEMOLITION PLAN
AutoCAD SHX Text C101
AutoCAD SHX Text
PROPOSED OVERALL LEVEE EXCAVATION PLAN
AutoCAD SHX Text C102
AutoCAD SHX Text
PLAN & PROFILE VIEWS OF EXCAVATION
AutoCAD SHX Text C103
AutoCAD SHX Text
PLAN & PROFILE VIEWS OF PROPOSED FLOODWALLS
AutoCAD SHX Text C104
AutoCAD SHX Text
PROPOSED FINAL GRADE PLAN
AutoCAD SHX Text S100
AutoCAD SHX Text
FLOODWALL MONOLITH FOUNDATION PLAN VIEWS
AutoCAD SHX Text S101
AutoCAD SHX Text
BOLLARD WALL LAYOUTS
AutoCAD SHX Text S102
AutoCAD SHX Text
TYPICAL FLOODWALL SECTIONS
AutoCAD SHX Text S103
AutoCAD SHX Text
FLOODWALL DETAILS 1 OF 4
AutoCAD SHX Text S104
AutoCAD SHX Text
FLOODWALL DETAILS 2 OF 4
AutoCAD SHX Text S105
AutoCAD SHX Text
FLOODWALL DETAILS 3 OF 4
AutoCAD SHX Text S106
AutoCAD SHX Text
FLOODWALL DETAILS 4 OF 4
AutoCAD SHX Text S107
AutoCAD SHX Text
TYPICAL BOLLARD WALL SECTIONS AND DETAILS 1 OF 2
AutoCAD SHX Text S108
AutoCAD SHX Text
TYPICAL BOLLARD WALL SECTIONS AND DETAILS 2 OF 2
AutoCAD SHX Text S200
AutoCAD SHX Text
PUMP STATION WALL REINFORCEMENT PLAN VIEW
AutoCAD SHX Text S201
AutoCAD SHX Text
PROPOSED WALL SECTIONS 1 OF 3
AutoCAD SHX Text S202
AutoCAD SHX Text
PROPOSED WALL SECTIONS 2 OF 3
AutoCAD SHX Text S203
AutoCAD SHX Text
EAST WALL PHOTOS
AutoCAD SHX Text S204
AutoCAD SHX Text
WEST WALL PHOTOS
AutoCAD SHX Text S205
AutoCAD SHX Text
NORTH WALL PHOTOS
AutoCAD SHX Text S206
AutoCAD SHX Text
SOUTH WALL PHOTOS
AutoCAD SHX Text S207
AutoCAD SHX Text
STEEL SUPPORT SECTION & DETAILS
AutoCAD SHX Text C105
AutoCAD SHX Text
REINFORCED FILTER FABRIC FENCE DETAILS
AutoCAD SHX Text C106
AutoCAD SHX Text
SLOPE PAVING DETAILS
AutoCAD SHX Text S109
AutoCAD SHX Text
TYPICAL DRILLED PILE SECTION & DETAILS
AutoCAD SHX Text
PROPOSED WALL SECTIONS 3 OF 3
AutoCAD SHX Text S208
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
J. S. LLOYD
AutoCAD SHX Text 42350
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text X
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text 12-15-2017
AutoCAD SHX Text S105A
AutoCAD SHX Text
FLOODWALL DETAILS 3A OF 4
G
EN
ER
AL
N O
TE
S
G100
@ 22X34
N.T.S.
DESIGN BY:
DRAWING NO:
H C
I D
P
E N
I T
A S
P
U M
P
S
T A
T I O
N
E D
I N
B U
R G
T
E X
A S
DRAWN BY:
DATE:
SCALE:
SHEET:
AutoCAD SHX Text GEOTECHNICAL NOTES: : 1. GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) SERVICE INDUSTRIES, INC. (PSI) SERVICE INDUSTRIES, INC. (PSI) INDUSTRIES, INC. (PSI) INDUSTRIES, INC. (PSI) INC. (PSI) INC. (PSI) (PSI) (PSI) AND TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION SERVICES REPORT FOR THE DESIGN OF REHABILITATION SERVICES REPORT FOR THE DESIGN OF REHABILITATION REPORT FOR THE DESIGN OF REHABILITATION REPORT FOR THE DESIGN OF REHABILITATION FOR THE DESIGN OF REHABILITATION FOR THE DESIGN OF REHABILITATION THE DESIGN OF REHABILITATION THE DESIGN OF REHABILITATION DESIGN OF REHABILITATION DESIGN OF REHABILITATION OF REHABILITATION OF REHABILITATION REHABILITATION REHABILITATION IMPROVEMENTS FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD PUMP WITHIN THE LOWER RIO GRAND FLOOD PUMP WITHIN THE LOWER RIO GRAND FLOOD WITHIN THE LOWER RIO GRAND FLOOD WITHIN THE LOWER RIO GRAND FLOOD THE LOWER RIO GRAND FLOOD THE LOWER RIO GRAND FLOOD LOWER RIO GRAND FLOOD LOWER RIO GRAND FLOOD RIO GRAND FLOOD RIO GRAND FLOOD GRAND FLOOD GRAND FLOOD FLOOD FLOOD CONTROL PROJECT PENITAS, TEXAS. DATED FEBRUARY 25, 2015. . DATED FEBRUARY 25, 2015. 2. SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON THE WEST FLOODWALL WAS PERFORMED BY TERRACON THE WEST FLOODWALL WAS PERFORMED BY TERRACON WEST FLOODWALL WAS PERFORMED BY TERRACON WEST FLOODWALL WAS PERFORMED BY TERRACON FLOODWALL WAS PERFORMED BY TERRACON FLOODWALL WAS PERFORMED BY TERRACON WAS PERFORMED BY TERRACON WAS PERFORMED BY TERRACON PERFORMED BY TERRACON PERFORMED BY TERRACON BY TERRACON BY TERRACON TERRACON TERRACON CONSULTANTS, INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED THEIR REPORT DATED JULY 14, 2017 AND TITLED THEIR REPORT DATED JULY 14, 2017 AND TITLED REPORT DATED JULY 14, 2017 AND TITLED REPORT DATED JULY 14, 2017 AND TITLED DATED JULY 14, 2017 AND TITLED DATED JULY 14, 2017 AND TITLED JULY 14, 2017 AND TITLED JULY 14, 2017 AND TITLED 14, 2017 AND TITLED 14, 2017 AND TITLED 2017 AND TITLED 2017 AND TITLED AND TITLED AND TITLED TITLED TITLED GEOGTECHNICAL ENGINEERING REPORT EDINBURG PUMP STATION. SURVEY NOTES: : 1. EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND ON THESE PLANS WAS PRODUCED FROM A GROUND ON THESE PLANS WAS PRODUCED FROM A GROUND THESE PLANS WAS PRODUCED FROM A GROUND THESE PLANS WAS PRODUCED FROM A GROUND PLANS WAS PRODUCED FROM A GROUND PLANS WAS PRODUCED FROM A GROUND WAS PRODUCED FROM A GROUND WAS PRODUCED FROM A GROUND PRODUCED FROM A GROUND PRODUCED FROM A GROUND FROM A GROUND FROM A GROUND A GROUND A GROUND GROUND GROUND SURVEY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY INC., SAN ANTONIO, TEXAS DURING JANUARY INC., SAN ANTONIO, TEXAS DURING JANUARY SAN ANTONIO, TEXAS DURING JANUARY SAN ANTONIO, TEXAS DURING JANUARY ANTONIO, TEXAS DURING JANUARY ANTONIO, TEXAS DURING JANUARY TEXAS DURING JANUARY TEXAS DURING JANUARY DURING JANUARY DURING JANUARY JANUARY JANUARY 2015. SEE SHEET C-100. 2. THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DELINEATE ANY SURFACE OR SUBSURFACE MINERAL ANY SURFACE OR SUBSURFACE MINERAL ANY SURFACE OR SUBSURFACE MINERAL SURFACE OR SUBSURFACE MINERAL SURFACE OR SUBSURFACE MINERAL OR SUBSURFACE MINERAL OR SUBSURFACE MINERAL SUBSURFACE MINERAL SUBSURFACE MINERAL MINERAL MINERAL RIGHTS, NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL TO THE SURFACE RESULTING FROM SAID MINERAL TO THE SURFACE RESULTING FROM SAID MINERAL THE SURFACE RESULTING FROM SAID MINERAL THE SURFACE RESULTING FROM SAID MINERAL SURFACE RESULTING FROM SAID MINERAL SURFACE RESULTING FROM SAID MINERAL RESULTING FROM SAID MINERAL RESULTING FROM SAID MINERAL FROM SAID MINERAL FROM SAID MINERAL SAID MINERAL SAID MINERAL MINERAL MINERAL RIGHTS. 3. BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS COORDINATE BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS COORDINATE SYSTEM, SOUTH ZONE (4205). 4. ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988. ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988. UTILITY COORDINATION NOTES: A ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC #1479066585) WAS REQUESTED FOR THE PUBLIC #1479066585) WAS REQUESTED FOR THE PUBLIC WAS REQUESTED FOR THE PUBLIC WAS REQUESTED FOR THE PUBLIC REQUESTED FOR THE PUBLIC REQUESTED FOR THE PUBLIC FOR THE PUBLIC FOR THE PUBLIC THE PUBLIC THE PUBLIC PUBLIC PUBLIC RIGHT-OF-WAY ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. AT THE TIME OF THE TOPOGRAPHIC SURVEY. AT THE TIME OF THE TOPOGRAPHIC SURVEY. THE TIME OF THE TOPOGRAPHIC SURVEY. THE TIME OF THE TOPOGRAPHIC SURVEY. TIME OF THE TOPOGRAPHIC SURVEY. TIME OF THE TOPOGRAPHIC SURVEY. OF THE TOPOGRAPHIC SURVEY. OF THE TOPOGRAPHIC SURVEY. THE TOPOGRAPHIC SURVEY. THE TOPOGRAPHIC SURVEY. TOPOGRAPHIC SURVEY. TOPOGRAPHIC SURVEY. SURVEY. SURVEY. ALL UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE AND VERIFIED. UTILITY PROVIDERS SHOULD BE AND VERIFIED. UTILITY PROVIDERS SHOULD BE VERIFIED. UTILITY PROVIDERS SHOULD BE VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITY PROVIDERS SHOULD BE UTILITY PROVIDERS SHOULD BE PROVIDERS SHOULD BE PROVIDERS SHOULD BE SHOULD BE SHOULD BE BE BE CONTACTED PRIOR TO CONSTRUCTION. CONTACT INFORMATION: : 1. ENTERPRISE PRODUCTS OPERATING LLC. PHONE: 1-800-245-2545 ENTERPRISE PRODUCTS OPERATING LLC. PHONE: 1-800-245-2545 2. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 YOU DIG" (1-800-245-4545) OR (811) 48 YOU DIG" (1-800-245-4545) OR (811) 48 DIG" (1-800-245-4545) OR (811) 48 DIG" (1-800-245-4545) OR (811) 48 (1-800-245-4545) OR (811) 48 (1-800-245-4545) OR (811) 48 OR (811) 48 OR (811) 48 (811) 48 (811) 48 48 48 HOURS PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK LOCATION TO LOCATE UTILITIES WITHIN THE WORK LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO LOCATE UTILITIES WITHIN THE WORK TO LOCATE UTILITIES WITHIN THE WORK LOCATE UTILITIES WITHIN THE WORK LOCATE UTILITIES WITHIN THE WORK UTILITIES WITHIN THE WORK UTILITIES WITHIN THE WORK WITHIN THE WORK WITHIN THE WORK THE WORK THE WORK WORK WORK ZONE. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NOTES: : 1. THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SWPPP WORK IN ACCORDANCE WITH SPECIFICATION WORK IN ACCORDANCE WITH SPECIFICATION WORK IN ACCORDANCE WITH SPECIFICATION IN ACCORDANCE WITH SPECIFICATION IN ACCORDANCE WITH SPECIFICATION ACCORDANCE WITH SPECIFICATION ACCORDANCE WITH SPECIFICATION WITH SPECIFICATION WITH SPECIFICATION SPECIFICATION SPECIFICATION SECTION 01.57.13 TEMPORARY ENVIRONMENTAL CONTROLS. 2. CONTRACTOR SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONTRACTOR SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN POLLUTION PREVENTION PLAN POLLUTION PREVENTION PLAN PREVENTION PLAN PREVENTION PLAN PLAN PLAN TO THE HCID#1 FOR REVIEW PRIOR TO MOBILIZATION.
AutoCAD SHX Text GENERAL NOTES: 1. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN WITH THE USIBWC - FIELD OFFICE WHEN WITH THE USIBWC - FIELD OFFICE WHEN THE USIBWC - FIELD OFFICE WHEN THE USIBWC - FIELD OFFICE WHEN USIBWC - FIELD OFFICE WHEN USIBWC - FIELD OFFICE WHEN - FIELD OFFICE WHEN - FIELD OFFICE WHEN FIELD OFFICE WHEN FIELD OFFICE WHEN OFFICE WHEN OFFICE WHEN WHEN WHEN ON USIBWC PROPERTY. 2. COORDINATE WORK ACTIVITIES INCLUDING ACCESS WITH HCID#1. COORDINATE WORK ACTIVITIES INCLUDING ACCESS WITH HCID#1. 3. THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON COMMISSION (THC), TEXAS COMMISSION ON COMMISSION (THC), TEXAS COMMISSION ON (THC), TEXAS COMMISSION ON (THC), TEXAS COMMISSION ON TEXAS COMMISSION ON TEXAS COMMISSION ON COMMISSION ON COMMISSION ON ON ON ENVIRONMENTAL QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (USFWS), TEXAS PARKS AND WILDLIFE (USFWS), TEXAS PARKS AND WILDLIFE TEXAS PARKS AND WILDLIFE TEXAS PARKS AND WILDLIFE PARKS AND WILDLIFE PARKS AND WILDLIFE AND WILDLIFE AND WILDLIFE WILDLIFE WILDLIFE DEPARTMENT (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (EPA) UNLESS HCID#1 IS PRESENT OR (EPA) UNLESS HCID#1 IS PRESENT OR UNLESS HCID#1 IS PRESENT OR UNLESS HCID#1 IS PRESENT OR HCID#1 IS PRESENT OR HCID#1 IS PRESENT OR IS PRESENT OR IS PRESENT OR PRESENT OR PRESENT OR OR OR HAS AUTHORIZED THE CONTRACTOR TO CONTACT THOSE ENTITIES. 4. ALL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ALL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL BE FULLY OPERATIONAL AND FREE OF ANY OIL BE FULLY OPERATIONAL AND FREE OF ANY OIL FULLY OPERATIONAL AND FREE OF ANY OIL FULLY OPERATIONAL AND FREE OF ANY OIL OPERATIONAL AND FREE OF ANY OIL OPERATIONAL AND FREE OF ANY OIL AND FREE OF ANY OIL AND FREE OF ANY OIL FREE OF ANY OIL FREE OF ANY OIL OF ANY OIL OF ANY OIL ANY OIL ANY OIL OIL OIL OR FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE SHALL BE REPAIRED IMMEDIATELY BY THE SHALL BE REPAIRED IMMEDIATELY BY THE BE REPAIRED IMMEDIATELY BY THE BE REPAIRED IMMEDIATELY BY THE REPAIRED IMMEDIATELY BY THE REPAIRED IMMEDIATELY BY THE IMMEDIATELY BY THE IMMEDIATELY BY THE BY THE BY THE THE THE CONTRACTOR, FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT HCID#1 TO REJECT THE DEFICIENT EQUIPMENT HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO REJECT THE DEFICIENT EQUIPMENT TO REJECT THE DEFICIENT EQUIPMENT REJECT THE DEFICIENT EQUIPMENT REJECT THE DEFICIENT EQUIPMENT THE DEFICIENT EQUIPMENT THE DEFICIENT EQUIPMENT DEFICIENT EQUIPMENT DEFICIENT EQUIPMENT EQUIPMENT EQUIPMENT USE ON SITE. 5. IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE DURING THE COURSE OF CONSTRUCTION, THE DURING THE COURSE OF CONSTRUCTION, THE THE COURSE OF CONSTRUCTION, THE THE COURSE OF CONSTRUCTION, THE COURSE OF CONSTRUCTION, THE COURSE OF CONSTRUCTION, THE OF CONSTRUCTION, THE OF CONSTRUCTION, THE CONSTRUCTION, THE CONSTRUCTION, THE THE THE CONTRACTOR SHALL IMMEDIATELY BRING THE CONDITION TO THE ATTENTION OF HCID#1. 6. THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN THAT WORK AREA IS LOCATED AT THE SOUTHERN THAT WORK AREA IS LOCATED AT THE SOUTHERN WORK AREA IS LOCATED AT THE SOUTHERN WORK AREA IS LOCATED AT THE SOUTHERN AREA IS LOCATED AT THE SOUTHERN AREA IS LOCATED AT THE SOUTHERN IS LOCATED AT THE SOUTHERN IS LOCATED AT THE SOUTHERN LOCATED AT THE SOUTHERN LOCATED AT THE SOUTHERN AT THE SOUTHERN AT THE SOUTHERN THE SOUTHERN THE SOUTHERN SOUTHERN SOUTHERN BORDER OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN AND ENCOUNTERS WITH DRUG AND / OR HUMAN AND ENCOUNTERS WITH DRUG AND / OR HUMAN ENCOUNTERS WITH DRUG AND / OR HUMAN ENCOUNTERS WITH DRUG AND / OR HUMAN WITH DRUG AND / OR HUMAN WITH DRUG AND / OR HUMAN DRUG AND / OR HUMAN DRUG AND / OR HUMAN AND / OR HUMAN AND / OR HUMAN / OR HUMAN / OR HUMAN OR HUMAN OR HUMAN HUMAN HUMAN SMUGGLING ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT CONTRACTOR WILL BE REQUIRED TO CARRY OUT CONTRACTOR WILL BE REQUIRED TO CARRY OUT WILL BE REQUIRED TO CARRY OUT WILL BE REQUIRED TO CARRY OUT BE REQUIRED TO CARRY OUT BE REQUIRED TO CARRY OUT REQUIRED TO CARRY OUT REQUIRED TO CARRY OUT TO CARRY OUT TO CARRY OUT CARRY OUT CARRY OUT OUT OUT AREA-SPECIFIC SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID THE COSTS FOR THESE MEASURES WILL NOT BE PAID THE COSTS FOR THESE MEASURES WILL NOT BE PAID COSTS FOR THESE MEASURES WILL NOT BE PAID COSTS FOR THESE MEASURES WILL NOT BE PAID FOR THESE MEASURES WILL NOT BE PAID FOR THESE MEASURES WILL NOT BE PAID THESE MEASURES WILL NOT BE PAID THESE MEASURES WILL NOT BE PAID MEASURES WILL NOT BE PAID MEASURES WILL NOT BE PAID WILL NOT BE PAID WILL NOT BE PAID NOT BE PAID NOT BE PAID BE PAID BE PAID PAID PAID FOR SEPARATELY AND WILL BE CONSIDERED INCIDENTAL TO THE PROJECT. 7. THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY A SAFE CONDITION. THE CONTRACTOR IS SOLELY A SAFE CONDITION. THE CONTRACTOR IS SOLELY SAFE CONDITION. THE CONTRACTOR IS SOLELY SAFE CONDITION. THE CONTRACTOR IS SOLELY CONDITION. THE CONTRACTOR IS SOLELY CONDITION. THE CONTRACTOR IS SOLELY THE CONTRACTOR IS SOLELY THE CONTRACTOR IS SOLELY CONTRACTOR IS SOLELY CONTRACTOR IS SOLELY IS SOLELY IS SOLELY SOLELY SOLELY RESPONSIBLE FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO PROTECTIVE MEASURES TO PREVENT DAMAGE TO PROTECTIVE MEASURES TO PREVENT DAMAGE TO MEASURES TO PREVENT DAMAGE TO MEASURES TO PREVENT DAMAGE TO TO PREVENT DAMAGE TO TO PREVENT DAMAGE TO PREVENT DAMAGE TO PREVENT DAMAGE TO DAMAGE TO DAMAGE TO TO TO ADJACENT PROPERTIES, STRUCTURES OR UTILITY FACILITIES. 8. THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONTRACT, THEREFORE, THE USIBWC SHALL CONTRACT, THEREFORE, THE USIBWC SHALL THEREFORE, THE USIBWC SHALL THEREFORE, THE USIBWC SHALL THE USIBWC SHALL THE USIBWC SHALL USIBWC SHALL USIBWC SHALL SHALL SHALL NOT BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN OF THE MATERIALS AND NONCONFORMING WORK. IN OF THE MATERIALS AND NONCONFORMING WORK. IN THE MATERIALS AND NONCONFORMING WORK. IN THE MATERIALS AND NONCONFORMING WORK. IN MATERIALS AND NONCONFORMING WORK. IN MATERIALS AND NONCONFORMING WORK. IN AND NONCONFORMING WORK. IN AND NONCONFORMING WORK. IN NONCONFORMING WORK. IN NONCONFORMING WORK. IN WORK. IN WORK. IN IN IN ADDITION, THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE CRITERIA FOR ACCEPTANCE OF WORK SHALL BE CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR ACCEPTANCE OF WORK SHALL BE FOR ACCEPTANCE OF WORK SHALL BE ACCEPTANCE OF WORK SHALL BE ACCEPTANCE OF WORK SHALL BE OF WORK SHALL BE OF WORK SHALL BE WORK SHALL BE WORK SHALL BE SHALL BE SHALL BE BE BE SPECIFICALLY DETAILED IN THE SPECIFICATIONS. 9. CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL COMPLETED CONTRACTUAL WORK UNTIL FINAL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONTRACTUAL WORK UNTIL FINAL CONTRACTUAL WORK UNTIL FINAL WORK UNTIL FINAL WORK UNTIL FINAL UNTIL FINAL UNTIL FINAL FINAL FINAL ACCEPTANCE OF PROJECT IS COMPLETED AND CONTRACTOR WARRANTY IS IMPLEMENTED BY HCID#1. 10. CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AND PROPERTY OWNERS AND LOCAL AGENCIES, AND PROPERTY OWNERS AND LOCAL AGENCIES, PROPERTY OWNERS AND LOCAL AGENCIES, PROPERTY OWNERS AND LOCAL AGENCIES, OWNERS AND LOCAL AGENCIES, OWNERS AND LOCAL AGENCIES, AND LOCAL AGENCIES, AND LOCAL AGENCIES, LOCAL AGENCIES, LOCAL AGENCIES, AGENCIES, AGENCIES, MAY OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN IS RESPONSIBLE FOR SECURING ANY OPEN IS RESPONSIBLE FOR SECURING ANY OPEN RESPONSIBLE FOR SECURING ANY OPEN RESPONSIBLE FOR SECURING ANY OPEN FOR SECURING ANY OPEN FOR SECURING ANY OPEN SECURING ANY OPEN SECURING ANY OPEN ANY OPEN ANY OPEN OPEN OPEN EXCAVATIONS AND OTHER SAFETY HAZARDS AT END OF WORK SHIFT EVERY DAY. 11. EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE LOCATED ON THE LANDSIDE OF THE LEVEE. THE LOCATED ON THE LANDSIDE OF THE LEVEE. THE ON THE LANDSIDE OF THE LEVEE. THE ON THE LANDSIDE OF THE LEVEE. THE THE LANDSIDE OF THE LEVEE. THE THE LANDSIDE OF THE LEVEE. THE LANDSIDE OF THE LEVEE. THE LANDSIDE OF THE LEVEE. THE OF THE LEVEE. THE OF THE LEVEE. THE THE LEVEE. THE THE LEVEE. THE LEVEE. THE LEVEE. THE THE THE THE FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING WHEN CONTRACTOR IS NOT ACTIVELY WORKING WHEN CONTRACTOR IS NOT ACTIVELY WORKING CONTRACTOR IS NOT ACTIVELY WORKING CONTRACTOR IS NOT ACTIVELY WORKING IS NOT ACTIVELY WORKING IS NOT ACTIVELY WORKING NOT ACTIVELY WORKING NOT ACTIVELY WORKING ACTIVELY WORKING ACTIVELY WORKING WORKING WORKING IN THE AREA. 12.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .