13_HCID1 Penitas PS AS BUILTS April 2020.pdf

PDF 14 MB Posted

Attached to
Design Build - Edinburg Pump Station
Solicitation number
191BWC21R0004
Issued by

About this file

This document provides details on a federal solicitation for design-build services. The United States Section of the International Boundary and Water Commission is seeking proposals to design and construct rehabilitation improvements to approximately 800 linear feet of levee and associated structures at the Edinburg Pump Station in Hidalgo County, Texas. The proposed work includes analysis and investigations of the existing levee, geotechnical testing, assessing structures for rehabilitation, preparing right-of-way, removing and stockpiling excavated material, widening the levee, installing erosion controls, constructing two new sections of floodwall and bollard walls, replacing a gatewell structure, backfilling, installing an aggregate roadway and fencing, and revegetation. Interested offerors should review the associated documents for additional requirement information. The agency issuing this solicitation is the International Boundary and Water Commission United States-Mexico.

View the file

Other files

File Type Posted
191BWC21R0004 DB Solicitation Revised per A00005.pdf PDF
191BCW21R0004 A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00004_final.pdf PDF
191BCW21R0004 A00004.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00003.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210609.pdf PDF
191BWC21R0004 A00003.pdf PDF
Final QA Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210526.pdf PDF
Additional and Revised Questions - Answers Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 Amendment A00002.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00002.pdf PDF
191BWC21R0004 Amendment A00001.pdf PDF
Questions and Answers Received Against Solicitation 191BWC21R0004.pdf PDF
Edinburg Prebid Agenda 20210503.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00001.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210519.pdf PDF
HCID1-USIBWC MOA_ 20160926.pdf PDF
Edinburg Prebid Sign-In Sheet 20210503.pdf PDF
16_USIBWC Model 2003.zip ZIP file
18_S-B LRGFCP Hydraulic Model Update Report 200807.pdf PDF
06_Geotech Report DHS Segment O-4(Special) 20080606.pdf PDF
25_Wage Determination 2015-5245.pdf PDF
26_191BWC21R0004 Edinburg Levee Design Build.pdf PDF
20_IBWC Form 116.pdf PDF
21_IBWC Form 117.pdf PDF
11_IBM10C0014 Selected Drawings 2010.pdf PDF
05_Geotech Report DHS Segment O-4B 20091109.pdf PDF
23_191BWC21R0004 Past Performance Questionnaire (Phase 2).docx DOCX document
22_191BWC21R0004 Client Authorization Letter (Phase 2).docx DOCX document
09_191BWC19R0004 Edinburg Specs 20190816.pdf PDF
19_IBWC Form 110.pdf PDF
02_Edinburg PS Geotech Report 20151118.pdf PDF
15_USIBWC LRGFCP Hydraulic Model Report 200306.pdf PDF
12_HCID1 Penitas PS Bid Package - Specs 20180509.pdf PDF
01_Edinburg PS Design Report 20151118 woA.pdf PDF
17_S-B Model 2008.zip ZIP file
14_Asbestos - Lead Paint Survey 20160125.pdf PDF
24_General Decision Number TX20210003.pdf PDF
07_Easement Metes - Bounds Drawings 20160330.pdf PDF
10_IBM14T0012 URS Structural Calculations.pdf PDF
04_Final Mission SEA and FONSI 20111031.pdf PDF
191BWC21R0004 Design Build.pdf PDF
08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf PDF
03_Final Mission EA 200702.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING, INC.

OYD

CONSTRUCTION PLANS FOR PROPOSED

HCID #1 PENITAS PUMP STATION

& LEVEE REHABILITATION

IN

EDINBURG, TEXAS

APRIL 2020

AS-BUILT

PROJECT

LOCATION

N

SITE PLAN

N

PROJECT

LOCATION

VICINITY MAP

AutoCAD SHX Text

HOUSTON TEXAS USA (832) 426-4656 LICENSE NUMBER #2846

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text B83

AutoCAD SHX Text

PENITAS UNIT

AutoCAD SHX Text

WMA

AutoCAD SHX Text

LOS PALOMAS

AutoCAD SHX Text

REFUGE

AutoCAD SHX Text

NATIONAL WILDLIFE

AutoCAD SHX Text

RIO GRANDE VALLEY

AutoCAD SHX Text

LOWER

AutoCAD SHX Text Pop 1,077

AutoCAD SHX Text

PENITAS

AutoCAD SHX Text

CHIHUAHUA

AutoCAD SHX Text

NWR

AutoCAD SHX Text

LRGV

AutoCAD SHX Text

NATIONAL WILDLIFE REFUGE

AutoCAD SHX Text

LOWER RIO GRANDE VALLEY

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text Golf Course

AutoCAD SHX Text Cem

AutoCAD SHX Text Park

AutoCAD SHX Text Antonio

AutoCAD SHX Text San

AutoCAD SHX Text 2.4

AutoCAD SHX Text 2.4

AutoCAD SHX Text 3.2

AutoCAD SHX Text 1.1

AutoCAD SHX Text 2.6

AutoCAD SHX Text 0.5

AutoCAD SHX Text 1.1

AutoCAD SHX Text

LA ESTRELLA

AutoCAD SHX Text

CARLOS

AutoCAD SHX Text

NUEVO CHITHU

AutoCAD SHX Text

NUEVA CHITHU

AutoCAD SHX Text

DUSTY

AutoCAD SHX Text

ARROW

AutoCAD SHX Text

APACHE

AutoCAD SHX Text

WAGON TRALI

AutoCAD SHX Text

VILLA RAMA S

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

SHAR-

AutoCAD SHX Text

CAMELOT

AutoCAD SHX Text

SQUIRE

AutoCAD SHX Text

CLAVELES

AutoCAD SHX Text

TRIPLE J

AutoCAD SHX Text

RAM

AutoCAD SHX Text

VILLA RAMA

AutoCAD SHX Text

AZUCENAS

AutoCAD SHX Text

TULIPAN

AutoCAD SHX Text

BOUGAINVILLEA

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

PALM

AutoCAD SHX Text

LA JOYA

AutoCAD SHX Text

PENITAS

AutoCAD SHX Text

MESQUITE

AutoCAD SHX Text

PALM

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text

RVSC

AutoCAD SHX Text

BANCO

AutoCAD SHX Text

CABALLERO

AutoCAD SHX Text

RIO

AutoCAD SHX Text

SETTLING BASIN

AutoCAD SHX Text

EDINBURG

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

WALKER

AutoCAD SHX Text

INDEX

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text G100

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text C100

AutoCAD SHX Text

EXISTING OVERALL SITE & DEMOLITION PLAN

AutoCAD SHX Text C101

AutoCAD SHX Text

PROPOSED OVERALL LEVEE EXCAVATION PLAN

AutoCAD SHX Text C102

AutoCAD SHX Text

PLAN & PROFILE VIEWS OF EXCAVATION

AutoCAD SHX Text C103

AutoCAD SHX Text

PLAN & PROFILE VIEWS OF PROPOSED FLOODWALLS

AutoCAD SHX Text C104

AutoCAD SHX Text

PROPOSED FINAL GRADE PLAN

AutoCAD SHX Text S100

AutoCAD SHX Text

FLOODWALL MONOLITH FOUNDATION PLAN VIEWS

AutoCAD SHX Text S101

AutoCAD SHX Text

BOLLARD WALL LAYOUTS

AutoCAD SHX Text S102

AutoCAD SHX Text

TYPICAL FLOODWALL SECTIONS

AutoCAD SHX Text S103

AutoCAD SHX Text

FLOODWALL DETAILS 1 OF 4

AutoCAD SHX Text S104

AutoCAD SHX Text

FLOODWALL DETAILS 2 OF 4

AutoCAD SHX Text S105

AutoCAD SHX Text

FLOODWALL DETAILS 3 OF 4

AutoCAD SHX Text S106

AutoCAD SHX Text

FLOODWALL DETAILS 4 OF 4

AutoCAD SHX Text S107

AutoCAD SHX Text

TYPICAL BOLLARD WALL SECTIONS AND DETAILS 1 OF 2

AutoCAD SHX Text S108

AutoCAD SHX Text

TYPICAL BOLLARD WALL SECTIONS AND DETAILS 2 OF 2

AutoCAD SHX Text S200

AutoCAD SHX Text

PUMP STATION WALL REINFORCEMENT PLAN VIEW

AutoCAD SHX Text S201

AutoCAD SHX Text

PROPOSED WALL SECTIONS 1 OF 3

AutoCAD SHX Text S202

AutoCAD SHX Text

PROPOSED WALL SECTIONS 2 OF 3

AutoCAD SHX Text S203

AutoCAD SHX Text

EAST WALL PHOTOS

AutoCAD SHX Text S204

AutoCAD SHX Text

WEST WALL PHOTOS

AutoCAD SHX Text S205

AutoCAD SHX Text

NORTH WALL PHOTOS

AutoCAD SHX Text S206

AutoCAD SHX Text

SOUTH WALL PHOTOS

AutoCAD SHX Text S207

AutoCAD SHX Text

STEEL SUPPORT SECTION & DETAILS

AutoCAD SHX Text C105

AutoCAD SHX Text

REINFORCED FILTER FABRIC FENCE DETAILS

AutoCAD SHX Text C106

AutoCAD SHX Text

SLOPE PAVING DETAILS

AutoCAD SHX Text S109

AutoCAD SHX Text

TYPICAL DRILLED PILE SECTION & DETAILS

AutoCAD SHX Text

PROPOSED WALL SECTIONS 3 OF 3

AutoCAD SHX Text S208

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text

J. S. LLOYD

AutoCAD SHX Text 42350

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text X

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text 12-15-2017

AutoCAD SHX Text S105A

AutoCAD SHX Text

FLOODWALL DETAILS 3A OF 4

G

EN

ER

AL

N O

TE

S

G100

@ 22X34

N.T.S.

DESIGN BY:

DRAWING NO:

H C

I D

P

E N

I T

A S

P

U M

P

S

T A

T I O

N

E D

I N

B U

R G

T

E X

A S

DRAWN BY:

DATE:

SCALE:

SHEET:

AutoCAD SHX Text GEOTECHNICAL NOTES: : 1. GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) GEOTECHNICAL REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) REPORT WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) WAS PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROVIDED BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) BY PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) PROFESSIONAL SERVICE INDUSTRIES, INC. (PSI) SERVICE INDUSTRIES, INC. (PSI) SERVICE INDUSTRIES, INC. (PSI) INDUSTRIES, INC. (PSI) INDUSTRIES, INC. (PSI) INC. (PSI) INC. (PSI) (PSI) (PSI) AND TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION TITLED GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION GEOTECHNICAL ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION ENGINEERING SERVICES REPORT FOR THE DESIGN OF REHABILITATION SERVICES REPORT FOR THE DESIGN OF REHABILITATION SERVICES REPORT FOR THE DESIGN OF REHABILITATION REPORT FOR THE DESIGN OF REHABILITATION REPORT FOR THE DESIGN OF REHABILITATION FOR THE DESIGN OF REHABILITATION FOR THE DESIGN OF REHABILITATION THE DESIGN OF REHABILITATION THE DESIGN OF REHABILITATION DESIGN OF REHABILITATION DESIGN OF REHABILITATION OF REHABILITATION OF REHABILITATION REHABILITATION REHABILITATION IMPROVEMENTS FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD FOR THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD THE LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD LEVEES AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD AT EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD EDINBURG PUMP WITHIN THE LOWER RIO GRAND FLOOD PUMP WITHIN THE LOWER RIO GRAND FLOOD PUMP WITHIN THE LOWER RIO GRAND FLOOD WITHIN THE LOWER RIO GRAND FLOOD WITHIN THE LOWER RIO GRAND FLOOD THE LOWER RIO GRAND FLOOD THE LOWER RIO GRAND FLOOD LOWER RIO GRAND FLOOD LOWER RIO GRAND FLOOD RIO GRAND FLOOD RIO GRAND FLOOD GRAND FLOOD GRAND FLOOD FLOOD FLOOD CONTROL PROJECT PENITAS, TEXAS. DATED FEBRUARY 25, 2015. . DATED FEBRUARY 25, 2015. 2. SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON SEEPAGE ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON ANALYSIS AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON AT THE WEST FLOODWALL WAS PERFORMED BY TERRACON THE WEST FLOODWALL WAS PERFORMED BY TERRACON THE WEST FLOODWALL WAS PERFORMED BY TERRACON WEST FLOODWALL WAS PERFORMED BY TERRACON WEST FLOODWALL WAS PERFORMED BY TERRACON FLOODWALL WAS PERFORMED BY TERRACON FLOODWALL WAS PERFORMED BY TERRACON WAS PERFORMED BY TERRACON WAS PERFORMED BY TERRACON PERFORMED BY TERRACON PERFORMED BY TERRACON BY TERRACON BY TERRACON TERRACON TERRACON CONSULTANTS, INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED INC., AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED AND DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED DOCUMENTED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED ON THEIR REPORT DATED JULY 14, 2017 AND TITLED THEIR REPORT DATED JULY 14, 2017 AND TITLED THEIR REPORT DATED JULY 14, 2017 AND TITLED REPORT DATED JULY 14, 2017 AND TITLED REPORT DATED JULY 14, 2017 AND TITLED DATED JULY 14, 2017 AND TITLED DATED JULY 14, 2017 AND TITLED JULY 14, 2017 AND TITLED JULY 14, 2017 AND TITLED 14, 2017 AND TITLED 14, 2017 AND TITLED 2017 AND TITLED 2017 AND TITLED AND TITLED AND TITLED TITLED TITLED GEOGTECHNICAL ENGINEERING REPORT EDINBURG PUMP STATION. SURVEY NOTES: : 1. EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND SHOWN ON THESE PLANS WAS PRODUCED FROM A GROUND ON THESE PLANS WAS PRODUCED FROM A GROUND ON THESE PLANS WAS PRODUCED FROM A GROUND THESE PLANS WAS PRODUCED FROM A GROUND THESE PLANS WAS PRODUCED FROM A GROUND PLANS WAS PRODUCED FROM A GROUND PLANS WAS PRODUCED FROM A GROUND WAS PRODUCED FROM A GROUND WAS PRODUCED FROM A GROUND PRODUCED FROM A GROUND PRODUCED FROM A GROUND FROM A GROUND FROM A GROUND A GROUND A GROUND GROUND GROUND SURVEY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY & ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY ASSOCIATES, INC., SAN ANTONIO, TEXAS DURING JANUARY INC., SAN ANTONIO, TEXAS DURING JANUARY INC., SAN ANTONIO, TEXAS DURING JANUARY SAN ANTONIO, TEXAS DURING JANUARY SAN ANTONIO, TEXAS DURING JANUARY ANTONIO, TEXAS DURING JANUARY ANTONIO, TEXAS DURING JANUARY TEXAS DURING JANUARY TEXAS DURING JANUARY DURING JANUARY DURING JANUARY JANUARY JANUARY 2015. SEE SHEET C-100. 2. THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL OR DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DELINEATE ANY SURFACE OR SUBSURFACE MINERAL DELINEATE ANY SURFACE OR SUBSURFACE MINERAL ANY SURFACE OR SUBSURFACE MINERAL ANY SURFACE OR SUBSURFACE MINERAL SURFACE OR SUBSURFACE MINERAL SURFACE OR SUBSURFACE MINERAL OR SUBSURFACE MINERAL OR SUBSURFACE MINERAL SUBSURFACE MINERAL SUBSURFACE MINERAL MINERAL MINERAL RIGHTS, NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL ANY RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL RIGHTS TO THE SURFACE RESULTING FROM SAID MINERAL TO THE SURFACE RESULTING FROM SAID MINERAL TO THE SURFACE RESULTING FROM SAID MINERAL THE SURFACE RESULTING FROM SAID MINERAL THE SURFACE RESULTING FROM SAID MINERAL SURFACE RESULTING FROM SAID MINERAL SURFACE RESULTING FROM SAID MINERAL RESULTING FROM SAID MINERAL RESULTING FROM SAID MINERAL FROM SAID MINERAL FROM SAID MINERAL SAID MINERAL SAID MINERAL MINERAL MINERAL RIGHTS. 3. BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS COORDINATE BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS COORDINATE SYSTEM, SOUTH ZONE (4205). 4. ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988. ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988. UTILITY COORDINATION NOTES: A ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC #1479066585) WAS REQUESTED FOR THE PUBLIC #1479066585) WAS REQUESTED FOR THE PUBLIC WAS REQUESTED FOR THE PUBLIC WAS REQUESTED FOR THE PUBLIC REQUESTED FOR THE PUBLIC REQUESTED FOR THE PUBLIC FOR THE PUBLIC FOR THE PUBLIC THE PUBLIC THE PUBLIC PUBLIC PUBLIC RIGHT-OF-WAY ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. PROPERTY AT THE TIME OF THE TOPOGRAPHIC SURVEY. AT THE TIME OF THE TOPOGRAPHIC SURVEY. AT THE TIME OF THE TOPOGRAPHIC SURVEY. THE TIME OF THE TOPOGRAPHIC SURVEY. THE TIME OF THE TOPOGRAPHIC SURVEY. TIME OF THE TOPOGRAPHIC SURVEY. TIME OF THE TOPOGRAPHIC SURVEY. OF THE TOPOGRAPHIC SURVEY. OF THE TOPOGRAPHIC SURVEY. THE TOPOGRAPHIC SURVEY. THE TOPOGRAPHIC SURVEY. TOPOGRAPHIC SURVEY. TOPOGRAPHIC SURVEY. SURVEY. SURVEY. ALL UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE REVIEWED AND VERIFIED. UTILITY PROVIDERS SHOULD BE AND VERIFIED. UTILITY PROVIDERS SHOULD BE AND VERIFIED. UTILITY PROVIDERS SHOULD BE VERIFIED. UTILITY PROVIDERS SHOULD BE VERIFIED. UTILITY PROVIDERS SHOULD BE UTILITY PROVIDERS SHOULD BE UTILITY PROVIDERS SHOULD BE PROVIDERS SHOULD BE PROVIDERS SHOULD BE SHOULD BE SHOULD BE BE BE CONTACTED PRIOR TO CONSTRUCTION. CONTACT INFORMATION: : 1. ENTERPRISE PRODUCTS OPERATING LLC. PHONE: 1-800-245-2545 ENTERPRISE PRODUCTS OPERATING LLC. PHONE: 1-800-245-2545 2. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 BEFORE YOU DIG" (1-800-245-4545) OR (811) 48 YOU DIG" (1-800-245-4545) OR (811) 48 YOU DIG" (1-800-245-4545) OR (811) 48 DIG" (1-800-245-4545) OR (811) 48 DIG" (1-800-245-4545) OR (811) 48 (1-800-245-4545) OR (811) 48 (1-800-245-4545) OR (811) 48 OR (811) 48 OR (811) 48 (811) 48 (811) 48 48 48 HOURS PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK ANY LOCATION TO LOCATE UTILITIES WITHIN THE WORK LOCATION TO LOCATE UTILITIES WITHIN THE WORK LOCATION TO LOCATE UTILITIES WITHIN THE WORK TO LOCATE UTILITIES WITHIN THE WORK TO LOCATE UTILITIES WITHIN THE WORK LOCATE UTILITIES WITHIN THE WORK LOCATE UTILITIES WITHIN THE WORK UTILITIES WITHIN THE WORK UTILITIES WITHIN THE WORK WITHIN THE WORK WITHIN THE WORK THE WORK THE WORK WORK WORK ZONE. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NOTES: : 1. THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION PERFORM SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SWPPP WORK IN ACCORDANCE WITH SPECIFICATION SWPPP WORK IN ACCORDANCE WITH SPECIFICATION WORK IN ACCORDANCE WITH SPECIFICATION WORK IN ACCORDANCE WITH SPECIFICATION IN ACCORDANCE WITH SPECIFICATION IN ACCORDANCE WITH SPECIFICATION ACCORDANCE WITH SPECIFICATION ACCORDANCE WITH SPECIFICATION WITH SPECIFICATION WITH SPECIFICATION SPECIFICATION SPECIFICATION SECTION 01.57.13 TEMPORARY ENVIRONMENTAL CONTROLS. 2. CONTRACTOR SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONTRACTOR SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SHALL SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN SUBMIT THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN POLLUTION PREVENTION PLAN POLLUTION PREVENTION PLAN PREVENTION PLAN PREVENTION PLAN PLAN PLAN TO THE HCID#1 FOR REVIEW PRIOR TO MOBILIZATION.

AutoCAD SHX Text GENERAL NOTES: 1. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ALL CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN CONSTRUCTION ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN ACTIVITIES WITH THE USIBWC - FIELD OFFICE WHEN WITH THE USIBWC - FIELD OFFICE WHEN WITH THE USIBWC - FIELD OFFICE WHEN THE USIBWC - FIELD OFFICE WHEN THE USIBWC - FIELD OFFICE WHEN USIBWC - FIELD OFFICE WHEN USIBWC - FIELD OFFICE WHEN - FIELD OFFICE WHEN - FIELD OFFICE WHEN FIELD OFFICE WHEN FIELD OFFICE WHEN OFFICE WHEN OFFICE WHEN WHEN WHEN ON USIBWC PROPERTY. 2. COORDINATE WORK ACTIVITIES INCLUDING ACCESS WITH HCID#1. COORDINATE WORK ACTIVITIES INCLUDING ACCESS WITH HCID#1. 3. THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON CONTACT THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON THE TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON TEXAS HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON HISTORICAL COMMISSION (THC), TEXAS COMMISSION ON COMMISSION (THC), TEXAS COMMISSION ON COMMISSION (THC), TEXAS COMMISSION ON (THC), TEXAS COMMISSION ON (THC), TEXAS COMMISSION ON TEXAS COMMISSION ON TEXAS COMMISSION ON COMMISSION ON COMMISSION ON ON ON ENVIRONMENTAL QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE QUALITY (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (TCEQ), U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE U.S. FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE FISH AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE SERVICE (USFWS), TEXAS PARKS AND WILDLIFE (USFWS), TEXAS PARKS AND WILDLIFE (USFWS), TEXAS PARKS AND WILDLIFE TEXAS PARKS AND WILDLIFE TEXAS PARKS AND WILDLIFE PARKS AND WILDLIFE PARKS AND WILDLIFE AND WILDLIFE AND WILDLIFE WILDLIFE WILDLIFE DEPARTMENT (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (TPWD) OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR THE ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR PROTECTION AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR AGENCY (EPA) UNLESS HCID#1 IS PRESENT OR (EPA) UNLESS HCID#1 IS PRESENT OR (EPA) UNLESS HCID#1 IS PRESENT OR UNLESS HCID#1 IS PRESENT OR UNLESS HCID#1 IS PRESENT OR HCID#1 IS PRESENT OR HCID#1 IS PRESENT OR IS PRESENT OR IS PRESENT OR PRESENT OR PRESENT OR OR OR HAS AUTHORIZED THE CONTRACTOR TO CONTACT THOSE ENTITIES. 4. ALL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ALL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL EQUIPMENT THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL THAT IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL IS USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL USED ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL ON HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL HCID#1 PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL PROPERTY MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL MUST BE FULLY OPERATIONAL AND FREE OF ANY OIL BE FULLY OPERATIONAL AND FREE OF ANY OIL BE FULLY OPERATIONAL AND FREE OF ANY OIL FULLY OPERATIONAL AND FREE OF ANY OIL FULLY OPERATIONAL AND FREE OF ANY OIL OPERATIONAL AND FREE OF ANY OIL OPERATIONAL AND FREE OF ANY OIL AND FREE OF ANY OIL AND FREE OF ANY OIL FREE OF ANY OIL FREE OF ANY OIL OF ANY OIL OF ANY OIL ANY OIL ANY OIL OIL OIL OR FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE FLUID LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS. ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ANY LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE LEAKS NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE NOTED ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ON EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE SHALL BE REPAIRED IMMEDIATELY BY THE SHALL BE REPAIRED IMMEDIATELY BY THE BE REPAIRED IMMEDIATELY BY THE BE REPAIRED IMMEDIATELY BY THE REPAIRED IMMEDIATELY BY THE REPAIRED IMMEDIATELY BY THE IMMEDIATELY BY THE IMMEDIATELY BY THE BY THE BY THE THE THE CONTRACTOR, FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FAILURE TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT DO SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT SO WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT WILL BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT BE CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT CAUSE FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT FOR THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT THE HCID#1 TO REJECT THE DEFICIENT EQUIPMENT HCID#1 TO REJECT THE DEFICIENT EQUIPMENT HCID#1 TO REJECT THE DEFICIENT EQUIPMENT TO REJECT THE DEFICIENT EQUIPMENT TO REJECT THE DEFICIENT EQUIPMENT REJECT THE DEFICIENT EQUIPMENT REJECT THE DEFICIENT EQUIPMENT THE DEFICIENT EQUIPMENT THE DEFICIENT EQUIPMENT DEFICIENT EQUIPMENT DEFICIENT EQUIPMENT EQUIPMENT EQUIPMENT USE ON SITE. 5. IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE DURING THE COURSE OF CONSTRUCTION, THE DURING THE COURSE OF CONSTRUCTION, THE THE COURSE OF CONSTRUCTION, THE THE COURSE OF CONSTRUCTION, THE COURSE OF CONSTRUCTION, THE COURSE OF CONSTRUCTION, THE OF CONSTRUCTION, THE OF CONSTRUCTION, THE CONSTRUCTION, THE CONSTRUCTION, THE THE THE CONTRACTOR SHALL IMMEDIATELY BRING THE CONDITION TO THE ATTENTION OF HCID#1. 6. THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN CONSIDERATION THAT WORK AREA IS LOCATED AT THE SOUTHERN THAT WORK AREA IS LOCATED AT THE SOUTHERN THAT WORK AREA IS LOCATED AT THE SOUTHERN WORK AREA IS LOCATED AT THE SOUTHERN WORK AREA IS LOCATED AT THE SOUTHERN AREA IS LOCATED AT THE SOUTHERN AREA IS LOCATED AT THE SOUTHERN IS LOCATED AT THE SOUTHERN IS LOCATED AT THE SOUTHERN LOCATED AT THE SOUTHERN LOCATED AT THE SOUTHERN AT THE SOUTHERN AT THE SOUTHERN THE SOUTHERN THE SOUTHERN SOUTHERN SOUTHERN BORDER OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN ALONG THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN THE RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN RIO GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN GRANDE AND ENCOUNTERS WITH DRUG AND / OR HUMAN AND ENCOUNTERS WITH DRUG AND / OR HUMAN AND ENCOUNTERS WITH DRUG AND / OR HUMAN ENCOUNTERS WITH DRUG AND / OR HUMAN ENCOUNTERS WITH DRUG AND / OR HUMAN WITH DRUG AND / OR HUMAN WITH DRUG AND / OR HUMAN DRUG AND / OR HUMAN DRUG AND / OR HUMAN AND / OR HUMAN AND / OR HUMAN / OR HUMAN / OR HUMAN OR HUMAN OR HUMAN HUMAN HUMAN SMUGGLING ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT ARE HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT HIGHLY PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT PROBABLE. CONTRACTOR WILL BE REQUIRED TO CARRY OUT CONTRACTOR WILL BE REQUIRED TO CARRY OUT CONTRACTOR WILL BE REQUIRED TO CARRY OUT WILL BE REQUIRED TO CARRY OUT WILL BE REQUIRED TO CARRY OUT BE REQUIRED TO CARRY OUT BE REQUIRED TO CARRY OUT REQUIRED TO CARRY OUT REQUIRED TO CARRY OUT TO CARRY OUT TO CARRY OUT CARRY OUT CARRY OUT OUT OUT AREA-SPECIFIC SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID SAFETY/SECURITY MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID MEASURES AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID AND THE COSTS FOR THESE MEASURES WILL NOT BE PAID THE COSTS FOR THESE MEASURES WILL NOT BE PAID THE COSTS FOR THESE MEASURES WILL NOT BE PAID COSTS FOR THESE MEASURES WILL NOT BE PAID COSTS FOR THESE MEASURES WILL NOT BE PAID FOR THESE MEASURES WILL NOT BE PAID FOR THESE MEASURES WILL NOT BE PAID THESE MEASURES WILL NOT BE PAID THESE MEASURES WILL NOT BE PAID MEASURES WILL NOT BE PAID MEASURES WILL NOT BE PAID WILL NOT BE PAID WILL NOT BE PAID NOT BE PAID NOT BE PAID BE PAID BE PAID PAID PAID FOR SEPARATELY AND WILL BE CONSIDERED INCIDENTAL TO THE PROJECT. 7. THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY IN A SAFE CONDITION. THE CONTRACTOR IS SOLELY A SAFE CONDITION. THE CONTRACTOR IS SOLELY A SAFE CONDITION. THE CONTRACTOR IS SOLELY SAFE CONDITION. THE CONTRACTOR IS SOLELY SAFE CONDITION. THE CONTRACTOR IS SOLELY CONDITION. THE CONTRACTOR IS SOLELY CONDITION. THE CONTRACTOR IS SOLELY THE CONTRACTOR IS SOLELY THE CONTRACTOR IS SOLELY CONTRACTOR IS SOLELY CONTRACTOR IS SOLELY IS SOLELY IS SOLELY SOLELY SOLELY RESPONSIBLE FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OR OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO OTHER PROTECTIVE MEASURES TO PREVENT DAMAGE TO PROTECTIVE MEASURES TO PREVENT DAMAGE TO PROTECTIVE MEASURES TO PREVENT DAMAGE TO MEASURES TO PREVENT DAMAGE TO MEASURES TO PREVENT DAMAGE TO TO PREVENT DAMAGE TO TO PREVENT DAMAGE TO PREVENT DAMAGE TO PREVENT DAMAGE TO DAMAGE TO DAMAGE TO TO TO ADJACENT PROPERTIES, STRUCTURES OR UTILITY FACILITIES. 8. THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL NOT BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL BE A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL A PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL PARTY IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL IN THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL THE CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONSTRUCTION CONTRACT, THEREFORE, THE USIBWC SHALL CONTRACT, THEREFORE, THE USIBWC SHALL CONTRACT, THEREFORE, THE USIBWC SHALL THEREFORE, THE USIBWC SHALL THEREFORE, THE USIBWC SHALL THE USIBWC SHALL THE USIBWC SHALL USIBWC SHALL USIBWC SHALL SHALL SHALL NOT BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN BE RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN RESPONSIBLE FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN FOR DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN DETERMINING ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN ACCEPTABILITY OF THE MATERIALS AND NONCONFORMING WORK. IN OF THE MATERIALS AND NONCONFORMING WORK. IN OF THE MATERIALS AND NONCONFORMING WORK. IN THE MATERIALS AND NONCONFORMING WORK. IN THE MATERIALS AND NONCONFORMING WORK. IN MATERIALS AND NONCONFORMING WORK. IN MATERIALS AND NONCONFORMING WORK. IN AND NONCONFORMING WORK. IN AND NONCONFORMING WORK. IN NONCONFORMING WORK. IN NONCONFORMING WORK. IN WORK. IN WORK. IN IN IN ADDITION, THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE THE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE REQUIREMENTS FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE MATERIAL AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE AND CRITERIA FOR ACCEPTANCE OF WORK SHALL BE CRITERIA FOR ACCEPTANCE OF WORK SHALL BE CRITERIA FOR ACCEPTANCE OF WORK SHALL BE FOR ACCEPTANCE OF WORK SHALL BE FOR ACCEPTANCE OF WORK SHALL BE ACCEPTANCE OF WORK SHALL BE ACCEPTANCE OF WORK SHALL BE OF WORK SHALL BE OF WORK SHALL BE WORK SHALL BE WORK SHALL BE SHALL BE SHALL BE BE BE SPECIFICALLY DETAILED IN THE SPECIFICATIONS. 9. CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL FOR CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONDITION OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL OF ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL ALL COMPLETED CONTRACTUAL WORK UNTIL FINAL COMPLETED CONTRACTUAL WORK UNTIL FINAL COMPLETED CONTRACTUAL WORK UNTIL FINAL CONTRACTUAL WORK UNTIL FINAL CONTRACTUAL WORK UNTIL FINAL WORK UNTIL FINAL WORK UNTIL FINAL UNTIL FINAL UNTIL FINAL FINAL FINAL ACCEPTANCE OF PROJECT IS COMPLETED AND CONTRACTOR WARRANTY IS IMPLEMENTED BY HCID#1. 10. CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, IS AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AWARE THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, THAT OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, OTHER FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, FEDERAL AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AGENCIES AND PROPERTY OWNERS AND LOCAL AGENCIES, AND PROPERTY OWNERS AND LOCAL AGENCIES, AND PROPERTY OWNERS AND LOCAL AGENCIES, PROPERTY OWNERS AND LOCAL AGENCIES, PROPERTY OWNERS AND LOCAL AGENCIES, OWNERS AND LOCAL AGENCIES, OWNERS AND LOCAL AGENCIES, AND LOCAL AGENCIES, AND LOCAL AGENCIES, LOCAL AGENCIES, LOCAL AGENCIES, AGENCIES, AGENCIES, MAY OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN PROJECT RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN RIGHT OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN OF WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN WAY. CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN CONTRACTOR IS RESPONSIBLE FOR SECURING ANY OPEN IS RESPONSIBLE FOR SECURING ANY OPEN IS RESPONSIBLE FOR SECURING ANY OPEN RESPONSIBLE FOR SECURING ANY OPEN RESPONSIBLE FOR SECURING ANY OPEN FOR SECURING ANY OPEN FOR SECURING ANY OPEN SECURING ANY OPEN SECURING ANY OPEN ANY OPEN ANY OPEN OPEN OPEN EXCAVATIONS AND OTHER SAFETY HAZARDS AT END OF WORK SHIFT EVERY DAY. 11. EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE LOCATED ON THE LANDSIDE OF THE LEVEE. THE LOCATED ON THE LANDSIDE OF THE LEVEE. THE ON THE LANDSIDE OF THE LEVEE. THE ON THE LANDSIDE OF THE LEVEE. THE THE LANDSIDE OF THE LEVEE. THE THE LANDSIDE OF THE LEVEE. THE LANDSIDE OF THE LEVEE. THE LANDSIDE OF THE LEVEE. THE OF THE LEVEE. THE OF THE LEVEE. THE THE LEVEE. THE THE LEVEE. THE LEVEE. THE LEVEE. THE THE THE THE FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING SHALL REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING REMAIN CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING CLEAR OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OF ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING ANY OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING OBSTRUCTIONS WHEN CONTRACTOR IS NOT ACTIVELY WORKING WHEN CONTRACTOR IS NOT ACTIVELY WORKING WHEN CONTRACTOR IS NOT ACTIVELY WORKING CONTRACTOR IS NOT ACTIVELY WORKING CONTRACTOR IS NOT ACTIVELY WORKING IS NOT ACTIVELY WORKING IS NOT ACTIVELY WORKING NOT ACTIVELY WORKING NOT ACTIVELY WORKING ACTIVELY WORKING ACTIVELY WORKING WORKING WORKING IN THE AREA. 12.