191BWC21R0004 DB Solicitation Revised per A00002.pdf

PDF 687 KB Posted

Attached to
Design Build - Edinburg Pump Station
Solicitation number
191BWC21R0004
Issued by

About this file

This is a solicitation for a design-build contract to rehabilitate approximately 800 linear feet of levee at the Edinburg Pump Station in Hidalgo County, Texas. The work includes analyzing the existing levee, conducting geotechnical testing and investigations, designing and constructing earthen embankment and concrete floodwalls, installing two new sections of floodwall with bollard walls, constructing floodwall foundations, replacing a gatewell structure, backfilling and grading levee embankment material, installing an aggregate roadway surface, replacing chain link fencing, and revegetation. Offerors must submit proposals in two phases by May 10, 2021, with evaluations based on design approach, past performance, and price. The contract will be a firm-fixed-price award with a period of performance of 960 calendar days from notice to proceed. The International Boundary and Water Commission is the contracting agency.

View the file

Other files

File Type Posted
191BWC21R0004 DB Solicitation Revised per A00005.pdf PDF
191BCW21R0004 A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00004_final.pdf PDF
191BCW21R0004 A00004.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00003.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210609.pdf PDF
191BWC21R0004 A00003.pdf PDF
Final QA Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210526.pdf PDF
Additional and Revised Questions - Answers Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 Amendment A00002.pdf PDF
191BWC21R0004 Amendment A00001.pdf PDF
Questions and Answers Received Against Solicitation 191BWC21R0004.pdf PDF
Edinburg Prebid Agenda 20210503.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00001.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210519.pdf PDF
HCID1-USIBWC MOA_ 20160926.pdf PDF
Edinburg Prebid Sign-In Sheet 20210503.pdf PDF
16_USIBWC Model 2003.zip ZIP file
13_HCID1 Penitas PS AS BUILTS April 2020.pdf PDF
18_S-B LRGFCP Hydraulic Model Update Report 200807.pdf PDF
06_Geotech Report DHS Segment O-4(Special) 20080606.pdf PDF
25_Wage Determination 2015-5245.pdf PDF
26_191BWC21R0004 Edinburg Levee Design Build.pdf PDF
20_IBWC Form 116.pdf PDF
21_IBWC Form 117.pdf PDF
11_IBM10C0014 Selected Drawings 2010.pdf PDF
05_Geotech Report DHS Segment O-4B 20091109.pdf PDF
23_191BWC21R0004 Past Performance Questionnaire (Phase 2).docx DOCX document
22_191BWC21R0004 Client Authorization Letter (Phase 2).docx DOCX document
09_191BWC19R0004 Edinburg Specs 20190816.pdf PDF
19_IBWC Form 110.pdf PDF
02_Edinburg PS Geotech Report 20151118.pdf PDF
15_USIBWC LRGFCP Hydraulic Model Report 200306.pdf PDF
12_HCID1 Penitas PS Bid Package - Specs 20180509.pdf PDF
01_Edinburg PS Design Report 20151118 woA.pdf PDF
17_S-B Model 2008.zip ZIP file
14_Asbestos - Lead Paint Survey 20160125.pdf PDF
24_General Decision Number TX20210003.pdf PDF
07_Easement Metes - Bounds Drawings 20160330.pdf PDF
10_IBM14T0012 URS Structural Calculations.pdf PDF
04_Final Mission SEA and FONSI 20111031.pdf PDF
191BWC21R0004 Design Build.pdf PDF
08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf PDF
03_Final Mission EA 200702.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

191BWC21R0004

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

191BWC21R0004 SEALED BID (IFB)

X NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

04/24/2021

RATING

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

2021S4201004

6. PROJECT NO.

CODE IBWC_

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

7. ISSUED BY

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME

Carmella Speer

b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS) c. EMAIL carmella.speer@ibwc.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The Contractor shall furnish all labor, material, and equipment necessary to complete the Design-Build Edinburg Pump Station Levee Rehabilitation. This requirement is being solicited as Full and Open Competition. This is a FIRM FIXED

PRICE CONTRACT .

In accordance with FAR Provision 52.236-27 Alt 1, Site Visit (Construction FEB 1995) - Alternate 1 (FEB 1995), a site visit shall be held at 1030 am CST on 03 May, 2021 at USIBWC Mercedes Field Office, 325 Golf Course Road, Mercedes, TX 78570.

All request for information must be submitted in writing (Microsoft Word documents only) no later than 2:00 pm MST on 10 May 2021. Questions should be sent to carmella.speer@ibwc.gov

In accordance with FAR Part 36.204 Disclosure of the Magnitude of Construction Projects the estimated magnitude of this project is between$5,000,000 and $10,000,000.

The applicable NAICS Code is 237990, Other Heavy and Civil Engineering Construction.

Offerors shall submit their proposals in accordance with the information referenced in Subsection L.01, Proposal Instructions for Both Phases

11. The Contractor shall begin performance calendar days and complete it within calendar days after receiving10 960

Section F.02award, X notice to proceed. This performance period is mandatory X negotiable. (See __________________________.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour)02:00MDTa.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee X is, is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

120d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

CGFS : : CGFS

local time 06/23/2021

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CONTACT: DUNS:

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY IBWC_

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

IPP

Invoices to be uploaded to Invoice Processing Platform at http://www.ipp.gov

CHARLESTON, SC 29415

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

Carmella Speer

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

04/24/2021

31c. DATE

STANDARD FORM 1442 (REV. 4-85)BACK

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs C Descriptions/Specifications/Statement of Work

C.01 Specifications and Plans D Packaging and Marking

D.01 Payment of Postage and Fees D.02 Marking

E Inspection and Acceptance 52.246-12 Inspection of Construction (Aug 1996)

F Deliveries or Performance 52.211-13 Time Extensions (Sept 2000) 52.242-14 Suspension of Work (Apr 1984) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-12 Liquidated Damages-Construction (Sept 2000)

G Contract Administration Data G.01 Contracting Officer -- IBWC (Aug 2011) G.02 Designation of Contracting Officer G.03 Contracting Officer's Representative -- IBWC (May 2009) G.04 Invoices G.05 Notification of Government Delays

INV-IPP ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS AND INSTRUCTIONS

TO IMPLEMENT USAGE OF THE INVOICE PROCESSING PLATFORM (IPP)

H Special Contract Requirements H.01 Performance and Payment Bonds (Dec 2015) H.02 Compensation and Liability Insurance (Dec 2015) H.03 Builders Risk Insurance (Dec 2015) H.04 Technical Data Submittal Requirements (Dec 2015) H.05 Accident Prevention and Pre-Planning (Dec 2015) H.06 Construction Program (Dec 2015) H.07 Construction Safety Requirements (Dec 2015) H.08 Cultural Resources (Dec 2015) H.09 Contract Work Schedule (Dec 2015) H.10 Utility and Telephone Services (Dec 2015) H.11 Administration of Default (Fixed-Price Construction) (Dec 2015) H.12 Time Extensions for Unusually Severe Weather (Dec 2015) H.13 Change Orders and Contract Modifications: Limitations on Markups (Dec 2015) H.14 Damage From the Elements (Dec 2015) H.15 Extended Warranties (Dec 2015) H.16 Contract Closeout Procedures (Dec 2015) H.17 DESIGN-BUILD CONTRACT - Order of Precedence (DEC 2015) H.18 DESIGN-BUILD CONTRACT - Incorporation of Designer of Record Final Design (DEC 2015) H.19 CDC and OSHA COVID-19 Requirements (July 2020)

I Contract Clauses 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (Jun 2020) 52.203-14 Display of Hotline Poster(s) (Jun 2020)

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Jun 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Jun 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.210-1 Market Research (Jun 2020) 52.215-2 Audit and Records-Negotiation (Jun 2020) 52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997) 52.219-8 Utilization of Small Business Concerns (Oct 2018) 52.219-9 Small Business Subcontracting Plan (Jun 2020) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Aug 2018) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-16 Approval of Wage Rates (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)..

52.222-41 Service Contract Labor Standards (Aug 2018) 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) 52.222-50 Combating Trafficking in Persons (Oct 2020) 52.222-54 Employment Eligibility Verification (Oct 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (Nov 2020) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug-Free Workplace (May 2001) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams (Jun 2016) 52.225-12 Notice of Buy American Requirement--Construction Materials Under Trade Agreements (May 2014) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021)

52.225-22 Notice of Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials (Jan 2021) 52.225-24 Alt II Notice of Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials Under Trade Agreements (Jan 2021) - Alternate II (Mar 2009) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-17 Rights in Data - Special Works (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts (Apr 2010) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-25 Prompt Payment (Jan 2017) 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts (Jan 2017) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I (Nov 1991) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-16 Alt I Quantity Surveys (Apr 1984) - Alternate I (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I (Apr 1984) 52.236-23 Responsibility of the Architect-Engineer Contractor (Apr 1984) 52.236-24 Work Oversight in Architect-Engineer Contracts (Apr 1984) 52.236-25 Requirements for Registration of Designers (June 2003) 52.236-26 Preconstruction Conference (Feb 1995) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (Apr 1984) 52.237-3 Continuity of Services (Jan 1991) 52.242-5 Payments to Small Business Subcontractors (Jan 2017) 52.242-13 Bankruptcy (July 1995) 52.243-1 Alt III Changes - Fixed-Price (Aug 1987) - Alternate III (Apr 1984) 52.243-4 Changes (June 2007) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-4 Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (Aug 1998) 52.245-1 Alt I Government Property (Jan 2017) - Alternate I (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-21 Warranty of Construction (Mar 1994) 52.246-23 Limitation of Liability (Feb 1997)

52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996) 52.249-7 Termination (Fixed-Price Architect-Engineer) (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Mar 2020) 52.219-16 Liquidated Damages-Subcontracting Plan (Jan 1999) 52.219-28 Post-Award Small Business Program Rerepresentation (Nov 2020) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) 52.225-9 Buy American-Construction Materials (Feb 2021) 52.225-11 Buy American Act-Construction Materials under Trade Agreements (Jan 2021) 52.227-4 Alt I Patent Indemnity-Construction Contracts (Dec 2007) - Alternate I (Dec 2007) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-16 Alt I Progress Payments (Jun 2020) - Alternate I (Mar 2000) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.236-4 Physical Data (Apr 1984) 52.236-22 Design Within Funding Limitations (Apr 1984) 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.248-3 Alt I Value Engineering-Construction (Oct 2020) - Alternate I (Apr 1984)

J List of Attachments

J.01 LIST OF ATTACHMENTS

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions (Sept 2007) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.222-38 Compliance with Veterans' Employment Reporting Requirements (Feb 2016) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan - Certification (Aug 2009) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications (Jun 2020) 52.227-6 Royalty Information (Apr 1984) 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) 52.236-28 Preparation of Proposals-Construction (September 2019) 52.204-17 Ownership or Control of Offeror (Aug 2020) 52.204-20 Predecessor of Offeror (Aug 2020) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Oct 2020) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) 52.219-1 Small Business Program Representations (Nov 2020) 52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation (Dec 2016) 52.227-15 Representation of Limited Rights Data and Restricted Computer Software (Dec 2007) 52.204-5 Women-Owned Business (Other Than Small Business) (Oct 2014) 52.204-8 Annual Representations and Certifications (Mar 2020)

L Instructions, Conditions, and Notices to Offerors and Respondents 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.204-7 System for Award Management (Oct 2018) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.207-1 Notice Of Standard Competition (May 2006) crystal.cadillo Cross-Out crystal.cadillo Highlight

52.215-1 Alt I Instructions to Offerors-Competitive Acquisition (Jan 2017) - Alternate I (Oct 1997) 52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work (May 2014) 52.222-46 Evaluation of Compensation for Professional Employees (Feb 1993) 52.225-10 Notice of Buy American Requirement-Construction Materials (May 2014) 52.232-13 Notice of Progress Payments (Apr 1984) 52.216-1 Type of Contract (Apr 1984) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.228-1 Bid Guarantee (Sept 1996) 52.233-2 Service of Protest (Sept 2006) 52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995)

L.01 PROPOSAL INSTRUCTIONS FOR BOTH PHASES

L.02 PHASE ONE PROPOSAL INSTRUCTIONS

L.03 PHASE TWO GENERAL PROPOSAL INSTRUCTIONS

L.04 BUSINESS PROPOSAL OFFEROR STATEMENTS INSTRUCTIONS

L.05 BID GUARANTEE

L.06 TECHNICAL PROPOSAL INSTRUCTIONS

L.07 PRICING PROPOSAL INSTRUCTIONS

L.08 PHASE TWO SOURCE EVALUATION AND SELECTION PROCEDURES

L.09 CONTRACTOR'S CONTRACT ADMINISTRATION

L.10 CONFLICT OF INTEREST

L.11 AVAILABILITY OF FORMS

M Evaluation Factors for Award

M.01 EVALUATION FACTORS FOR PHASE ONE

M.02 BASIS FOR AWARD

M.03 PHASE TWO EVALUATION FACTORS FOR AWARD

M.04 PHASE TWO OFFER EVALUATION

M.05 SCORING ADJECTIVES AND DEFINITIONS

Line Item Summary

Solicitation Number:

191BWC21R0004

Contract Number: Title: Edinburg Levee Design Build Contract

Date of Solicitation:

04/24/2021

Line Item No.

Description Quantity Unit Unit Price Total Cost

001 Design-Build Edinburg Pump Stations Levee Rehabilitation

CLIN 001

Design Phase Type of Contract Pricing:

Doc Ref No: 2021S4201004 Delivery Date FOB:

Destination

Funding Information:

1.00 LS

002 Design-Build Edinburg Pump Stations Levee Rehabilitation

CLIN 002

Construction Phase Type of Contract Pricing:

Doc Ref No: 2021S4201004 Delivery Date FOB:

Destination

Funding Information:

1.00 LS

003 Design-Build Edinburg Pump Stations Levee Rehabilitation

CLIN 003

No Cost Receiving Lines (Internal Use Only) Type of Contract Pricing:

Doc Ref No: 2021S4201004 Delivery Date FOB:

Destination

Funding Information:

40.00 EA

Section C - Descriptions/Specifications/Statement of Work

C.01 - Specifications and Plans

Technical specifications, drawings, and plans for this solicitation, 191BWC21R0004, are referenced in

Section J and included as attachments to this document.

Section D - Packaging and Marking

D.01 - Payment of Postage and Fees

All postage and fees related to submitting information, including forms, reports, etc., to the Contracting Officer (CO) and the Contracting Officer's Representative (COR) shall be paid by the Contractor.

D.02 - Marking

All information submitted to the CO or the COR shall be clearly marked to show the Name of the Contractor and the Contract Number.

Section E - Inspection and Acceptance

Clause Title Fill-ins

52.246-12 Inspection of Construction (Aug 1996)

Section F - Deliveries or Performance

Clause Title Fill-ins

52.211-13 Time Extensions (Sept 2000)

52.242-14 Suspension of Work (Apr 1984)

52.211-10 - Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Nine hundred sixty (960) calendar days. All design work shall be completed within four hundred fifteen (415) calendar days.

Construction work shall be completed within three hundred sixty five (365) calendar days. Revegetation work shall be completed within one hundred eighty (180) calendar days of completion of construction. The durations provided for design and construction are anticipated and shall not be exceeded. Final design and construction Contract durations will be negotiated with Offerors during Phase Two technical proposal evaluations and shall be reflected in the Award document. .* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 - Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,714.74 per calendar day late for construction, $385 per calendar day late for revegetation, $261.24 per calendar day late for final paperwork for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Section G - Contract Administration Data

G.01 - Contracting Officer -- IBWC (Aug 2011)

"Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The scope of the CO's authority is defined by FAR 1.602-1, the

CO's warrant, and other applicable federal laws. The term includes certain authorized representatives of the Contracting Officer within the limits of their authority as delegated by the Contracting Officer.

In no event shall any understanding or agreement between the contractor and any government employee other than the contracting officer of any contract, modification, change order, letter or verbal direction to the contract- or be effective or binding upon the government. All such actions must be formalized by a proper contractual document executed by an appointed contracting officer. The contractor is hereby put on notice that in the event a change in work to be performed or increases in the scope of work to be performed, it is the contractor's responsibility to make inquiry of the contracting officer before making the deviation. Payments will not be made without being authorized by an appointed contracting officer with the legal authority to bind the government.

G.02 - Designation of Contracting Officer

The Contracting Officer for this requirement is:

Carmella L. Speer Supervisory Contract Specialist carmella.speer@ibwc.gov

US Section, International Boundary and Water Commission 4191 North Mesa Street El Paso, Texas 79902

G.03 - Contracting Officer's Representative -- IBWC (May 2009)

The Contracting Officer shall designate a technical representative to act for the Contracting Officer during the contract period. The Contracting Officer's Representative (COR) will act for the Contracting Officer only in technical matters and will not be authorized to commit the Government on any contract terms, conditions, or changes in unit price, total contract price, quantity, or quality, or delivery schedule. Any changes to the contract in unit price, total contract price, quantity, quality, or delivery schedule will be made only by the Contracting Officer by executed modification to the contract.

The Contracting Officer's Representative will be appointed in writing after contract award.

G.04 - Invoices

All invoices will be submitted electronically via the IPP electronic system. Further information on the process will be provided after contract award.

A copy shall be furnished to the CO and COR. The CO or COR may request additional individuals to copy as needed.

G.05 - Notification of Government Delays

In the event the contractor encounters difficulty in meeting performance requirements, or anticipates difficulty in complying with the contract delivery schedule or dates, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this Contract, the Contractor shall immediately notify the Contracting Officer and the COR in writing, giving pertinent details.

NOTE: this data shall not be construed as a waiver by the Government of any delivery schedule or dates or of any rights or remedies provided by law or under this Contract.

INV-IPP - ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS AND INSTRUCTIONS TO IMPLEMENT

USAGE OF THE INVOICE PROCESSING PLATFORM (IPP).

(a) Definitions. As used in these instructions

(1)”Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Payment documentation and process” and the applicable Payment clause included in this contract.

(b) Except as provided in paragraph (c) of these instructions, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP) at www.ipp.gov. Information regarding IPP is available on the Internet at www.ipp.gov. Assistance with the IPP application can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866)973-3131. The Contractor shall ensure that its supporting documentation conforms to IPP requirements. IPP accommodates up to 25 supporting attachments per invoice, individual attachment file size may not exceed ten megabytes (10mb). If the Contractor assesses that their supporting documentation will not reasonably conform to IPP requirements, the Contractor shall contact the Contracting Officer to explore possible alternatives. In addition, the IPP only allows certain characters to be used as the invoice number. The invoice number shall conform to the IPP convention and the attachments (if used) shall match exactly the invoice number allowed. The allowed characters in the IPP are “abcdefghijklmnopqrstuvwxyzABCDEFGHIJKLMNOPQRSTUVWXYZ0123456789-_”

(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing.

(d) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer’s written authorization with each payment request.

[End of instructions]

Section H - Special Contract Requirements

H.01 - Performance and Payment Bonds (Dec 2015)

(a) For contracts that exceed $150,000, the Contractor shall, within ten (10) calendar days after award of contract, furnish to the Government bonds as follows:

(1) SF 25, Performance bond. Performance bond with a surety or sureties approved by the Contracting Officer, securing performance and fulfillment of the Contractor's obligations under this contract, with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(2) SF 25A, Payment bond. Payment bond with a surety or sureties approved by the Contracting Officer, assuring payment as required by law to all persons supplying labor or materials in the prosecution of the work provided for in the contract with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(b) Costs. All costs of furnishing performance and payment bonds shall be included in the total bid in the schedule.

(c) Requirements for execution of surety bonds. Each surety company bond (performance or payment), that purports to have been executed by an agent or attorney in fact for the corporate surety, is required to have submitted with it a power of attorney to the signatory agency or attorney in fact, and (1) be executed by the cor-porate surety upon a date reasonably proximate to the date of the bond, or (2) the power of attorney shall be accompanied by a certification of the surety to the effect that the power of attorney was in full force and effect upon a date reasonable proximate to the date of the bond.

(d) Individual Sureties.

(1) If individual surety bonds are furnished for payment and performance bonds, the individual sureties must submit with their bonds proof of ownership and value of the assets which they claim in their net worth. The Government's preferred method of proof is to have a statement of net worth prepared by a certified public accountant in accordance with generally accepted accounting principles. The statement of net worth on the SF 28, Affidavit of Individual Surety is not in itself sufficient and will not be accepted absent of additional proof of value and ownership.

(2) Bidders are also cautioned that individual sureties must provide complete and detailed information in block 10 of the SF 28 concerning other contracts on which they have provided bonds. This information should include contract number, contract location, amount and type of bond, email address, and telephone number of the involved contracting officer.

(3) Failure to provide the proof and information requested above will cause delays to the start of con- struction for which the contractor must bear the responsibility, and may result in termination of contract for fail- ure to provide adequate bonds.

(End of Clause)

H.02 - Compensation and Liability Insurance (Dec 2015)

The Contractor shall within ten (10) calendar days after award of contract provide and maintain minimum insur-ance as follows:

(a) General Liability Insurance for bodily injury and property damage with minimum limits $500,000 each occurrence with an aggregate of $1,000,000.

(b) Automobile Liability for bodily injury and property damage with minimum of $250,000 for injury to or death of any one (1) person, $500,000 each accident or occurrence for bodily injury, and $100,000 for each ac-cident or occurrence for property damage liability.

(c) Worker's Compensation Insurance for all labor employed on the project who may come within the pro-tection of workers' compensation laws and Employers General Liability with minimum limits of $100,000 each accident, bodily injury by disease $100,000 each employee, $500,000 aggregate.

In every case the insurance coverage shall amount to at least the limits stated above. However, where the Financial Responsibility Compulsory Insurance Law of the State in which the project is located requires higher limits, the Automobile Liability Insurance Policy shall provide coverage of at least those limits required by State law.

The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name both the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico, as additionally insured. The requirement for naming the United States of America as an additional insured does not apply to Worker's Compensation Insurance.

Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained.

The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor's writ- ten certification shall be accompanied by either a Certificate issued by the insurer or photocopies of the insur- ance policies which reflect that the cancellation/change provisions of this contract have been met.

The Contractor shall insert the substance of this clause including this paragraph in subparagraphs under this contract and shall require subcontractors to provide and maintain the same limits.

At least 5 days prior to each such subcontractor's personnel commencing work on this project, the Contractor shall furnish (or ensure that there has been furnished) to the Contracting Officer a current Certificate of Insurance meeting the requirements as stated above.

(End of Clause)

H.03 - Builders Risk Insurance (Dec 2015)

(a) The Contractor is responsible for losses suffered prior to Government acceptance of the work. Therefore, the Contractor is responsible for protection of the work and repair of damages. For the protection of the Con-tractor and the Government, the Contractor is required to obtain Builder's Risk Insurance with the maximum level of coverage available in the project locality and no less than 100% of the contract price.

(b) The Contractor shall not commence work under this contract until he has obtained all the insurance re-quired and such insurance has been approved by the Contracting Officer, nor shall the Contractor allow any subcontractor to commence work on their subcontract until the insurance required of the subcontractor has been so obtained and approved.

(c) The Contractor shall procure within ten (10) calendar days after award of contract, and maintain during the life of this contract, Builder's Risk Insurance based on 100 percent (100%) of the completed value of the insur-able portion of the project.

(d) The Contractor shall furnish the Contracting Officer with certificates showing the type, amount, class of op- erations covered, effective dates and dates of expiration of policies. Such certificates shall also contain substantially the following statement: "The insurance covered by this certificate will not be canceled or materially altered, except after thirty (30) calendar days written notice has been received by the Contracting Officer."

(e) The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico, as an additional insured.

(End of Clause)

H.04 - Technical Data Submittal Requirements (Dec 2015)

(a) Technical data required to be provided to the government are described in the paragraph entitled “Submittal Requirements” in the Technical Specifications, Division 01-General Requirements, Section 01.33.00.01- Submittals.

(b) If the Contractor fails to provide required technical data within the time(s) specified in this contract, or any extension, such failures shall be considered to demonstrate unsatisfactory progress and:

(1) There shall be retained from the progress or other payments under this contract such amount(s) as the Contracting Officer considers adequate protection to the Government therefore.

(2) The Contractor and its sureties shall be liable to and assessed by the Government for all damages caused by such failure.

(3) The Contractor’s right to proceed with the work that has been delayed may be terminated for default.

(c) In the event the Contractor provides submittals prior to Notice to Proceed, the Government may review the submittals prior to the Notice to Proceed. The Contractor shall not seek compensation for efforts spent on the preparation of submittal documents submitted prior to the Notice to Proceed.

(d) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(e) The Government may expedite the review of submittals. Expedite is defined as any review time less than the allotted time specified for the review of the submittal in Section 01.33.00.01. However, the Government re-serves the right to require up to the amount of time specified in Section 01.33.00.01 for review of submittals or re-submittals.

(End of Clause)

H.05 - Accident Prevention and Pre-Planning (Dec 2015)

With reference to the requirements of Contract Clause 52.236-13 (Alternate I) for an overall safety program, the Contractor shall:

(a) Submit a detailed plan for performing each major phase of work.

(b) Require Subcontractors to submit their plan of operations showing methods they propose to use in accom-plishing major phases of work.

(c) Be prepared to discuss the plans in conferences convened by the Contracting Officer or Contracting Of-ficer’s Representative prior to starting work on each major phase of work.

Plans shall include all pertinent information, such as methods of providing safety measures for personnel per-forming required work. The plan for accomplishing work shall be submitted prior to commencing operations.

(End of Clause)

H.06 - Construction Program (Dec 2015)

(a) The Contractor shall submit a progress schedule of construction in accordance with the requirements set forth in the Technical Specifications, Division 01-General Requirements, Section 01.32.16.01-Construction Progress Schedule. The ini- tial compliance confirmed progress schedule under Section 01.32.16.01 shall serve as a baseline for the project. The Contractor's progress schedule shall account for the assigned workday calendar, seasonal weather conditions, and other constraints considered in the planning and scheduling of all work to ensure the completion within the allotted contract time. The progress schedule shall be of suit- able scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Con- tractor fails to submit a progress schedule within the time prescribed, the Contracting Officer (CO) may withhold approval of progress payments until the Contractor submits the required progress schedule.

Until such time as the submitted progress schedule is compli- ance confirmed as the official schedule of the project, the CO may withhold approval of progress payments.

(b) If, in the opinion of the CO, the Contractor falls behind the compliance confirmed progress schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the CO, without additional cost to the Government. In this circumstance, the CO may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the CO deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the CO under this clause shall be grounds for a determination by the CO that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the CO may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of Clause)

H.07 - Construction Safety Requirements (Dec 2015)

(a) Offerors shall obtain and review the current Construction Industry "OSHA Safety and Health Standards (29 CFR 1926)" and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated November 30, 2014 (see Technical Specifications, Division 01- General Requirements, Specification 01.35.23.01-Safety), prior to submitting offers and preparing re- quired safety program. Offerors shall utilize these standards in preparing required safety programs.

(b) The Contractor shall comply with all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated November 30, 2014. This manual is available from:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

(c) In the event there is a conflict between the requirements contained in OSHA Safety and Health Standards (29 CFR 1926), U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), specifications paragraphs, Contractor's approved safety program, or referenced safety and health standards, the more stringent requirement will prevail.

H.08 - Cultural Resources (Dec 2015)

In accordance with the National Historic Preservation Act of 1966 (16 U.S.C. 470), the following procedures are implemented to en- sure historic preservation and fair compensation to the Contractor for delays attendant to cultural resources investigations.

In the event potential historical, architectural, archaeological, or cultural resources (herein after cultural resources) are discovered dur- ing subsurface excavations at the site of construction, the following procedures shall be instituted:

(1) The Contractor shall immediately cease work in that area, secure the location from further disturbance and possible vandalism, and immediately notify the Contracting Officer and the Contracting Officer’s Representative.

(2) The Contracting Officer shall issue a “Suspension of Work” directing the Contractor to cease all construction operations at the location of such potential cultural resources find.

(3) Such “Suspension of Work” shall be effective until such time as a qualified archaeologist can be called to assess the value of these potential cultural resources and make recommendations to the State Historical Preservation Officer. Any “Suspension of Work” shall contain the following:

(a) A clear description of the work to be suspended;

(b) Any instructions regarding issuance of further orders by the Contractor for material services;

(c) Guidance as to action to be taken on subcontracts;

(d) Any suggestions to the Contractor as to minimization of costs;

(e) Estimated duration of the temporary suspension.

If the archaeologist determines that the potential find is a bonafide cultural resource, at the direction of the State Historical Preserva- tion Officer, the Contracting Officer shall extend the duration of the “Suspension of Work” in writing, and the Contractor shall sus- pend work at the location of the find.

Equitable adjustment of the construction contract shall be made in the following manner:

(1) Time Extension. If the work temporarily suspended is on the “critical path,” the total number of days for which the suspension is in effect shall be added to the number of allowable contract days.

If a portion of work at the time of such suspension is not on the “critical path,” but subsequently becomes work on the critical path, the allowable contract time will be computed from the date such work is classified as on the critical path.

(2) Additional Compensation. If, as a result of a suspension of the work, the Contractor sustains a loss which could not have been avoided by judicious handling of forces, equipment, and (plant) or redirection of forces or equipment to perform other work on the contract, there shall be paid to the Contractor an amount as determined by the Contracting Officer to be fair and reasonable compensa- tion for the Contractor’s actual loss in accordance with the following:

(a) Idle Time of Equipment. Compensation for equipment idle time will be determined on a force account (time and materi- als) basis, and shall include the cost of extra moving of equipment and rental loss.

(b) Idle Time of Labor. Compensation for idle time of workers will be determined by the Contracting Officer as “Labor” less any actual productivity factor of this portion of the work force.

(c) Increased Costs of Labor and Materials. Increased costs of labor and materials will be compensated only to the extent such increase was in fact caused by the suspension as determined by the Contracting Officer.

Compensation for actual loss due to idle time of either equipment or labor shall not include markup for profit.

The hours for which compensation will be paid will be the actual normal working time during which such delay condition exists, but will in no case exceed eight hours in any one day.

The days for which compensation will be paid shall be full or partial calendar days, excluding Saturdays, Sundays, Federal and State holidays, during the existence of such delay.

The Texas Historical Commission is located at 1511 Colorado Street, Austin, TX 78701. The mailing address is P.O. Box 12276, Aus-tin, TX 78711. The Texas Historical Commission may be reached by email at thc@thc.state.tx.us,by telephone at 512-463-6100.

(End of Clause)

H.09 - Contract Work Schedule (Dec 2015)

Normal working hours for the Contractor shall not be earlier than 6:00 am nor later than 5:30 pm, Monday through Friday, excluding

Federal Holidays. The Contractor shall not exceed 40 hours per week for normal working hours. If the Contractor wishes to work during periods other than that above or in excess of 40 hours per week, additional Government inspection forces will be required. The Contractor shall notify the Contracting Officer's Representative (COR) three (3) business days in advance of their desire to work during other periods to allow the determination if additional inspection forces are reasonably available. If such forces are reasonably available, the Contracting Officer or COR may authorize the Contractor to perform work during periods other than normal duty hours/ days or in excess of 40 hours per week; however, if additional inspection forces are required to perform in excess of their normal duty hours/days, the actual cost of the overtime inspection at overtime rates will be charged to the Contractor and will be deducted from the final payment of the Contract amount. Consistent with Section 6103(a) of Title 5 of the United States Code the following are legal public holidays:

New Year’s Day, January 1.

Birthday of Martin Luther King, Jr., the third Monday in January.

Washington’s Birthday, the third Monday in February. Memorial Day, the last Monday in May.

Independence Day, July 4.

Labor Day, the first Monday in September.

Columbus Day, the second Monday in October.

Veterans Day, November 11.

Thanksgiving Day, the fourth Thursday in November.

Christmas Day, December 25.

A listing of Federal Holidays are available at the following link:

https://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/

For Holidays that fall on a Saturday, for Federal employees, the preceding Friday will be treated as a holiday for pay and leave purposes (See 5 U.S.C. 6103(b)).

For Holidays that fall on a Sunday, for Federal employees, the following Monday will be treated as a holiday for pay and leave purposes (See section 3(a) of Executive order 11582, February 11, 1971).

If the above holidays are a paid holiday and results in works hours in excess of 40 hours in any workweek, laborers and mechanics shall be paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours consistent with FAR Clause 52.222-4. (End of Clause)

H.10 - Utility and Telephone Services (Dec 2015)

The U.S. Section, International Boundary and Water Commission will not provide utility (water, internet, gas, and electricity) and telephone services to the Contractor. The Contractor shall, at their own expense and in a workmanlike manner satisfactory to the Contracting Officer, install and maintain all necessary temporary con-nections and distribution lines, and shall remove the same prior to final acceptance of the work by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .