08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf
PDF 38 MB Posted
- Attached to
- Design Build - Edinburg Pump Station
- Solicitation number
- 191BWC21R0004
About this file
This document provides details for a federal contract solicitation for design and construction services. The United States Section of the International Boundary and Water Commission is seeking proposals to design and construct approximately 800 linear feet of levee rehabilitation improvements at the Edinburg Pump Station in Hidalgo County, Texas. The proposed work includes analysis and investigations of the existing levee, additional geotechnical testing, assessing structures within the levee, preparing right-of-way, removing and stockpiling excavated material, widening the levee, installing new sections of concrete floodwall and bollard walls, constructing floodwall foundations, replacing an existing gatewell structure, backfilling and grading embankment material, installing an aggregate roadway surface, removing and replacing fencing, and revegetation. Interested offerors should review the associated documents for additional requirement information. The agency issuing this solicitation is the International Boundary and Water Commission United States-Mexico.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Penitas
La Joya
B83
WALKER
LAKE
EDINBURG SETTLING
BASIN
P e ñ i t a s
S t
M i l i t a r y
R d
Rio Grande Rio Grande
SOLICITATION NO: __________________
CONTRACT NO: _____________________
C O
S S
O L I C
I T
A T
I O
N
N
O
C O
N T
R A
C T
N
O
URS GROUP, INC.
9400 AMBERGLEN BLVD.
AUSTIN, TX 78729
(512) 454-4797
TBPE Firm No. F-3162
U.S. INTERNATIONAL BOUNDARY AND
WATER COMMISSION
EL PASO, TX
REHABILITATION IMPROVEMENTS FOR THE
LEVEES AT EDINBURG PUMP STATION
HIDALGO COUNTY, TEXAS
TEXAS
Brownsville
El Paso
Christi
Corpus
Laredo
Lubbock
Amarillo
Worth
Fort
Abilene
Austin
Galveston
Houston
Dallas
Longview
San
Antonio
Project Description:
The Project includes the Edinburg Pump Station, Earthen Levees and
Concrete floodwalls of the Rio Grande Levee System along the Rio
Grande within Hidalgo County from Station 1+00.00 to Station 10+50.00.
The approximate total length of construction is 787 feet.
EDINBURG
PUMP
HOUSE
INTAKE
CHANNEL
WEST LEVEE
IMPROVEMENTS
EAST LEVEE
IMPROVEMENTS
PROJECT CONTACTS:
USIBWC HEADQUARTERS (915) 832-4101
Mr. Valentin Arzloa
4171 N. Mesa Street, Suite C-100
El Paso, TX 79902
USIBWC MERCEDES FIELD OFFICE (956) 565-3150
Mr. Rodolfo Montero
325 Golf Course Road
Mercedes, TX 78570
HIDALGO COUNTY IRRIGATION (956) 383-3886
DISTRICT 1
Mr. Rusty McDaniel
1904 N. Expressway 281
Edinburg, TX 78542
BORDER PATROL (202) 306-7823
Mr. Scott Recinos
1331 Pennsylvania Avenue, NW Suite 755N
(National Place Bldg)
Washington, D.C. 20229
UTILITIES (800) 245-4545
Type of Construction:
Site Work: Earthen Levee and Ramps
Structural: Concrete Floodwalls, C-B Slurry Walls and Miscellaneous
Metal Work
D a w n b
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
G d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
H E
L
V
E E
S
A
T
E
D I N
B U
G
P
U M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B e g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
A S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
I N
D E
X
O
F
D
R A
W I N
G S
D R A W I N G I N D E X
DRAWING
NUMBER
SHEET
NUMBER
DRAWING TITLE
G-0011 COVER SHEET
G-0022 INDEX OF DRAWINGS
G-0033 LEGEND & ABBREVIATIONS
G-0044 GENERAL NOTES
G-0055 ESTIMATE OF QUANTITIES
C-1006 EXISTING OVERALL SITE PLAN
C-1017 EXISTING WESTERN SITE PLAN
C-1028 EXISTING EASTERN SITE PLAN
C-200
SURVEY CONTROL PLAN
C-201
HORIZONTAL CONTROL PLAN
C-300
DEMOLITION AND SLURRY WALL / FLOODWALL EXCAVATION PLAN
C-400
PROPOSED OVERALL LEVEE IMPROVEMENTS KEY PLAN
C-401
PROPOSED WESTERN LEVEE DETAILS
C-402
PROPOSED EASTERN LEVEE DETAILS
C-500
PROPOSED WEST PLAN AND PROFILE B\L STA. 0+00 TO STA. 2+25
C-502
PROPOSED EAST PLAN AND PROFILE B\L STA. 5+75 TO STA. 9+00
C-600
PROPOSED TYPICAL LEVEE SECTIONS 1 OF 6
C-601
PROPOSED TYPICAL LEVEE SECTIONS 2 OF 6
C-602
PROPOSED TYPICAL LEVEE SECTIONS 3 OF 6
C-800
CROSS-SECTIONS SHEET 1 OF 7
C-801 CROSS-SECTIONS SHEET 2 OF 7
C-802
CROSS-SECTIONS SHEET 3 OF 7
C-803
CROSS-SECTIONS SHEET 4 OF 7
C-804
CROSS-SECTIONS SHEET 5 OF 7
C-805
CROSS-SECTIONS SHEET 6 OF 7
C-806
CROSS-SECTIONS SHEET 7 OF 7
C-301
WESTERN FLOODWALL EXCAVATION PLAN AND PROFILE
C-302
EASTERN FLOODWALL EXCAVATION PLAN AND PROFILE
C-501
PROPOSED WEST PLAN AND PROFILE B\L STA. 2+25 TO STA. 5+00
C-700
PROPOSED EAST BLANKET DRAINAGE PLAN AND PROFILE
C-701
PROPOSED WEST BLANKET DRAINAGE PLAN AND PROFILE
C-702
CHIMNEY / BLANKET DRAIN DETAILS
C-703
CHIMNEY DRAIN BEHIND FLOODWALL
D R A W I N G I N D E X
DRAWING
NUMBER
SHEET
NUMBER
DRAWING TITLE
GENERAL DRAWINGS
CIVIL DRAWINGS
STRUCTURAL DRAWINGS
GT-10161 SOIL BORING LOGS SHEET 1 OF 2
GT-10262 SOIL BORING LOGS SHEET 2 OF 2
S-001
S-002
S-100
S-300
S-301
S-302
S-303
S-304
S-305
S-306
S-307
S-308
S-309
S-310
S-311
S-312
S-400
S-401
STRUCTURAL GENERAL NOTES 1 OF 2
STRUCTURAL GENERAL NOTES 2 OF 2
FLOODWALL FOUNDATION PLANS
TYPICAL FLOODWALL MONOLITH FOUNDATION PLAN
TYPICAL FLOODWALL SECTION AND DETAILS
CONCRETE SECTIONS AND DETAILS
TYPICAL FLOODWALL JOINT SECTIONS
TYPICAL FLOODWALL JOINT SECTIONS AND DETAILS
TYPICAL BOLLARD WALL SECTIONS AND DETAILS 1 OF 2
TYPICAL BOLLARD WALL SECTIONS AND DETAILS 2 OF 2
ANTI-CLIMBING FENCE TYPICAL DETAILS
TYPICAL DRILLED PIER SECTIONS AND DETAILS
GATEWELL SECTIONS AND DETAILS
METAL LADDER SECTIONS AND DETAILS
SLIDE GATE DRAINAGE STRUCTURE SECTIONS AND DETAILS
STAINLESS STEEL SLIDE GATE DETAILS 1 OF 2
FLOATING BOLLARD WALL TYPICAL DETAILS 1 OF 2
FLOATING BOLLARD WALL TYPICAL DETAILS 2 OF 2
GT-10060 SOIL BORING LOCATION PLAN
GEOTECHNICAL DRAWINGS
R-10063 RIGHTS OF WAY PLAN
RIGHTS-OF-WAY DRAWINGS
C-603 PROPOSED TYPICAL LEVEE SECTIONS 4 OF 6
C-604 PROPOSED TYPICAL LEVEE SECTIONS 5 OF 6
C-605 PROPOSED TYPICAL LEVEE SECTIONS 6 OF 6
C-403 EROSION PROTECTION PLAN
C-503
C-504
C-505
PROPOSED EAST PLAN AND PROFILE B\L STA. 8+50 TO STA. 11+00
PROPOSED WEST RAMP PLAN AND PROFILE
PROPOSED EAST RAMP PLAN AND PROFILE
S-31357 STAINLESS STEEL SLIDE GATE DETAILS 2 OF 2
R-10164 RIGHTS OF WAY PLAN WEST DETAILS
R-10265 RIGHTS OF WAY PLAN EAST DETAILS
G-002
STATE PLANE COORDINATES
INDICATES SECTION OR DETAIL
TAKEN FROM AND SHOWN ON
THE SAME SHEET, LETTER
INDICATES SECTION & NUMBER
INDICATES DETAIL
A
ABBREVIATIONS LEGEND
EXCAVATION
DEMOLITION
CHIMNEY BLANKET
CONCRETE
RIP RAP
N 10548161.57
E 466585.12
TYPE III BARRICADE
SIGN
MESSAGE BOARD
USIBWC EASEMENT
LEVEE TOE
XX
SECTION "LETTER" OR DETAIL "#"
SHEET NUMBER
ALIGNMENT
NEW LEVEE CROWN
DITCH
AC ACRES
ACP ASPHALTIC CONCRETE PAVING
AGGR AGGREGATE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AZ AZIMUTH
B/B BACK TO BACK
BC BACK OF CURB
BL BASE LINE
BM BENCHMARK
BMPS BEST MANAGEMENT PRACTICES SYSTEM
BOT F BOTTOM FACE
C&G CURB AND GUTTER
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT
CL CENTER LINE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CONST CONSTRUCTION
COR
CONTRACTING OFFICER REPRESENTATIVE
CP CONTROL POINT
CPT CONE PENETRATION TEST
CU FT CUBIC FEET
CU YD CUBIC YARD
DEPTH
DA
DRAINAGE AREA
DEG DEGREE
DEMO DEMOLITION
DIA DIAMETER
DIST DISTANCE
DMS DEGREES, MINUTES, SECONDS
EASTING
EA EACH
EC EDGE OF CURB
EL ELEVATION
ELEC ELECTRIC
ENV ENVIRONMENTAL
ESMT EASEMENT
EW EACH WAY
EX EXTERNAL LENGTH
EXIST EXISTING
EXIST GR EXISTING GRADE
FH FIRE HYDRANT
FHWA FEDERAL HIGHWAY ADMINISTRATION
FIN FINISH
FIN GR FINISH GRADE
FLL FLOW LINE
FOC FACE OF CURB
FOW
FACE OF WALL
FT FOOT
FW FLOODWALL
NATURAL GAS
G LN GAS LINE
GALV GALVANIZED
GCA
GRADED CRUSHED AGGREGATE
GR GROUND
GR LN GRADE LINE
HORIZONTAL
HDWL HEADWALL
HGL
HYDRAULIC GRADE LINE
HNDRL HANDRAIL
HR HOUR
HS HIGH STRENGTH
HV HIGH VOLTAGE
HWY HIGHWAY
ID INSIDE DIAMETER
IN INCHES
K-VALUE
kVA KILOVOLT AMPERE
LENGTH
LAT LATERAL
LBS POUNDS
LF LINEAR FEET (FOOT)
LR LEVEE RAISE
LS LUMP SUM
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MSE MECHANICAL STABILIZED EARTH
MTZ METZGER
NORTHING
NAD83 NORTH AMERICAN DATUM (1983)
NAVD88 NORTH AMERICAN VERTICAL DATUM (1988)
No NUMBER
NOM NOMINAL
NTS
NOT TO SCALE
OC
ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
PC POINT OF CURVE
PGL PROFILE GRADE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PP POWER POLE
PROP PROPOSED
PT POINT OF TANGENCY
PVMT PAVEMENT
PSI POUNDS PER SQUARE INCH
PVC POLY VINYL CHLORIDE
DISCHARGE
RADIUS
RCP REINFORCED CONCRETE PIPE
RD ROAD
REL RELOCATE
REM REMOVE
ROW RIGHT OF WAY
RR RAILROAD
SOUTH
SD STORM DRAIN
SEC SECOND
SF
SQUARE FEET
SHLDR SHOULDER
SQ YD SQUARE YARD
SS SANITARY SEWER
ST STREET
STA STATION
SW SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN
TAN TANGENT
TCP TRAFFIC CONTROL PLAN
TE TOP ELEVATION
TEMP TEMPORARY
TOC TOP OF CURB
TOC FTG TOP OF CONCRETE FOOTING
TOC WALL TOP OF CONCRETE WALL
TOLE TOP OF LEVEE ELEVATION
TxDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UNPV RD UNPAVED ROAD
USACE UNITED STATES ARMY CORPS OF ENGINEERS
USIBWC
U.S. INTERNATIONAL BOUNDARY & WATER COMMISSION
VERTICAL
VC
VEL VELOCITY
VFZ VEGETATION FREE ZONE
VPC VERTICAL POINT OF CURVATURE
VPI
VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
WEST
W/ WITH
W/O WITHOUT
WL WATER LINE
EMBANKMENT FILL
LRGV LOWER RIO GRANDE VALLEY
TRAFFIC FLOW ARROW
N
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Q
R
S
V
W
K
L
H
G
E
D
VERTICAL CONTROL POINT
HORIZONTAL CONTROL POINT
HORIZONTAL VERTICAL CONTROL POINT
CULV CULVERT
RCB REINFORCED CONCRETE BOX
UNION PACIFIC RAILROADUPRR
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
CR COUNTY ROAD
FM FARM TO MARKET
FND FOUND
PCC POINT OF COMPOUND CURVE
SCP SECONDARY CONTROL POINT
CONSTRUCTION ZONE
FLOW
EPCWID1 EL PASO COUNTY WATER IMPROVEMENT DISTRICT #1
SF
SILT FENCE
BORDER FENCE
FLEX BASE
TOPSOIL
AREA TO BE SEEDED
WSE
MINIMUM TOLE
WSE WATER SURFACE ELEVATION
X SECT CROSS SECTION
LOC
LIMITS OF CONSTRUCTION
LT LEFT
RT RIGHT
X X BARB WIRE FENCE
CHAIN LINK FENCE
SHPO STATE HISTORIC PRESERVATION OFFICER
PRC POINT OF REVERSE CURVE
EMD ENVIRONMENTAL MANAGEMENT DIVISION
RGRP RIO GRANDE RECTIFICATION PROJECT
L E
G E
B B
R E
V I A
T I O
N S
LEGEND
OVERHEAD UTILITY
UTILITY POLE
FOUND 1" IRON PIPE
RECORD INFORMATION
NOT TO SCALE
OFFICIAL PUBLIC RECORD OF REAL PROPERTY OF
BEXAR COUNTY, TEXAS
DEED AND PLAT RECORDS OF BEXAR COUNTY, TEXAS
SQUARE FEET
RIGHT-OF-WAY
FIRE HYDRANT
LIGHT STANDARD
STORM WATER MANHOLE
WASTEWATER MANHOLE
WATER VALVE
SIGN/BILLBOARD (AS NOTED)
ELECTRIC TRANSFORMER
WIRE FENCE
CHAIN LINK FENCE
FOUND 1/2" IRON ROD
TELEPHONE PEDESTAL
FIR
GAS VALVE
BOLLARD
GUY WIRE
GATE POST
CONCRETE
REINFORCED CONCRETE PIPE
NEW COUNTY BLOCK
(UNLESS OTHERWISE NOTED)
FOUND TXDOT CONCRETE MONUMENT
SET 1/2" IRON ROD W/CAP STAMPED
"VICKREY PROPERTY CORNER"
SIR
UNLESS OTHERWISE NOTED
UNLESS OTHERWISE NOTED
UNLESS OTHERWISE NOTED
UNLESS OTHERWISE NOTED
SOIL BORE
ROW
NATURAL GAS PIPELINE
OHE
G
CONCRETE WALL WITH BOLLARD FENCE
(TEXAS GAS SERVICE)
PROPOSED BOLLARD FENCE
CONCRETE WALL WITH BOLLARD FENCE
LOD LOD
LIMITS OF DISTURBANCE
CONCRETE WALL FOOTING
SLURRY CUTOFF WALL
OVERHEAD ELECTRIC LINE
OHE
WOODEN FENCE
CHAIN LINK FENCE DEMOLITION
A
XX
SLURRY WALL
G-003 a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
G d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
G E
N E
R A
L
N
O T
E S
GENERAL NOTES:
1.0 COORDINATE WORK ACTIVITIES, INCLUDING ACCESS, WITH THE USIBWC
CONTRACTING OFFICER'S REPRESENTATIVE (COR).
1.1 CONTRACTOR SHALL REFER TO TECHNICAL SPECIFICATIONS DIVISION 01-GENERAL
REQUIREMENTS, 01.57.13 "TEMPORARY CONTROLS FOR WORK AREAS".
1.2 THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC),
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), U.S. FISH AND WILDLIFE
SERVICE (USFWS), TEXAS PARKS AND WILDLIFE DEPARTMENT (TPWD) OR THE
ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS USIBWC ENVIRONMENTAL
STAFF ARE PRESENT OR HAVE AUTHORIZED THE CONTRACTOR TO CONTACT THOSE
ENTITIES.
1.3 THE IBWC EASEMENT SHOWN ON THESE PLANS WAS TAKEN FROM THE CAD FILES
PREPARED FOR THE PROJECT ENTITLED: “EDINBURG PUMP LEVEE RELOCATION &
CHANNEL CROSSING IMPROVEMENTS PROJECT - DHS SEGMENT O-04 B”, PREPARED BY
DANNENBAUM ENGINEERING COMPANY-MCALLEN, LLC IN 2010. THE EASEMENT
LINEWORK IN THE CAD FILE WAS SCALED DOWN FROM A STATED PROJECT COMBINED
SCALE FACTOR (CFS) OF 1.00000249 TO 1.00000000 TO FIT THE COORDINATES OF THIS
CURRENT PROJECT. THE CFS WAS REPORTED IN THE DOCUMENT "HORIZONTAL AND
VERTICAL CONTROL FOR HIDALGO COUNTY LEVEE RESTORATION PROJECT", ALSO
PREPARED BY DANNENBAUM IN 2008.
1.4 ALL EQUIPMENT THAT IS USED ON GOVERNMENT PROPERTY MUST BE FULLY
OPERATIONAL AND FREE OF ANY OIL OR FLUID LEAKS. ANY LEAKS NOTED ON
EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR,
FAILURE TO DO SO WILL BE CAUSE FOR THE GOVERNMENT TO REJECT THE
DEFICIENT EQUIPMENTS USE ONSITE.
1.5 CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL
WORK UNTIL FINAL ACCEPTANCE OF PROJECT IS COMPLETED AND CONTRACTOR
WARRANTY IS IMPLEMENTED BY USIBWC.
1.6 CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES / PROPERTY OWNERS /
LOCAL AGENCIES, MAY OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS
RESPONSIBLE FOR SECURING ANY OPEN EXCAVATIONS AND OTHER SAFETY HAZARDS
AT END OF WORK SHIFT EVERY DAY.
1.7 THE CONTRACTOR IS NOT ALLOWED TO USE VEGETATIVE BUFFER AS PART OF THEIR
SWPPP CONTROLS.
1.8 THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL AS REQUIRED PER THE
APPLICABLE SPECIFICATION AND PLAN SHEETS REQUIREMENTS THROUGHOUT
CONSTRUCTION AND SHALL INSPECT EROSION CONTROLS ON A MINIMUM WEEKLY
BASIS.
1.9 “EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE
LEVEE. THE FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTION WHEN
CONTRACTOR ISN'T ACTIVELY WORKING IN THE AREA.
1.10 ALL WORK SHALL BE DONE BY A CONTRACTOR HAVING A VALID, APPROPRIATE
CONTRACTOR'S LICENSE ISSUED BY THE STATE OF TEXAS REGISTRAR OF
CONTRACTORS.
1.11 ALL BID ITEMS ARE COMPLETE IN PLACE, INCLUDING FURNISHING ALL MATERIALS,
EQUIPMENT, TOOLS, SUPPLIES, INCIDENTALS, TRANSPORTATION AND EXPERIENCED
PERSONNEL AND SUPERINTENDENCE REQUIRED.
1.12 THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTY AND EXISTING AND
NEW IMPROVEMENTS, AND SHALL PROVIDE POSITIVE CONTROL OF EARTH SPILLAGE,
CONSTRUCTION WATER AND RUNOFF WATER FROM THE SITE.
1.13 THE CONTRACTOR SHALL LIMIT ALL CONSTRUCTION ACTIVITIES TO WITHIN THE
USIBWC RIGHT-OF -WAY AND EASEMENTS AS NOTED ON THE CONTRACT DRAWINGS.
1.14 ALL FEES AND PERMITS REQUIRED FOR THE WORK SHALL BE OBTAINED BY AND PAID
FOR THE CONTRACTOR. NO PROJECT EXTENSION WILL BE ALLOTTED DUE TO TIME
REQUIRED TO OBTAIN PERMITS.
1.15 THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL
REGULATIONS RELATED TO THE SAFETY OF PERSONNEL AND THE PUBLIC ON THE JOB
SITE, INCLUDING APPLICABLE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
REGULATIONS, AS WELL AS USACE EM 385-1-1.
1.16 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AT THE STAGING AND
STORAGE AREA DURING CONSTRUCTION. TEMPORARY FENCING NOTED IN THE
CONTRACTOR'S SITE SECURITY PLAN SHALL BE INSTALLED AND MAINTAINED BY THE
CONTRACTOR DURING THE ENTIRE CONSTRUCTION OF THE PROJECT.
1.17 DURING THE COURSE OF ALL WORK ON THE PROJECT, THE CONTRACTOR SHALL
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR ALL JOB SITE CONDITIONS
INCLUDING SAFETY OF ALL PERSONS AND SECURITY OF ALL PROPERTY. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING THE SKILLS AND
ATTENTION UTILIZED WITHIN THE INDUSTRY. THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER
THIS CONTRACT. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY
AND HOLD THE USIBWC AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY,
REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS
PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE
UISBWC OR ENGINEER.
SURVEY NOTES:
2.0 EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A
GROUND SURVEY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS
DURING JANUARY 2015. SEE SHEET C-200.
2.1 THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE
MINERAL RIGHTS, NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING
FROM SAID MINERAL RIGHTS.
2.2 BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS
COORDINATE SYSTEM, SOUTH ZONE (4205).
2.3 ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF
1988.
2.4 UTILITIES SHOWN HEREIN ARE BASED ON FIELD OBSERVATIONS ONLY.
UTILITY COORDINATION NOTES:
3.0 A ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC
RIGHT-OF-WAY ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC
SURVEY. ALL UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY
PURVEYORS SHOULD BE CONTACTED PRIOR TO CONSTRUCTION.
CONTACT INFORMATION:
ENTERPRISE PRODUCTS OPERATING LLC.
PHONE: 1-800-245-2545
3.1 CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48
HOURS PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN
THE WORK ZONE.
TRAFFIC CONTROL NOTES:
4.0 THE CONTRACTOR SHALL MAINTAIN TRAFFIC CONTROL FOR THE PROJECT SITE IN
ACCORDANCE WITH SPECIFICATION SECTION 01.55.00 VEHICULAR ACCESS AND
PARKING.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NOTES:
5.0 THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH
SPECIFICATION SECTION 01.57.13 TEMPORARY ENVIRONMENTAL CONTROLS.
GENERAL NOTES (CONT):
1.18 ALL BID ITEMS ARE COMPLETE IN PLACE, INCLUDING FURNISHING ALL MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, INCIDENTALS, TRANSPORTATION AND EXPERIENCED PERSONNEL AND
SUPERINTENDENCE REQUIRED.
1.19 IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE
CONTRACTOR SHALL IMMEDIATELY BRING THE CONDITION TO THE ATTENTION OF THE USIBWC COR.
1.20 A COPY OF THESE CONTRACT DRAWINGS SHALL BE KEPT IN AN EASILY ACCESSIBLE LOCATION ON
THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.
1.21 THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE
SOUTHERN BORDER OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH
DRUG AND / OR HUMAN SMUGGLING ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE
REQUIRED TO CARRY OUT AREA-SPECIFIC SAFETY/SECURITY MEASURES AND THE COSTS FOR
THESE MEASURES WILL NOT BE PAID FOR SEPARATELY AND WILL BE CONSIDERED INCIDENTAL TO
THE PROJECT.
1.22 THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT
DAMAGE TO ADJACENT PROPERTIES, STRUCTURES OR UTILITY FACILITIES.
1.23 THE USIBWC COR SHALL DETERMINE ACCEPTABILITY OF THE MATERIALS OF CONSTRUCTION AS
INDICATED IN THE APPLICABLE SECTIONS OF THE SPECIFICATIONS. THE CONTRACTOR SHALL BEAR
ALL COSTS OF PROVIDING THE BURDEN OF PROOF THAT NON-CONFORMING WORK IS REASONABLE
AND ADEQUATELY ADDRESSES THE DESIGN PURPOSE. THE CONTRACTOR SHALL BEAR ALL RISK
FOR CONTINUING WITH NON-CONFORMING WORK IN QUESTION UNTIL A DETERMINATION REGARDING
ITS ACCEPTABILITY IS MADE BY USIBWC COR. THE USIBWC COR MAY IMPOSE CONDITIONS FOR
ACCEPTANCE OF NON-CONFORMING WORK. THE CONTRACTOR SHALL BEAR ALL COSTS FOR THE
FULFILLMENT OF THE CONDITIONS IMPOSED. ALL DECISIONS REGARDING WHETHER THE WORK
SATISFIES THE DESIGN PURPOSE, WHETHER NON-CONFORMING WORK IS REASONABLY
ACCEPTABLE, AND THE CONDITIONS FOR ACCEPTANCE SHALL BE AT THE SOLE DISCRETION OF THE
USIBWC COR.
1.24 WORK WILL BE CONDUCTED IN AREAS ADJACENT TO URBAN DEVELOPMENT AND CONTRACTOR WILL
EXERCISE CAUTION AND FOLLOW NECESSARY PRECAUTIONS AS PER THE REQUIREMENTS OF THE
PROJECT SPECIFICATIONS.
1.25 ALL TRASH, RUBBLE, AND DEBRIS ENCOUNTERED WITHIN THE PROJECT LIMITS SHALL BE REMOVED
AND DISPOSED OF OFFSITE BY THE CONTRACTOR AT AN APPROVED LOCATION. THE CONTRACTOR
SHALL PAY ALL ASSOCIATED DUMPING FEES.
1.26 EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE
FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTION WHEN THE CONTRACTOR ISN'T ACTIVELY
WORKING IN THE AREA.
1.27 THESE CONTRACT DRAWINGS HAVE BEEN PREPARED BASED ON AN ABOVE-GROUND SURVEY. THE
EXISTING UNDERGROUND UTILITIES SHOWN ARE BASED ON AS-BUILT INFORMATION PROVIDED BY
THE USIBWC. THE BEST EFFORT HAS BEEN MADE TO DEPICT THESE UTILITIES, BUT THESE
LOCATIONS SHALL BE CONSIDERED APPROXIMATE. THERE MAY BE ADDITIONAL UNDERGROUND
UTILITIES NOT SHOWN ON THE CONTRACT DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY EXISTENCE AND LOCATION OF ALL UTILITIES INCLUDING USE OF PRIVATE
UTILITY LOCATING SERVICE AND POTHOLING AS NECESSARY TO CONFIRM ALL UTILITIES PRIOR TO
CONSTRUCTION PER THE APPLICABLE SPECIFICATION REQUIREMENTS.
1.28 QUANTITIES SHOWN ON VARIOUS “QUANTITY SUMMARY TABLES” HEREIN SHALL BE CONSIDERED AS
INFORMATIONAL ONLY AND SHALL NOT SERVE AS THE BASIS OF THE CONTRACTORS BID. IT IS
EXPRESSLY UNDERSTOOD AND AGREED THAT THE QUANTITIES NOTED IN THESE TABLES ARE NOT
BY VIRTUE OF SUBMITTING A BID, A PART OF THE CONTRACT, AND REPRESENT ONLY AN OPINION BY
THE ENGINEER AS TO THE QUANTITIES SPECIFIC TO THAT TABLE. THE QUANTITY TABLES ARE
INCLUDED IN THE PLANS ONLY FOR THE CONVENIENCE OF BIDDERS AND THEIR USE IS SUBJECT TO
ALL THE CONDITIONS AND LIMITATIONS SET FORTH IN THE CONTRACT DOCUMENTS RELATING TO
THE EXAMINATION OF THE CONTRACT DOCUMENTS AND THE SUBMISSION OF A BID. SPECIFICALLY, SUBMISSION OF A BID SHALL BE CONCLUSIVE EVIDENCE THAT THE BIDDER HAS INVESTIGATED AND
IS SATISFIED AS TO THE CONDITIONS TO BE ENCOUNTERED, THE CHARACTER, QUALITY, AND SCOPE
OF WORK TO BE PERFORMED, THE QUANTITIES OF MATERIALS TO BE FURNISHED, AND THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE BIDDER IS CAUTIONED THAT IT IS HIS/HER
SOLE RESPONSIBILITY TO MAKE SUCH INDEPENDENT INVESTIGATION AND EXAMINATION AS THE
BIDDER DEEMS NECESSARY IN ORDER TO SATISFY HIS/HERSELF AS TO THE CONDITIONS TO BE
ENCOUNTERED IN THE PERFORMANCE OF WORK AND THE QUANTITIES REQUIRED TO COMPLETE
THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE BIDDER SHALL TAKE NO
ADVANTAGE OF ANY APPARENT ERROR OR OMISSION IN THE PLANS, BID SCHEDULE ITEMS,
ESTIMATED QUANTITIES NOTED IN THE SCHEDULE, SPECIFICATIONS OR OTHER CONTRACT
DOCUMENTS. IN THE EVENT THE BIDDER DISCOVERIES AN APPARENT ERROR OR OMISSION OR BE IN
DOUBT AS TO THEIR MEANING, THE BIDDER SHALL IMMEDIATELY NOTIFY THE USIBWC, IN WRITING, REQUESTING A CLARIFICATION OR INTERPRETATION. ANY CLARIFICATION AND OR INTERPRETATION
DEEMED APPROPRIATE BY THE USIBWC SHALL BE ISSUED TO ALL PROSPECTIVE BIDDERS IN THE
FORM OF AN ADDENDUM. ANY ADDENDUM SO ISSUED SHALL FORM A PART OF THE CONTRACT
DOCUMENTS.
1.28 NEITHER THE USIBWC NOR THE ENGINEER WARRANTS OR GUARANTEES THE RESULTS OF ANY
GEOTECHNICAL OR SUBSURFACE INVESTIGATIONS AS BEING REPRESENTATIVE OF THE SITE,
BEYOND THE ACTUAL LOCATION OF THE TEST SPECIMEN(S) AND ASSUMES NO RESPONSIBILITY FOR
THE MANNER IN WHICH THIS INFORMATION MAY BE USED OR THE CONCLUSIONS REACHED IN
UTILIZING THE INFORMATION AS PROVIDED IN THE CONTRACT DOCUMENTS. FURTHER, THE USIBWC
AND THE ENGINEER NEITHER WARRANTS OR GUARANTEES THE CONCLUSIONS REACHED,
RECOMMENDATIONS MADE OR TEST RESULTS PRESENTED AS PART OF THE GEOTECHNICAL OR
SUBSURFACE INVESTIGATION AS BEING REPRESENTATIVE OF THE ENTIRE SITE. IT SHALL BE THE
CONTRACTORS SOLE RESPONSIBILITY TO SUPPLEMENT ANY INFORMATION PROVIDED WITH
ADDITIONAL SUBSURFACE INVESTIGATIONS AND TESTING, AT THEIR SOLE EXPENSE IN ORDER TO
ASSURE THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS IS REPRESENTATIVE OF THE
CONDITIONS TO BE ENCOUNTERED WITHIN THE LIMITS OF THE PROJECT AT THE TIME OF
CONSTRUCTION.
G-004
SPEC 31 21 00.00 12
DRAINAGE BLANKET (FINE AGGREGATE)
SPEC 31 21 00.00 12
CHIMNEY DRAIN (COARSE AGGREGATE)
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
G d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
E S
T I M
A T
E
O
F
Q
U A
N T
I T
I E
S
ESTIMATE OF QUANTITIES
PROPOSED LEVEE IMPROVEMENTS AT WESTERN LEVEE
SPEC 31 23 00.00 12
EXCAVATION
SPEC
SPEC 31 24 00.00 12
EMBANKMENT
SPEC 31 24 00.00 12
TOPSOIL
SPEC 50 20 00
FLEX BASE
CUT CU. YD. FILL CU. YD. 2D SURFACE AREA 3D SURFACE AREA
7,899 CU. YD.
218 CU. YD.
292 CU. YD.
2,552 CU. YD. 9,880 S.F.
37,030 S.F.
9,894.5 S.F. 11,782.5 S.F.
38,090 S.F.
11,082 S.F.
ESTIMATE OF QUANTITIES
PROPOSED LEVEE IMPROVEMENTS AT EASTERN LEVEE
SPEC CUT CU. YD. FILL CU. YD. 2D SURFACE AREA 3D SURFACE AREA
4,975 CU. YD.
249 CU. YD.
292 CU. YD.
1,272 CU. YD. 4,782 S.F.
37,123 S.F. 38,491 S.F.
5,425 S.F.
NOTES:
1. SEE SHEET C-401 FOR PROPOSED WESTERN LEVEE IMPROVEMENTS.
2. SEE SHEET C-402 FOR PROPOSED EASTERN LEVEE IMPROVEMENTS.
3. 2D SURFACE DENOTES FLAT HORIZONTAL SURFACE AREA.
4. 3D SURFACE DENOTES GROUND SURFACE AREA (CURVED).
5. QUANTITIES SHOWN ON THIS SHEET ARE FOR THE CONSTRUCTOR'S INFORMATION
ONLY AND ARE ONLY REPRESENTATIVE OF THE WESTERN AND EASTERN LEVEE
IMPROVEMENT WORK. THE CONSTRUCTOR SHALL REFER TO THE CONTRACT
DOCUMENTS AND COORDINATE WITH THE COR TO DETERMINE HOW ACTUAL PAYMENT
WILL BE VERIFIED AND PROCESSED.
6. ESTIMATED QUANTITIES SHOWN ON THIS SHEET ARE BASED ON THE BEST
INFORMATION AVAILABLE AND IT IS THE CONSTRUCTOR'S RESPONSIBILITY TO VERIFY
THEM PRIOR TO THE CONSTRUCTION.
7. ALL VOLUMES WERE DERIVED FROM CALCULATING DIFFERENCES IN TIN (TRIANGULAR
IRREGULAR NETWORK) SURFACE MODELS USING AUTOCAD CIVIL 3D SOFTWARE.
SPEC 32 31 13
SPEC DESCRIPTION
LF
UNITS QUANTITIES
EA
REMOVE , STORE, AND
REINSTALL WOODEN
STAIRCASE
REMOVE AND REPLACE
FENCE
ESTIMATE OF QUANTITIES
(REMOVE AND REPLACE)
SPEC 05 50 03.00 12
METALWORK
SPEC 05 50 04.02 12
MISCELLANEOUS
METALWORK
SPEC
SPEC 03 31 00.00 12
CAST-IN-PLACE
STRUCTURAL
CONCRETE
DISCRIPTION
QUANITIES UNITS
REINFORCED
CONCRETE
MISC. STEEL
FABRICATIONS,
HANDRAILS,
LADDER,
BOLLARD CAPS,
CONNECTIONS
LUMP SUM
CU. YDS.
ESTIMATE OF QUANTITIES
PROPOSED STRUCTURAL MATERIAL
SPEC 03 31 00.00 12
CAST-IN-PLACE
STRUCTURAL
CONCRETE
35STABILIZATION
SLAB
CONCRETE
CU. YDS.
SPEC 31 41 16.00 12
STEEL SHEET
PILING
STEEL SHEET
PILING
S.F.
SPEC 31 63 29
DRILLED
CONCRETE PIERS
AND SHAFTS
REINFORCED
CONCRETE
DRILLED PIERS
L.F.
780 CU. YD.
11,344 S.F.
SPEC 35 42 34
RIP RAP
527 CU. YD.
13,483 S.F.
SPEC 02 41 00
SPEC 31 23 00.00 12
EXCAVATION
SPEC 31 24 00.00 12
EMBANKMENT FILL
SPEC 31 24 00.00 12
TOPSOIL
SPEC 50 20 00
FLEX BASE
SPEC 35 42 34
RIP RAP
SPEC 31 56 13
SLURRY WALL CEMENT BENTONITE 567 CU. YD.
925 CU. YD.
18,884 S.F.
448 CU. YD.
14,460 S.F.
SPEC 35 42 35
GEOSYNTHETIC EROSION CONTROL
SPEC 31 05 19.04 12
SEPARATOR GEOTEXTILE
UNDER FLEX BASE
SPEC 31 05 19.04 12
SEPARATOR GEOTEXTILE UNDER RIP RAP
15,130 S.F. 15,733 S.F.
12,630 S.F. 13,421 S.F.
SPEC 35 42 35
GEOSYNTHETIC EROSION CONTROL
SPEC 31 05 19.04 12
SEPARATOR GEOTEXTILE
UNDER FLEX BASE
15, 695 S.F. 15,781S.F.
G-005
SPEC 31 21 00.00 12
DRAINAGE BLANKET (FINE AGGREGATE)
SPEC 31 21 00.00 12
CHIMNEY DRAIN (COARSE AGGREGATE)
27 CU. YD. 160 S.F.
12,082 S.F.
14,460 S.F. 12,082 S.F.
15,130 S.F. 15,733 S.F.
12,630 S.F. 13,421 S.F.
13,483 S.F.
SPEC 31 05 19.04 12
SEPARATOR GEOTEXTILE UNDER RIP RAP
14,216 S.F.
14,216 S.F.
15, 695 S.F. 15,781S.F.
9,894.5 S.F. 11,782.5 S.F.
27 CU. YD. 160 S.F.
SPEC 32 31 13 EA
REMOVE AND REPLACE
GATES
a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 40' 80'
SCALE: 1" = 40'
20'
E X
I S
T I N
G
O
V E
R A
L L
S
I T
E
P
L A
N
C-100
NOTES:
1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL
SURVEY INFORMATION.
2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.
EXISTING OVERALL SITE PLAN
SCALE: 1"=40'
EXISTING WESTERN SITE PLAN
C-101
1 EXISTING EASTERN SITE PLAN
C-102 a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 10' 20' 40'
SCALE: 1" = 20'
E X
I S
T I N
G
W
E S
T E
I T
E
P
L A
N
C-101
NOTES:
1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL
SURVEY INFORMATION.
2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.
M A
T C
H
L
I N
E
S E
E
S
H E
EXISTING WESTERN SITE PLAN
SCALE: 1"=20'
C-100
LEGEND:
LIMITS OF WORK
B-107
B-103
B-106
B-104
6' CHAIN LINK FENCE
WITH 3 BARB WIRE STRAND
STAIRCASE
SHED
GATE
GATE
SIDEWALK
EDGE OF
DIRT ROAD
EDGE OF
DIRT ROAD
O F
F I C
E
INTAKE CHANNEL
WITH BRACING
CONCRETE
STRUCTURE
IBWC EASEMENT
(SEE GENERAL NOTE
1.3 ON SHEET G-004)
CONCRETE WALL
WITH BOLLARD
FENCE
SHED
SHED
BOX CULVERT
6" RCP, FL:126.57
N= 16607709.85
E= 1001583.62
SIGN:
NATURAL GAS PIPELINE
TEXAS GAS SERVICE
1-800-344-8377
N= 16607697.95
E= 1001550.69
SIGN:
NATURAL GAS PIPELINE
TEXAS GAS SERVICE
1-800-344-8377
N= 16607907.00
E= 1001421.30
UTILITY POLE
N= 16608193.22
E= 1001540.70
UTILITY POLE
N= 16608173.79
E= 1001472.32
SOIL BORING
N= 16608082.34
E= 1001590.29
SOIL BORING
N= 16608078.37
E= 1001373.90
SOIL BORING
N= 16607941.40
E= 1001479.67
SOIL BORING
N= 16608108.53
E= 1001442.93
24" ENTERPRISE
UNDERGROUND GAS LINE TOP
OF GAS LINE AT EL. 72.20 FT +/-
N= 16608075.91
E= 1001579.46
N= 16607824.20
E= 1001593.60
N= 16607813.47
E= 1001610.48
N= 16607925.76
E= 1001647.50
N= 16607874.05
E= 1001728.07
N= 16607788.06
E= 1001693.48
N= 16608126.65
E= 1001394.70
N= 16608196.92
E= 1001491.11
PROPERTY LINE
(TYP.)
LIMITS OF CONSTRUCTION
(TYP.)
N= 16607744.47
E= 1001719.00
0 10' 20' 40'
SCALE: 1" = 20'
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
E X
I S
T I N
G
E
A S
T E
I T
E
P
L A
N
C-102
NOTES:
1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL
SURVEY INFORMATION.
2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.
M A
T C
H
L
I N
E
S E
E
S
H E
EXISTING EASTERN SITE PLAN
SCALE: 1"=20'
C-100
LIMITS OF WORK
N:16608075.91
E:1001579.46
N:16608431.67
E:1001317.99
0 40' 80'
SCALE: 1" = 40'
20' a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
S U
R V
Y
N
T R
O L
P
L A
N
C-200
CP #4
"X" CHISELED ON SIDEWALK
N: 16608571.309
E: 1001806.756
Z: 125.202
CP #3
"X" CHISELED ON SIDEWALK
N: 16608259.739
E: 1001979.276
Z: 123.712
CP #2
1/2" IRON ROD WITH
YELLOW CAP STAMPED
"VICKREY TRAVERSE"
N: 16608002.979
E: 1001489.717
Z: 132.163
CP #1
1/2" IRON ROD WITH
YELLOW CAP STAMPED
"VICKREY TRAVERSE"
N: 16608324.990
E: 1001268.804
Z: 133.534
SURVEY CONTROL
1. SURVEY CONTROL WAS ESTABLISHED BY VICKREY & ASSOCIATES, INC.,
SAN ANTONIO, TEXAS DURING JANUARY 2015.
2. PROJECTION: TEXAS SOUTH, NAD 83
VERTICAL DATUM: NAVD88
MONUMENT: NGS S 1409
SITE ORIGIN: CONTROL POINT 3 (CP #3)
N: 16608259.739
E: 1001979.276
Z: 123.71
GROUND SCALE FACTOR: 1.0000170739
SURVEY CONTROL PLAN
SCALE: 1"=40'
4+00 5+00 6+00 7+00
4+00 5+00 6+00 7+00
EXISTING
PUMP HOUSE
BP: STA= 0+00.00
N=16608072.24
E= 1001709.34
EP: STA= 4+65.57
N=16607786.03
E= 1001433.14
PC: STA= 2+37.84
N=16607999.12
E= 1001492.75
PT: STA= 1+84.31
N=16608016.75
E= 1001543.29
PT: STA= 2+80.01
N=16607968.56
E= 1001466.57
PRC: STA= 1+00.13
N=16608027.17
E= 1001626.20
BP: STA= 0+00.00
N=16608328.74
E= 1001505.96
EP: STA= 4+66.41
N=16608143.80
E= 1001181.34
PT: STA= 3+40.93
N=16608263.63
E= 1001218.55
PCC: STA= 1+15.06
N=16608364.99
E= 1001396.88
BP: STA= 0+00.00
N=16608450.95
E= 1000941.94
EP: STA= 11+00.66
N=16607728.46
E= 1001662.71
PI: STA= 0+63.56
N=16608433.06
E= 1001002.93
PI: STA= 1+27.32
N=16608416.88
E= 1001064.60
PI: STA= 1+96.13
N=16608403.78
E= 1001132.16
PC: STA= 2+35.80
N=16608394.71
E= 1001170.78
PC: STA= 7+05.24
N=16608053.35
E= 1001479.63
PC: STA= 8+94.47
N=16607872.55
E= 1001526.53
PT: STA= 3+77.81
N=16608317.87
E= 1001286.66
PT: STA= 7+99.38
N=16607966.84
E= 1001514.20
PT: STA= 10+05.48
N=16607781.16
E= 1001583.45
WEST RAMP ALIGNMENT
EAST RAMP ALIGNMENT
BP: STA= 0+00.00
N=16608345.91
E= 1001460.96
EP: STA= 1+38.27
N=16608262.11
E= 1001395.57
PT: STA= 1+23.88
N=16608275.67
E= 1001390.76
ACCESS DRIVE ALIGNMENT
L
L
L
L
L5
L
L
C
C
C
L
L
C
C
C
L
C
C
L
C
PI : STA= 3+09.95
∆= 40.68
N= 16608377.78
E= 1001242.9639
PI : STA= 2+55.62
∆= 86.28
N= 16608397.86
E= 1001260.2253
PI : STA= 1+15.45
∆= 129.05
N= 16608384.46
E= 1001352.1390
PI : STA= 0+57.65
∆= 8.91
N= 16608351.11
E= 1001452.8329
PI : STA= 9+53.61
∆= 48.93
N= 16607813.91
E= 1001534.1987
PI : STA= 0+56.61
∆= 66.71
N= 16608022.34
E= 1001682.6044
PI : STA= 1+42.85
∆= 24.12
N= 16608030.81
E= 1001583.6348
PI : STA= 7+53.32
∆= 28.66
N= 16608014.51
E= 1001507.9666
PI : STA= 2+61.12
∆= 60.40
N= 16607991.46
E= 1001470.7663
ALIGNMENT=LEVEE ALIGNMENT
STATION=3+51.84
NORTHING=16608337.81
EASTING=1001270.04
ALIGNMENT=WEST RAMP
STATION=2+49.21 =
ALIGNMENT=LEVEE ALIGNMENT
STATION=7+61.56
NORTHING=16608003.59
EASTING=1001505.57
ALIGNMENT=EAST RAMP
STATION=2+24.26 =
LEVEE ALIGNMENT HORIZONTAL ALIGNMENT DATA TABLE
CURVE (C)
LINE (L)
NUMBER
C1
C2
C3
L1
L2
L3
L4
L5
L6
L7
POINT
PC
PT/PRC
PC
PT/PRC
PC
PT/PRC
START PT.
END PT.
START PT.
END PT.
START PT.
END PT.
START PT.
END PT.
START PT.
END PT.
START PT.
END PT.
START PT.
END PT.
STATION
2+35.80
3+77.81
7+05.24
7+99.38
8+94.47
10+05.48
0+00.00
0+63.56
0+63.56
1+27.32
1+27.32
1+96.13
1+96.13
2+35.80
3+77.81
7+05.24
7+99.38
8+94.47
10+05.48
11+00.66
RADIUS
200.00
188.20
130.00
LENGTH
142.01
94.14
111.01
63.56
63.76
68.81
39.67
327.43
95.08
95.18
LINE/CHORD
DIRECTION
S56° 27' 08.81"E
S21° 46' 49.57"E
S31° 54' 50.36"E
S73° 39' 33.43"E
S75° 17' 33.49"E
S79° 01' 35.96"E
S76° 47' 39.34"E
S36° 06' 38.28"E
S7° 27' 00.87"E
S56° 22' 39.86"E
DELTA
ANGLE
40° 41' 01"
28° 39' 37"
48° 55' 39"
NORTHING
16,608,394.71
16,608,317.87
16,608,053.35
16,607,966.84
16,607,872.55
16,607,781.16
16,608,450.95
16,608,433.06
16,608,433.06
16,608,416.88
16,608,416.88
16,608,403.78
16,608,403.78
16,608,394.71
16,608,317.87
16,608,053.35
16,607,966.84
16,607,872.55
16,607,781.16
16,607,728.46
EASTING
1,001,170.78
1,001,286.66
1,001,479.63
1,001,514.20
1,001,526.53
1,001,583.45
1,000,941.94
1,001,002.93
1,001,002.93
1,001,064.60
1,001,064.60
1,001,132.16
1,001,132.16
1,001,170.78
1,001,286.66
1,001,479.63
1,001,514.20
1,001,526.53
1,001,583.45
1,001,662.71
WEST RAMP HORIZONTAL ALIGNMENT DATA TABLE
CURVE (C)
LINE (L)
NUMBER
C4
C5
L8
POINT
PC
PT/PRC
PC
PT/PRC
START PT.
END PT.
STATION
0+00.00
1+15.06
1+15.06
3+40.93
3+40.93
4+66.41
RADIUS
739.98
150.00
LENGTH
115.06
225.87
125.48
LINE/CHORD
DIRECTION
N71° 36' 55.35"W
S60° 23' 13.90"W
S17° 14' 58.50"W
DELTA
ANGLE
8° 54' 33"
86° 16' 31"
NORTHING
16,608,328.74
16,608,364.99
16,608,364.99
16,608,263.63
16,608,263.63
16,608,143.80
EASTING
1,001,505.96
1,001,396.88
1,001,396.88
1,001,218.55
1,001,218.55
1,001,181.34
EAST RAMP HORIZONTAL ALIGNMENT DATA TABLE
CURVE (C)
LINE (L)
NUMBER
C6
C7
C8
L9
L10
POINT
PC
PT/PRC
PC
PT/PRC
PC
PT/PRC
START PT.
END PT.
START PT.
END PT.
STATION
0+00.00
1+00.13
1+00.13
1+84.31
2+37.84
2+80.01
1+84.31
2+37.84
2+80.01
4+65.57
RADIUS
86.00
200.00
40.00
LENGTH
100.13
84.18
42.17
53.53
185.56
LINE/CHORD
DIRECTION
S61° 32' 18.35"W
S82° 50' 08.84"W
S40° 34' 43.03"W
S70° 46' 41.12"W
S10° 22' 44.94"W
DELTA
ANGLE
66° 42' 36"
24° 06' 55"
60° 23' 56"
NORTHING
16,608,072.24
16,608,027.17
16,608,027.17
16,608,016.75
16,607,999.12
16,607,968.56
16,608,016.75
16,607,999.12
16,607,968.56
16,607,786.03
EASTING
1,001,709.34
1,001,626.20
1,001,626.20
1,001,543.29
1,001,492.75
1,001,466.57
1,001,543.29
1,001,492.75
1,001,466.57
1,001,433.14
ACCESS DRIVE HORIZONTAL ALIGNMENT DATA TABLE
CURVE (C)
LINE (L)
NUMBER
C9
L11
POINT
PC
PT/PRC
START PT.
END PT.
STATION
0+00.00
1+23.88
1+23.88
1+38.27
RADIUS
55.00
LENGTH
123.88
14.39
LINE/CHORD
DIRECTION
S44° 58' 55.68"W
S19° 32' 38.29"E
DELTA
ANGLE
129° 03' 08"
NORTHING
16,608,345.91
16,608,275.67
16,608,275.67
16,608,262.11
EASTING
1,001,460.96
1,001,390.76
1,001,390.76
1,001,395.57
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 40' 80'
SCALE: 1" = 40'
20'
H O
R I Z
O N
T A
L
C
O N
T R
O L
P
L A
N
C-201
HORIZONTAL CONTROL PLAN
4+00 5+00 6+00 7+00
4+00 5+00 6+00 7+00
6 1
7 1
PUMP HOUSE
SHED
O F
F I C
E
CONC. STRUCTURE
SHED
SHED
LIMITS OF NEW
FOUNDATION
LIMITS OF NEW
FOUNDATION
USIBWC EASEMENT
4+00 5+00 6+00 7+00
EXISTING WALL
(TO REMAIN)
EXISTING
GRADE
PROPOSED
EXCAVATION GRADE
EXCAVATION
GRADE
(NO WORK)
(NO WORK)
PROPOSED LIMIT OF
DISTURBANCE ADJACENT
TO PUMP STATION
(MINIMUM 10 FT OFFSET)
PROPOSED WESTERN
EXCAVATION LIMITS (TYP.)
S
E
S36° 06' 38.28"E
327.43'
S
E
L
Δ
R
L
Δ
R
WEST RAMP ALIGNMENT
LEVEE ALIGNMENT
C-301
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 10' 20' 40'
SCALE: 1" = 20'
D E
M O
L I T
I
U
R R
Y
W
A L
C-300
CAUTION!!!
GAS LINES
KEYED DEMOLITION NOTES:
1. REMOVE, STORE AND REINSTALL WOODEN STAIRCASE.
2. REMOVE & REPLACE CHAIN LINK FENCE AND GATES AS
SHOWN.
3. REMOVE PORTION OF EXISTING BERM AS REQUIRED TO
CONSTRUCT ACCESS DRIVE.
4. EXCAVATE TO MINIMUM GRADES SHOWN TO CONSTRUCT
FLOODWALL STRUCTURE.
5. EXCAVATE TO THE MINIMUM GRADES SHOWN TO
CONSTRUCT PROPOSED C-B SLURRY WALL.
6. PERFORM BENCHING EXCAVATION AND EMBANKMENT
PLACEMENT TO ELEV. 120 FT ON RIVERSIDE SLOPES
PRIOR TO CONSTRUCTING C-B SLURRY WALL OR DRILLED
PIER FOUNDATIONS TO AVOID DISTURBING SOILS IN
CONTACT WITH SLURRY WALL OR DRILLED PIERS.
7. EXCAVATE FOR PROPOSED FLOODWALL DRAINAGE
BLANKET.
8. REFER TO TABLE ON SHEET G-005 ESTIMATE OF
QUANTITIES FOR DEMOLITION AND EXCAVATION.
GENERAL NOTES:
1. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"
(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY
LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.
2. TEMPORARY EXCAVATIONS ARE THE RESPONSIBILITY OF THE
CONTRACTOR, AND ARE SHOWN ONLY TO ILLUSTRATE MINIMUM
CRITERIA AND DESIGN INTENT. ACTUAL TEMPORARY EXCAVATION
DIMENSIONS ARE TO BE SUBMITTED BY CONTRACTOR FOR
ENGINEER'S APPROVAL. EXCAVATIONS SHALL MEET OSHA
CRITERIA, AND SLURRY TRENCH EXCAVATIONS MUST PROVIDE A
MINIMUM FACTOR OF SAFETY = 1.2.
3. DRILLED PIER INSTALLATION MAY NOT COMMENCE UNTIL
COMPLETION OF CEMENT-BENTONITE SLURRY WALL (SEE
SPECIFICATION SECTIONS 31 63 29 & 31 56 13).
4. CONTRACTOR SHALL REMOVE EXISTING CHAIN LINK FENCING
AND GATES (ALL WITH 3 STRAND BARBED WIRE) AND REPLACE
WITH NEW FENCING AND GATES TO MATCH EXISTING AND IN
ACCORDANCE WITH SPECIFICATION SECTION 32 31 13.
CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF NEW FENCING
AND GATES WITH COR AND SUBMIT FOR COMPLIANCE
CONFIRMATION.
F L O
O D
W A
L L
E
X C
A V
A T
I O
N
P
L A
N
WESTERN EXCAVATION DETAILS
EASTERN EXCAVATION DETAILS
DEMOLITION AND SLURRY WALL/FLOODWALL EXCAVATION PLAN
SCALE: 1" = 20'
C-302
NOTE:
SEE SHEETS C-301 AND C-302 FOR FLOODWALL
EXCAVATION AND DEOMLITION DETAILS
C-302
C-301
PROPOSED EXCAVATION GRADE
EXISTING GRADE
LIMITS OF DEMOLITION
E
V A
T I O
N
F
T
E L E
V A
T I O
N
F
T
2+25 2+50 3+00 3+50 4+00 4+50 5+00
10.00'
BOTTOM OF EXCAVATION EL= 120.0'
200 +/-
PERMISSIBLE EXCAVATION
SLOPE 1V:1.5H
LIMITS OF EXCAVATION
1V:1.5H
LIMITS OF SLURRY WALL
AREA OF EXCAVATION
STA. 2+91.72
EL. 120.00
STA. 4+62.40
EL. 120.00
STA. 2+92.40
EL. 90.00
STA. 4+62.40
EL. 90.00
STA. 4+82.40
EL. 131.12
LIMITS OF FLOODWALL
STA. 4+64.23
EL. 120.00
STA. 3+82.40
EL. 120.00
100-YR WSE (133.8 FT.)
MIN TOLE (136.8 FT.) (W/S FREEBOARD)
CHMINEY BLANKET
PROFILE. SEE C-700'S
FOR DETAILS
4+00 5+00
4+00 5+00
LIMITS OF
FLOODWALL
FOUNDATION
4+00 5+00
STA= 3+77.34
OFFSET= 22.33RT.
N= 16608305.05
E= 1001268.37
STA= 2+86.97
OFFSET= 0.87LT.
N= 16608377.58
E= 1001218.97
STA= 4+64.23
OFFSET= 22.33RT.
N= 16608234.89
E= 1001319.55
STA= 3+68.18
OFFSET= 4.27RT.
N= 16608322.83
E= 1001277.48
STA= 3+77.39
OFFSET= 1.81RT.
N= 16608317.15
E= 1001284.95
STA= 3+67.40
OFFSET= 19.25RT.
N= 16608313.98
E= 1001265.36
V
H
V
H
V
H
V
H
V
H
V
H
V
H
V
H
1V:1.5H
1V:1.5H
EXISTING GRADE
PROPOSED
EXCAVATION GRADE
STA= 4+64.23
OFFSET= 1.82RT.
N= 16608246.98
E= 1001336.12
10.2'200 +/-
86.8'(±)9.0'(±)
(NO WORK)
78.7'(±)
PROPOSED WESTERN FLOODWALL
EXCAVATION LIMITS (TYP.)
S
E
L
Δ
R
LEVEE ALIGNMENT
STA= 2+93.11
OFFSET= 14.45LT.
N= 16608386.42
E= 1001231.09
LEVEE ALIGNMENT
STA= 4+23.84
OFFSET= 4.14LT.
N= 16608283.13
E= 1001317.13
STA= 4+31.84
OFFSET= 4.22LT.
N= 16608276.71
E= 1001321.92
STA= 4+31.25
OFFSET= 61.25LT.
N= 16608310.80
E= 1001367.64
STA= 4+23.23
OFFSET= 62.90LT.
N= 16608318.25
E= 1001364.25
EXCAVATION BENCH
FOR C-B SLURRY
WALL CONSTRUCTION
0 10' 20' 40'
SCALE: 1" = 20'
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
C-301 0 5 10 20
SCALE: 1" = 10' HORIZ.; 1" = 1' VERT.
WESTERN FLOODWALL EXCAVATION PLAN
SCALE: 1" = 10'
C-300
WESTERN FLOODWALL EXCAVATION PROFILE
SCALE: 1" = 10'
C-300
W E
S T
E R
N
F
L O
O D
W A
X C
A V
A T
I O
N
P L A
N
A
O
F I L
E
MATCHLINE A-A
MATCHLINE A-A
PROPOSED EXCAVATION GRADE
EXISTING GRADE
PROPOSED C-B SLURRY WALL
6+00 7+00
6+00 7+00
LIMITS OF
FLOODWALL
FOUNDATION
6+00 7+00
STA= 6+67.22
OFFSET= 2.00RT.
N= 16608082.88
E= 1001455.61
STA= 6+67.28
OFFSET= 22.00RT.
N= 16608071.05
E= 1001439.49
STA= 6+24.70
OFFSET= 2.00RT.
N= 16608117.24
E= 1001430.55
STA= 6+24.70
OFFSET= 22.00RT.
N= 16608105.45
E= 1001414.39
STA= 7+07.52
OFFSET= 21.99RT.
N= 16608038.76
E= 1001463.04
PROPOSED
EXCAVATION GRADE
10.0'
120.7'(±)
42.6'(±) 40.0'(±)
(NO WORK)
PROPOSED LIMIT OF
DISTURBANCE ADJACENT
TO PUMP STATION
(MINIMUM 10 FT OFFSET)
S
E
L
Δ
R
LEVEE ALIGNMENT
EAST RAMP ALIGNMENT
STA= 7+07.25
OFFSET= 1.99RT.
N= 16608050.56
E= 1001479.19
E L E
V A
T I O
N
F
T
E L E
V A
T I O
N
F
T
5+75 6+00 6+50 7+00 7+50 8+00 8+50
NO WORK
120' +/-
PERMISSIBLE EXCAVATION
SLOPE 1V:1.5H
LIMITS OF EXCAVATION
1V:1.5H
10.00'
NO SLURRY WALL REQUIRED
BOTTOM OF
EXCAVATION EL= 120.0'
AREA OF
EXCAVATION
BOTTOM OF
EXCAVATION EL= 118.0'
STA. 6+05.24
EL. 130.83
STA. 6+24.70
EL. 118.00
STA. 6+65.24
EL. 118.00
STA. 6+68.24
EL. 120.00
STA. 7+07.25
EL. 120.00
LIMITS OF FLOODWALL
STA. 6+25.24
EL. 118.00
STA. 7+05.24
EL. 120.00
100-YR WSE (133.8 FT.)
MIN TOLE (136.8 FT.) (W/S FREEBOARD)
CHMINEY BLANKET
PROFILE. SEE C-700'S
FOR DETAILS
STA. 7+25.86
EL. 132.41
0 10' 20' 40'
SCALE: 1" = 20'
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
C-302 0 5 10 20
SCALE: 1" = 10' HORIZ.; 1" = 1' VERT.
EASTERN FLOODWALL EXCAVATION PLAN
SCALE: 1" = 10'
C-300
EASTERN FLOODWALL EXCAVATION PROFILE
SCALE: 1" = 10'
C-300
E A
S T
E R
N
F
L O
O D
W A
L L
E
X C
A V
A T
I O
N
P L A
N
A
O
F I L
E
PROPOSED EXCAVATION GRADE
EXISTING GRADE
PROPOSED C-B SLURRY WALL
4+00 5+00 6+00 7+00
4+00 5+00 6+00 7+00
EXISTING
PUMP HOUSE
PROPOSED EAST RAMP
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 40' 80'
SCALE: 1" = 40'
20'
P R
O P
O S
V E
R A
V E
E
I M
P R
O V
E M
E N
T S
K E
Y
P
L A
N
C-400
GENERAL NOTES:
1. SEE PROJECT LEGEND ON SHEET G-003 FOR SHADING
DETAILS.
2. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"
(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY
LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.
3. SEE SHEETS C-300 THRU C-302 FOR DEMOLITION AND
EXCAVATION WORK.
4. DRILLED PIER INSTALLATION MAY NOT COMMENCE UNTIL
COMPLETION OF CEMENT-BENTONITE SLURRY WALL (SEE
SPECIFICATION SECTIONS 31 63 29 & 31 56 13).
PROPOSED WESTERN DETAILS
PROPOSED OVERALL LEVEE IMPROVEMENTS KEYPLAN
SCALE: 1" = 40'
PROPOSED EASTERN DETAILS
C-503
C-505
C-502
C-500
C-504
SEE SHEETS C-401, C-402, AND C-500 THRU C-505 FOR PROPOSED IMPROVEMENT
DETAILS, LEVEE PLAN AND PROFILES AND RAMP PLAN AND PROFILES
C-500
C-501
C-502
C-503
C-504
C-505
C-402
C-401
C-501
C-402
C-401
LEGEND:
LIMITS OF
CONSTRUCTION
4+00 5+00
STA. 1+00 BEGIN LEVEE
CONSTRUCTION
N 16,608,423.81
E 1,001,038.18
EXIST. FENCE
EXIST. WOODEN
FENCE
REMOVE PORTION
OF EXISTING BERM
AND CONSTRUCT
ACCESS DRIVE
EXIST. CONCRETE
PAD
EXIST. CONCRETE WALL
WITH BOLLARD FENCE
PROPOSED WEST RAMP
(20 FT WIDE ROADWAY, TYP.)
EXISTING PUMP
STATION
PROPOSED
FLOATING BOLLARD
FENCE SEE NOTE 2
PROPOSED END OF
FLOATING BOLLARD
FENCE TO BE CONNECTED
TO EXISTING CONCRETE
WALL SEE NOTE 2
PROPOSED WESTERN LEVEE
N:16608431.67
E:1001317.99
N:16608278.93
E:1001429.31
N:16608195.64
E:1001316.20
N:16608298.44
E:1001160.34
N:16608284.34
E:1001205.33
N:16608235.01
E:1001213.49
N:16608452.36
E:1001337.34
N:16608453.20
E:1001335.02
N:16608517.53
E:1001263.09
N:16608546.21
E:1001217.53
N:16608612.50
E:1001120.17
N:16608326.87
E:1001071.95
N:16608485.83
E:1001097.88
N:16608613.04
E:1001113.06
R-C END WALL
30.0'
PROPERTY LINE
(TYP.)
4+00 5+00
S
E
S75° 17' 33.49"E
63.76'
S
E
S
E
S36° 06' 38.28"E
327.43'
L
Δ
R
BEGIN SLURRY WALL
CONSTRUCTION
STA =2+92.52
OFFSET =6.49LT.
N =16608379.81
E =1001226.63
BEGIN ACCESS DRIVE
CONSTRUCTION
STA =0+48.18
OFFSET =0.07LT.
N =16608345.91
E =1001460.96
BEGIN WEST RAMP
CONSTRUCTION
STA =0+00.00
OFFSET =0.00
N =16608328.74
E =1001505.96
STA =4+66.41
OFFSET =0.00
N =16608143.80
E =1001181.34
END ACCESS DRIVE
CONSTRUCTION
STA =0+87.90
OFFSET =99.74LT.
N =16608262.11
E =1001395.57
END WESTERN LEVEE
IMPROVEMENTS
STA =4+62.40
OFFSET =0.00
N =16608249.54
E =1001336.51
END SLURRY WALL, WESTERN
FLOODWALL AND BOLLARD WALL
CONSTRUCTION
STA =4+62.38
OFFSET =12.00RT.
N =16608242.48
E =1001326.81
BEGIN FLOOD WALL
CONSTRUCTION
STA =3+82.40
OFFSET =12.00RT.
N =16608307.10
E =1001279.67
END WEST RAMP
CONSTRUCTION
STA =3+53.61
OFFSET =0.00
N =16608251.53
E =1001214.79
BOX CULVERT
6" RCP
FL:111.52
N= 16608334.50
E= 1001147.50
DROP INLET
TOP=121.58'
INVERT (CENTER):112.52
36" RCP (NW, SW, SE)
N= 16608449.33
E= 1001178.29
DROP INLET
TOP=121.68'
INVERT (CENTER):112.61
36" RCP (SE)
N= 16608460.54
E= 1001161.86
SIGN:
NATURAL GAS PIPELINE
TEXAS GAS SERVICE
1-800-344-8377
N= 16608494.08
E= 1001126.34
SIGN:
NATURAL GAS PIPELINE
TEXAS GAS SERVICE
1-800-344-8377
N= 16608520.65
E= 1001064.91
CONCRETE PAD
N= 16608417.56
E= 1000990.82
S-300
S-300
COMPLETE CONSTRUCTION
OF EXISTING GATEWELL STRUCTURE
N= 16608411.14
E= 1001170.24
TRANSITION TO
MATCH EXISTING
ACCESS ROAD
S-309
REINSTALLED
STAIRCASE SEE NOTE 5.
PROPOSED
CHAIN LINK
FENCE
D r a
D e s i g n e d b y
R e v i e w e d b y
D a t e
S u b m i t t e d b y
D e s c r i p t i o n D a t e
A c t i o n
S o l i c i t a t i o n
N o
C o n t r a c t
N o
R e v
F i l e
N a m e
P l o t
D a t e
P l o t
S c a l e
S y m b o l T r a c k i n g
N o
I B
M T
C
C d w g
R E
H A
B I L
I T
A T
I O
N
I M
P R
O V
E M
E N
T S
F O
R
T
V
E E
S
A
T
E
D I N
B U
M
P
S
T A
T I O
N
H I D
A L
U
N T
Y
T
E X
A S
P R
O J E
U R
S
G r o u p
I n c
A m b e r g l e n
B l v d
A u s t i n
T e x a s
T B g
N o
F
U S
I N
T E
R N
A T
I O
N A
L
B
O U
N D
A R
Y
W A
T E
R
C
O M
M I S
S I O
N
S
O
T
X
FOR CONSTRUCTION
1 2 3 4 5
D
C
A
B
DRAWING NO.:
65OF
SHEET NO.:
S
E A
N
C
O O
K
P
E
B R
I A
N
M
E R
C E
R O
N
S E
O
K
P
E
L A
N C
E
F
I N
N E
F R
O C
K
P
E
0 10' 20' 40'
SCALE: 1" = 20'
P R
O P
O S
W
S
T E
V E
E
D
E T
A I L S
C-401
PROPOSED WESTERN LEVEE DETAILS
SCALE: 1" = 20'
M A
T C
H
L
I N
E
S E
E
S
H E
C-400
SEE C-500 AND C-501 FOR WEST LEVEE PLAN
AND PROFILE AND SEE C-504 FOR WEST RAMP
PLAN AND PROFILE
GENERAL NOTES:
1. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"
(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY
LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.
2. THE FLOATING BOLLARD FENCE IS SHOWN FOR
INFORMATIONAL PURPOSES ONLY. NO COST OR WORK SHALL
BE INCLUDED IN THIS PROJECT.
3. SEE SPECIFICATION SECTION 35 42 37 FOR RIP RAP
REQUIREMENTS.
4. TOP SOIL EMBANKMENT SHALL BE PLACED ON GEOSYNTHETIC
EROSION CONTROL MATERIAL IN ACCORDANCE WITH
SPECIFICATION 35 42 35. TOP SOIL SHALL BE SEEDED IN
ACCORDANCE WITH SPECIFICATION SECTION 32 92 00.
5. CONTRACTOR SHALL REMOVE AND REINSTALL THE WOODEN
STAIRCASE IN THIS AREA. THE CONTRACTOR SHALL PERFORM
ANY MODIFICATIONS AS REQUIRED PRIOR TO REINSTALLING
THE STAIRCASE. THE CONTRACTOR SHALL COORDINATE THE
EXACT LOCATION WITH THE COR AND SUBMIT SHOP
DRAWINGS FOR REVIEW AND COMPLIANCE CONFORMATION
PRIOR TO MAKING MODIFICATIONS.
6. DRILLED PIER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .