08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf

PDF 38 MB Posted

Attached to
Design Build - Edinburg Pump Station
Solicitation number
191BWC21R0004
Issued by

About this file

This document provides details for a federal contract solicitation for design and construction services. The United States Section of the International Boundary and Water Commission is seeking proposals to design and construct approximately 800 linear feet of levee rehabilitation improvements at the Edinburg Pump Station in Hidalgo County, Texas. The proposed work includes analysis and investigations of the existing levee, additional geotechnical testing, assessing structures within the levee, preparing right-of-way, removing and stockpiling excavated material, widening the levee, installing new sections of concrete floodwall and bollard walls, constructing floodwall foundations, replacing an existing gatewell structure, backfilling and grading embankment material, installing an aggregate roadway surface, removing and replacing fencing, and revegetation. Interested offerors should review the associated documents for additional requirement information. The agency issuing this solicitation is the International Boundary and Water Commission United States-Mexico.

View the file

Other files

File Type Posted
191BWC21R0004 DB Solicitation Revised per A00005.pdf PDF
191BCW21R0004 A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00004_final.pdf PDF
191BCW21R0004 A00004.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00003.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210609.pdf PDF
191BWC21R0004 A00003.pdf PDF
Final QA Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210526.pdf PDF
Additional and Revised Questions - Answers Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 Amendment A00002.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00002.pdf PDF
191BWC21R0004 Amendment A00001.pdf PDF
Questions and Answers Received Against Solicitation 191BWC21R0004.pdf PDF
Edinburg Prebid Agenda 20210503.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00001.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210519.pdf PDF
HCID1-USIBWC MOA_ 20160926.pdf PDF
Edinburg Prebid Sign-In Sheet 20210503.pdf PDF
16_USIBWC Model 2003.zip ZIP file
13_HCID1 Penitas PS AS BUILTS April 2020.pdf PDF
18_S-B LRGFCP Hydraulic Model Update Report 200807.pdf PDF
06_Geotech Report DHS Segment O-4(Special) 20080606.pdf PDF
25_Wage Determination 2015-5245.pdf PDF
26_191BWC21R0004 Edinburg Levee Design Build.pdf PDF
20_IBWC Form 116.pdf PDF
21_IBWC Form 117.pdf PDF
11_IBM10C0014 Selected Drawings 2010.pdf PDF
05_Geotech Report DHS Segment O-4B 20091109.pdf PDF
23_191BWC21R0004 Past Performance Questionnaire (Phase 2).docx DOCX document
22_191BWC21R0004 Client Authorization Letter (Phase 2).docx DOCX document
09_191BWC19R0004 Edinburg Specs 20190816.pdf PDF
19_IBWC Form 110.pdf PDF
02_Edinburg PS Geotech Report 20151118.pdf PDF
15_USIBWC LRGFCP Hydraulic Model Report 200306.pdf PDF
12_HCID1 Penitas PS Bid Package - Specs 20180509.pdf PDF
01_Edinburg PS Design Report 20151118 woA.pdf PDF
17_S-B Model 2008.zip ZIP file
14_Asbestos - Lead Paint Survey 20160125.pdf PDF
24_General Decision Number TX20210003.pdf PDF
07_Easement Metes - Bounds Drawings 20160330.pdf PDF
10_IBM14T0012 URS Structural Calculations.pdf PDF
04_Final Mission SEA and FONSI 20111031.pdf PDF
191BWC21R0004 Design Build.pdf PDF
03_Final Mission EA 200702.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Penitas

La Joya

B83

WALKER

LAKE

EDINBURG SETTLING

BASIN

P e ñ i t a s

S t

M i l i t a r y

R d

Rio Grande Rio Grande

SOLICITATION NO: __________________

CONTRACT NO: _____________________

C O

S S

O L I C

I T

A T

I O

N

N

O

C O

N T

R A

C T

N

O

URS GROUP, INC.

9400 AMBERGLEN BLVD.

AUSTIN, TX 78729

(512) 454-4797

TBPE Firm No. F-3162

U.S. INTERNATIONAL BOUNDARY AND

WATER COMMISSION

EL PASO, TX

REHABILITATION IMPROVEMENTS FOR THE

LEVEES AT EDINBURG PUMP STATION

HIDALGO COUNTY, TEXAS

TEXAS

Brownsville

El Paso

Christi

Corpus

Laredo

Lubbock

Amarillo

Worth

Fort

Abilene

Austin

Galveston

Houston

Dallas

Longview

San

Antonio

Project Description:

The Project includes the Edinburg Pump Station, Earthen Levees and

Concrete floodwalls of the Rio Grande Levee System along the Rio

Grande within Hidalgo County from Station 1+00.00 to Station 10+50.00.

The approximate total length of construction is 787 feet.

EDINBURG

PUMP

HOUSE

INTAKE

CHANNEL

WEST LEVEE

IMPROVEMENTS

EAST LEVEE

IMPROVEMENTS

PROJECT CONTACTS:

USIBWC HEADQUARTERS (915) 832-4101

Mr. Valentin Arzloa

4171 N. Mesa Street, Suite C-100

El Paso, TX 79902

USIBWC MERCEDES FIELD OFFICE (956) 565-3150

Mr. Rodolfo Montero

325 Golf Course Road

Mercedes, TX 78570

HIDALGO COUNTY IRRIGATION (956) 383-3886

DISTRICT 1

Mr. Rusty McDaniel

1904 N. Expressway 281

Edinburg, TX 78542

BORDER PATROL (202) 306-7823

Mr. Scott Recinos

1331 Pennsylvania Avenue, NW Suite 755N

(National Place Bldg)

Washington, D.C. 20229

UTILITIES (800) 245-4545

Type of Construction:

Site Work: Earthen Levee and Ramps

Structural: Concrete Floodwalls, C-B Slurry Walls and Miscellaneous

Metal Work

D a w n b

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

G d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

H E

L

V

E E

S

A

T

E

D I N

B U

G

P

U M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B e g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

A S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

I N

D E

X

O

F

D

R A

W I N

G S

D R A W I N G I N D E X

DRAWING

NUMBER

SHEET

NUMBER

DRAWING TITLE

G-0011 COVER SHEET

G-0022 INDEX OF DRAWINGS

G-0033 LEGEND & ABBREVIATIONS

G-0044 GENERAL NOTES

G-0055 ESTIMATE OF QUANTITIES

C-1006 EXISTING OVERALL SITE PLAN

C-1017 EXISTING WESTERN SITE PLAN

C-1028 EXISTING EASTERN SITE PLAN

C-200

SURVEY CONTROL PLAN

C-201

HORIZONTAL CONTROL PLAN

C-300

DEMOLITION AND SLURRY WALL / FLOODWALL EXCAVATION PLAN

C-400

PROPOSED OVERALL LEVEE IMPROVEMENTS KEY PLAN

C-401

PROPOSED WESTERN LEVEE DETAILS

C-402

PROPOSED EASTERN LEVEE DETAILS

C-500

PROPOSED WEST PLAN AND PROFILE B\L STA. 0+00 TO STA. 2+25

C-502

PROPOSED EAST PLAN AND PROFILE B\L STA. 5+75 TO STA. 9+00

C-600

PROPOSED TYPICAL LEVEE SECTIONS 1 OF 6

C-601

PROPOSED TYPICAL LEVEE SECTIONS 2 OF 6

C-602

PROPOSED TYPICAL LEVEE SECTIONS 3 OF 6

C-800

CROSS-SECTIONS SHEET 1 OF 7

C-801 CROSS-SECTIONS SHEET 2 OF 7

C-802

CROSS-SECTIONS SHEET 3 OF 7

C-803

CROSS-SECTIONS SHEET 4 OF 7

C-804

CROSS-SECTIONS SHEET 5 OF 7

C-805

CROSS-SECTIONS SHEET 6 OF 7

C-806

CROSS-SECTIONS SHEET 7 OF 7

C-301

WESTERN FLOODWALL EXCAVATION PLAN AND PROFILE

C-302

EASTERN FLOODWALL EXCAVATION PLAN AND PROFILE

C-501

PROPOSED WEST PLAN AND PROFILE B\L STA. 2+25 TO STA. 5+00

C-700

PROPOSED EAST BLANKET DRAINAGE PLAN AND PROFILE

C-701

PROPOSED WEST BLANKET DRAINAGE PLAN AND PROFILE

C-702

CHIMNEY / BLANKET DRAIN DETAILS

C-703

CHIMNEY DRAIN BEHIND FLOODWALL

D R A W I N G I N D E X

DRAWING

NUMBER

SHEET

NUMBER

DRAWING TITLE

GENERAL DRAWINGS

CIVIL DRAWINGS

STRUCTURAL DRAWINGS

GT-10161 SOIL BORING LOGS SHEET 1 OF 2

GT-10262 SOIL BORING LOGS SHEET 2 OF 2

S-001

S-002

S-100

S-300

S-301

S-302

S-303

S-304

S-305

S-306

S-307

S-308

S-309

S-310

S-311

S-312

S-400

S-401

STRUCTURAL GENERAL NOTES 1 OF 2

STRUCTURAL GENERAL NOTES 2 OF 2

FLOODWALL FOUNDATION PLANS

TYPICAL FLOODWALL MONOLITH FOUNDATION PLAN

TYPICAL FLOODWALL SECTION AND DETAILS

CONCRETE SECTIONS AND DETAILS

TYPICAL FLOODWALL JOINT SECTIONS

TYPICAL FLOODWALL JOINT SECTIONS AND DETAILS

TYPICAL BOLLARD WALL SECTIONS AND DETAILS 1 OF 2

TYPICAL BOLLARD WALL SECTIONS AND DETAILS 2 OF 2

ANTI-CLIMBING FENCE TYPICAL DETAILS

TYPICAL DRILLED PIER SECTIONS AND DETAILS

GATEWELL SECTIONS AND DETAILS

METAL LADDER SECTIONS AND DETAILS

SLIDE GATE DRAINAGE STRUCTURE SECTIONS AND DETAILS

STAINLESS STEEL SLIDE GATE DETAILS 1 OF 2

FLOATING BOLLARD WALL TYPICAL DETAILS 1 OF 2

FLOATING BOLLARD WALL TYPICAL DETAILS 2 OF 2

GT-10060 SOIL BORING LOCATION PLAN

GEOTECHNICAL DRAWINGS

R-10063 RIGHTS OF WAY PLAN

RIGHTS-OF-WAY DRAWINGS

C-603 PROPOSED TYPICAL LEVEE SECTIONS 4 OF 6

C-604 PROPOSED TYPICAL LEVEE SECTIONS 5 OF 6

C-605 PROPOSED TYPICAL LEVEE SECTIONS 6 OF 6

C-403 EROSION PROTECTION PLAN

C-503

C-504

C-505

PROPOSED EAST PLAN AND PROFILE B\L STA. 8+50 TO STA. 11+00

PROPOSED WEST RAMP PLAN AND PROFILE

PROPOSED EAST RAMP PLAN AND PROFILE

S-31357 STAINLESS STEEL SLIDE GATE DETAILS 2 OF 2

R-10164 RIGHTS OF WAY PLAN WEST DETAILS

R-10265 RIGHTS OF WAY PLAN EAST DETAILS

G-002

STATE PLANE COORDINATES

INDICATES SECTION OR DETAIL

TAKEN FROM AND SHOWN ON

THE SAME SHEET, LETTER

INDICATES SECTION & NUMBER

INDICATES DETAIL

A

ABBREVIATIONS LEGEND

EXCAVATION

DEMOLITION

CHIMNEY BLANKET

CONCRETE

RIP RAP

N 10548161.57

E 466585.12

TYPE III BARRICADE

SIGN

MESSAGE BOARD

USIBWC EASEMENT

LEVEE TOE

XX

SECTION "LETTER" OR DETAIL "#"

SHEET NUMBER

ALIGNMENT

NEW LEVEE CROWN

DITCH

AC ACRES

ACP ASPHALTIC CONCRETE PAVING

AGGR AGGREGATE

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

APPROX APPROXIMATE

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AZ AZIMUTH

B/B BACK TO BACK

BC BACK OF CURB

BL BASE LINE

BM BENCHMARK

BMPS BEST MANAGEMENT PRACTICES SYSTEM

BOT F BOTTOM FACE

C&G CURB AND GUTTER

CB CATCH BASIN

CFS CUBIC FEET PER SECOND

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONSTRUCTION JOINT

CL CENTER LINE

CMP CORRUGATED METAL PIPE

CONC CONCRETE

CONST CONSTRUCTION

COR

CONTRACTING OFFICER REPRESENTATIVE

CP CONTROL POINT

CPT CONE PENETRATION TEST

CU FT CUBIC FEET

CU YD CUBIC YARD

DEPTH

DA

DRAINAGE AREA

DEG DEGREE

DEMO DEMOLITION

DIA DIAMETER

DIST DISTANCE

DMS DEGREES, MINUTES, SECONDS

EASTING

EA EACH

EC EDGE OF CURB

EL ELEVATION

ELEC ELECTRIC

ENV ENVIRONMENTAL

ESMT EASEMENT

EW EACH WAY

EX EXTERNAL LENGTH

EXIST EXISTING

EXIST GR EXISTING GRADE

FH FIRE HYDRANT

FHWA FEDERAL HIGHWAY ADMINISTRATION

FIN FINISH

FIN GR FINISH GRADE

FLL FLOW LINE

FOC FACE OF CURB

FOW

FACE OF WALL

FT FOOT

FW FLOODWALL

NATURAL GAS

G LN GAS LINE

GALV GALVANIZED

GCA

GRADED CRUSHED AGGREGATE

GR GROUND

GR LN GRADE LINE

HORIZONTAL

HDWL HEADWALL

HGL

HYDRAULIC GRADE LINE

HNDRL HANDRAIL

HR HOUR

HS HIGH STRENGTH

HV HIGH VOLTAGE

HWY HIGHWAY

ID INSIDE DIAMETER

IN INCHES

K-VALUE

kVA KILOVOLT AMPERE

LENGTH

LAT LATERAL

LBS POUNDS

LF LINEAR FEET (FOOT)

LR LEVEE RAISE

LS LUMP SUM

MAX MAXIMUM

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MSE MECHANICAL STABILIZED EARTH

MTZ METZGER

NORTHING

NAD83 NORTH AMERICAN DATUM (1983)

NAVD88 NORTH AMERICAN VERTICAL DATUM (1988)

No NUMBER

NOM NOMINAL

NTS

NOT TO SCALE

OC

ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

PC POINT OF CURVE

PGL PROFILE GRADE

PI POINT OF INTERSECTION

PL PROPERTY LINE

PP POWER POLE

PROP PROPOSED

PT POINT OF TANGENCY

PVMT PAVEMENT

PSI POUNDS PER SQUARE INCH

PVC POLY VINYL CHLORIDE

DISCHARGE

RADIUS

RCP REINFORCED CONCRETE PIPE

RD ROAD

REL RELOCATE

REM REMOVE

ROW RIGHT OF WAY

RR RAILROAD

SOUTH

SD STORM DRAIN

SEC SECOND

SF

SQUARE FEET

SHLDR SHOULDER

SQ YD SQUARE YARD

SS SANITARY SEWER

ST STREET

STA STATION

SW SIDEWALK

SWPPP STORM WATER POLLUTION PREVENTION PLAN

TAN TANGENT

TCP TRAFFIC CONTROL PLAN

TE TOP ELEVATION

TEMP TEMPORARY

TOC TOP OF CURB

TOC FTG TOP OF CONCRETE FOOTING

TOC WALL TOP OF CONCRETE WALL

TOLE TOP OF LEVEE ELEVATION

TxDOT TEXAS DEPARTMENT OF TRANSPORTATION

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UNPV RD UNPAVED ROAD

USACE UNITED STATES ARMY CORPS OF ENGINEERS

USIBWC

U.S. INTERNATIONAL BOUNDARY & WATER COMMISSION

VERTICAL

VC

VEL VELOCITY

VFZ VEGETATION FREE ZONE

VPC VERTICAL POINT OF CURVATURE

VPI

VERTICAL POINT OF INTERSECTION

VPT VERTICAL POINT OF TANGENCY

WEST

W/ WITH

W/O WITHOUT

WL WATER LINE

EMBANKMENT FILL

LRGV LOWER RIO GRANDE VALLEY

TRAFFIC FLOW ARROW

N

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

Q

R

S

V

W

K

L

H

G

E

D

VERTICAL CONTROL POINT

HORIZONTAL CONTROL POINT

HORIZONTAL VERTICAL CONTROL POINT

CULV CULVERT

RCB REINFORCED CONCRETE BOX

UNION PACIFIC RAILROADUPRR

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

CR COUNTY ROAD

FM FARM TO MARKET

FND FOUND

PCC POINT OF COMPOUND CURVE

SCP SECONDARY CONTROL POINT

CONSTRUCTION ZONE

FLOW

EPCWID1 EL PASO COUNTY WATER IMPROVEMENT DISTRICT #1

SF

SILT FENCE

BORDER FENCE

FLEX BASE

TOPSOIL

AREA TO BE SEEDED

WSE

MINIMUM TOLE

WSE WATER SURFACE ELEVATION

X SECT CROSS SECTION

LOC

LIMITS OF CONSTRUCTION

LT LEFT

RT RIGHT

X X BARB WIRE FENCE

CHAIN LINK FENCE

SHPO STATE HISTORIC PRESERVATION OFFICER

PRC POINT OF REVERSE CURVE

EMD ENVIRONMENTAL MANAGEMENT DIVISION

RGRP RIO GRANDE RECTIFICATION PROJECT

L E

G E

B B

R E

V I A

T I O

N S

LEGEND

OVERHEAD UTILITY

UTILITY POLE

FOUND 1" IRON PIPE

RECORD INFORMATION

NOT TO SCALE

OFFICIAL PUBLIC RECORD OF REAL PROPERTY OF

BEXAR COUNTY, TEXAS

DEED AND PLAT RECORDS OF BEXAR COUNTY, TEXAS

SQUARE FEET

RIGHT-OF-WAY

FIRE HYDRANT

LIGHT STANDARD

STORM WATER MANHOLE

WASTEWATER MANHOLE

WATER VALVE

SIGN/BILLBOARD (AS NOTED)

ELECTRIC TRANSFORMER

WIRE FENCE

CHAIN LINK FENCE

FOUND 1/2" IRON ROD

TELEPHONE PEDESTAL

FIR

GAS VALVE

BOLLARD

GUY WIRE

GATE POST

CONCRETE

REINFORCED CONCRETE PIPE

NEW COUNTY BLOCK

(UNLESS OTHERWISE NOTED)

FOUND TXDOT CONCRETE MONUMENT

SET 1/2" IRON ROD W/CAP STAMPED

"VICKREY PROPERTY CORNER"

SIR

UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED

SOIL BORE

ROW

NATURAL GAS PIPELINE

OHE

G

CONCRETE WALL WITH BOLLARD FENCE

(TEXAS GAS SERVICE)

PROPOSED BOLLARD FENCE

CONCRETE WALL WITH BOLLARD FENCE

LOD LOD

LIMITS OF DISTURBANCE

CONCRETE WALL FOOTING

SLURRY CUTOFF WALL

OVERHEAD ELECTRIC LINE

OHE

WOODEN FENCE

CHAIN LINK FENCE DEMOLITION

A

XX

SLURRY WALL

G-003 a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

G d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

G E

N E

R A

L

N

O T

E S

GENERAL NOTES:

1.0 COORDINATE WORK ACTIVITIES, INCLUDING ACCESS, WITH THE USIBWC

CONTRACTING OFFICER'S REPRESENTATIVE (COR).

1.1 CONTRACTOR SHALL REFER TO TECHNICAL SPECIFICATIONS DIVISION 01-GENERAL

REQUIREMENTS, 01.57.13 "TEMPORARY CONTROLS FOR WORK AREAS".

1.2 THE CONTRACTOR WILL NOT CONTACT THE TEXAS HISTORICAL COMMISSION (THC),

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), U.S. FISH AND WILDLIFE

SERVICE (USFWS), TEXAS PARKS AND WILDLIFE DEPARTMENT (TPWD) OR THE

ENVIRONMENTAL PROTECTION AGENCY (EPA) UNLESS USIBWC ENVIRONMENTAL

STAFF ARE PRESENT OR HAVE AUTHORIZED THE CONTRACTOR TO CONTACT THOSE

ENTITIES.

1.3 THE IBWC EASEMENT SHOWN ON THESE PLANS WAS TAKEN FROM THE CAD FILES

PREPARED FOR THE PROJECT ENTITLED: “EDINBURG PUMP LEVEE RELOCATION &

CHANNEL CROSSING IMPROVEMENTS PROJECT - DHS SEGMENT O-04 B”, PREPARED BY

DANNENBAUM ENGINEERING COMPANY-MCALLEN, LLC IN 2010. THE EASEMENT

LINEWORK IN THE CAD FILE WAS SCALED DOWN FROM A STATED PROJECT COMBINED

SCALE FACTOR (CFS) OF 1.00000249 TO 1.00000000 TO FIT THE COORDINATES OF THIS

CURRENT PROJECT. THE CFS WAS REPORTED IN THE DOCUMENT "HORIZONTAL AND

VERTICAL CONTROL FOR HIDALGO COUNTY LEVEE RESTORATION PROJECT", ALSO

PREPARED BY DANNENBAUM IN 2008.

1.4 ALL EQUIPMENT THAT IS USED ON GOVERNMENT PROPERTY MUST BE FULLY

OPERATIONAL AND FREE OF ANY OIL OR FLUID LEAKS. ANY LEAKS NOTED ON

EQUIPMENT ONSITE SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR,

FAILURE TO DO SO WILL BE CAUSE FOR THE GOVERNMENT TO REJECT THE

DEFICIENT EQUIPMENTS USE ONSITE.

1.5 CONTRACTOR IS RESPONSIBLE FOR CONDITION OF ALL COMPLETED CONTRACTUAL

WORK UNTIL FINAL ACCEPTANCE OF PROJECT IS COMPLETED AND CONTRACTOR

WARRANTY IS IMPLEMENTED BY USIBWC.

1.6 CONTRACTOR IS AWARE THAT OTHER FEDERAL AGENCIES / PROPERTY OWNERS /

LOCAL AGENCIES, MAY OPERATE WITHIN PROJECT RIGHT OF WAY. CONTRACTOR IS

RESPONSIBLE FOR SECURING ANY OPEN EXCAVATIONS AND OTHER SAFETY HAZARDS

AT END OF WORK SHIFT EVERY DAY.

1.7 THE CONTRACTOR IS NOT ALLOWED TO USE VEGETATIVE BUFFER AS PART OF THEIR

SWPPP CONTROLS.

1.8 THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL AS REQUIRED PER THE

APPLICABLE SPECIFICATION AND PLAN SHEETS REQUIREMENTS THROUGHOUT

CONSTRUCTION AND SHALL INSPECT EROSION CONTROLS ON A MINIMUM WEEKLY

BASIS.

1.9 “EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE

LEVEE. THE FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTION WHEN

CONTRACTOR ISN'T ACTIVELY WORKING IN THE AREA.

1.10 ALL WORK SHALL BE DONE BY A CONTRACTOR HAVING A VALID, APPROPRIATE

CONTRACTOR'S LICENSE ISSUED BY THE STATE OF TEXAS REGISTRAR OF

CONTRACTORS.

1.11 ALL BID ITEMS ARE COMPLETE IN PLACE, INCLUDING FURNISHING ALL MATERIALS,

EQUIPMENT, TOOLS, SUPPLIES, INCIDENTALS, TRANSPORTATION AND EXPERIENCED

PERSONNEL AND SUPERINTENDENCE REQUIRED.

1.12 THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTY AND EXISTING AND

NEW IMPROVEMENTS, AND SHALL PROVIDE POSITIVE CONTROL OF EARTH SPILLAGE,

CONSTRUCTION WATER AND RUNOFF WATER FROM THE SITE.

1.13 THE CONTRACTOR SHALL LIMIT ALL CONSTRUCTION ACTIVITIES TO WITHIN THE

USIBWC RIGHT-OF -WAY AND EASEMENTS AS NOTED ON THE CONTRACT DRAWINGS.

1.14 ALL FEES AND PERMITS REQUIRED FOR THE WORK SHALL BE OBTAINED BY AND PAID

FOR THE CONTRACTOR. NO PROJECT EXTENSION WILL BE ALLOTTED DUE TO TIME

REQUIRED TO OBTAIN PERMITS.

1.15 THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL

REGULATIONS RELATED TO THE SAFETY OF PERSONNEL AND THE PUBLIC ON THE JOB

SITE, INCLUDING APPLICABLE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

REGULATIONS, AS WELL AS USACE EM 385-1-1.

1.16 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AT THE STAGING AND

STORAGE AREA DURING CONSTRUCTION. TEMPORARY FENCING NOTED IN THE

CONTRACTOR'S SITE SECURITY PLAN SHALL BE INSTALLED AND MAINTAINED BY THE

CONTRACTOR DURING THE ENTIRE CONSTRUCTION OF THE PROJECT.

1.17 DURING THE COURSE OF ALL WORK ON THE PROJECT, THE CONTRACTOR SHALL

ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR ALL JOB SITE CONDITIONS

INCLUDING SAFETY OF ALL PERSONS AND SECURITY OF ALL PROPERTY. THE

CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING THE SKILLS AND

ATTENTION UTILIZED WITHIN THE INDUSTRY. THE CONTRACTOR SHALL BE SOLELY

RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,

AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER

THIS CONTRACT. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE

LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY

AND HOLD THE USIBWC AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY,

REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS

PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE

UISBWC OR ENGINEER.

SURVEY NOTES:

2.0 EXISTING TOPOGRAPHIC DATA SHOWN ON THESE PLANS WAS PRODUCED FROM A

GROUND SURVEY PERFORMED BY VICKREY & ASSOCIATES, INC., SAN ANTONIO, TEXAS

DURING JANUARY 2015. SEE SHEET C-200.

2.1 THIS SURVEY DOES NOT IDENTIFY OR DELINEATE ANY SURFACE OR SUBSURFACE

MINERAL RIGHTS, NOR DOES IT IDENTIFY ANY RIGHTS TO THE SURFACE RESULTING

FROM SAID MINERAL RIGHTS.

2.2 BEARINGS ARE BASED ON NORTH AMERICAN DATUM OF 1983(2011), TEXAS

COORDINATE SYSTEM, SOUTH ZONE (4205).

2.3 ELEVATIONS SHOWN HEREIN ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF

1988.

2.4 UTILITIES SHOWN HEREIN ARE BASED ON FIELD OBSERVATIONS ONLY.

UTILITY COORDINATION NOTES:

3.0 A ONE CALL UTILITY LOCATE (TICKET #1479066585) WAS REQUESTED FOR THE PUBLIC

RIGHT-OF-WAY ADJACENT TO SUBJECT PROPERTY AT THE TIME OF THE TOPOGRAPHIC

SURVEY. ALL UTILITIES SHOWN SHOULD BE REVIEWED AND VERIFIED. UTILITY

PURVEYORS SHOULD BE CONTACTED PRIOR TO CONSTRUCTION.

CONTACT INFORMATION:

ENTERPRISE PRODUCTS OPERATING LLC.

PHONE: 1-800-245-2545

3.1 CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (1-800-245-4545) OR (811) 48

HOURS PRIOR TO BEGINNING WORK AT ANY LOCATION TO LOCATE UTILITIES WITHIN

THE WORK ZONE.

TRAFFIC CONTROL NOTES:

4.0 THE CONTRACTOR SHALL MAINTAIN TRAFFIC CONTROL FOR THE PROJECT SITE IN

ACCORDANCE WITH SPECIFICATION SECTION 01.55.00 VEHICULAR ACCESS AND

PARKING.

STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NOTES:

5.0 THE CONTRACTOR SHALL PERFORM SWPPP WORK IN ACCORDANCE WITH

SPECIFICATION SECTION 01.57.13 TEMPORARY ENVIRONMENTAL CONTROLS.

GENERAL NOTES (CONT):

1.18 ALL BID ITEMS ARE COMPLETE IN PLACE, INCLUDING FURNISHING ALL MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, INCIDENTALS, TRANSPORTATION AND EXPERIENCED PERSONNEL AND

SUPERINTENDENCE REQUIRED.

1.19 IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED DURING THE COURSE OF CONSTRUCTION, THE

CONTRACTOR SHALL IMMEDIATELY BRING THE CONDITION TO THE ATTENTION OF THE USIBWC COR.

1.20 A COPY OF THESE CONTRACT DRAWINGS SHALL BE KEPT IN AN EASILY ACCESSIBLE LOCATION ON

THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.

1.21 THE CONTRACTOR MUST TAKE INTO CONSIDERATION THAT WORK AREA IS LOCATED AT THE

SOUTHERN BORDER OF THE UNITED STATES ALONG THE RIO GRANDE AND ENCOUNTERS WITH

DRUG AND / OR HUMAN SMUGGLING ACTIVITIES ARE HIGHLY PROBABLE. CONTRACTOR WILL BE

REQUIRED TO CARRY OUT AREA-SPECIFIC SAFETY/SECURITY MEASURES AND THE COSTS FOR

THESE MEASURES WILL NOT BE PAID FOR SEPARATELY AND WILL BE CONSIDERED INCIDENTAL TO

THE PROJECT.

1.22 THE CONTRACTOR SHALL PERFORM EXCAVATION IN A SAFE CONDITION. THE CONTRACTOR IS

SOLELY RESPONSIBLE FOR SHORING, SHEETING, OR OTHER PROTECTIVE MEASURES TO PREVENT

DAMAGE TO ADJACENT PROPERTIES, STRUCTURES OR UTILITY FACILITIES.

1.23 THE USIBWC COR SHALL DETERMINE ACCEPTABILITY OF THE MATERIALS OF CONSTRUCTION AS

INDICATED IN THE APPLICABLE SECTIONS OF THE SPECIFICATIONS. THE CONTRACTOR SHALL BEAR

ALL COSTS OF PROVIDING THE BURDEN OF PROOF THAT NON-CONFORMING WORK IS REASONABLE

AND ADEQUATELY ADDRESSES THE DESIGN PURPOSE. THE CONTRACTOR SHALL BEAR ALL RISK

FOR CONTINUING WITH NON-CONFORMING WORK IN QUESTION UNTIL A DETERMINATION REGARDING

ITS ACCEPTABILITY IS MADE BY USIBWC COR. THE USIBWC COR MAY IMPOSE CONDITIONS FOR

ACCEPTANCE OF NON-CONFORMING WORK. THE CONTRACTOR SHALL BEAR ALL COSTS FOR THE

FULFILLMENT OF THE CONDITIONS IMPOSED. ALL DECISIONS REGARDING WHETHER THE WORK

SATISFIES THE DESIGN PURPOSE, WHETHER NON-CONFORMING WORK IS REASONABLY

ACCEPTABLE, AND THE CONDITIONS FOR ACCEPTANCE SHALL BE AT THE SOLE DISCRETION OF THE

USIBWC COR.

1.24 WORK WILL BE CONDUCTED IN AREAS ADJACENT TO URBAN DEVELOPMENT AND CONTRACTOR WILL

EXERCISE CAUTION AND FOLLOW NECESSARY PRECAUTIONS AS PER THE REQUIREMENTS OF THE

PROJECT SPECIFICATIONS.

1.25 ALL TRASH, RUBBLE, AND DEBRIS ENCOUNTERED WITHIN THE PROJECT LIMITS SHALL BE REMOVED

AND DISPOSED OF OFFSITE BY THE CONTRACTOR AT AN APPROVED LOCATION. THE CONTRACTOR

SHALL PAY ALL ASSOCIATED DUMPING FEES.

1.26 EQUIPMENT AND MATERIAL NOT IN USE SHALL BE LOCATED ON THE LANDSIDE OF THE LEVEE. THE

FLOODPLAIN SHALL REMAIN CLEAR OF ANY OBSTRUCTION WHEN THE CONTRACTOR ISN'T ACTIVELY

WORKING IN THE AREA.

1.27 THESE CONTRACT DRAWINGS HAVE BEEN PREPARED BASED ON AN ABOVE-GROUND SURVEY. THE

EXISTING UNDERGROUND UTILITIES SHOWN ARE BASED ON AS-BUILT INFORMATION PROVIDED BY

THE USIBWC. THE BEST EFFORT HAS BEEN MADE TO DEPICT THESE UTILITIES, BUT THESE

LOCATIONS SHALL BE CONSIDERED APPROXIMATE. THERE MAY BE ADDITIONAL UNDERGROUND

UTILITIES NOT SHOWN ON THE CONTRACT DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO VERIFY EXISTENCE AND LOCATION OF ALL UTILITIES INCLUDING USE OF PRIVATE

UTILITY LOCATING SERVICE AND POTHOLING AS NECESSARY TO CONFIRM ALL UTILITIES PRIOR TO

CONSTRUCTION PER THE APPLICABLE SPECIFICATION REQUIREMENTS.

1.28 QUANTITIES SHOWN ON VARIOUS “QUANTITY SUMMARY TABLES” HEREIN SHALL BE CONSIDERED AS

INFORMATIONAL ONLY AND SHALL NOT SERVE AS THE BASIS OF THE CONTRACTORS BID. IT IS

EXPRESSLY UNDERSTOOD AND AGREED THAT THE QUANTITIES NOTED IN THESE TABLES ARE NOT

BY VIRTUE OF SUBMITTING A BID, A PART OF THE CONTRACT, AND REPRESENT ONLY AN OPINION BY

THE ENGINEER AS TO THE QUANTITIES SPECIFIC TO THAT TABLE. THE QUANTITY TABLES ARE

INCLUDED IN THE PLANS ONLY FOR THE CONVENIENCE OF BIDDERS AND THEIR USE IS SUBJECT TO

ALL THE CONDITIONS AND LIMITATIONS SET FORTH IN THE CONTRACT DOCUMENTS RELATING TO

THE EXAMINATION OF THE CONTRACT DOCUMENTS AND THE SUBMISSION OF A BID. SPECIFICALLY, SUBMISSION OF A BID SHALL BE CONCLUSIVE EVIDENCE THAT THE BIDDER HAS INVESTIGATED AND

IS SATISFIED AS TO THE CONDITIONS TO BE ENCOUNTERED, THE CHARACTER, QUALITY, AND SCOPE

OF WORK TO BE PERFORMED, THE QUANTITIES OF MATERIALS TO BE FURNISHED, AND THE

REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE BIDDER IS CAUTIONED THAT IT IS HIS/HER

SOLE RESPONSIBILITY TO MAKE SUCH INDEPENDENT INVESTIGATION AND EXAMINATION AS THE

BIDDER DEEMS NECESSARY IN ORDER TO SATISFY HIS/HERSELF AS TO THE CONDITIONS TO BE

ENCOUNTERED IN THE PERFORMANCE OF WORK AND THE QUANTITIES REQUIRED TO COMPLETE

THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE BIDDER SHALL TAKE NO

ADVANTAGE OF ANY APPARENT ERROR OR OMISSION IN THE PLANS, BID SCHEDULE ITEMS,

ESTIMATED QUANTITIES NOTED IN THE SCHEDULE, SPECIFICATIONS OR OTHER CONTRACT

DOCUMENTS. IN THE EVENT THE BIDDER DISCOVERIES AN APPARENT ERROR OR OMISSION OR BE IN

DOUBT AS TO THEIR MEANING, THE BIDDER SHALL IMMEDIATELY NOTIFY THE USIBWC, IN WRITING, REQUESTING A CLARIFICATION OR INTERPRETATION. ANY CLARIFICATION AND OR INTERPRETATION

DEEMED APPROPRIATE BY THE USIBWC SHALL BE ISSUED TO ALL PROSPECTIVE BIDDERS IN THE

FORM OF AN ADDENDUM. ANY ADDENDUM SO ISSUED SHALL FORM A PART OF THE CONTRACT

DOCUMENTS.

1.28 NEITHER THE USIBWC NOR THE ENGINEER WARRANTS OR GUARANTEES THE RESULTS OF ANY

GEOTECHNICAL OR SUBSURFACE INVESTIGATIONS AS BEING REPRESENTATIVE OF THE SITE,

BEYOND THE ACTUAL LOCATION OF THE TEST SPECIMEN(S) AND ASSUMES NO RESPONSIBILITY FOR

THE MANNER IN WHICH THIS INFORMATION MAY BE USED OR THE CONCLUSIONS REACHED IN

UTILIZING THE INFORMATION AS PROVIDED IN THE CONTRACT DOCUMENTS. FURTHER, THE USIBWC

AND THE ENGINEER NEITHER WARRANTS OR GUARANTEES THE CONCLUSIONS REACHED,

RECOMMENDATIONS MADE OR TEST RESULTS PRESENTED AS PART OF THE GEOTECHNICAL OR

SUBSURFACE INVESTIGATION AS BEING REPRESENTATIVE OF THE ENTIRE SITE. IT SHALL BE THE

CONTRACTORS SOLE RESPONSIBILITY TO SUPPLEMENT ANY INFORMATION PROVIDED WITH

ADDITIONAL SUBSURFACE INVESTIGATIONS AND TESTING, AT THEIR SOLE EXPENSE IN ORDER TO

ASSURE THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS IS REPRESENTATIVE OF THE

CONDITIONS TO BE ENCOUNTERED WITHIN THE LIMITS OF THE PROJECT AT THE TIME OF

CONSTRUCTION.

G-004

SPEC 31 21 00.00 12

DRAINAGE BLANKET (FINE AGGREGATE)

SPEC 31 21 00.00 12

CHIMNEY DRAIN (COARSE AGGREGATE)

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

G d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

E S

T I M

A T

E

O

F

Q

U A

N T

I T

I E

S

ESTIMATE OF QUANTITIES

PROPOSED LEVEE IMPROVEMENTS AT WESTERN LEVEE

SPEC 31 23 00.00 12

EXCAVATION

SPEC

SPEC 31 24 00.00 12

EMBANKMENT

SPEC 31 24 00.00 12

TOPSOIL

SPEC 50 20 00

FLEX BASE

CUT CU. YD. FILL CU. YD. 2D SURFACE AREA 3D SURFACE AREA

7,899 CU. YD.

218 CU. YD.

292 CU. YD.

2,552 CU. YD. 9,880 S.F.

37,030 S.F.

9,894.5 S.F. 11,782.5 S.F.

38,090 S.F.

11,082 S.F.

ESTIMATE OF QUANTITIES

PROPOSED LEVEE IMPROVEMENTS AT EASTERN LEVEE

SPEC CUT CU. YD. FILL CU. YD. 2D SURFACE AREA 3D SURFACE AREA

4,975 CU. YD.

249 CU. YD.

292 CU. YD.

1,272 CU. YD. 4,782 S.F.

37,123 S.F. 38,491 S.F.

5,425 S.F.

NOTES:

1. SEE SHEET C-401 FOR PROPOSED WESTERN LEVEE IMPROVEMENTS.

2. SEE SHEET C-402 FOR PROPOSED EASTERN LEVEE IMPROVEMENTS.

3. 2D SURFACE DENOTES FLAT HORIZONTAL SURFACE AREA.

4. 3D SURFACE DENOTES GROUND SURFACE AREA (CURVED).

5. QUANTITIES SHOWN ON THIS SHEET ARE FOR THE CONSTRUCTOR'S INFORMATION

ONLY AND ARE ONLY REPRESENTATIVE OF THE WESTERN AND EASTERN LEVEE

IMPROVEMENT WORK. THE CONSTRUCTOR SHALL REFER TO THE CONTRACT

DOCUMENTS AND COORDINATE WITH THE COR TO DETERMINE HOW ACTUAL PAYMENT

WILL BE VERIFIED AND PROCESSED.

6. ESTIMATED QUANTITIES SHOWN ON THIS SHEET ARE BASED ON THE BEST

INFORMATION AVAILABLE AND IT IS THE CONSTRUCTOR'S RESPONSIBILITY TO VERIFY

THEM PRIOR TO THE CONSTRUCTION.

7. ALL VOLUMES WERE DERIVED FROM CALCULATING DIFFERENCES IN TIN (TRIANGULAR

IRREGULAR NETWORK) SURFACE MODELS USING AUTOCAD CIVIL 3D SOFTWARE.

SPEC 32 31 13

SPEC DESCRIPTION

LF

UNITS QUANTITIES

EA

REMOVE , STORE, AND

REINSTALL WOODEN

STAIRCASE

REMOVE AND REPLACE

FENCE

ESTIMATE OF QUANTITIES

(REMOVE AND REPLACE)

SPEC 05 50 03.00 12

METALWORK

SPEC 05 50 04.02 12

MISCELLANEOUS

METALWORK

SPEC

SPEC 03 31 00.00 12

CAST-IN-PLACE

STRUCTURAL

CONCRETE

DISCRIPTION

QUANITIES UNITS

REINFORCED

CONCRETE

MISC. STEEL

FABRICATIONS,

HANDRAILS,

LADDER,

BOLLARD CAPS,

CONNECTIONS

LUMP SUM

CU. YDS.

ESTIMATE OF QUANTITIES

PROPOSED STRUCTURAL MATERIAL

SPEC 03 31 00.00 12

CAST-IN-PLACE

STRUCTURAL

CONCRETE

35STABILIZATION

SLAB

CONCRETE

CU. YDS.

SPEC 31 41 16.00 12

STEEL SHEET

PILING

STEEL SHEET

PILING

S.F.

SPEC 31 63 29

DRILLED

CONCRETE PIERS

AND SHAFTS

REINFORCED

CONCRETE

DRILLED PIERS

L.F.

780 CU. YD.

11,344 S.F.

SPEC 35 42 34

RIP RAP

527 CU. YD.

13,483 S.F.

SPEC 02 41 00

SPEC 31 23 00.00 12

EXCAVATION

SPEC 31 24 00.00 12

EMBANKMENT FILL

SPEC 31 24 00.00 12

TOPSOIL

SPEC 50 20 00

FLEX BASE

SPEC 35 42 34

RIP RAP

SPEC 31 56 13

SLURRY WALL CEMENT BENTONITE 567 CU. YD.

925 CU. YD.

18,884 S.F.

448 CU. YD.

14,460 S.F.

SPEC 35 42 35

GEOSYNTHETIC EROSION CONTROL

SPEC 31 05 19.04 12

SEPARATOR GEOTEXTILE

UNDER FLEX BASE

SPEC 31 05 19.04 12

SEPARATOR GEOTEXTILE UNDER RIP RAP

15,130 S.F. 15,733 S.F.

12,630 S.F. 13,421 S.F.

SPEC 35 42 35

GEOSYNTHETIC EROSION CONTROL

SPEC 31 05 19.04 12

SEPARATOR GEOTEXTILE

UNDER FLEX BASE

15, 695 S.F. 15,781S.F.

G-005

SPEC 31 21 00.00 12

DRAINAGE BLANKET (FINE AGGREGATE)

SPEC 31 21 00.00 12

CHIMNEY DRAIN (COARSE AGGREGATE)

27 CU. YD. 160 S.F.

12,082 S.F.

14,460 S.F. 12,082 S.F.

15,130 S.F. 15,733 S.F.

12,630 S.F. 13,421 S.F.

13,483 S.F.

SPEC 31 05 19.04 12

SEPARATOR GEOTEXTILE UNDER RIP RAP

14,216 S.F.

14,216 S.F.

15, 695 S.F. 15,781S.F.

9,894.5 S.F. 11,782.5 S.F.

27 CU. YD. 160 S.F.

SPEC 32 31 13 EA

REMOVE AND REPLACE

GATES

a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 40' 80'

SCALE: 1" = 40'

20'

E X

I S

T I N

G

O

V E

R A

L L

S

I T

E

P

L A

N

C-100

NOTES:

1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL

SURVEY INFORMATION.

2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.

EXISTING OVERALL SITE PLAN

SCALE: 1"=40'

EXISTING WESTERN SITE PLAN

C-101

1 EXISTING EASTERN SITE PLAN

C-102 a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 10' 20' 40'

SCALE: 1" = 20'

E X

I S

T I N

G

W

E S

T E

I T

E

P

L A

N

C-101

NOTES:

1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL

SURVEY INFORMATION.

2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.

M A

T C

H

L

I N

E

S E

E

S

H E

EXISTING WESTERN SITE PLAN

SCALE: 1"=20'

C-100

LEGEND:

LIMITS OF WORK

B-107

B-103

B-106

B-104

6' CHAIN LINK FENCE

WITH 3 BARB WIRE STRAND

STAIRCASE

SHED

GATE

GATE

SIDEWALK

EDGE OF

DIRT ROAD

EDGE OF

DIRT ROAD

O F

F I C

E

INTAKE CHANNEL

WITH BRACING

CONCRETE

STRUCTURE

IBWC EASEMENT

(SEE GENERAL NOTE

1.3 ON SHEET G-004)

CONCRETE WALL

WITH BOLLARD

FENCE

SHED

SHED

BOX CULVERT

6" RCP, FL:126.57

N= 16607709.85

E= 1001583.62

SIGN:

NATURAL GAS PIPELINE

TEXAS GAS SERVICE

1-800-344-8377

N= 16607697.95

E= 1001550.69

SIGN:

NATURAL GAS PIPELINE

TEXAS GAS SERVICE

1-800-344-8377

N= 16607907.00

E= 1001421.30

UTILITY POLE

N= 16608193.22

E= 1001540.70

UTILITY POLE

N= 16608173.79

E= 1001472.32

SOIL BORING

N= 16608082.34

E= 1001590.29

SOIL BORING

N= 16608078.37

E= 1001373.90

SOIL BORING

N= 16607941.40

E= 1001479.67

SOIL BORING

N= 16608108.53

E= 1001442.93

24" ENTERPRISE

UNDERGROUND GAS LINE TOP

OF GAS LINE AT EL. 72.20 FT +/-

N= 16608075.91

E= 1001579.46

N= 16607824.20

E= 1001593.60

N= 16607813.47

E= 1001610.48

N= 16607925.76

E= 1001647.50

N= 16607874.05

E= 1001728.07

N= 16607788.06

E= 1001693.48

N= 16608126.65

E= 1001394.70

N= 16608196.92

E= 1001491.11

PROPERTY LINE

(TYP.)

LIMITS OF CONSTRUCTION

(TYP.)

N= 16607744.47

E= 1001719.00

0 10' 20' 40'

SCALE: 1" = 20'

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

E X

I S

T I N

G

E

A S

T E

I T

E

P

L A

N

C-102

NOTES:

1. SEE SURVEY NOTES ON SHEET G-004 FOR ADDITIONAL

SURVEY INFORMATION.

2. SEE SHEET C-200 FOR SURVEY CONTROL INFORMATION.

M A

T C

H

L

I N

E

S E

E

S

H E

EXISTING EASTERN SITE PLAN

SCALE: 1"=20'

C-100

LIMITS OF WORK

N:16608075.91

E:1001579.46

N:16608431.67

E:1001317.99

0 40' 80'

SCALE: 1" = 40'

20' a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

S U

R V

Y

N

T R

O L

P

L A

N

C-200

CP #4

"X" CHISELED ON SIDEWALK

N: 16608571.309

E: 1001806.756

Z: 125.202

CP #3

"X" CHISELED ON SIDEWALK

N: 16608259.739

E: 1001979.276

Z: 123.712

CP #2

1/2" IRON ROD WITH

YELLOW CAP STAMPED

"VICKREY TRAVERSE"

N: 16608002.979

E: 1001489.717

Z: 132.163

CP #1

1/2" IRON ROD WITH

YELLOW CAP STAMPED

"VICKREY TRAVERSE"

N: 16608324.990

E: 1001268.804

Z: 133.534

SURVEY CONTROL

1. SURVEY CONTROL WAS ESTABLISHED BY VICKREY & ASSOCIATES, INC.,

SAN ANTONIO, TEXAS DURING JANUARY 2015.

2. PROJECTION: TEXAS SOUTH, NAD 83

VERTICAL DATUM: NAVD88

MONUMENT: NGS S 1409

SITE ORIGIN: CONTROL POINT 3 (CP #3)

N: 16608259.739

E: 1001979.276

Z: 123.71

GROUND SCALE FACTOR: 1.0000170739

SURVEY CONTROL PLAN

SCALE: 1"=40'

4+00 5+00 6+00 7+00

4+00 5+00 6+00 7+00

EXISTING

PUMP HOUSE

BP: STA= 0+00.00

N=16608072.24

E= 1001709.34

EP: STA= 4+65.57

N=16607786.03

E= 1001433.14

PC: STA= 2+37.84

N=16607999.12

E= 1001492.75

PT: STA= 1+84.31

N=16608016.75

E= 1001543.29

PT: STA= 2+80.01

N=16607968.56

E= 1001466.57

PRC: STA= 1+00.13

N=16608027.17

E= 1001626.20

BP: STA= 0+00.00

N=16608328.74

E= 1001505.96

EP: STA= 4+66.41

N=16608143.80

E= 1001181.34

PT: STA= 3+40.93

N=16608263.63

E= 1001218.55

PCC: STA= 1+15.06

N=16608364.99

E= 1001396.88

BP: STA= 0+00.00

N=16608450.95

E= 1000941.94

EP: STA= 11+00.66

N=16607728.46

E= 1001662.71

PI: STA= 0+63.56

N=16608433.06

E= 1001002.93

PI: STA= 1+27.32

N=16608416.88

E= 1001064.60

PI: STA= 1+96.13

N=16608403.78

E= 1001132.16

PC: STA= 2+35.80

N=16608394.71

E= 1001170.78

PC: STA= 7+05.24

N=16608053.35

E= 1001479.63

PC: STA= 8+94.47

N=16607872.55

E= 1001526.53

PT: STA= 3+77.81

N=16608317.87

E= 1001286.66

PT: STA= 7+99.38

N=16607966.84

E= 1001514.20

PT: STA= 10+05.48

N=16607781.16

E= 1001583.45

WEST RAMP ALIGNMENT

EAST RAMP ALIGNMENT

BP: STA= 0+00.00

N=16608345.91

E= 1001460.96

EP: STA= 1+38.27

N=16608262.11

E= 1001395.57

PT: STA= 1+23.88

N=16608275.67

E= 1001390.76

ACCESS DRIVE ALIGNMENT

L

L

L

L

L5

L

L

C

C

C

L

L

C

C

C

L

C

C

L

C

PI : STA= 3+09.95

∆= 40.68

N= 16608377.78

E= 1001242.9639

PI : STA= 2+55.62

∆= 86.28

N= 16608397.86

E= 1001260.2253

PI : STA= 1+15.45

∆= 129.05

N= 16608384.46

E= 1001352.1390

PI : STA= 0+57.65

∆= 8.91

N= 16608351.11

E= 1001452.8329

PI : STA= 9+53.61

∆= 48.93

N= 16607813.91

E= 1001534.1987

PI : STA= 0+56.61

∆= 66.71

N= 16608022.34

E= 1001682.6044

PI : STA= 1+42.85

∆= 24.12

N= 16608030.81

E= 1001583.6348

PI : STA= 7+53.32

∆= 28.66

N= 16608014.51

E= 1001507.9666

PI : STA= 2+61.12

∆= 60.40

N= 16607991.46

E= 1001470.7663

ALIGNMENT=LEVEE ALIGNMENT

STATION=3+51.84

NORTHING=16608337.81

EASTING=1001270.04

ALIGNMENT=WEST RAMP

STATION=2+49.21 =

ALIGNMENT=LEVEE ALIGNMENT

STATION=7+61.56

NORTHING=16608003.59

EASTING=1001505.57

ALIGNMENT=EAST RAMP

STATION=2+24.26 =

LEVEE ALIGNMENT HORIZONTAL ALIGNMENT DATA TABLE

CURVE (C)

LINE (L)

NUMBER

C1

C2

C3

L1

L2

L3

L4

L5

L6

L7

POINT

PC

PT/PRC

PC

PT/PRC

PC

PT/PRC

START PT.

END PT.

START PT.

END PT.

START PT.

END PT.

START PT.

END PT.

START PT.

END PT.

START PT.

END PT.

START PT.

END PT.

STATION

2+35.80

3+77.81

7+05.24

7+99.38

8+94.47

10+05.48

0+00.00

0+63.56

0+63.56

1+27.32

1+27.32

1+96.13

1+96.13

2+35.80

3+77.81

7+05.24

7+99.38

8+94.47

10+05.48

11+00.66

RADIUS

200.00

188.20

130.00

LENGTH

142.01

94.14

111.01

63.56

63.76

68.81

39.67

327.43

95.08

95.18

LINE/CHORD

DIRECTION

S56° 27' 08.81"E

S21° 46' 49.57"E

S31° 54' 50.36"E

S73° 39' 33.43"E

S75° 17' 33.49"E

S79° 01' 35.96"E

S76° 47' 39.34"E

S36° 06' 38.28"E

S7° 27' 00.87"E

S56° 22' 39.86"E

DELTA

ANGLE

40° 41' 01"

28° 39' 37"

48° 55' 39"

NORTHING

16,608,394.71

16,608,317.87

16,608,053.35

16,607,966.84

16,607,872.55

16,607,781.16

16,608,450.95

16,608,433.06

16,608,433.06

16,608,416.88

16,608,416.88

16,608,403.78

16,608,403.78

16,608,394.71

16,608,317.87

16,608,053.35

16,607,966.84

16,607,872.55

16,607,781.16

16,607,728.46

EASTING

1,001,170.78

1,001,286.66

1,001,479.63

1,001,514.20

1,001,526.53

1,001,583.45

1,000,941.94

1,001,002.93

1,001,002.93

1,001,064.60

1,001,064.60

1,001,132.16

1,001,132.16

1,001,170.78

1,001,286.66

1,001,479.63

1,001,514.20

1,001,526.53

1,001,583.45

1,001,662.71

WEST RAMP HORIZONTAL ALIGNMENT DATA TABLE

CURVE (C)

LINE (L)

NUMBER

C4

C5

L8

POINT

PC

PT/PRC

PC

PT/PRC

START PT.

END PT.

STATION

0+00.00

1+15.06

1+15.06

3+40.93

3+40.93

4+66.41

RADIUS

739.98

150.00

LENGTH

115.06

225.87

125.48

LINE/CHORD

DIRECTION

N71° 36' 55.35"W

S60° 23' 13.90"W

S17° 14' 58.50"W

DELTA

ANGLE

8° 54' 33"

86° 16' 31"

NORTHING

16,608,328.74

16,608,364.99

16,608,364.99

16,608,263.63

16,608,263.63

16,608,143.80

EASTING

1,001,505.96

1,001,396.88

1,001,396.88

1,001,218.55

1,001,218.55

1,001,181.34

EAST RAMP HORIZONTAL ALIGNMENT DATA TABLE

CURVE (C)

LINE (L)

NUMBER

C6

C7

C8

L9

L10

POINT

PC

PT/PRC

PC

PT/PRC

PC

PT/PRC

START PT.

END PT.

START PT.

END PT.

STATION

0+00.00

1+00.13

1+00.13

1+84.31

2+37.84

2+80.01

1+84.31

2+37.84

2+80.01

4+65.57

RADIUS

86.00

200.00

40.00

LENGTH

100.13

84.18

42.17

53.53

185.56

LINE/CHORD

DIRECTION

S61° 32' 18.35"W

S82° 50' 08.84"W

S40° 34' 43.03"W

S70° 46' 41.12"W

S10° 22' 44.94"W

DELTA

ANGLE

66° 42' 36"

24° 06' 55"

60° 23' 56"

NORTHING

16,608,072.24

16,608,027.17

16,608,027.17

16,608,016.75

16,607,999.12

16,607,968.56

16,608,016.75

16,607,999.12

16,607,968.56

16,607,786.03

EASTING

1,001,709.34

1,001,626.20

1,001,626.20

1,001,543.29

1,001,492.75

1,001,466.57

1,001,543.29

1,001,492.75

1,001,466.57

1,001,433.14

ACCESS DRIVE HORIZONTAL ALIGNMENT DATA TABLE

CURVE (C)

LINE (L)

NUMBER

C9

L11

POINT

PC

PT/PRC

START PT.

END PT.

STATION

0+00.00

1+23.88

1+23.88

1+38.27

RADIUS

55.00

LENGTH

123.88

14.39

LINE/CHORD

DIRECTION

S44° 58' 55.68"W

S19° 32' 38.29"E

DELTA

ANGLE

129° 03' 08"

NORTHING

16,608,345.91

16,608,275.67

16,608,275.67

16,608,262.11

EASTING

1,001,460.96

1,001,390.76

1,001,390.76

1,001,395.57

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 40' 80'

SCALE: 1" = 40'

20'

H O

R I Z

O N

T A

L

C

O N

T R

O L

P

L A

N

C-201

HORIZONTAL CONTROL PLAN

4+00 5+00 6+00 7+00

4+00 5+00 6+00 7+00

6 1

7 1

PUMP HOUSE

SHED

O F

F I C

E

CONC. STRUCTURE

SHED

SHED

LIMITS OF NEW

FOUNDATION

LIMITS OF NEW

FOUNDATION

USIBWC EASEMENT

4+00 5+00 6+00 7+00

EXISTING WALL

(TO REMAIN)

EXISTING

GRADE

PROPOSED

EXCAVATION GRADE

EXCAVATION

GRADE

(NO WORK)

(NO WORK)

PROPOSED LIMIT OF

DISTURBANCE ADJACENT

TO PUMP STATION

(MINIMUM 10 FT OFFSET)

PROPOSED WESTERN

EXCAVATION LIMITS (TYP.)

S

E

S36° 06' 38.28"E

327.43'

S

E

L

Δ

R

L

Δ

R

WEST RAMP ALIGNMENT

LEVEE ALIGNMENT

C-301

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 10' 20' 40'

SCALE: 1" = 20'

D E

M O

L I T

I

U

R R

Y

W

A L

C-300

CAUTION!!!

GAS LINES

KEYED DEMOLITION NOTES:

1. REMOVE, STORE AND REINSTALL WOODEN STAIRCASE.

2. REMOVE & REPLACE CHAIN LINK FENCE AND GATES AS

SHOWN.

3. REMOVE PORTION OF EXISTING BERM AS REQUIRED TO

CONSTRUCT ACCESS DRIVE.

4. EXCAVATE TO MINIMUM GRADES SHOWN TO CONSTRUCT

FLOODWALL STRUCTURE.

5. EXCAVATE TO THE MINIMUM GRADES SHOWN TO

CONSTRUCT PROPOSED C-B SLURRY WALL.

6. PERFORM BENCHING EXCAVATION AND EMBANKMENT

PLACEMENT TO ELEV. 120 FT ON RIVERSIDE SLOPES

PRIOR TO CONSTRUCTING C-B SLURRY WALL OR DRILLED

PIER FOUNDATIONS TO AVOID DISTURBING SOILS IN

CONTACT WITH SLURRY WALL OR DRILLED PIERS.

7. EXCAVATE FOR PROPOSED FLOODWALL DRAINAGE

BLANKET.

8. REFER TO TABLE ON SHEET G-005 ESTIMATE OF

QUANTITIES FOR DEMOLITION AND EXCAVATION.

GENERAL NOTES:

1. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"

(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY

LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.

2. TEMPORARY EXCAVATIONS ARE THE RESPONSIBILITY OF THE

CONTRACTOR, AND ARE SHOWN ONLY TO ILLUSTRATE MINIMUM

CRITERIA AND DESIGN INTENT. ACTUAL TEMPORARY EXCAVATION

DIMENSIONS ARE TO BE SUBMITTED BY CONTRACTOR FOR

ENGINEER'S APPROVAL. EXCAVATIONS SHALL MEET OSHA

CRITERIA, AND SLURRY TRENCH EXCAVATIONS MUST PROVIDE A

MINIMUM FACTOR OF SAFETY = 1.2.

3. DRILLED PIER INSTALLATION MAY NOT COMMENCE UNTIL

COMPLETION OF CEMENT-BENTONITE SLURRY WALL (SEE

SPECIFICATION SECTIONS 31 63 29 & 31 56 13).

4. CONTRACTOR SHALL REMOVE EXISTING CHAIN LINK FENCING

AND GATES (ALL WITH 3 STRAND BARBED WIRE) AND REPLACE

WITH NEW FENCING AND GATES TO MATCH EXISTING AND IN

ACCORDANCE WITH SPECIFICATION SECTION 32 31 13.

CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF NEW FENCING

AND GATES WITH COR AND SUBMIT FOR COMPLIANCE

CONFIRMATION.

F L O

O D

W A

L L

E

X C

A V

A T

I O

N

P

L A

N

WESTERN EXCAVATION DETAILS

EASTERN EXCAVATION DETAILS

DEMOLITION AND SLURRY WALL/FLOODWALL EXCAVATION PLAN

SCALE: 1" = 20'

C-302

NOTE:

SEE SHEETS C-301 AND C-302 FOR FLOODWALL

EXCAVATION AND DEOMLITION DETAILS

C-302

C-301

PROPOSED EXCAVATION GRADE

EXISTING GRADE

LIMITS OF DEMOLITION

E

V A

T I O

N

F

T

E L E

V A

T I O

N

F

T

2+25 2+50 3+00 3+50 4+00 4+50 5+00

10.00'

BOTTOM OF EXCAVATION EL= 120.0'

200 +/-

PERMISSIBLE EXCAVATION

SLOPE 1V:1.5H

LIMITS OF EXCAVATION

1V:1.5H

LIMITS OF SLURRY WALL

AREA OF EXCAVATION

STA. 2+91.72

EL. 120.00

STA. 4+62.40

EL. 120.00

STA. 2+92.40

EL. 90.00

STA. 4+62.40

EL. 90.00

STA. 4+82.40

EL. 131.12

LIMITS OF FLOODWALL

STA. 4+64.23

EL. 120.00

STA. 3+82.40

EL. 120.00

100-YR WSE (133.8 FT.)

MIN TOLE (136.8 FT.) (W/S FREEBOARD)

CHMINEY BLANKET

PROFILE. SEE C-700'S

FOR DETAILS

4+00 5+00

4+00 5+00

LIMITS OF

FLOODWALL

FOUNDATION

4+00 5+00

STA= 3+77.34

OFFSET= 22.33RT.

N= 16608305.05

E= 1001268.37

STA= 2+86.97

OFFSET= 0.87LT.

N= 16608377.58

E= 1001218.97

STA= 4+64.23

OFFSET= 22.33RT.

N= 16608234.89

E= 1001319.55

STA= 3+68.18

OFFSET= 4.27RT.

N= 16608322.83

E= 1001277.48

STA= 3+77.39

OFFSET= 1.81RT.

N= 16608317.15

E= 1001284.95

STA= 3+67.40

OFFSET= 19.25RT.

N= 16608313.98

E= 1001265.36

V

H

V

H

V

H

V

H

V

H

V

H

V

H

V

H

1V:1.5H

1V:1.5H

EXISTING GRADE

PROPOSED

EXCAVATION GRADE

STA= 4+64.23

OFFSET= 1.82RT.

N= 16608246.98

E= 1001336.12

10.2'200 +/-

86.8'(±)9.0'(±)

(NO WORK)

78.7'(±)

PROPOSED WESTERN FLOODWALL

EXCAVATION LIMITS (TYP.)

S

E

L

Δ

R

LEVEE ALIGNMENT

STA= 2+93.11

OFFSET= 14.45LT.

N= 16608386.42

E= 1001231.09

LEVEE ALIGNMENT

STA= 4+23.84

OFFSET= 4.14LT.

N= 16608283.13

E= 1001317.13

STA= 4+31.84

OFFSET= 4.22LT.

N= 16608276.71

E= 1001321.92

STA= 4+31.25

OFFSET= 61.25LT.

N= 16608310.80

E= 1001367.64

STA= 4+23.23

OFFSET= 62.90LT.

N= 16608318.25

E= 1001364.25

EXCAVATION BENCH

FOR C-B SLURRY

WALL CONSTRUCTION

0 10' 20' 40'

SCALE: 1" = 20'

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

C-301 0 5 10 20

SCALE: 1" = 10' HORIZ.; 1" = 1' VERT.

WESTERN FLOODWALL EXCAVATION PLAN

SCALE: 1" = 10'

C-300

WESTERN FLOODWALL EXCAVATION PROFILE

SCALE: 1" = 10'

C-300

W E

S T

E R

N

F

L O

O D

W A

X C

A V

A T

I O

N

P L A

N

A

O

F I L

E

MATCHLINE A-A

MATCHLINE A-A

PROPOSED EXCAVATION GRADE

EXISTING GRADE

PROPOSED C-B SLURRY WALL

6+00 7+00

6+00 7+00

LIMITS OF

FLOODWALL

FOUNDATION

6+00 7+00

STA= 6+67.22

OFFSET= 2.00RT.

N= 16608082.88

E= 1001455.61

STA= 6+67.28

OFFSET= 22.00RT.

N= 16608071.05

E= 1001439.49

STA= 6+24.70

OFFSET= 2.00RT.

N= 16608117.24

E= 1001430.55

STA= 6+24.70

OFFSET= 22.00RT.

N= 16608105.45

E= 1001414.39

STA= 7+07.52

OFFSET= 21.99RT.

N= 16608038.76

E= 1001463.04

PROPOSED

EXCAVATION GRADE

10.0'

120.7'(±)

42.6'(±) 40.0'(±)

(NO WORK)

PROPOSED LIMIT OF

DISTURBANCE ADJACENT

TO PUMP STATION

(MINIMUM 10 FT OFFSET)

S

E

L

Δ

R

LEVEE ALIGNMENT

EAST RAMP ALIGNMENT

STA= 7+07.25

OFFSET= 1.99RT.

N= 16608050.56

E= 1001479.19

E L E

V A

T I O

N

F

T

E L E

V A

T I O

N

F

T

5+75 6+00 6+50 7+00 7+50 8+00 8+50

NO WORK

120' +/-

PERMISSIBLE EXCAVATION

SLOPE 1V:1.5H

LIMITS OF EXCAVATION

1V:1.5H

10.00'

NO SLURRY WALL REQUIRED

BOTTOM OF

EXCAVATION EL= 120.0'

AREA OF

EXCAVATION

BOTTOM OF

EXCAVATION EL= 118.0'

STA. 6+05.24

EL. 130.83

STA. 6+24.70

EL. 118.00

STA. 6+65.24

EL. 118.00

STA. 6+68.24

EL. 120.00

STA. 7+07.25

EL. 120.00

LIMITS OF FLOODWALL

STA. 6+25.24

EL. 118.00

STA. 7+05.24

EL. 120.00

100-YR WSE (133.8 FT.)

MIN TOLE (136.8 FT.) (W/S FREEBOARD)

CHMINEY BLANKET

PROFILE. SEE C-700'S

FOR DETAILS

STA. 7+25.86

EL. 132.41

0 10' 20' 40'

SCALE: 1" = 20'

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

C-302 0 5 10 20

SCALE: 1" = 10' HORIZ.; 1" = 1' VERT.

EASTERN FLOODWALL EXCAVATION PLAN

SCALE: 1" = 10'

C-300

EASTERN FLOODWALL EXCAVATION PROFILE

SCALE: 1" = 10'

C-300

E A

S T

E R

N

F

L O

O D

W A

L L

E

X C

A V

A T

I O

N

P L A

N

A

O

F I L

E

PROPOSED EXCAVATION GRADE

EXISTING GRADE

PROPOSED C-B SLURRY WALL

4+00 5+00 6+00 7+00

4+00 5+00 6+00 7+00

EXISTING

PUMP HOUSE

PROPOSED EAST RAMP

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 40' 80'

SCALE: 1" = 40'

20'

P R

O P

O S

V E

R A

V E

E

I M

P R

O V

E M

E N

T S

K E

Y

P

L A

N

C-400

GENERAL NOTES:

1. SEE PROJECT LEGEND ON SHEET G-003 FOR SHADING

DETAILS.

2. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"

(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY

LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.

3. SEE SHEETS C-300 THRU C-302 FOR DEMOLITION AND

EXCAVATION WORK.

4. DRILLED PIER INSTALLATION MAY NOT COMMENCE UNTIL

COMPLETION OF CEMENT-BENTONITE SLURRY WALL (SEE

SPECIFICATION SECTIONS 31 63 29 & 31 56 13).

PROPOSED WESTERN DETAILS

PROPOSED OVERALL LEVEE IMPROVEMENTS KEYPLAN

SCALE: 1" = 40'

PROPOSED EASTERN DETAILS

C-503

C-505

C-502

C-500

C-504

SEE SHEETS C-401, C-402, AND C-500 THRU C-505 FOR PROPOSED IMPROVEMENT

DETAILS, LEVEE PLAN AND PROFILES AND RAMP PLAN AND PROFILES

C-500

C-501

C-502

C-503

C-504

C-505

C-402

C-401

C-501

C-402

C-401

LEGEND:

LIMITS OF

CONSTRUCTION

4+00 5+00

STA. 1+00 BEGIN LEVEE

CONSTRUCTION

N 16,608,423.81

E 1,001,038.18

EXIST. FENCE

EXIST. WOODEN

FENCE

REMOVE PORTION

OF EXISTING BERM

AND CONSTRUCT

ACCESS DRIVE

EXIST. CONCRETE

PAD

EXIST. CONCRETE WALL

WITH BOLLARD FENCE

PROPOSED WEST RAMP

(20 FT WIDE ROADWAY, TYP.)

EXISTING PUMP

STATION

PROPOSED

FLOATING BOLLARD

FENCE SEE NOTE 2

PROPOSED END OF

FLOATING BOLLARD

FENCE TO BE CONNECTED

TO EXISTING CONCRETE

WALL SEE NOTE 2

PROPOSED WESTERN LEVEE

N:16608431.67

E:1001317.99

N:16608278.93

E:1001429.31

N:16608195.64

E:1001316.20

N:16608298.44

E:1001160.34

N:16608284.34

E:1001205.33

N:16608235.01

E:1001213.49

N:16608452.36

E:1001337.34

N:16608453.20

E:1001335.02

N:16608517.53

E:1001263.09

N:16608546.21

E:1001217.53

N:16608612.50

E:1001120.17

N:16608326.87

E:1001071.95

N:16608485.83

E:1001097.88

N:16608613.04

E:1001113.06

R-C END WALL

30.0'

PROPERTY LINE

(TYP.)

4+00 5+00

S

E

S75° 17' 33.49"E

63.76'

S

E

S

E

S36° 06' 38.28"E

327.43'

L

Δ

R

BEGIN SLURRY WALL

CONSTRUCTION

STA =2+92.52

OFFSET =6.49LT.

N =16608379.81

E =1001226.63

BEGIN ACCESS DRIVE

CONSTRUCTION

STA =0+48.18

OFFSET =0.07LT.

N =16608345.91

E =1001460.96

BEGIN WEST RAMP

CONSTRUCTION

STA =0+00.00

OFFSET =0.00

N =16608328.74

E =1001505.96

STA =4+66.41

OFFSET =0.00

N =16608143.80

E =1001181.34

END ACCESS DRIVE

CONSTRUCTION

STA =0+87.90

OFFSET =99.74LT.

N =16608262.11

E =1001395.57

END WESTERN LEVEE

IMPROVEMENTS

STA =4+62.40

OFFSET =0.00

N =16608249.54

E =1001336.51

END SLURRY WALL, WESTERN

FLOODWALL AND BOLLARD WALL

CONSTRUCTION

STA =4+62.38

OFFSET =12.00RT.

N =16608242.48

E =1001326.81

BEGIN FLOOD WALL

CONSTRUCTION

STA =3+82.40

OFFSET =12.00RT.

N =16608307.10

E =1001279.67

END WEST RAMP

CONSTRUCTION

STA =3+53.61

OFFSET =0.00

N =16608251.53

E =1001214.79

BOX CULVERT

6" RCP

FL:111.52

N= 16608334.50

E= 1001147.50

DROP INLET

TOP=121.58'

INVERT (CENTER):112.52

36" RCP (NW, SW, SE)

N= 16608449.33

E= 1001178.29

DROP INLET

TOP=121.68'

INVERT (CENTER):112.61

36" RCP (SE)

N= 16608460.54

E= 1001161.86

SIGN:

NATURAL GAS PIPELINE

TEXAS GAS SERVICE

1-800-344-8377

N= 16608494.08

E= 1001126.34

SIGN:

NATURAL GAS PIPELINE

TEXAS GAS SERVICE

1-800-344-8377

N= 16608520.65

E= 1001064.91

CONCRETE PAD

N= 16608417.56

E= 1000990.82

S-300

S-300

COMPLETE CONSTRUCTION

OF EXISTING GATEWELL STRUCTURE

N= 16608411.14

E= 1001170.24

TRANSITION TO

MATCH EXISTING

ACCESS ROAD

S-309

REINSTALLED

STAIRCASE SEE NOTE 5.

PROPOSED

CHAIN LINK

FENCE

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n D a t e

A c t i o n

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

F i l e

N a m e

P l o t

D a t e

P l o t

S c a l e

S y m b o l T r a c k i n g

N o

I B

M T

C

C d w g

R E

H A

B I L

I T

A T

I O

N

I M

P R

O V

E M

E N

T S

F O

R

T

V

E E

S

A

T

E

D I N

B U

M

P

S

T A

T I O

N

H I D

A L

U

N T

Y

T

E X

A S

P R

O J E

U R

S

G r o u p

I n c

A m b e r g l e n

B l v d

A u s t i n

T e x a s

T B g

N o

F

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

W A

T E

R

C

O M

M I S

S I O

N

S

O

T

X

FOR CONSTRUCTION

1 2 3 4 5

D

C

A

B

DRAWING NO.:

65OF

SHEET NO.:

S

E A

N

C

O O

K

P

E

B R

I A

N

M

E R

C E

R O

N

S E

O

K

P

E

L A

N C

E

F

I N

N E

F R

O C

K

P

E

0 10' 20' 40'

SCALE: 1" = 20'

P R

O P

O S

W

S

T E

V E

E

D

E T

A I L S

C-401

PROPOSED WESTERN LEVEE DETAILS

SCALE: 1" = 20'

M A

T C

H

L

I N

E

S E

E

S

H E

C-400

SEE C-500 AND C-501 FOR WEST LEVEE PLAN

AND PROFILE AND SEE C-504 FOR WEST RAMP

PLAN AND PROFILE

GENERAL NOTES:

1. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG"

(1-800-245-4545) 48 HOURS PRIOR TO BEGINNING WORK AT ANY

LOCATION TO LOCATE UTILITIES WITHIN THE WORK ZONE.

2. THE FLOATING BOLLARD FENCE IS SHOWN FOR

INFORMATIONAL PURPOSES ONLY. NO COST OR WORK SHALL

BE INCLUDED IN THIS PROJECT.

3. SEE SPECIFICATION SECTION 35 42 37 FOR RIP RAP

REQUIREMENTS.

4. TOP SOIL EMBANKMENT SHALL BE PLACED ON GEOSYNTHETIC

EROSION CONTROL MATERIAL IN ACCORDANCE WITH

SPECIFICATION 35 42 35. TOP SOIL SHALL BE SEEDED IN

ACCORDANCE WITH SPECIFICATION SECTION 32 92 00.

5. CONTRACTOR SHALL REMOVE AND REINSTALL THE WOODEN

STAIRCASE IN THIS AREA. THE CONTRACTOR SHALL PERFORM

ANY MODIFICATIONS AS REQUIRED PRIOR TO REINSTALLING

THE STAIRCASE. THE CONTRACTOR SHALL COORDINATE THE

EXACT LOCATION WITH THE COR AND SUBMIT SHOP

DRAWINGS FOR REVIEW AND COMPLIANCE CONFORMATION

PRIOR TO MAKING MODIFICATIONS.

6. DRILLED PIER…