Final QA Received Against Solicitation 191BWC21R0004.pdf

PDF 113 KB Posted

Attached to
Design Build - Edinburg Pump Station
Solicitation number
191BWC21R0004
Issued by

About this file

This document contains final questions and answers regarding solicitation 191BWC21R0004 for design-build rehabilitation of the Edinburg Pump Station levee in Hidalgo County, Texas. The United States Section of the International Boundary and Water Commission is seeking proposals for design and construction services including levee improvements, earthen embankment, concrete floodwalls, ramps, and associated structures along approximately 800 linear feet. Proposers must complete SF-330 forms for all team members, including non-engineering subcontractors. Geotechnical testing firms may perform pre-design investigations and quality control testing during construction provided personnel involved in design are not involved in quality control. CAD files of existing condition drawings will be provided to the selected offeror after award.

View the file

Other files

File Type Posted
191BWC21R0004 DB Solicitation Revised per A00005.pdf PDF
191BCW21R0004 A00005.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00004_final.pdf PDF
191BCW21R0004 A00004.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00003.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210609.pdf PDF
191BWC21R0004 A00003.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210526.pdf PDF
Additional and Revised Questions - Answers Received Against Solicitation 191BWC21R0004.pdf PDF
191BWC21R0004 Amendment A00002.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00002.pdf PDF
191BWC21R0004 Amendment A00001.pdf PDF
Questions and Answers Received Against Solicitation 191BWC21R0004.pdf PDF
Edinburg Prebid Agenda 20210503.pdf PDF
191BWC21R0004 DB Solicitation Revised per A00001.pdf PDF
191BWC21R0004 DB SOW Edinburg Levee 20210519.pdf PDF
HCID1-USIBWC MOA_ 20160926.pdf PDF
Edinburg Prebid Sign-In Sheet 20210503.pdf PDF
16_USIBWC Model 2003.zip ZIP file
13_HCID1 Penitas PS AS BUILTS April 2020.pdf PDF
18_S-B LRGFCP Hydraulic Model Update Report 200807.pdf PDF
06_Geotech Report DHS Segment O-4(Special) 20080606.pdf PDF
25_Wage Determination 2015-5245.pdf PDF
26_191BWC21R0004 Edinburg Levee Design Build.pdf PDF
20_IBWC Form 116.pdf PDF
21_IBWC Form 117.pdf PDF
11_IBM10C0014 Selected Drawings 2010.pdf PDF
05_Geotech Report DHS Segment O-4B 20091109.pdf PDF
23_191BWC21R0004 Past Performance Questionnaire (Phase 2).docx DOCX document
22_191BWC21R0004 Client Authorization Letter (Phase 2).docx DOCX document
09_191BWC19R0004 Edinburg Specs 20190816.pdf PDF
19_IBWC Form 110.pdf PDF
02_Edinburg PS Geotech Report 20151118.pdf PDF
15_USIBWC LRGFCP Hydraulic Model Report 200306.pdf PDF
12_HCID1 Penitas PS Bid Package - Specs 20180509.pdf PDF
01_Edinburg PS Design Report 20151118 woA.pdf PDF
17_S-B Model 2008.zip ZIP file
14_Asbestos - Lead Paint Survey 20160125.pdf PDF
24_General Decision Number TX20210003.pdf PDF
07_Easement Metes - Bounds Drawings 20160330.pdf PDF
10_IBM14T0012 URS Structural Calculations.pdf PDF
04_Final Mission SEA and FONSI 20111031.pdf PDF
191BWC21R0004 Design Build.pdf PDF
08_IBM14T0012 Edinburg Drawings_FS 20151118.pdf PDF
03_Final Mission EA 200702.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Edinburg Pump Station Levee Rehabilitation - 191BWC21R0004

Final Additional and Revised Questions and Answers

Q84. Will the IBWC please confirm that for all non-engineering subcontractors/entities that the full Part 1 of SF-330 (Sections A through I) are required? Or will it suffice to submit just Section E (resumes) and Section F (projects) for non-engineering (construction) subcontractors because these entities will already be identified in the Offeror/Prime Contractor’s SF-330 in Section C and Section D?

A84. Yes, the full Part I of the SF-330 is required for each team members including non-engineering subcontractors/entities. Solicitation L.02 D.e.1. (pg 69/85) states, "While SF-330 is not usually intendent for non-engineering firms, use this form for all team members although non-engineering firms shall not complete Part II."

See answers A25a and A25b. An SF-330 is required for every entity listed as part of the team for the subfactor under Solicitation Section L.02 D.c.2.

Q85. In solicitation paragraph L.02, D.d.4 (a) QC Testing Laboratory, the Government states “No testing laboratory shall be employed that was affiliated with the design of the project”.

We plan to perform additional geotechnical testing prior to design. Please confirm that simply performing geotechnical drilling and performing laboratory testing prior to the design does not constitute an affiliation with the design of the project. We would like to confirm that this sentence above does not prevent the same geotechnical drilling and testing firm from performing QC testing during construction.

A85. DB SOW Section 01.43.26.01 1.14 C. requires that the personnel performing or overseeing the QC testing during construction shall not have been involved with the design of the project. This only limits the personnel used, not the testing company. Any engineers reviewing testing or performing analyses and the PE overseeing and stamping the testing results for design shall not be used to perform or oversee the QC testing during construction. See the revised Solicitation L.02 D.d.4(a) for clarification.

The following question has been revised to be reflect information provided by HCID1.

Q52: We assume the CAD files of URS drawings (attachment No. 08) and as built LLOYD drawings (attachment No. 13) will be available to the awarding contractor for use after bid stage. Please confirm.

A52: Yes, CAD files for the URS drawings and the HCID1 as-built drawings (Lloyd drawings, Solicitation Attachment #13) will be available for use after award to the Design-Builder.

A52R: Yes, CAD files for the URS drawings will be available for use after award to the Design-Builder.

The CAD files for the HCID1 as-built drawings (Lloyd drawings, Solicitation Attachment #13) will not be available to the awarding contractor.

File details come from the government source that posted it. Updated .