Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N69450-21-R-0028
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Bahamas, THE
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Facilities Engineering Command seeks to award a firm-fixed price design-bid-build construction contract to repair the primary operational pier facility at the Atlantic Undersea Test and Evaluation Center located on Andros Island, Bahamas. The scope of work involves removing the existing pier superstructure while retaining the existing steel piles, and constructing a new closed-pier structure with compacted structural fill and a reinforced concrete deck integrated with shore power, potable water, fire protection, lighting and mooring systems. Evaluation criteria include construction experience, past performance, safety, technical approach, and small business participation. Proposals are due by August 24, 2021.
There is no set-aside designation. The NAICS code is 237990 and PSC code is W912. The estimated value is between $25-100 million to be awarded under solicitation number N69450-21-R-0028. The performance period is from notice to proceed until 955 calendar days. The place of performance is the AUTEC facility located on Andros Island, Bahamas.
Notice text
1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) construction.
2. The intent of the project is to repair the primary operational pier facility at the Atlantic Undersea
Test and Evaluation Center (AUTEC) located at Andros Island, Bahamas. The existing superstructure will be removed, but the existing steel piles will be cutoff and incorporated in the new pier to help stabilize structural backfill. The proposed pier is a closed-pier mole-type structure with a steel pipe pile combination wall aligned with the existing pier perimeter that will retain compacted structural fill. The compacted fill will be capped with a reinforced concrete slab-on-grade deck. The new pier will abut the existing landside bulkhead. The proposed pier will include shore power, potable water, fire protection system, lighting, mooring hardware and foam filled fender system. Pier utilities will tie-in to existing landside sources.
Temporary mooring for AUTEC vessels will be constructed to provide safe mooring for the vessels during construction. The temporary mooring facility will be constructed to minimize interruptions to AUTEC operations.
The AUTEC pier facility is a berthing facility located at Andros Island, Bahamas to support the AUTEC Range. Potable water and AC electric power are available at the pier.
3. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236 204, the
Magnitude for this project is between $25,000,000 and $100,000,000.
Files
Show all 35
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas | Award Notice | |
| This notice | Solicitation | |
| Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas | Pre-Solicitation | |
| Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity