Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas

Award Notice Posted

Solicitation number
N69450-22-C-0006
Agency
Awarded
to Orion Government Services LLC
Set-aside
No set-aside

Opportunity facts

Contract number
N69450-22-C-0006 Federal contract award
Place of performance
Bahamas, THE

Notice details come from SAM.gov. Updated .

About this opportunity

This Award Notice from the Department of the Navy Naval Facilities Engineering Command awarded a firm-fixed price contract to ORION GOVERNMENT SERVICES, LLC on December 16, 2021 for $2,829,311 to provide design-bid-build construction services for the repair of the primary operational pier facility at the Atlantic Undersea Test and Evaluation Center located on Andros Island in the Bahamas. The repair project involves removing the existing superstructure but retaining the existing steel piles, constructing a new closed-pier mole-type structure with a steel pipe pile wall and compacted structural fill capped with a reinforced concrete deck to replace the existing pier and integrate shore power, potable water, lighting and vessel mooring systems while minimizing interruptions to center operations.

Notice text

This acquisition resulted in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) construction and was solicited as Full and Open on an Unrestricted basis.

The intent of the project is to repair the primary operational pier facility at the Atlantic Undersea Test and Evaluation Center (AUTEC) located at Andros Island, Bahamas. The existing superstructure will be removed, but the existing steel piles will be cutoff and incorporated in the new pier to help stabilize structural backfill. The proposed pier is a closed-pier mole-type structure with a steel pipe pile combination wall aligned with the existing pier perimeter that will retain compacted structural fill. The compacted fill will be capped with a reinforced concrete slab-on-grade deck. The new pier will abut the existing landside bulkhead. The proposed pier will include shore power, potable water, fire protection system, lighting, mooring hardware and foam filled fender system. Pier utilities will tie-in to existing landside sources.

Temporary mooring for AUTEC vessels will be constructed to provide safe mooring for the vessels during construction. The temporary mooring facility will be constructed to minimize interruptions to AUTEC operations.

The AUTEC pier facility is a berthing facility located at Andros Island, Bahamas to support the AUTEC Range. Potable water and AC electric power are available at the pier.

Awarded contract N69450-22-C-0006 to ORION GOVERNMENT SERVICES, LLC for 28293111.00 on 2021-12-16.

Notice history

Notice Type Posted
This notice Award Award Notice
Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas Latest solicitation Solicitation
Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas Pre-Solicitation
Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors