Environmental Review Worksheet.pdf

PDF 316 KB Posted

Attached to
Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas
Solicitation number
N69450-21-R-0028
Issued by

About this file

This document contains an environmental review worksheet and related federal contract opportunity for pier repair work at the Atlantic Undersea Test and Evaluation Center in the Bahamas. The environmental review worksheet details the proposed pier repair project, which involves removing the existing superstructure but incorporating the existing steel piles into a new closed-pier mole-type structure with steel pipe piles and compacted structural fill. The new pier will include utilities such as shore power, potable water, and lighting. Coral relocation and mitigation will be required prior to construction. The related federal contract opportunity is a solicitation from the Naval Facilities Engineering Command for design-bid-build construction services for the pier repair project. The firm-fixed-price contract is estimated to be between $25-100 million according to the Defense Federal Acquisition Regulation Supplement. The pier repair will replace the primary operational pier facility at AUTEC and is intended to support ongoing operations at the testing range located on Andros Island.

View the file

Other files

File Type Posted
Amendment_ 0007 AUTEC.pdf PDF
Amendment 0006 AUTEC.pdf PDF
ACM Survey _M2103772 AUTEC.pdf PDF
2021-08-06_Pier1902Repair_Amend5_Specifications.pdf PDF
2021-08-05_Pier1902Repair_Amend5_Drawings.pdf PDF
AUTEC_map_Locations1.pdf PDF
2021-08-06_Pier1902Repair_Amend5_Change Log.pdf PDF
Amendment 0005 AUTEC.pdf PDF
AUL Spreadsheet.xlsx XLSX spreadsheet
Amendment 0004 AUTEC.pdf PDF
Hydrographic Survey Map 1.pdf PDF
Hydrographic Survey Map 2.pdf PDF
Pier repair Staging area 7-2021.pdf PDF
Amendment 0003 AUTEC.pdf PDF
Site Visit Photos_2.pdf PDF
Site Visit Photos_1A.pdf PDF
Site Visit Attendance Roster AUTEC.pdf PDF
Amendment 0002 AUTEC.pdf PDF
Pre-Proposal Conference Attendance Roster AUTEC3.pdf PDF
Amendment 0001 AUTEC.pdf PDF
Attachment C_COVID-19 Traveler Information Form.pdf PDF
Amendment 0001_AUTEC1.pdf PDF
20210402_Pier1902Repair_Final_Drawings_signed.pdf PDF
20210402_Pier1902Repair_Final_Specifications_Appendices.pdf PDF
Attachment B AUTEC Access Form.docx DOCX document
20210407_Pier1902Repair_Final_Specifications.pdf PDF
Exhibit B Safety Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
Exhibit A Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment A Bahamas Health Visa Guide and Procedures.docx DOCX document
Exhibit F Small Business Subcontracting Plan.doc DOC document
Exhibit E SB Participation Commitment Doc.docx DOCX document
Exhibit C Past Performance Questionnaire.docx DOCX document
N69450_21_R_0028_Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTEC NUWC Det Andros Island Project Environmental Review Worksheet

Project Title: ER # (supplied by ES&H)

Section II – Water Quality Yes No Unknown Does the project fall within an aquifer recharge area?

Will any excavations/drilling/digging/trenching be conducted?

Is Dig Permit complete for the excavation/

Detailed Project Description:

drilling/digging/trenching?

General Project Attributes Will the excavation/drilling/digging/trenching be in

Does the new/affected facility contain: Yes No Unknown excess of ten feet deep?

Hazardous Paint? Will the project affect any water piping?

Asbestos material? Will the project/facility discharge any Equipment containing PCBs? substance into any coastal water?

Will the project potentially affect: Section III – Hazardous Material/Waste Threatened or endangered species or their Does the new/affected facility: Yes No Unknown habitats? Store Hazardous Materials?

Historic or archeological resources/sites? Store Hazardous Waste?

Wildlife populations or their habitats? Will the project or facility generate Hazardous Waste?

Will the project require: Section IV – Petroleum, Oil & Lubricants (POL) Trimming or removal of trees or brush? Will the: Yes No Unknown Integration with existing water distribution Project impact any POL distribution systems?

systems? Equipment used during/post construction use POL?

Wastewater collection services? Project require the transfer or storage of POL?

Will the new/completed: Section V – Cultural, Historical, and Natural Resources Facility require solid or medical waste containers? Will the project: Yes No Unknown Facility require parking? Require any dredging?

Facility have an impact on existing traffic patterns? Potentially impact any wetland area?

Section I – Air Quality Encroach upon any wetland area?

Will the new/affected: Yes No Unknown During the construction will the project:

Facility require an emission survey? Cause surface water run-off?

Facility require the use of refrigerants? Promote erosion of soil/sediment?

Facility be part of an annual IH survey? Section VI – Assessment (completed by M&O Environmental Office) Project produce significant noise levels? Requester Name:

Requester Signature:

Dept # Date:

M&O Environmental Office Approval Name:

Signature: Date:

Approve Disapprove NUWC Review

Section VII – NUWC Env Review (Determined by NUWC) Name:

Signature: Date:

NUWCDETAUTEC Approval? Yes No

Section VIII – NPT Env Review Name:

Signature: Date:

Environmental Office Comments:

NPT Env Review Board Approval? Yes No

FORM DC 1056 (01/07)

9.0.0.2.20120627.2.874785

Project Title: Site 1 Pier 1902 Repair Project
ER # (supplied by ES&H: 040621_ER01
Detailed Project Description:: The existing Site 1 pier's existing steel piles will be incorporated in the repaired pier. The new pier repair is a closed-pier mole-type structure with a steel H-pile combination wall aligned at the existing pier's perimeter. The new pier will include shore power, potable water, fire protection system, lighting & mooring. There is a need for coral relocation/mitigation prior to construction.
Does the project fall within an aquifer recharge area: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
Will the project or facility generate Hazardous Waste: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 1
undefined: 0
undefined: 0
undefined: 0
undefined: 1
Requester Name: Lauren Thompson
Environmental Office Comments:: A revised DC1056 will be submitted once the 'unknowns' are determined, but this ER is sufficient for the bid package.

The coral mitigation must occur within 6 months prior to project start. If project is significantly delayed and coral mitigation has occurred, a new underwater survey of the pier is required. Prospective dredge material must be sampled for specific contaminants. AUTEC is responsible for the sampling.

All hazardous materials must have prior NUWC AUL approval.

All unused hazmat must return with vendor to the States upon project completion Any hazardous waste must be appropriately collected and turned in to the AUTEC Hazardous Waste Facility for disposal.

All recyclables must be turned in to the AUTEC QRP.

POC for Environmental: Patti Findlay, x2667 (telework: 561-313-2618)

Requester Signature:
Dept: 7032
Date: 2021-04-08
Name: Aaron Smith
Signature:
Date: 2021-04-12
Approve: On
Disapprove: Off
NUWC Review: Off
Name: Maria Lopez
Signature:
Date: 4/12/2021
NPT Env Review Board Approval:
Name:
Signature:
Date: