Environmental Review Worksheet.pdf
PDF 316 KB Posted
- Solicitation number
- N69450-21-R-0028
About this file
This document contains an environmental review worksheet and related federal contract opportunity for pier repair work at the Atlantic Undersea Test and Evaluation Center in the Bahamas. The environmental review worksheet details the proposed pier repair project, which involves removing the existing superstructure but incorporating the existing steel piles into a new closed-pier mole-type structure with steel pipe piles and compacted structural fill. The new pier will include utilities such as shore power, potable water, and lighting. Coral relocation and mitigation will be required prior to construction. The related federal contract opportunity is a solicitation from the Naval Facilities Engineering Command for design-bid-build construction services for the pier repair project. The firm-fixed-price contract is estimated to be between $25-100 million according to the Defense Federal Acquisition Regulation Supplement. The pier repair will replace the primary operational pier facility at AUTEC and is intended to support ongoing operations at the testing range located on Andros Island.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTEC NUWC Det Andros Island Project Environmental Review Worksheet
Project Title: ER # (supplied by ES&H)
Section II – Water Quality Yes No Unknown Does the project fall within an aquifer recharge area?
Will any excavations/drilling/digging/trenching be conducted?
Is Dig Permit complete for the excavation/
Detailed Project Description:
drilling/digging/trenching?
General Project Attributes Will the excavation/drilling/digging/trenching be in
Does the new/affected facility contain: Yes No Unknown excess of ten feet deep?
Hazardous Paint? Will the project affect any water piping?
Asbestos material? Will the project/facility discharge any Equipment containing PCBs? substance into any coastal water?
Will the project potentially affect: Section III – Hazardous Material/Waste Threatened or endangered species or their Does the new/affected facility: Yes No Unknown habitats? Store Hazardous Materials?
Historic or archeological resources/sites? Store Hazardous Waste?
Wildlife populations or their habitats? Will the project or facility generate Hazardous Waste?
Will the project require: Section IV – Petroleum, Oil & Lubricants (POL) Trimming or removal of trees or brush? Will the: Yes No Unknown Integration with existing water distribution Project impact any POL distribution systems?
systems? Equipment used during/post construction use POL?
Wastewater collection services? Project require the transfer or storage of POL?
Will the new/completed: Section V – Cultural, Historical, and Natural Resources Facility require solid or medical waste containers? Will the project: Yes No Unknown Facility require parking? Require any dredging?
Facility have an impact on existing traffic patterns? Potentially impact any wetland area?
Section I – Air Quality Encroach upon any wetland area?
Will the new/affected: Yes No Unknown During the construction will the project:
Facility require an emission survey? Cause surface water run-off?
Facility require the use of refrigerants? Promote erosion of soil/sediment?
Facility be part of an annual IH survey? Section VI – Assessment (completed by M&O Environmental Office) Project produce significant noise levels? Requester Name:
Requester Signature:
Dept # Date:
M&O Environmental Office Approval Name:
Signature: Date:
Approve Disapprove NUWC Review
Section VII – NUWC Env Review (Determined by NUWC) Name:
Signature: Date:
NUWCDETAUTEC Approval? Yes No
Section VIII – NPT Env Review Name:
Signature: Date:
Environmental Office Comments:
NPT Env Review Board Approval? Yes No
FORM DC 1056 (01/07)
9.0.0.2.20120627.2.874785
| Project Title: Site 1 Pier 1902 Repair Project |
| ER # (supplied by ES&H: 040621_ER01 |
| Detailed Project Description:: The existing Site 1 pier's existing steel piles will be incorporated in the repaired pier. The new pier repair is a closed-pier mole-type structure with a steel H-pile combination wall aligned at the existing pier's perimeter. The new pier will include shore power, potable water, fire protection system, lighting & mooring. There is a need for coral relocation/mitigation prior to construction. |
| Does the project fall within an aquifer recharge area: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| Will the project or facility generate Hazardous Waste: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| undefined: 0 |
| undefined: 0 |
| undefined: 0 |
| undefined: 1 |
| Requester Name: Lauren Thompson |
| Environmental Office Comments:: A revised DC1056 will be submitted once the 'unknowns' are determined, but this ER is sufficient for the bid package. |
The coral mitigation must occur within 6 months prior to project start. If project is significantly delayed and coral mitigation has occurred, a new underwater survey of the pier is required. Prospective dredge material must be sampled for specific contaminants. AUTEC is responsible for the sampling.
All hazardous materials must have prior NUWC AUL approval.
All unused hazmat must return with vendor to the States upon project completion Any hazardous waste must be appropriately collected and turned in to the AUTEC Hazardous Waste Facility for disposal.
All recyclables must be turned in to the AUTEC QRP.
POC for Environmental: Patti Findlay, x2667 (telework: 561-313-2618)
| Requester Signature: |
| Dept: 7032 |
| Date: 2021-04-08 |
| Name: Aaron Smith |
| Signature: |
| Date: 2021-04-12 |
| Approve: On |
| Disapprove: Off |
| NUWC Review: Off |
| Name: Maria Lopez |
| Signature: |
| Date: 4/12/2021 |
| NPT Env Review Board Approval: |
| Name: |
| Signature: |
| Date: |
File details come from the government source that posted it. Updated .