Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas
Solicitation number
N69450-21-R-0028
Issued by

About this file

This federal solicitation seeks proposals for a design-bid-build construction project to repair Pier 1902 at the Atlantic Undersea Test and Evaluation Center facility in Andros Island, Bahamas. The work includes demolishing the existing pier superstructure while retaining existing steel piles, constructing a new closed-pier structure with a steel pile wall and compacted structural fill capped with a concrete deck, and building a temporary vessel mooring facility. The project magnitude is between $25-100 million. The Navy will award a firm-fixed-price contract with a performance period from notice to proceed to 955 calendar days. Offerors must submit price and non-price proposals by August 2, 2021. The non-price factors to be evaluated are construction experience, past performance, safety, technical approach, and small business participation.

View the file

Other files

File Type Posted
Amendment_ 0007 AUTEC.pdf PDF
Amendment 0006 AUTEC.pdf PDF
ACM Survey _M2103772 AUTEC.pdf PDF
2021-08-06_Pier1902Repair_Amend5_Specifications.pdf PDF
Environmental Review Worksheet.pdf PDF
2021-08-05_Pier1902Repair_Amend5_Drawings.pdf PDF
AUTEC_map_Locations1.pdf PDF
2021-08-06_Pier1902Repair_Amend5_Change Log.pdf PDF
Amendment 0005 AUTEC.pdf PDF
AUL Spreadsheet.xlsx XLSX spreadsheet
Amendment 0004 AUTEC.pdf PDF
Hydrographic Survey Map 1.pdf PDF
Hydrographic Survey Map 2.pdf PDF
Pier repair Staging area 7-2021.pdf PDF
Amendment 0003 AUTEC.pdf PDF
Site Visit Photos_2.pdf PDF
Site Visit Photos_1A.pdf PDF
Site Visit Attendance Roster AUTEC.pdf PDF
Amendment 0002 AUTEC.pdf PDF
Pre-Proposal Conference Attendance Roster AUTEC3.pdf PDF
Amendment 0001 AUTEC.pdf PDF
Attachment C_COVID-19 Traveler Information Form.pdf PDF
Amendment 0001_AUTEC1.pdf PDF
20210402_Pier1902Repair_Final_Drawings_signed.pdf PDF
20210402_Pier1902Repair_Final_Specifications_Appendices.pdf PDF
Attachment B AUTEC Access Form.docx DOCX document
20210407_Pier1902Repair_Final_Specifications.pdf PDF
Exhibit B Safety Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
Exhibit A Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment A Bahamas Health Visa Guide and Procedures.docx DOCX document
Exhibit F Small Business Subcontracting Plan.doc DOC document
Exhibit E SB Participation Commitment Doc.docx DOCX document
Exhibit C Past Performance Questionnaire.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION N69450-21-R-0028 - A PIER REPAIR PROJECT FOR ATLANTIC UNDERSEA TEST EVALUATON CENTER (AUTEC) FACILITY

1902 AT ANDROS ISLAND, BAHAMAS.

In accordance w ith Defense Federal Acquisition Regulation Supplement (DFARS) 236 204, the Magnitude for this project is betw een $25,000,000 and $100,000,000.

A Pre-Proposal Conference and Site Visit w ill be scheduled at AUTEC Andros Island, Bahamas. See Section 00 10 00 Site Visit and FAR Clause 52.236-27 ALT 1 for additional details.

This acquisition is solicited as Full and Open competition (Unrestricted), Design-Bid-Build under NAICS: 237990.

ALEX NORIEGA 904-542-6699

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

01-Jul-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________955 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________02 Aug 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC ENGINEERING SYSTEMS COMMAND SE

CORE CONSTRUCTION

BLDG 903 YORKTOWN

PO BOX 0030

JACKSONVILLE FL 32212-0030

N69450

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

05:30 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N6945021R0028 60

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N6945021R0028

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Project Permanent Pier Demo and Repair

FFP

The work includes repair of Pier 1902 by constructing a closed-pier mole-type structure with a steel H-pile combination wall aligned at the existing pier's perimeter that will retain compacted structural fill. The existing pier superstructure will be demolished and removed and the existing steel piles will be cutoff and incorporated in the repaired pier. The construction will include demolition, excavation, grading, pile testing, pile driving, cast-in-place concrete, electrical utilities, potable water, fire protection and incidental related work. Excludes work described in Contract Line Item CLIN 0002 OPTION 001.

FOB: Destination

PSC CD: Z2PC

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Project OPTION Temp Berth Design, Construction, Removal

FFP

The work includes design and constructing a temporary berth for temporary mooring for AUTEC vessels to provide safe mooring for the vessels during construction. The temporary berth will be constructed prior to any demolition works commencing on Pier 1902 to minimize interruptions to AUTEC operations.

The temporary berth shall be designed in accordance with the specifications and design criteria herein. Options presented in design drawings are conceptual and for reference only. The temporary berth shall be completely removed after all repairs to Pier 1902 are complete and the Pier 1902 is put into service by AUTEC.

PSC CD: Z2PC

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 955 dys. ADC 1 PWD KEY WEST

INSPECTOR OF RECORD

PO BOX 9018, BLDG A-629

LEXINGTON & LANGLEY

KEY WEST FL 33040-9018

(305) 293-3863

N44222

0002 955 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

N44222

CLAUSES INCORPORATED BY REFERENCE

52.211-13 Time Extensions SEP 2000 52.236-15 Schedules for Construction Contracts APR 1984 52.242-14 Suspension of Work APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 955 calendar days. The time stated for completion shall include final cleanup of the premises.

Note: Contract award represents the Notice to Proceed in terms of establishing the Contract Completion Date

(CCD).

(End of clause)

Section 00 21 16 - Instructions to Proposers

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.209-11 Representation by Corporations Regarding Delinquent Tax

Liability or a Felony Conviction under any Federal Law

FEB 2016

52.214-34 Submission Of Offers In The English Language APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.217-5 Evaluation Of Options JUL 1990 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

MAR 2020

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity SEP 2016 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

OCT 2020

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.252-5 Authorized Deviations In Provisions NOV 2020 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be a DO C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $ 3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from NAVFAC Southeast CORE Construction / Attention: Rebecca Jones, Bldg 903 PO Box 30 NAS Jacksonville

FL.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(b) An organized Site Visit has been scheduled for this project at AUTEC Andros Island Bahamas

See PRE-PROPOSAL AND SITE VISIT in Section 00 21 16 for additional details.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

INSTRUCTIONS TO OFFERORS

EXHIBITS/ATTACHMENTS

Exhibit A – Construction Experience Project Data Sheet

Exhibit B – Safety Data Sheet

Exhibit C – Past Performance Questionnaire (PPQ)

Exhibit D – Historical Small Business Utilization

Exhibit E - Small Business Participation CommitmentDocument

Exhibit F – Small Business Subcontracting Plan Template

Attachment A – Bahamas Health Visa Guide and Procedures

Attachment B – AUTEC Access Form

The following Drawings and Specifications have been posted on SAM.gov:

20210402_Pier1902Repair_Final_Drawings

20210402_Pier1902Repair_Final_Specifications_Appendices

20210402_Pier1902Repair_Final_Specifications

PRE-PROPOSAL INQUIRIES (PPI)

Interested parties with technical inquiries shall submit their inquiries in writing via a "Bidder Inquiry" in ProjNet at www.projnet.org\projnet. The bidder inquiry key for this solicitation is HT6UI5-QEH4QV.

The Government reserves the right to decline addressing certain questions. Further, no questions, unless in the Government's interest, will be answered any later than five (5) business days prior to the stated deadline for responses to this announcement. The deadline for submission of Bidder or Pre-Proposal Inquiries is 26 July 2021.

Simple questions and answers will be made via ProjNet. Official amendments to the RFP will be made via the SAM.gov website. All Offerors are encouraged to register on ProjNet for alerts, to stay abreast of bidder inquiries and Government responses that are posted in reference to this solicitation. Only self-registered users on ProjNet can submit and review inquiries. To self- register, go to the webpage, click BID tab, select Bidder Inquiry, select agency NAVFAC and enter the key for this solicitation listed above and your e-mail address. After initial login, enter all the required information to create your user ID. Verify the information on the next screen; and, from there, you may submit and view inquiries. Those submitting inquiries will receive a system generated e-mail notification when their inquiry has been processed and responded to. It is the Offeror's responsibility to monitor for inquiries and responses.

SAM.gov

Amendments will be posted directly to SAM.gov. The drawings and specifications are available on SAM.gov under the Attachments/Links section of this solicitation. Additionally, other postings will be made to SAM.gov, such as revised drawings, etc., under the Attachments/Links section of the solicitation. Postings to the Attachments/Links section of SAM.gov do not generate an automated email to Offerors. It is recommended Offerors periodically check the SAM.gov Attachments/Links section of the solicitation to see if additional postings have been made. It is the Offeror’s responsibility to check SAM.gov for all postings.

PRE-PROPOSAL CONFERENCE AND SITE VISIT

In accordance with FAR 52.236-27 Alt 1, the Pre-Proposal Conference and Site Visit will be scheduled at the Atlantic Undersea Test and Evaluation Center (AUTEC) at Andros Island, Bahamas. This is the only anticipated Site Visit. The Pre-Proposal conference will be held virtually on 08 July 2021 10:00 AM Eastern utilizing MS Teams. Contracting procedures and a project overview will be provided at the conference. Each Offeror must submit a consolidated list of all individuals planning to attend the Pre-Proposal Conference with email and phone number to Alex Noriega at alex.noriega@navy.mil no later than 4:30 PM Eastern on 06 July 2021. Interested parties will be provided detailed information on how to join the conference through MS Teams.

An organized site visit is scheduled at the site for 15 July 2021. To gain access to the site visit, each Offeror must email the consolidated list of individuals on company letterhead, noting the name and title of the project (Facility 1902 Pier Repair Project), to site visit POC: Amir Kanel at amir.kanel@navy.mil; (561) 671-2620 no later than 10:00 AM Eastern on 08 July 2021. CC to Lauren Thompson at lauren.m.thompson@navy.mil ; (561) 671-2664 and Alex Noriega at alex.noriega@navy.mil; (904) 542-6704 on the visit request email. Ensure that the completed AUTEC Access form is completed and attached to your request for each attendee. Do not fill in Date of Birth and Place of Birth on Access Form since these are PII. Attendees will need to provide this to the Travel Coordinator over the phone after you send in your email request. At this time, you will also need to pay for your flight with your credit card. The cost is $215.33. You can call the Travel Coordinator at 561-671-2741/2738 the day after you submit your email request but no later than 1 business day prior to travel day of 15 July 2021. Working hours are from 8 AM to 4:30 PM Eastern Monday to Friday. Highly recommend not to wait till the last minute to make your travel reservations.

The organized site visit will commence at the aforementioned date. Attendees will meet at the AUTEC Terminal on Southern Blvd., West Palm Beach, FL no later than 7 AM Eastern. Please be on time. Go to this website for more detailed information: https://www.navsea.navy.mil/Home/Warfare-Centers/NUWC- Newport/What-We-Do/Detachments/AUTEC/ . Useful links are Official Visits, Reservations, and Information/Downloads. In Information/Downloads link, you will find Parking and Pick-up Location instructions.

As of 01 May 2021, fully immunized personnel no longer have to get a PCR (Polymerase Chain Reaction) Test prior to traveling to the Bahamas. HOWEVER, you DO still have to apply for a Bahamas Health Visa prior to travel and you need to bring your proof of vaccination.

Bahamas Travel

• Information, including reservations and cost can be found in the:

https://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/What-We- Do/Detachments/AUTEC/Official-Visits/

• Personnel traveling to AUTEC Base must the AUTEC Travel Coordinator:

Email address: autec_tvl_coord.fct@navy.mil and CC Amir Kanel at amir.kanel@navy.mil and Lauren Thompson at lauren.m.thompson@navy.mil

• Bahamas Ministry of Health and CDC have imposed additional travel regulations, in some cases AUTEC is exempt. Email or text required to stay compliant.

• Bahamas Ministry of Health – Issues Travel Visa good for five (5 days) this includes day of travel/entrance, negative test being taken and travel visa = 5 days

• Upload negative test results into Bahamas Ministry of Health for Travel Visa – typically receive approval for Travel Visa within 24 hours – Associated Fee - $40.

Bahamas Travel Health Visa or COVID-19 Status - The Bahamas

• Once on island – First day requirement: Email daily to Check-in to the Bahamas Ministry of Health - / - Safety Questionnaire – Web Site below – Daily Requirement – /- Failure to do so - Fine assessed $100. Per day missed https://www.surveymonkey.com/r/5RBL2P2?tripid=BSDOMAIR2101WJ3468&name=Karen%20Seymour&em ail=kseymour@bahamas.com

• Ministry of Health: 5th day on island required to e-mail - exempting you from providing antigen test results – web-site below – failure – Fine $250. Per day Kseymour@bahamas.com

• New CDC guidelines of 72 hr negative test for returning State-side – waived for Military and contractors – required to have documentation of Gov’t Orders, PO and/or contract award

• Require a rapid test in order to return state-side – can be obtained via HM1 Charles Taylor – Email HM1 Taylor at charles.b.taylor2@navy.mil

• Contractors must purchase test kit from retail-store – HM1 Taylor will provide Results &

Form to return.

• Contractors require Covid Safety Plan approval, if not fully vaccinated.

AUTEC Base Andros Island Specific Guidance

In accordance with current Navy and CDC guidance, mask wear for FULLY IMMUNIZED personnel is no longer required indoors or outdoors onboard AUTEC effective immediately with the exceptions as listed below.

If you are not immunized, you ARE required to follow current CDC and DoN guidance regarding mask wear which means wear a mask!

Definition:

‐ IMMUNIZED / FULLY VACCINATED: Interchangeable terms for an individual who has completed the vaccine series and is considered immune two weeks (14 days) after the vaccine sequence is complete.

Exceptions:

‐ Due to the increased risk of the spread of the COVID-19 virus at the following locations, face coverings shall be worn regardless of immunization status:

• The Lighthouse

• Galley

• Retail store

• Dispensary

• Post 1

• Base Taxi

Current screening protocols are still in effect. So, if you come onboard the installation, expect the standard questions and a temperature check. Same for CCB. If you are leaving the island to enter the United States, you will still require a negative COVID-19 test IAW CDC requirements regardless of immunization status. Please continue to self-monitor and if you start experiencing symptoms, report to the dispensary for examination/testing.

Mask wear is still authorized. If you feel inclined to wear a mask, that is your choice to make. Ensure that the face coverings are IAW the CDC and guidelines.

Like many things, COVID-19 immunization status is Personal Health Information (PHI). Please respect the privacy of the members of our community.

This policy update is specific to on base at AUTEC. When off base, you must comply with local guidelines.

AUTEC’s health and wellbeing is a COMMUNITY effort and will require full support to maintain our important mission.

PROPOSAL SUBMISSION INSTRUCTIONS

In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Proposal, submitted as follows:

a. Price Proposal and Non-Price Proposal - The Price Proposal and the Non-Price Proposal shall be emailed to alex.noriega@navy.mil with copy to rebecca.m.jones@navy.mil and contain “N69450-21-R- 0028” in the subject line no later than 5:30 PM Eastern 02 August 2021. Proposal receipt will be acknowledged by the Contract Specialist by return e-mail. If e-mail acknowledgement is not received, it is the Offeror’s responsibility to follow-up to ensure proposal receipt. NAVFAC Southeast will not be aware that an Offeror submitted a proposal for this project if it is inadvertently emailed to the incorrect email address. This is the reason for the Offeror to follow-up if an email receipt is not received from the Contract Specialist on the day of submission. Price Proposal and Non- Price Proposal shall be separate attached files and shall be labeled “Price Proposal” and “Non-Price Proposal” accordingly. File shall be Adobe PDFformatted and under 10MB. Proposals must be received by electronic mail (e-mail) no later than the date and time stated above. Hard copies will not be accepted.

Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 "Instructions to Offerors – Competitive Acquisitions" and may be rejected. You are highly advised to submit at least one day prior to avoid late submission (See FAR 15.208(b)(1)(i)). The Offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions.

The first page of each proposal should clearly state:

Type of Proposal: Price Proposal or Non-Price Proposal RFP Number: N69450-21-R-0028 Title of Project: FACILITY 1902 PIER REPAIR PROJECT, AUTEC ANDROS ISLAND BAHAMAS

ATTN: ALEX NORIEGA, CORE CONSTRUCTION

Offeror’s Name:

Offerors shall include the following information with their proposals:

Authorized Negotiator’s (POC) Name POC Telephone Number POC Email Address CAGE Code DUNS Number (Offeror and any Team Members) TIN (Taxpayer ID Number) Business Size (Large or Small Business)

In response to this request for proposal, the complete proposal shall include both the Price Proposal and Non-Price Proposal, submitted as follows:

A. Price Proposal - Submit one electronic copy of the Price Proposal as an Adobe PDF file. The entire Price proposal shall not exceed 30 pages in length utilizing a minimum Arial Font of 12 with pages numbered. Title page, table of contents, dividers, acknowledgement of all amendments, and any pages specifically excluded under each section do not count towards the total page count and should not be numbered. If page count exceeds 30 pages, only the first 30 pages will be reviewed.

It shall be organized as follows:

Section 1 – Cover Letter with required information to include additional POC

Section 2 – Executed DD1442 and acknowledgment of all amendments

Section 3 – Section 00 10 00 CLIN Pricing

Section 4 – Original Bid Bond (SF-24)

Section 5 – Representations & Certifications required by Section 00 45 00 of the RFP

Section 6 – FAPIIS Certification

Section 7 – Copy of annual VETS 4212 Report

Section 8 – Sub-Contracting Plan (Exhibit F)

Section 9 – Responsibility Determination Information

Note: The SAM, FAPIIS and VETS-4212 registration must be in the name and address, CAGE, and DUNS of the Offeror identified on the SF 1442.

B. Non-Price Proposal - Submit one electronic copy of the Non-Price Proposal as an Adobe PDF file. The entire Non-Price Proposal shall not exceed 50 pages in length utilizing a minimum Arial Font of 12 with pages numbered. Joint Venture Agreement, CPARS Evaluations, and/or Past Performance Questionnaires are specifically excluded under each factor do not count towards the total page count and should not be numbered. If page count exceeds 50 pages, only the first 50 pages will be reviewed.

It shall be organized as follows:

Section 1 – Factor 1, Construction Experience

Section 2 – Factor 2, Past Performance

Section 3 – Factor 3, Safety

Section 4 – Factor 4, Technical Approach

Section 5 – Factor 5, Small Business Utilization

The Offeror’s proposal must include all data and information required by the solicitation and must be submitted in accordance with these instructions. The Offeror shall be compliant with the requirements as stated herein.

Nonconformance may result in an unfavorable proposal evaluation.

TIMELY RECEIPT OF PROPOSALS

PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR PROPOSAL MUST BE RECEIVED NO

LATER THAN THE DATE AND TIME SPECIFIED. Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors - Competitive Acquisitions” and may be rejected.

Incurred Expenses - The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

No Alternate or Multiple Proposals - Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

Section 00 22 16 - Supplementary Instructions to Proposers

52.217-5 Evaluation Of Options JUL 1990

SUBMISSION REQ AND EVAL FACTOR

SUBMISSION REQUIREMENTS AND EVALUATION FACTORS FOR AWARD

I. INTRODUCTION

A. Intentionally Left Blank

B. DESCRIPTION OF ACQUISITION

1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid- Build (DBB) construction.

2. The intent of the project is to repair the primary operational pier facility at the Atlantic Undersea

Test and Evaluation Center (AUTEC) located at Andros Island, Bahamas. The existing superstructure will be removed, but the existing steel piles will be cutoff and incorporated in the new pier to help stabilize structural backfill. The proposed pier is a closed-pier mole-type structure with a steel pipe pile combination wall aligned with the existing pier perimeter that will retain compacted structural fill. The compacted fill will be capped with a reinforced concrete slab-on-grade deck. The new pier will abut the existing landside bulkhead. The proposed pier will include shore power, potable water, fire protection system, lighting, mooring hardware and foam filled fender system. Pier utilities will tie-in to existing landside sources.

Temporary mooring for AUTEC vessels will be constructed to provide safe mooring for the vessels during construction. The temporary mooring facility will be constructed to minimize interruptions to AUTEC operations.

The AUTEC pier facility is a berthing facility located at Andros Island, Bahamas to support the AUTEC Range. Potable water and AC electric power are available at the pier.

3. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236 204, the Magnitude for this project is between $25,000,000 and $100,000,000.

4. Liquidated damages will be assessed as follows:

CLIN 0001 - $2,235/calendar day of delay CLIN 0002 - $250/calendar day of delay

5. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value after evaluation in accordance with the factors and their relative importance in the solicitation, as outlined in Section III of this plan.

6. This acquisition will be solicited on an unrestricted basis with full and open competition as authorized in the approved acquisition plan and approved DD Form 2579 Small Business Coordination Record.

II. Intentionally Left Blank

III. EVALUATION

A. BASIS FOR AWARD

1. In accordance with Federal Acquisition Regulation (FAR), the Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.

2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The Tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced Offeror or other than the highest technically rated Offeror.

4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (Past performance) rating; and all technical factors and the performance confidence assessment (Past Performance) rating, when combined are approximately equal to price.

5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.

B. Intentionally left blank C. Intentionally left blank D. Intentionally left blank E. Intentionally left blank

F. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of Price and the following Non-Price factors:

Factor 1 – Construction Experience

Factor 2 – Past Performance

Factor 3 - Safety

Factor 4 – Technical Approach

Factor 5 – Small Business Utilization

The distinction between experience and Past Performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the Non-Price evaluation factors is the technical factors (Factors, 1, 3, 4, and 5) are of equal importance to each other and, when combined are equal in importance to the Past Performance evaluation/performance confidence assessment factor (Factor 2). When the proposal is evaluated as a whole, the technical factors and Past Performance/Performance Confidence Assessment factor combined (i.e., the Non-Price evaluation factors) are approximately equal to Price.

The importance of price will increase if the Offerors’ Non-Price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a Non-Price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and Non-Price Factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor

(a) Price:

(1) Solicitation Submittal Requirements:

Submit one electronic copy of the Price Proposal as an Adobe PDF file. The entire Price proposal shall not exceed 30 pages in length utilizing a minimum Arial Font of 12 with pages numbered. Title page, table of contents, dividers, acknowledgement of all amendments, and any pages specifically excluded under each section do not count towards the total page count and should not be numbered. If page count exceeds 30 pages, only the first 30 pages will be reviewed.

(i) Cover letter containing the following information:

Authorized negotiator’s (Point of Contract (POC)) name with middle initial POC telephone number POC email address DUNS number CAGE code Federal Tax ID Number (TIN) Business Size (Large or Small Business) It is recommended to also include an additional POC’s contact information

(ii) Executed Standard Form (SF) 1442. Offeror shall insert its company name, address, DUNS Number, CAGE Code, and Federal Tax ID number in Block #14, telephone number in Block #15, acknowledge all amendments (if applicable) in Block #19, name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF 1442. If proposing as a joint venture, Offeror shall provide the DUNS number for all members of the joint venture.

(iii) SF 1442 Schedule of Prices for Contract Line Items Number (CLINs) 0001 and 0002. Complete the Section 00 10 00 CLIN SF 1442 Schedule of Prices. The price for Contract Line Item Numbers CLIN 0001 (Base Bid) through CLIN 0002 shall be considered available for award for 120 calendar days after the proposal due date.

(iv) Bid bond (SF-24). Offeror shall submit a bid bond (SF24) in the amount of 20% of your total project bid price or $3,000,000 whichever amount is less.

(v) System for Award Management (SAM). Offeror shall ensure current registration on the SAM website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00 45 00 of the RFP is not provided in SAM, include the Representation or Certification in your price proposal.

(vi) Federal Awardee Performance and Integrity Information System (FAPIIS). Offeror shall ensure FAPIIS Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters (July 2013) is current through maintaining an active registration in the System for Award Management (SAM).

(vii) Veteran’s Employment & Training Service (VETS). VETS-4212 Federal Contractor Reporting. Offeror shall ensure a current VETS-4212 (previously VETS-100 and/or VETS- 100-A) report has been submitted to the Department of Labor website, http://www.dol.gov/vets/vets4212.htm, if the Offeror is required to submit. An email confirmation of submission can be requested and received by the Offeror from the DOL website and is to be submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement stating that the Offeror is not required to submit a report and state the reason. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

Note: The bid bond, SAM, FAPIIS, and VETS-4212 registrations must be in the name/CAGE and DUNS of the Offeror identified on the SF 1442.

(2) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in 00 22 16 of the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the Independent Government Estimate (IGE).

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the Offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the Offeror shall provide the following information in the price proposal package:

1. One (1) signed bank reference demonstrating adequate financial resources.

If Offeror's firm has a line of credit - provide information on how many figures Offeror can borrow against the line of credit (i.e. minimum 6 figures – exact line of credit is not required).

2. The Offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the Offeror.

3. Description of Offeror's facilities and equipment.

4. Other Offeror's work presently under contract.

Although required to be submitted with Offeror's price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm's responsibility determination should your firm be considered for award. Proposal packages from unsuccessful Offerors will not be returned to the Offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

(b) Non-Price Factors:

(1) Factor 1 - Construction Experience:

(a) Solicitation Submittal Requirements: The Offeror shall submit the following information:

(1) Construction Experience:

Submit a minimum of two (2) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP.

All projects must meet the definition of a Relevant Project to be considered.

RELEVANT PROJECT: A submitted relevant project must be a Waterfront construction project of similar size, scope, and complexity to this solicitation, completed by the Offeror as Prime Contractor, at a total contract value of $15 million or greater; and, must include both of the following:

• Construction of a new combi-wall or sheet pile supported pier/wharf

AND

• Construction of heavy concrete slabs and pile caps

At least one (1) Project submitted shall be completed within the past seven (7) years of the date of issuance of this RFP. The remaining additional projects, up to four (4) shall be completed within the past ten (10) years of the date of issuance of this RFP. Maximum number of projects submitted for consideration shall not exceed five (5).

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The Construction Experience Project Data Sheet (Exhibit A) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: contract value, completion date, capacity, construction methods, scope, and automation system incorporation).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined. If a joint venture/partnership arrangement is being proposed, include copies of agreements and letters of commitment signed by an Officer of each firm with the authority to bind the company. Agreements must include company name, DUNS number, address, point of contact, email address, phone number and fax numbers. The agreements shall demonstrate the relationship between firms, the percentage of work that each firm will complete, and the type of work each firm will perform. The experience of any member for the joint venture/partnership will be evaluated as that of the Offeror.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

(b) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.

Offerors who fail to submit experience for all Joint Venture members may be rated lower.

Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.

Relevant projects with construction costs of $25 million or greater will be considered more favorably.

(2) Factor 2 - Past Performance:

(a) Solicitation Submittal Requirements:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 – Construction Experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (Exhibit C) for each project included in Factor 1 – Construction Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the Past Performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Alex Noriega, via email at alex.noriega@navy.mil. PPQ’s do not count towards the overall page limitation.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Construction Experience. Offerors may also address any adverse Past Performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

(b) Basis of Evaluation:

This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 1 – Construction Experience and may also consider Past Performance on other projects currently documented in known sources.

The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s Past Performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant Past Performance history will receive a NEUTRAL Confidence rating.

Past Performance ratings of “Substantial Confidence” and “Satisfactory Confidence” hold more value than a “Neutral Confidence” rating and will be considered more favorably in the evaluation of Past Performance.

(3) Factor 3 - Safety:

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information on Exhibit B: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors.

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2020, CY2019, CY2018, CY2017, and

CY2016] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond…