Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912WJ26RA003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Bourne, Massachusetts, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New England District is soliciting proposals for construction services related to a Power Generation Microgrid project at Cape Cod Space Force Station in Bourne, Massachusetts. The project encompasses the design and construction of an integrated power generation system incorporating a battery energy storage system, existing wind turbine integration, diesel-powered generators, uninterruptible power supplies, enhanced microgrid controls, electrical duct banks throughout the site, and protective barriers against High-Altitude Electromagnetic Pulse (HEMP) events. All work must be executed within restricted military areas requiring enhanced security protocols while minimizing disruption to mission-critical operations and maintaining facility occupancy throughout construction. The solicitation will be evaluated using a best-value tradeoff process based on four factors in descending order of importance: Past Performance, Management Approach, Small Business Participation Commitment Document, and Price. Offerors must demonstrate experience with construction projects exceeding $50 million involving at least three disciplines and high-voltage work, with preference given to experience on military installations, battery energy storage systems, and HEMP shielding projects. The proposal deadline is March 11, 2026, and technical inquiries must be submitted by February 25, 2026.

There is no set-aside designation for this solicitation. The estimated contract value ranges from $100,000,000 to $250,000,000 on a firm-fixed-price basis, with performance comprising an initial 15-calendar-day mobilization period and 1,456 calendar days for total project completion through summer 2026 award. All offerors, including small and large businesses, must commit to a minimum of 20 percent small business participation by contract value. Key requirements include Level 2 Cybersecurity Maturity Model Certification (CMMC) prior to award, a 20 percent bid guarantee, mandatory attendance at pre-bid site visits held January 8 and 15, 2026, and compliance with site security protocols requiring U.S. citizen escorts with Secret Security Clearance for all contractor personnel in restricted areas. The work is classified under NAICS code 237130 (Power and Communication Line and Related Structures Construction) with a small business size standard of $45,000,000. The project will take place entirely within Cape Cod Space Force Station in Bourne, Massachusetts, an active-duty military installation containing ground-based radar systems critical to national security.

Notice text

2 versions

Update #2 · Latest ·

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con structed within the grounds of CCSFS in fa cilities which are in restricted areas requir ing enhanced security protocols. The im pacted facilities are to remain occupied throughout construction with minimal dis ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera tors, uninterrupted power supplies, critical and non-critical power distribution re sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis sion critical operations and impacted pro tective HEMP barriers.

Update #1 ·

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be constructed within the grounds of CCSFS in facilities which are in restricted areas requiring enhanced security protocols. The impacted facilities are to remain occupied throughout construction with minimal disruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery energy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all facility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid controls, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered generators, uninterrupted power supplies, critical and non-critical power distribution resources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mission critical operations and impacted protective HEMP barriers.

Files

File Type Posted
Amendment 0009 Update Sheet X-601.pdf PDF
Amendment 0009 Updated Sheet 3-T-112.pdf PDF
Amendment 0009 Updated Sheet Vol 1 CU-201.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 Update Sheet Vol 4 ES103 and ES501.pdf PDF
Amendment 0008 Attachment 11690371.pdf PDF
Amendment 0008 Attachment 11699407.pdf PDF
Amendment 0008 Attachment 11680816.pdf PDF
Amendment 0008 Attachment 11699385.pdf PDF
Amendment 0008 Attachment 11699393.pdf PDF
Amendment 0008 Attachment 11680669.pdf PDF
Amendment 0008 Attachment 11699397.pdf PDF
Amendment 0008 Attachment 11692148.pdf PDF
Amendment 0008 Attachment 11676438.pdf PDF
Amendment 0008 Submission Requirements and Evaluation Criteria.pdf PDF
Amendment 0008 Attachment 11699366.pdf PDF
Amendment 0008 Attachment 11712612.pdf PDF
Amendment 0008 Attachment 11699373.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 Submission Requirements and Evaluation.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Attachment A - Joint Venture Agreement.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment C - Small Business Participation Commitment Document.pdf PDF
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf PDF
Amendment 0001.pdf PDF
Submission Requirements and Evaluation Criteria.pdf PDF
Solicitation W912WJ26RA003.pdf PDF
JA 02 - Disconnect Switches (Redacted).pdf PDF
Site Security Requirements.pdf PDF
JA 03 - Fire Alarm System (Redacted).pdf PDF
JA 01 - Power Filters (Redacted).pdf PDF
Show all 36

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity