Amendment 0008 Attachment 11699366.pdf
PDF 699 KB Posted
- Attached to
- Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
- Solicitation number
- W912WJ26RA003
About this file
This is a utility plan architectural drawing for Phase 3, Area 2 of a construction project. The sheet number is 3-CU102 and is prepared by the Department of the Army, Corps of Engineers. The drawing provides a detailed site plan showing utility infrastructure, mechanical systems, and associated equipment layouts for a specific building area.
The plan includes general notes referencing additional sheets for civil legend and abbreviations, ductbank and utility profiles, scour protection, and utility profiles. Sheet keynotes identify electrical, concrete encasement, ductbank, lighting, and power conduit equipment, as well as requirements for hydrocavitation calculations and secondary electrical conduit placement. The drawing specifies that existing utilities in conduit be shown through the electrical drawings, and notes the coordination of existing system items in conduit with requirements for transponent work adjacent to Building 3R. The key plan provides geographic orientation and context for Area 2 within the larger project site. Multiple numbered reference circles and detailed annotations throughout the drawing indicate specific utility connections, equipment locations, and construction details requiring coordination with other contract documents and drawings.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .