Amendment 0009 Update Sheet Vol 4 ES103 and ES501.pdf

PDF 738 KB Posted

Attached to
Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
Solicitation number
W912WJ26RA003
Issued by

About this file

This document is a set of electrical construction drawings and specifications for a federal facility project. Sheet ES103 depicts an Electrical Site Plan for Area 3, showing the layout of electrical infrastructure including a ductbank schedule with twelve entries identifying various conduit sizes (ranging from 2" to 4"), types (PVC and concrete encased), and purposes (primary 288V, secondary 480V, spare, and control circuits). The plan includes details on cable routing, temporary power connections, pole locations, and underground utility positioning. The drawing references general sheet notes regarding electrical specifications, symbol legends, abbreviations, and cross-references to additional electrical distribution documentation (EP903 series sheets).

Sheet ES501 provides detailed specifications and cross-sectional views for critical electrical infrastructure components. It includes four primary detail sections: a Reinforced Concrete Encased Ductbank specification with yellow warning tape and polyester rope installation requirements; a Concrete Encased Ductbank design showing conduit spacing and 3,000 PSI concrete specifications; a Utility Vault design with recess pulling rings and center opening access; and a Transformer Section showing primary and secondary connections with rackway details. The specifications emphasize concrete strength requirements (3,000 PSI minimum at 28 days), proper ductbank conductor spacing, conduit material standards (PVC with multiple polyester rope pulls), and structural support configurations. Additional details include handhole specifications, direct buried conduit standards, and transformer installation requirements with 3/4" radius elbows for concrete encasement.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0009 Updated Sheet Vol 1 CU-201.pdf PDF
Amendment 0009 Updated Sheet 3-T-112.pdf PDF
Amendment 0009 Update Sheet X-601.pdf PDF
Amendment 0008 Attachment 11680816.pdf PDF
Amendment 0008 Attachment 11699385.pdf PDF
Amendment 0008 Attachment 11699366.pdf PDF
Amendment 0008 Attachment 11680669.pdf PDF
Amendment 0008 Submission Requirements and Evaluation Criteria.pdf PDF
Amendment 0008 Attachment 11699373.pdf PDF
Amendment 0008 Attachment 11712612.pdf PDF
Amendment 0008 Attachment 11699397.pdf PDF
Amendment 0008 Attachment 11692148.pdf PDF
Amendment 0008 Attachment 11690371.pdf PDF
Amendment 0008 Attachment 11699407.pdf PDF
Amendment 0008 Attachment 11676438.pdf PDF
Amendment 0008 Attachment 11699393.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 Submission Requirements and Evaluation.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Attachment C - Small Business Participation Commitment Document.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment A - Joint Venture Agreement.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf PDF
Submission Requirements and Evaluation Criteria.pdf PDF
JA 02 - Disconnect Switches (Redacted).pdf PDF
Site Security Requirements.pdf PDF
JA 03 - Fire Alarm System (Redacted).pdf PDF
Solicitation W912WJ26RA003.pdf PDF
JA 01 - Power Filters (Redacted).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file