Amendment 0009 Updated Sheet 3-T-112.pdf
PDF 334 KB Posted
- Attached to
- Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
- Solicitation number
- W912WJ26RA003
About this file
This is a telecommunications infrastructure plan document for Phase 3, Building 4, Floor 1, Area A. The sheet is an architectural/engineering drawing that depicts the layout and routing of telecommunications systems within a building facility.
The plan shows the physical layout of Floor 1 with designated areas including control rooms, electrical rooms, storage/auxiliary spaces, and a generator area. Key infrastructure elements illustrated include antenna cable routes, security camera coordination points, and telecommunications equipment placement. The drawing includes reference callouts for existing systems to be reinstalled and coordinate with security camera adjustments. General sheet notes reference related specification sheets for cable distribution, cabling details, and outlet specifications. The document is marked as Sheet E, Building 4, with revision number 3-T-112. The plan incorporates BICSI certification markings and includes a key plan identifying the specific building section documented. The drawing contains standard architectural notation with numbered reference points throughout and dimensional grid lines for spatial reference.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .